0203_A_FUEL_SETTLER_TANKS_REPAIR.doc

DOC document 68 KB Posted

Attached to
USNS MERCY (T-AH 19) ROH/DD Federal contract opportunity
Solicitation number
N32205-15-R-5000
Issued by
Department of the Navy Military Sealift Command

About this file

Category A New work item 0203 Fuel Settle Tank Repairs Valve Replacements

View the file

Other files for this federal contract opportunity

Other files attached to USNS MERCY (T-AH 19) ROH/DD, newest first.
File Type Posted
RFQ_Q_and_A_-_No._2.docx DOCX document
RFQ_Q_and_A_-_No._1.docx DOCX document
0112_B_NO_1_BALLAST_TANK_FORWARD_STEEL_REPAIRS_-_Revision_A.doc DOC document
0903_A_UW_HULL_PRESERVATION_MERCY_FY16.docx DOCX document
Attachment_J_-_3_Category_B_Work_Items_-_Revised_2_Aug_15.xlsx XLSX spreadsheet
0514_A_ADG_ENGINE_MOUNTS_REPLACEMENT.doc DOC document
USNS_MERCY_Reference_List__15_ROH_DD___3_Aug_2015.doc DOC document
Pictures_for_WI_0515.zip ZIP file
TANK_CAPACITY_TABLES.PDF PDF
MERCY_FY16_0515_A_CHT_PIPING_REPAIRS.doc DOC document
USNS_Mercy_WI_Index_Nov_15_ROH_DD_Ver_1____3_Aug_2015.doc DOC document
Attachment_J_-_2_Category_A_Work_Items_-_Revised_2_Aug_15.xlsx XLSX spreadsheet
N32205-15-R-5000-P0006.doc DOC document
0105_A_WATER_TIGHT_DOOR_REPAIR_-_Revision_A.docx DOCX document
0202_A_AUTOMATION_SYSTEM_GROOM_-_Revision_A.doc DOC document
0508_A_EDG_MAINTENANCE_-_Revision_A.doc DOC document
0021_A_CLEAN_AND_GAS_FREE_TANKS_VOIDS_COFFERDAMS_AND_SPACES_-_Revision_A.doc DOC document
0607_A_ANNUAL_CRANES_INSPECTIONS_-_Revision_A.doc DOC document
N32205-15-R-5000-P0005.doc DOC document
0901_A_DOCKING_AND_UNDOCKING_-_Revision_A.doc DOC document
USNS_Mercy_WI_Index_Nov_15_ROH_DD_Ver_1____24_July_2015.doc DOC document
MERCY_LAUNDRY_RED_STATION_RELIEF_VALVE_3in_x_4in.jpg JPG image
MERCY_EVAP_3_ _4_140_STATION_RELIEF_VALVE_2.5in_x_4in.jpg JPG image
N32205-15-R-5000-P0004.doc DOC document
Non-Disclosure_Agreement_-_International_Inspections.docx DOCX document
N32205-15-R-5000-P0003.doc DOC document
N32205-15-R-5000-P0002.doc DOC document
390-100-039_F.PDF PDF
Amendment_P0001.doc DOC document
5980056_A_Scantling_Plan.PDF PDF
0101_5981321_G_Painting_Schedule.pdf PDF
390-100-041_G_is__Fr_78-87.PDF PDF
N32205-15-R-5000.doc DOC document
USNS_Mercy_WI_Index_Nov_15_ROH_DD_Ver_25_June.doc DOC document
WORK_ITEMS.zip ZIP file
MERCY_-_CDRLs_J-6.zip ZIP file
J-Attachments.zip ZIP file
Show all 37

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USNS MERCY

(T-AH 19)

MACHINERY, PROPULSION

N32205-15-R-5000

28 FEBRUARY 2014

ITEM NO. 203

Category “A”

MSC/SCHUMACHER

FUEL SETTLE TANKS REPAIRS AND VALVES REPLACEMENTS (VR15-063)

1.0

ABSTRACT:

This work item describes the steel repairs to the fuel settler tanks and the replacement of all fuel system recirculation and tank stripping valves from the tanks.

2.0

REFERENCES/ENCLOSURES:

2.1 References:

2.1.1 MSC DWG 8387470_C Periodic Safety Test Procedures

USNS Mercy (T-AH 19)

2.2 Enclosures:

3.0

ITEM LOCATION/DESCRIPTION:

3.1 Location/Quantity:

3.1.1 Location: Engine Room, 40’ Flat, Port Side. 6-95-0

3.2.1 Quantity: Port and Starboard DFM Settler Tanks 4.0

GOVERNMENT FURNISHED EQUIPMENT/MATERIAL/SERVICES:

4.1 2 each, Steel 800# 1.5” socket weld fire Safe ball valves

4.2 3 each, Steel 800# 1” socket weld fire Safe ball valves

4.3 4 each, steel 800# 1.5” socket weld flanges

4.4 6 each, steel 800# 1” socket weld flanges 5.0

NOTES:

5.1 The contractor and all subcontractors, regardless of tier must consult the General Technical Requirements (GTR) to determine applicability to this work item. In performance of this work item, the contractor and all subcontractors regardless of tier must comply with the requirements of all applicable GTR’s.

5.2 The contractor and all subcontractors, regardless of tier are advised to review other work items under this contract to determine their effect on the work required under this work item. Many of the definitions relating to performance of this work item are found in Work Item 001.

6.0

QUALITY ASSURANCE REQUIREMENTS:

6.1 All Inspections and tests shall be performed in the presence of contractor’s representative, MSFSC REP, ABS Surveyor and USCG Inspector, as applicable. Notify the MSCREP, USCG Inspector and the ABS Surveyor 24 hours prior to the scheduled inspections and tests.

7.0

STATEMENT OF WORK REQUIRED:

7.1 Contractor shall provide all labor, material, staging and equipment to accomplish this work item.

7.2 Contractor shall work with ship’s force to lock-out/tag-out the equipment identified in paragraphs 3.0 as needed. Upon completion of this work item restore systems to full operation.

7.3 Remove all interference in the way of accomplishing this

work including but not limited to deck plates, piping, hand rails, deck plate frames, lighting fixtures, labels and signs, insulation pads and blankets to facilitate removal and installation of the components. Reinstall all removed interference upon completion work.

7.4 Both tanks will be “gas free” in work item 0021. Perform 30 “UT” readings in the areas at the most port and starboard corners of the aft 40” flat from 3’ inboard to the side shell on bulkhead 129.

7.5 Provide “condition found” report to Chief Engineer and MSCREP.

7.6 Crop out corroded bulkhead and replace with new 20.4# steel plate 3 ft x 2ft both sides from shell inboard.

7.7 Remove existing recirculation and tank stripping valves. Modify piping to fit new flanges and valves. Weld new flanges in place.

7.8 Install new valves with new steel fasteners and new gaskets made for fuel systems.

7.9 Modify existing reach rod for the 2 recirculation and 3 stripping valves.

7.9 Inspection / Test

7.9.1 Hydrostatic test each tank to test bulkhead repair in accordance with ABS rules.

7.9.2 Hydrostatic test piping system to ensure now flanges and valve do not leak in accordance with ABS rules.

7.10 Painting

7.10.1 Clean, prime, and paint new and disturbed surfaces

to match the surroundings. Paint shall be provided as GFM.

8.0 GENERAL REQUIREMENTS: None.