WI 021 - Revision A

View the file

Other files

File Type Posted
RFQ_Q_and_A_-_No._2.docx DOCX document
RFQ_Q_and_A_-_No._1.docx DOCX document
0112_B_NO_1_BALLAST_TANK_FORWARD_STEEL_REPAIRS_-_Revision_A.doc DOC document
N32205-15-R-5000-P0006.doc DOC document
MERCY_FY16_0515_A_CHT_PIPING_REPAIRS.doc DOC document
Pictures_for_WI_0515.zip ZIP file
USNS_MERCY_Reference_List__15_ROH_DD___3_Aug_2015.doc DOC document
0203_A_FUEL_SETTLER_TANKS_REPAIR.doc DOC document
USNS_Mercy_WI_Index_Nov_15_ROH_DD_Ver_1____3_Aug_2015.doc DOC document
Attachment_J_-_2_Category_A_Work_Items_-_Revised_2_Aug_15.xlsx XLSX spreadsheet
TANK_CAPACITY_TABLES.PDF PDF
0903_A_UW_HULL_PRESERVATION_MERCY_FY16.docx DOCX document
0514_A_ADG_ENGINE_MOUNTS_REPLACEMENT.doc DOC document
Attachment_J_-_3_Category_B_Work_Items_-_Revised_2_Aug_15.xlsx XLSX spreadsheet
USNS_Mercy_WI_Index_Nov_15_ROH_DD_Ver_1____24_July_2015.doc DOC document
0202_A_AUTOMATION_SYSTEM_GROOM_-_Revision_A.doc DOC document
0508_A_EDG_MAINTENANCE_-_Revision_A.doc DOC document
0901_A_DOCKING_AND_UNDOCKING_-_Revision_A.doc DOC document
N32205-15-R-5000-P0005.doc DOC document
0607_A_ANNUAL_CRANES_INSPECTIONS_-_Revision_A.doc DOC document
0105_A_WATER_TIGHT_DOOR_REPAIR_-_Revision_A.docx DOCX document
MERCY_EVAP_3_ _4_140_STATION_RELIEF_VALVE_2.5in_x_4in.jpg JPG image
N32205-15-R-5000-P0004.doc DOC document
MERCY_LAUNDRY_RED_STATION_RELIEF_VALVE_3in_x_4in.jpg JPG image
Non-Disclosure_Agreement_-_International_Inspections.docx DOCX document
N32205-15-R-5000-P0003.doc DOC document
N32205-15-R-5000-P0002.doc DOC document
5980056_A_Scantling_Plan.PDF PDF
0101_5981321_G_Painting_Schedule.pdf PDF
390-100-041_G_is__Fr_78-87.PDF PDF
Amendment_P0001.doc DOC document
390-100-039_F.PDF PDF
USNS_Mercy_WI_Index_Nov_15_ROH_DD_Ver_25_June.doc DOC document
J-Attachments.zip ZIP file
WORK_ITEMS.zip ZIP file
MERCY_-_CDRLs_J-6.zip ZIP file
N32205-15-R-5000.doc DOC document
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USNS Mercy

(T-AH 19)

GENERAL REQUIREMENTS N32205-15-R-5000

28 February 2014

ITEM 021 CATEGORY “A” MSC/STOEGBAUER

ADD 1

CLEAN AND GAS FREE TANKS, VOIDS, COFFERDAMS & SPACES

1.0 ABSTRACT:

1.1 This work item describes the requirement to open, clean, gas-free, maintain, and close miscellaneous tanks, voids, cofferdams, and spaces. Storage of re-usable fuel and lube oils is also required.

2.0 REFERENCES/ENCLOSURES:

2.1 References:

2.1.1 NAVSEA DRAWING 5989201 F, TRIM & STABILITY

BOOKLET

2.1.2 NAVSEA DWG 5980063 D, CAPACITY PLAN

2.1.3 NAVSEA DWG 5981000_D, BOOKLET OF GENERAL PLANS

2.1.4 MSC DWG 6247177, INBOARD PROFILE

2.2 Enclosures:

2.2.1 USNS MERCY (T-AH 19) TANKS, VOIDS, AND

COFFERDAMS

3.0 ITEM LOCATION / DESCRIPTION: See Enclosure 2.2.1.

4.0 GOVERNMENT FURNISHED EQUIPMENT/ MATERIAL: None.

5.0 NOTES

5.1 The contractor and all subcontractors, regardless of tier, must consult the General Technical Requirements to determine applicability to this Work Item. In performance of this Work Item, the contractor and all subcontractors, regardless of tier, must comply with the requirements of all applicable GTR’s, including but not limited to, GTR’s 1 through 7, 22, 23, and 29.

5.2 The contractor and all subcontractors, regardless of tier, are advised to review all other Work Items under this contract to determine their effect on the work required under this Work Item. Many of the definitions relating to the performance of this Work Item are found in Work Item 001.

5.3 In the event that any tank contents are deemed to be hazardous wastes in accordance with federal, state and local (CONUS) or international (OCONUS) standards, the costs for handling and disposal of those wastes shall be covered under work item 023 of this work package.

6.0 QUALITY ASSURANCE REQUIREMENTS:

6.1 Tank coating system conditions shall be identified and documented by the contractor during tank surveys. ABS surveyor shall receive a copy of contractor’s reports.

7.0 STATEMENT OF WORK REQUIRED

7.1 It is the contractor’s responsibility to analyze and properly plan tank unloading procedures to ensure that no undue stresses are imposed on the vessel structure. Ship’s force and MSCREP will assist contractor with ship loading documents and software. The contractor shall utilize the services of a Naval Architect or structural engineer to support this planning. The contractor shall provide their tank unloading plan to the MSCREP at least 2 business days prior to starting this work to permit review and approval by MSC Naval Architect.

7.2 Contractor and Ships Force shall take, record, and verify soundings of all tanks listed in enclosure 2.2.1, on arrival at the contractor’s facility. Chief Engineer shall review and endorse all soundings taken/recorded. Submit copy of endorsed record to the MSCREP.

7.3 Provide a clean storage facility with a capacity of approximately 500,000 gal of fuel oil, 7,500 gal of JP-5 and 5,000 gal of lube oil. Contractor designated storage facility shall be inspected by the MSCREP for cleanliness and acceptability prior to any transferring of fuel oil and lube oil. Prior to off loading of liquids, samples shall be taken by the contractor of each of the tanks to be moved to temporary storage.

These samples shall be turned over to the Chief Engineer. Each sample bottle shall be labeled with tank taken from, contents, and date taken. Any visual indications of contamination shall be brought to the attention of the MSCREP immediately. Upon completion of transferring of liquids, the contractor, in conjunction with ship's force, shall validate quantities at the storage facility.

7.3.1 In the event that contamination is suspected, a change order will be issued to the contractor to have a laboratory analysis conducted on the sample.

7.4 Removals: The ship force will pump down tanks to low suction. The contractor shall provide all labor, material, staging, ladders, and equipment including but not limited to: pumps, hoses to transfer contents, strip residual contents and top off tanks identified in enclosure 2.2.1. Ships force personnel shall operate ship’s equipment ONLY to assist the contractor with the transfer for filling and emptying tanks to either other tanks onboard or to shore storage facilities to accomplish this work item. Applicable federal, state, local or international procedures for transferring fuel and lube oils over water shall be followed by the contractor. Contents to be temporarily stored are indicated. All other liquids shall be disposed of in accordance with local, state, federal and/or international regulations. In some states, the presence of oil in the wash water may deem the mixture to be hazardous waste.

When pricing this item, the contractor shall assume that oil is present in the tank wash water. The cost for disposal of the mixture shall be included in the price quote regardless of whether or not, due to the presence of oil, the wash water is deemed hazardous waste or non-hazardous waste. If the mixture is determined to be hazardous waste due to some contaminant other than oil, the procedures outlined in Work Item 0023 shall be used for the identification, handling and disposal.

The costs for removal are still part of this (WI 021) work item. All other costs for offload and disposal shall be captured in this work item.

7.5 When directed by the MSCREP, return all fuel oil and lube oil to the vessel. Prior to returning of liquids, the contractor, together with ship's force, shall take samples of all stored liquids. These samples shall be turned over to the Chief Engineer. Each sample bottle shall be labeled with temporary storage tank taken from, contents, and date taken. Any visual indications of contamination shall be brought to the attention of the MSCREP immediately.

7.6 Accomplish the following for each tank/space listed in enclosure 2.2.1:

7.6.1 Open manholes and erect/maintain safety guards over openings.

7.6.2 Temporarily provide blowers and ventilate tanks and spaces, inclusive of confined areas around manhole covers. Ventilation of the tanks shall be accomplished so as to prevent tank fumes from exhausting in the interior compartments of the ship.

7.6.3 Temporarily provide and maintain, as required, tank lamping/lighting. Lighting shall be explosion proof, safety type lights.

7.7 Clean and Gas Free tanks and spaces listed in enclosure 2.2.1. Cleaning shall completely remove all traces of dirt, sludge, scale, debris and liquids. All tanks and spaces shall be presented in a clean and dry condition and shall be ready to be certified and maintained “Safe for Men/ Safe for Hot Work”. The provision of gas free certificates is covered under work item 020 of this work package.

7.7.1 Where a battery of tanks is designated for cleaning and gas freeing, all interior spaces in way of same, such as cofferdams, voids, bilges, bilge wells and other spaces, even if not specifically mentioned, shall be considered as being included as spaces to be cleaned and gas freed.

7.7.2 For all tanks and spaces indicated in enclosure 2.2.1, air vents, sounding tubes, filling and suction lines and other appurtances shall be included for cleaning and gas freeing. Secondary manhole covers for each tank shall also be opened.

7.7.3 Post Original Gas Free Certification at each Tank/Space Location. Certificate shall be mounted directly at the tank/space manhole entrance.

7.7.4 Post copy of Gas Free Certificates at the designated gangway access to the vessel. Certifications posted at gangway shall be in a protective weather/water proof enclosure that is accessible and visible.

7.8 Surveys and testing requirements for these tanks shall be addressed in other work items in this work package.

7.9 At the conclusion of all required work, conduct a final closeout inspection for each tank / space listed in enclosure 2.2.1 with the MSCREP. No tank shall be closed until a final inspection is accomplished with the MSCREP in attendance.

7.9.1 Contractor is responsible for repairing all tank coating damage caused by work in this solicitation work package. During close out inspection, if coatings are found damaged by contractor’s work, contractor shall repair damaged areas prior to final close out of tank/space, at contractor’s expense.

Damaged coatings shall be repaired in accordance with MSC paint system and the paint representative’s recommendations.

7.9.2 Ensure all blowers, lighting, staging, tools, and miscellaneous equipment are removed prior to the final inspection. Any staging necessary for MSCREP close out inspection shall be removed just prior to final acceptance close out of tank/space.

7.9.3 Present Tank in “Final” clean condition. No dirt, dust, debris or liquids shall be allowed. Any tank or space failing the close out inspection, shall be re-cleaned until passing MSCREP inspection (repeated cleanings and inspections will be at contractor expense, and may become subject to issuance of a QDR).

7.10 Upon acceptance of final closeout inspection and by direction of the MSCREP, reinstall manhole covers using new gaskets, grommets, and wicking. Submit a Condition Found Report for any missing or damaged fasteners or hardware.

7.11 The tanks and spaces, included in enclosure 2.2.1, shall be opened, cleaned and prepared for gas free certification within 5 days of the shipyard availability start.

7.12 Required Deliverable Report:Contractor shall create, maintain, update, and submit weekly during the progress meeting, a tank/space work matrix. This matrix shall contain the following information:

A.
Tank / Space Name
B.
Tank/Space Location Designation
C.
Date Tank/Space Opened
D.
Date Gas Free Cleaning Started
E.
Date Gas Free Cleaning Completed
F.
Date Gas Free Cert. Received
G.
Date ABS Initial Structural Survey Complete
H.
Date Air Test / Hydro Test Completed
I.
Date Final Tank/Space Cleaning Started
J.
Date Final Tank/Space Cleaning Completed
K.
Date Tank/Space Final Close
L.
Tank/Space Related Repair Status:

List major job sequence within a tank/space followed by date start & date completed (such as below):

* Access Cuts -> Date Removed / Date Installed

* Blasting -> date start / date complete

* Painting -> date start / date complete

* Related work items internal repairs

(pipe, valve, structure, etc)

* Related work items external repairs (welding, UT’s, zincs, other structural related; etc.)

* Fluids added / removed from tank/space (pot water chlorination; Undocking Stability; fuels/oils; etc.)

M.
Other

7.13 Paint all disturbed surfaces to match surroundings.

7.14 Preparation of Drawings: None.

7.15 Manufacturer's Rep: None.

8.0 GENERAL REQUIREMENTS: None

ENCLOSURE 2.2.1 – USNS Mercy (T-AH 19)

TANKS, VOIDS, AND COFFERDAMS

Ballast Tanks

Description
Tank Location
95% Capacity

(gals)

Fore Peak Tank

(7-0-0)
731557
Ballast Tank 01 FWD
(7-23-0)
892185

Ballast Tank 01 AFT

(7-36-0)
1284179
Wing Tank 02 P
(7-42-2)
454425
Wing Tank 02 S
(7-42-1)
434029
Double Bottom Ballast 02 C
(7-42-0)
608138
Ballast Tank 04
(7-60-0)
1195326
Double Bottom Ballast 05
(7-69-0)
604819
Double Bottom Ballast 06 C
(7-78-0)
446217
Double Bottom Ballast 07 P
(7-84-2)
73588
Double Bottom Ballast 07 S
(7-84-1)
62871
Double Bottom Ballast ER
(7-87-0)
126453
Aft Peak Tank
(7-129-0)
131655

Diesel Fuel Tanks

Description
Tank Location
95% Capacity
Diesel Fuel Tank – C
(5-87-0)
225662
Diesel Fuel Tank – P
(6-69-2)
504404
Diesel Fuel Tank - S
(6-69-1)
504404
Diesel Oil Service Tank
(2-120-1)
13381
Diesel Oil Settling Tank - P
(2-129-2)
55715
Diesel Oil Settling Tank - S
(2-129-1)
55715
Diesel Oil Wing Tank - P
(6-87-2)
186681
Diesel Oil Wing Tank - S
(6-87-1)
193119

Jet Fuel Tank

Description
Tank Location
95% Capacity

OIL Sludge and Waste Tanks

Description
Tank Location
95% Capacity
Waste Oil Tank
(6-95-0)
7980

Lube Oil Tanks

Description
Tank Location
95% Capacity

Fresh Water Tanks

Description
Tank Location
95% Capacity

Potable Water Tanks

Description
Tank Location
95% Capacity

Raw Sewage Tanks

Description
Tank Location
95% Capacity
Raw Sewage Tank – AFT
(6-75-1)
10852
Raw Sewage Tank – FWD
(6-48-1)
10852
Anti-Rolling Tank
(6-64-0)
1188632
MSD Tank
(6-95-0)
3000

MSD Effluet Tanks

Description
Tank Location
95% Capacity
MSD Effluent Tank - AFT
(6-73-1)
4278
MSD Effluent Tank – FWD
(6-46-1)
4278

MSD Surge Tanks

Description
Tank Location
95% Capacity
MSD Surge Tank - AFT
(6-75-2)
4278
MSD Surge Tank - FWD
(6-46-2)
4278

021-7