N32205-15-R-5000-P0004.doc
DOC document 56 KB Posted
- Attached to
- USNS MERCY (T-AH 19) ROH/DD Federal contract opportunity
- Solicitation number
- N32205-15-R-5000
About this file
Amendment N32205-15-R-5000-0004
View the file
Other files for this federal contract opportunity
Show all 37
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION B - SUPPLIES OR SERVICES AND PRICES
The following have been modified:
SUMMARY OF CHANGES
A. REQUEST FOR SPECIFICATION CLARIFICATION
SPECIFICATION ITEM NO.: 201
PARAGRAPH / SECTION NO: 7.1.3
TITLE: MAIN CIRCULATING PUMP & MOTOR REPLACEMENT
QUESTION:
Paragraph 7.1.3 requires the offeror to furnish a cofferdam on the circulating pump sea chest. It is intended that this work item will be accomplished while the ship is in dry-dock. Does the vessel still require a cofferdam?
ANSWER:
This is dependent on the offeror’s repair schedule as to whether this work item will be accomplished while on dry-dock or when the ship is tied to the pier. The ship does not require a cofferdam while in dry-dock, but will require a cofferdam if the work is performed at the pier as the ship would have only one (1) valve protection and the cofferdam would provide an extra layer of safety.
B. REQUEST FOR SPECIFICATION CLARIFICATION
SPECIFICATION ITEM NO.: 505
PARAGRAPH / SECTION NO: 3.2
TITLE: OVERHAUL VARIOUS RELIEF VALVES
QUESTION:
The offeror requests the valve details (size & type) be provided for this work item.
ANSWER:
The name plate data for the relief valves are annotated below (these were noted from the original VRP.
a. Valve serving 100 # System is a 3” x 4”
b. Valve serving 140 # System is a 2.5” x 4”
**Two (2) pictures of these valves are also attached for clarification.
C. REQUEST FOR SPECIFICATION CLARIFICATION
SPECIFICATION ITEM NO.: 021
PARAGRAPH / SECTION NO: 7.9.2
TITLE: CLEAN AND GAS FREE TANKS, VOIDS, COFFERDAMS & SPACES
QUESTION:
The offeror requests a designation on how much staging is required to perform the close out inspection due to previous history of the amount of staging needed for this work item.
The offeror inquires if at a minimum, is one (1) tower per tank/space adequate?
ANSWER:
The offeror should review NAVSEA Drawing 5980063 D, Capacity Plan, and 5981000 D, booklet of General Plans to make its own determination on the amount of staging required based on these references.
D. REQUEST FOR SPECIFICATION CLARIFICATION
SPECIFICATION ITEM NO.: 304
PARAGRAPH / SECTION NO: 3.2 & 7.0
TITLE: FUEL OIL, CHT, FEED and POTABLE WATER TANKS – TLI INSTALLATION
QUESTION:
It is noted that in work item 0304, paragraph 3.2, the quantity of materials does not match the specification directions provided in the Statement of Work required
The offeror requests clarification as to the quantities of material and/or work scope.
ANSWER:
The quantities annotated in paragraph 3.2 are correct. The offeror is required to provide the following:
(1 ea) 30 x 30 PLC /IO Enclosure
(4 ea) HMI Displays
(2 ea) 1500 UPS
(1 ea) 700 UPS
The (1 ea) Modified IO - (To clarify, the offeror is required to remove the existing IO unit, send it to NAG Marine for modification, return and install the modified unit to the vessel).
To clarify work Item 0304, 7.1.5 is hereby corrected to read as follows:
“7.1.5 Provide electric installation services to installed Tank Level Indicators in accordance with reference 2.1.”
E. REQUEST FOR SPECIFICATION CLARIFICATION
SPECIFICATION ITEM NO: HULL STRUCTURE – WORK ITEMS 101, 102, 105, 109, 110, 111, and 112. PARAGRAPH / SECTION NO: Various Sub-paragraphs
TITLE: STEEL REPAIRS
QUESTION:
Upon review of the various work items involving steel repairs, it appears there are numerous unknowns and variables to take into account in order to provide a competitive proposal.
Could MSC share any Reports and Conditions Found Reports (CFRs) that these work specifications were formulated from for this availability? Specifically:
Are there CAD files, Redline drawings, and/or pictures of existing conditions of areas to be addressed in the work package?
ANSWERS:
During the USNS MERCY (T-AH 19) ROH/DD from Jan – April 2015, there were Condition Found Reports (CFRs) generated by the shipyard and the local ABS surveyor. The Primary Port Engineer will determine which CFRs are applicable to any of the steel repair work items and provide them via a separate amendment.
There are no CAD files or Redline drawings available, but pictures of the No. 2 and No. 4 Service areas are available. Contact Ms. Melanie Barrett at Melanie.Barrett@navy.mil or via phone (757) 443-5962 or (757) 777-6766 to request and receive electronic copies of these pictures for reference.
ADDITIONAL INFORMATION:
MSC has hard copy drawings of the following drawings for further clarification of the vessel specifications:
1) 390-800-022 Sections 14 - 34
2) 5980056-A – Pages 1-8
3) 5980047-B - "Mid-Ship Section"
4) General Arrangement O1, O2, and O3 Levels -T-AH 19 801-6247172-A
5) Scantling Sections, annotating Tanks 1, 2, & 5 and the propeller/rudder areas.
Should any offeror be interested in obtaining any or all copies of these references via FEDEX, contact Ms. Melanie Barrett at Melanie.Barrett@navy.mil or via phone at (757) 443-5962 or (757) 777-6766 and the drawings will be mailed out.
SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICE TO BIDDERS
The following have been modified:
L-3
SPECIFICATION CLARIFICATION
Offerors may use the Request for Specification Clarification, provided in Section J-8, to request clarification of any work item specification or contract term. No verbal requests for information will be accepted by the Contracting Officer or his technical representative. Offeror's questions must be submitted to the Contracting Officer in writing. All requests for specification clarification must be received by MSC Norfolk no later than 2:00 p.m. (Eastern Time) on 31 July 2015.
Should any offeror be interested in a Pre-Proposal phone conference, per FAR 15.201, the offeror should contact Ms. Melanie Barrett, Contract Specialist N104/5, at Melanie.Barrett@navy.mil or via phone (757) 443-5962 or (757) 777-6766 (c). Once the conference is scheduled, the offeror may discuss work item clarifications with the Chief Engineer Brian Muir, the Primary Port Engineer Joe Schumacher, and the Deputy Project Engineer David Barton. Ms. Barrett will set up a phone bridge to call in with a password, so as to facilitate a separate phone conference with the MSC Representatives listed above and any offeror and its representatives. Due to the ship’s location off the coast of Roxas City, PI, the ship is 12 hours ahead (Eastern time), so arrangements must be made well before any conference call to ensure the ship personnel are available to clarify specific questions.