0903_A_UW_HULL_PRESERVATION_MERCY_FY16.docx

DOCX document 54 KB Posted

Attached to
USNS MERCY (T-AH 19) ROH/DD Federal contract opportunity
Solicitation number
N32205-15-R-5000
Issued by
Department of the Navy Military Sealift Command

About this file

Category A New Work Item - 0903 U/W Hull Preservation

View the file

Other files for this federal contract opportunity

Other files attached to USNS MERCY (T-AH 19) ROH/DD, newest first.
File Type Posted
RFQ_Q_and_A_-_No._2.docx DOCX document
RFQ_Q_and_A_-_No._1.docx DOCX document
0112_B_NO_1_BALLAST_TANK_FORWARD_STEEL_REPAIRS_-_Revision_A.doc DOC document
MERCY_FY16_0515_A_CHT_PIPING_REPAIRS.doc DOC document
0203_A_FUEL_SETTLER_TANKS_REPAIR.doc DOC document
USNS_Mercy_WI_Index_Nov_15_ROH_DD_Ver_1____3_Aug_2015.doc DOC document
Attachment_J_-_2_Category_A_Work_Items_-_Revised_2_Aug_15.xlsx XLSX spreadsheet
N32205-15-R-5000-P0006.doc DOC document
USNS_MERCY_Reference_List__15_ROH_DD___3_Aug_2015.doc DOC document
Attachment_J_-_3_Category_B_Work_Items_-_Revised_2_Aug_15.xlsx XLSX spreadsheet
0514_A_ADG_ENGINE_MOUNTS_REPLACEMENT.doc DOC document
Pictures_for_WI_0515.zip ZIP file
TANK_CAPACITY_TABLES.PDF PDF
0607_A_ANNUAL_CRANES_INSPECTIONS_-_Revision_A.doc DOC document
N32205-15-R-5000-P0005.doc DOC document
0901_A_DOCKING_AND_UNDOCKING_-_Revision_A.doc DOC document
USNS_Mercy_WI_Index_Nov_15_ROH_DD_Ver_1____24_July_2015.doc DOC document
0202_A_AUTOMATION_SYSTEM_GROOM_-_Revision_A.doc DOC document
0508_A_EDG_MAINTENANCE_-_Revision_A.doc DOC document
0021_A_CLEAN_AND_GAS_FREE_TANKS_VOIDS_COFFERDAMS_AND_SPACES_-_Revision_A.doc DOC document
0105_A_WATER_TIGHT_DOOR_REPAIR_-_Revision_A.docx DOCX document
MERCY_LAUNDRY_RED_STATION_RELIEF_VALVE_3in_x_4in.jpg JPG image
MERCY_EVAP_3_ _4_140_STATION_RELIEF_VALVE_2.5in_x_4in.jpg JPG image
N32205-15-R-5000-P0004.doc DOC document
N32205-15-R-5000-P0003.doc DOC document
Non-Disclosure_Agreement_-_International_Inspections.docx DOCX document
N32205-15-R-5000-P0002.doc DOC document
390-100-041_G_is__Fr_78-87.PDF PDF
390-100-039_F.PDF PDF
Amendment_P0001.doc DOC document
5980056_A_Scantling_Plan.PDF PDF
0101_5981321_G_Painting_Schedule.pdf PDF
J-Attachments.zip ZIP file
USNS_Mercy_WI_Index_Nov_15_ROH_DD_Ver_25_June.doc DOC document
N32205-15-R-5000.doc DOC document
WORK_ITEMS.zip ZIP file
MERCY_-_CDRLs_J-6.zip ZIP file
Show all 37

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USNS MERCY

(T-AH 19)

HULL N32205-15-R-5000

30 July 2015

ITEM NO 903 CATEGORY “A” MSC/SCHUMACHER

U/W HULL PRESERVATION

1.0 ABSTRACT:

1.1 This work item describes the requirements to wash, spot blast, and preserve the underwater hull.

2.0 REFERENCES/ENCLOSURES:

2.1 References:

2.1.1 Surface Preparation Specifications, Steel Structures Painting Council, Systems and Specifications, Volume 2

2.1.2 NAVSEA DWG 5981000_D, BOOKLET OF GENERAL PLANS

2.1.3 NAVSEA DWG 5980117 REV B; DRAFT MARKS & PAINT LINES

2.2 Enclosures: None.

3.0 ITEM LOCATION/QUANTITY:

3.1 Location: Wetted surfaces from the center keel to the top of the Deep Load Line including rudders, rudder stock, sea chests, sea chest strainers, scoops, struts, bilge keels, capastic shields and other appendages port and starboard sides.

3.2 Quantity:

· Solvent Cleaning Approx. 5,000 sq. ft.

· Spot Blast, SSPC-SP12, WJ-2LApprox. 5,000 sq. ft.
· Spot coat AMERLOCK 400 GFK TerracotaApprox. 5,000 sq. ft.
· Spot coat AMERCOAT 240 RedApprox. 5,000 sq. ft.
· Spot coat AMERCOAT 240 Haze GrayApprox. 5,000 sq. ft.
· Spot coat AMERON ABC-3 BlackApprox. 5,000 sq. ft.
· Spot coat AMERON ABC-3 BlackApprox. 5,000 sq. ft.
· Spot coat Anti-foulingApprox. 5,000 sq. ft.
· HP Water WashApprox. 133,000 sq. ft.
· One full coat Anti-foulingApprox. 5,000 sq. ft.
· Two coats AMERCOAT 5450 WhiteMarkings – See 2.1.3
· Two coats AMERCOAT 5450 BlackMarkings – See 2.1.3

4.0 GOVERNMENT FURNISHED MATERIAL/SERVICES/INFORMATION:

4.1 Government Furnished Material (GFM)

AMERCOAT 240 Oxide Red50 gals
AMERCOAT 240 Haze Gray50 gals
AMERON ABC-3 Black100 gals
AMERON ABC-3 Red100 gals
AMERCOAT 5450 White12 gals
AMERCOAT 5450 Black12 gals
AMERLOCK 400 GFK Terracotta40 gals
T-1080 gals

4.2 Government Furnished Services (GFS):

4.2.1A PPG Paint Field Service Representative will
be on site to offer technical assistance to the
MSCREP.

5.0 NOTES

5.1 The contractor and all subcontractors, regardless of tier must consult the General Technical Requirements (GTR) to determine applicability to this work item. In performance of this work item, the contractor and all subcontractors regardless of tier must comply with the requirements of all applicable GTR’s.

5.2 The contractor and all subcontractors, regardless of tier are advised to review other work items under this contract to determine their effect on the work required under this work item. Many of the definitions relating to performance of this work item are found in Work Item 001.

5.3 Thinner and Solvent is furnished for paint application viscosity control only. GFM supplied thinner shall not be used for cleaning of gear and/or equipment.

5.4 Any additional paint or thinner requirements necessary to complete this Specification Item will be furnished by the shipyard/contractor at no expense to the government.

5.5 Shipyard will take responsibility for receiving and proper storage of GFM paint, and for documenting receipt of paint and return of unused paint to the MSCREP within three (3) days of completion of painting.

5.6 This item shall be worked in conjunction with other dry-docking items.

6.0 QUALITY ASSURANCE REQUIREMENTS: None additional.

7.0 STATEMENT OF WORK:

7.1 Arrangements/Outfitting

7.1.1 Assure dry-dock blocking arrangement is in accordance with the requirements of Work Item 901.

7.1.2 Provide and erect all necessary staging and/or provide suitable alternative means (scissor lift, manlifts, etc.) required for proper working conditions and inspection. Ensure compliance with all local safety standards.

7.1.3 Provide and maintain adequate lighting of a suitable nature during the course of all water washing, blasting, coating and inspection activities. Remove lighting from the work site when so directed by MSCREP.

7.1.4 Remove all interferences as found necessary to accomplish this work item. Upon completion of work, re-install all interferences.

7.1.5 Immediately upon drydocking the entire hull from the keel to six inches (6") above the Deep Load Line including, but not limited to, appendages such as sea chests, strainer plates, thruster tunnel(s), bilge keels, struts and rudder(s) shall be high pressure water washed with enough pressure to remove all marine growth (slime, grass, tube worms, barnacles, etcetera), salts peeling with the guidance of the MSC Paint Representative. Accomplish the requirements of SSPC-SP1, Solvent Cleaning, Accomplish the requirements of Surface Preparation Standard SSPC-SP1, Solvent Cleaning, to remove all dirt, oil, grease, soluble salts or other organic matter. Biodegradable cleaners or other eco-friendly methods/agents shall be used to the greatest extent possible. Upon completion of all cleaning chloride testing shall be performed at random locations. If contamination is found, additional tests shall be made as necessary to determine the extent of contamination and to prove the success of remediation. The maximum allowable contamination concentrations shall be less than 10 ug/cm2 of chloride contaminants as determined by field or laboratory analysis using reliable, reproducible test equipment.

7.1.6 Upon completion of the HP water washing and prior to the start of surface preparation take and record Dry Film Thickness (DFT) readings of the existing coatings at a rate of one (1) spot reading per 1000 SF. DFT gages shall be calibrated and spot readings shall be taken in accordance with SSPC-PA2, Measurement of Dry Coating Thickness With Magnetic Gages. Prepare a report showing the existing antifouling DFT. Assume that the DFT of the underlying anti-corrosive epoxy is an average of 11 mils. Submit the results of the DFT inspection to the MSCREP within 24 hours of completion.

7.1.7 Contractor and MSCREP shall inspect entire underwater hull and within four (4) hours of dry-docking and submit a dry-docking report, in triplicate, to the MSCREP. Identify areas for spot blasting and replacement of the existing anti-fouling paint system.

7.1.8 Temporarily remove all sea chest strainer plates and gratings. After completing work, replace all sea chest strainer plates in their parent locations.

7.1.9 Leave the MGPS anodes in place to prevent blast grit and paint from entering the engine room.

7.1.10 Prior to start of surface preparation and painting the contractor shall ensure that the vessel's equipment is protected from damage caused by blasting abrasive, dust or paint. Measures to be taken include, but are not limited to, the following: Plug open ends of pipes, including sea connections, vents and ducts;

Install protective covering on all impressed current anodes, reference cells, sacrificial anodes and transducers, propellers, exposed shafting and bow thruster propellers; Grease and wrap all valve stems and exposed portions of hydraulic cylinders. Install filters on all air intake vents. Install stack covers on the main and auxiliary uptakes. Install covers on all fuel tank vents; In the areas to be abrasive blasted and/or coated, Degraded protective covering shall be repaired prior to the restart of work. Contamination of the vessel and its equipment shall be reported to the MSCREP verbally immediately upon its discovery, followed by a written report within four (4) hours of the verbal notification. The contractor shall be responsible for cleaning the contaminated equipment and showing that the contamination has not caused damage to same. Cost to repair equipment damaged by such contamination shall be borne by the Contractor.

7.1.11Paint material shall be stored within the paint manufacturer's recommended temperature range. When paint material is being applied, ensure that the material's temperature is within the manufacturer's recommended range for application, but in any case not less than 70o F.
7.1.12Ensure the following conditions are met prior

to painting: Surfaces shall be clean, dry and free of oil, grease or residue from abrasive blasting; The edges of the spot blasted areas shall be feathered-in;

The surface appearance of the prepared surface shall meet the definition established by the cited surface preparation standard(s); Air and substrate temperatures shall be within the range published by the paint manufacturer; The ambient air and substrate temperatures must register at least 5o F. above the dew point temperature; The relative humidity is within the range set by the manufacturer’s product data sheet. In the event that there is no range established by the manufacturer, the relative humidity shall be no higher than 85 percent; No coating shall be applied at temperatures below 35o F. without prior written approval of the MSCREP; Painting shall not be performed between the hours of sunset and 0800 without prior written approval of the MSCREP; Any overspray shall have been removed prior to the application of the next coat of paint in the system; Material Safety Data Sheets for the product(s) being applied are on the job site and have been reviewed by the personnel involved.

7.1.13 Prior to application of any coating, the area

to be painted shall be inspected and approved by the MSCREP and the Paint Representative. Inspection shall include surface preparation including cleanliness, and surface profile as determined by Keane-Tator Comparator (or equal) examination and/or replica tape, DFT readings of prior coats, etcetera, as applicable depending upon the current stage of coating application. This inspection includes not only the initial coat of paint, but all subsequent coats as well.

7.1.14 Immediately prior to coating the surface shall be re-tested for non-visual surface contaminates at random locations to ensure that the surfaces have not been re-contaminated. If contamination is found, additional tests shall be made as necessary to determine the extent of contamination and to prove the success of remediation. Results of this testing shall be presented to the MSCREP at time of inspection for coating application. The maximum allowable contamination concentrations shall be less than 10 ug/cm2 of chloride contaminants as determined by field or laboratory analysis using reliable, reproducible test equipment. If UHP Water Jetting is utilized for surface preparation the limits established by NV-2 shall be met.

7.1.15 In areas spot prepared to bare metal, such as block sections miss last dry-docking, whether prepared by abrasive blasting, water jetting or other means, the edges of the surrounding intact coating shall be feathered-in.

7.1.15 Cut in the light load line and deep load line. Restore all hull markings (draft marks, plimsol marks, load line grids, bulkhead. markings, etcetera) directed by the MSC REP. Remove all protective coverings and re-install all interferences. Remove any paint which has adhered to normally unpainted items including, but not limited to, port lights, anodes, valve stems, etcetera. Anode shields damaged as a result of work performed under this item shall be repaired by the contractor at no additional expense to the government.

7.1.17 Upon completion, all protective covering shall be removed and the vessel shall be cleaned of all residues resulting from the surface preparation and painting operations. Tanks shall be left clean and ready for use.

Note: From the keel to the light load line, each coat of antifouling shall be alternately black and red.

From the light load line to the deep load line, all anti-fouling coats shall be red.

7.2 Surface Preparation:

7.2.1 Accomplish abrasive blasting in accordance with Surface Preparation Standard, SSPC-SP12, WJ-2L, Cleaning of Metals – Very Thorough Cleaning required in 3.0. The blast profile achieved shall be angular in nature and within the range set by the manufacturer’s product data sheet for the coating system being applied. Profile shall be determined using a Keane-Tator (or equal) Surface Profile Comparator. Testex (or equal) Replica Tape shall be used at a rate of one (1) reading per 1,000 SF for verification. Replica Tape shall be mounted, identified as to location and included as part of the final paint report. Feather edge all blasted areas and freeboard existing paint.

7.2.2 Accomplish a HP Wash to all surfaces in 3.0 to create an anchor pattern on the surface of the intact anti-corrosive epoxy and anti-fouling paint.

7.2.3 Upon completion of surface preparation all dust

and dirt generated by this work item shall be removed.

7.3 Coating Application:

7.3.1 Apply the following paint system:

Spot blast areas - Leading Edge Of Stem, Rudder and Rudder Horn, Bulbous Bow:

One coat AMERLOCK 400 GFK Terracota 10 - 12 mils DFT

Spot blast areas - UW Hull, Rudder, Horn and seachests:

One spot coat AMERCOAT 240 Red 5 - 6 mils DFT

One spot coat AMERCOAT 240 Haze Gray 5 - 6 mils DFT

One spot coat AMERON ABC-3 Black 5 - 6 mils DFT

One spot coat AMERON ABC-3 Black 5 - 6 mils DFT

One spot AMERON ABC-3 Red 5 - 6 mils DFT UW Hull, Rudder, Horn and Seachests:

One coat AMERON ABC-3 Red 5 - 6 mils DFT

Markings – See 2.1.3:

Two coats AMERCOAT 5450 White 5 - 6 mils DFT

Two coats AMERCOAT 5450 Black 5 - 6 mils DFT

NOTE 1: Area Volume Control Method will be used to control application rate of full coats of AMERON ABC- 3.

NOTE 2: Recoat times may be critical. Consult with coating inspector.

7.4 Inspection/Testing:

7.4.1 Paint system application shall be inspected by the coating inspector and the MSCREP for acceptance.

7.4.2 DFT readings of the prior coat of paint shall be presented to the MSC Port Engineer at the time of inspection for coating. Spot readings shall be taken at a rate of five per 1,000 square feet. DFT gages shall be calibrated, spot readings shall be taken and DFT tolerances shall be in accordance with SSPC-PA2, Measurement of Dry Coating Thickness With Magnetic Gages.

Note: All coatings shall be allowed to air dry. The minimum and maximum times to recoat shall be in accordance with the manufacturer's recommendations.

7.5 Preparation of Drawings/Documentation:

7.5.1 The contractor shall prepare a paint report and submit same to the MSCREP within three (3) days of completing the coating application. The report shall include the following data: The date, time and location of each coating application; The air and substrate temperatures, relative humidity and dew point temperature at the time of each coating application; Dry film thickness readings at a rate of five (5) spot readings per 1,000 sq. ft. of surface for each coat of paint. DFT gages shall be calibrated, spot readings shall be taken and tolerances for coating thickness shall be in accordance with SSPC-PA2, Measurement of Dry Coating Thickness With Magnetic Gages; The manufacturer, Product Identification Number and Batch Numbers for each coat of paint applied; Surface profile measurements of the spot abrasive blast cleaned metal substrate; Results of testing for non-visible surface contamination (soluble salts).

7.5.2 Submit "as painted" coating report to the MSCREP, in triplicate, within three (3)days of completion. Record to include number of square feet blast cleaned, primed, and intermediate coated. Record shall also include the number of gallons of each coat of epoxy anti-corrosion coats and ablative anti fouling topcoat. Submit readings daily to MSCREP.

8.0 GENERAL REQUIREMENTS: None.