Revised 2-11-15
MILITARY SEALIFT COMMAND
NORFOLK, VIRGINIA
ROH COVER SHEET
FOR
USNS RICHARD E BYRD (T-AKE 4)
USCG No.: CG831781 ABS ID No.:08154762
IMO No.: 9300609
RFP NO.: N32205-15-R-3000
(29 Sep 2014)
2 April 2015 thru 12 May 2015 ROH/DD AVAILABILITY
PRINCIPLE DIMENSIONS
LENGTH
689 ft 00 in
BREADTH
105 ft 06 in
DRAFT FULL LOAD (mean) 30 ft 06 in ABL
GROSS TONNAGE
43758 TONS (Registered)
MAXIMUM DISPLACEMENT
41470 TONS
ESTIMATED ARRIVAL DRAFT
25 ft 1 in Fwd, 25 ft 6 in Aft
AIR DRAFT WITH MAST DOWN
160 ft 10 in ABL
WORK ITEM INDEX
USNS RICHARD E BYRD (T-AKE 4)
SECTION 0000
GENERAL REQUIREMENTS
NOT SEPARATELY PRICED (NSP) REQUIREMENTS
Intent, Scope, General Requirements and
Definitions
Technical and Manufacturer’s Representatives
Approach, Berth, and Mooring Requirements
Testing and Quality Assurance
Electrical Safety Procedure Requirements
Heavy Weather Plan
CATEGORY “A” WORK ITEMS
Furnish Office for Overhaul Management Team (OMT)
Furnish General Services
Telephone Services
Project Planning and Production Status
Monitoring Reports
Preparation of Weight and Moment Report
Integrated Logistics and GFM Support Requirements
Fire Protection and Ship’s Safety Program
Handling Ship’s Stores
Delivery and Redelivery of the Vessel Shipboard Access
Gas Free Certificates
Clean and Gas Free Tanks, Voids, Cofferdams and Spaces
Dock Trials and Sea Trial
Hazardous Waste Disposal
CATEGORY “B” WORK ITEMS
0025 Physical Security Continuation of Services
SECTION 0100
HULL STRUCTURE
Roller Chock Replacement 0102 Cargo Door Modification (T-ALT-361) 0103 Freeze Chill Decking Shipyard Support 0104 Freeze Chill Decking, Structural, Piping, and Electrical Support (T-ALT 204)Rev A 0106 Improved Point Detection Sys (T-ALT 378) Forward Mast Anchor Light TALT 266
0108 Liquid Cargo Deck NonSkid Renewal
Renew Non-Slip 02 LEVEL FWD OF HOUSE 0109 Deck House Preservation Rev A
0111 Replace Chain Fairlead TALT 307
SECTION 0200
PROPULSION MACHINERY
0201 MDE No 1 AND 4 - 6K HR MAINT TECH REP
SECTION 0300
ELECTRICAL
0301 PROPULSION MOTOR AND COOLER CLEANING
Clean HV/SS and Emergency Switchboards
0303 PLC Survey
0304 HV Jumper Cable Replacement 0305 Install ABT for MDG Water Mist (T-ALT 196 0310 Ammo Hold SO2 Gas Detection System Installation
SECTION 0400
COMMUNICATION AND NAVIGATION
0401 GMDSS Upgrade (T-ALT 337)
0403 HF Antenna and Tilt Base Antenna T-ALT 380
0405 RADAR & ECDIS VISIONMASTER VMFT UPGRADE (TALT 224/347)
SECTION 0500
AUXILIARY MACHINERY SYSTEMS
0501 Aft AFFF Piping-Flight Deck Sprinkling System
0502 Aft AFFF Piping-Helo Hanger Sprinkling System 0503 Chloropac Installation (T-ALT 170) 0505 Vacuum Sewage System Piping Flush 0506 Crane Cooling System Modification (T-ALT 176)Rev A 0508 Cargo Brine System Valves TALT 349
0509 Firemain Isolation Valve Installations Rev A 0510 LTFW Cooler Cleaning 0511 Vane Axial Fan Motor Overhauls 0514 Bowthruster Gearbox Vent TALT 291
0518 HP Air Union Nut Replacement 0524 Marpol Samplers 0525 Sewage Pipe Line Replacement(VRR 13-053)
SECTION 0600
OUTFIT, FURNISHINGS and HABITABILITY
0601 Galley Equipment Calibration
Life and Rescue Boat Release Hook Upgrade (T-ALT 376) 0608 Galley HVAC Mods TALT330 ABS Reqd
0634 Galley Area Polmeric Deck Covering Installation
SECTION 0800
HEATING, VENTILATION and AIR CONDITIONING
Install Fan Coils in COSAL Storeroom (T-Alt 283)
Laundry Exhaust Duct Cleaning
Galley Exhaust Duct Cleaning 0805 IMECO CHILLER SHIPYARD SUPPORT Rev D 0806 IMECO HVAC SHIPYARD SUPPORT (T-ALT 319)Rev D
SECTION 0900
DRYDOCKING
Dry-Docking and Undocking Vessel
Propeller Shaft and Stern Tube Inspection Rev A
Stern Tube Seal Inspection
Propeller Shaft Horizonal Proximity Probe Installation
Renew Seachest, Rope Guard, & Bow Thruster Zincs
0909 Underwater Hull Cleaning and Painting 0910 Inspect and Test Cathodic Protection System 0911 Overhaul Sea Valves Remove SW-V-211 and SW-V-248 Install Hull Inserts 0915 Anchor Upgrade TALT 326 Rev A 0917 Shaft Grounding Interference Removal
0922 Bilge Alarm Installation 0923 Propeller Boss Cap Replacement (T-ALT 325)
SECTION 1000
UNREP GEAR
Renew Flight Deck Non-Skid Rev B 1004 Cargo Handling Area NonSkid Renewal 1005 Refurbish UNREP Blocks and Preservation and Painting of Kingpost Rev A
DRAWING /REFERENCE INDEX
USNS RICHARD E BYRD (T-AKE 4)
| Work Item |
| Reference |
| Drawing/Reference Title |
None
| 003 |
| 2.1 |
| Mil STD Mil-DTL-28628D, dtd July 1991; Camels |
| 003 |
| 2.2 |
| Mil STD Mil-F-29248, dtd 21 November 1986; Fenders, Marine, Foam Filled, Netless |
| 003 |
| 2.3 |
| NAVSEA 802-8387002, General Arrangement Plan |
| 003 |
| 2.4 |
| NAVSEA 835-7489033, Rev C, Mooring Analysis |
| 003 |
| 2.5 |
| MSC Quality Management System Procedures Manual; EPI N0721-001.00-AQ – UNDER KEEL CLEARANCE |
| 004 |
| 2.1 |
| Mil-I-45208, (Series), Inspection Systems |
| 005 |
| 2.1 |
| High Voltage Awareness Instruction Guide PowerPoint |
| 005 |
| 2.2 |
| High Voltage Awareness PowerPoint Presentation |
| 005 |
| 2.3 |
| MSC Safety Management System Procedure 2.1-004-All, Lock-out/ Tag-out |
| 005 |
| 2.4 |
| MSC Safety Management System Procedure 2.1-016-AKE, High Voltage System |
| 005 |
| 2.6 |
| NFPA 70E Standard for Electrical Safety Requirements for Employee Workplaces |
| 006 |
| 2.1.1 |
| MSC Drawing 835-8195241, Trim and Stability Booklet |
| 011 |
| 2.1.1 |
| NAVSEA 802-8387002, General Arrangement |
| 011 |
| 2.1.2 |
| MSC Chemical Treatment Handbook |
| 015 |
| 2.1 |
| DOD Security Manual for Safeguarding Classified Information, DOD Manual 5220.22-M |
| 015 |
| 2.2 |
| Military Sealift Command Standard Drawing 7080803, Preparation of Computer Aided Designed (CAD) Drawings for USNS Ships. |
| 015 |
| 2.3 |
| American Society of Mechanical Engineers (ASME), Y14.24M, Types and Applications of Engineering Drawings |
| 015 |
| 2.4 |
| Military Sealift Command Standard Drawing 7079667, Preparation of Selected Record Drawings for USNS Ships |
| 016 |
| 2.1 |
| NFPA 312, Standard for Fire Protection of Vessels During Construction, Repair and Lay-Up |
| 016 |
| 2.2 |
| NFPA 51B, Standard for Fire Prevention in use of Cutting and Welding Processes |
| 018 |
| 2.1 |
| NAVMED P-5010-6, Manual of Naval Preventive Medicine, Chapter 6, Water Supply Afloat |
| 021 |
| 2.1.1 |
| MSC Dwg 801-8387014, Capacity Plan |
| 021 |
| 2.1.2 |
| MSC Dwg 835-8195241, Trim and Stability Booklet |
| 023 |
| 2.1.1 |
| Resource Conservation and Recovery Act (RCRA) as Amended |
| 023 |
| 2.1.3 |
| Applicable Uniform Hazard Waste Manifest Form |
| 023 |
| 2.1.4 |
| Test Methods for Evaluating Solid Waste, Physical/Chemical Methods; EPA Document, SW-846: The Official compendium of analytical and sampling methods that have been evaluated and approved for use in complying with the RCRA regulations. |
| 101 |
| 2.1.1 |
| NAVSEA Drawing No. 582-7488941 Rev C, (NASSCO 471-331-4216), Mooring Arrangement And Detail Aft And Towing Package |
| 101 |
| 2.1.2 |
| Smith and Berger Marine Inc. Drawing No. B60526 Rev 4, General Arrangement Model 10 X 10 SS Chock |
| 101 |
| 2.1.3 |
| NAVSEA Drawing No. 103-8389961 Rev A, Replace Roller Chocks (ABS APPROVED) |
| 101 |
| 2.2.1 |
| Enclosure 1; Smith and Berger Marine Inc. Drawing No. B60526 Rev 4, General Arrangement Model 10 X 10 SS Chock. |
| 102 |
| 2.1 |
| Federal Equipment Co Drawing No. WD0300 Rev A, Bottom Bar Weather Sealing Kit |
| 104 |
| 2.1.1 |
| NAVSEA Dwg. No. 635-7489069, Rev E, Arrangement & Details of Refrigerated Cargo Hold #3 |
| 104 |
| 2.1.2 |
| NAVSEA Dwg. No. 631-7488891, Rev F, Paint Schedule |
| 104 |
| 2.2.1 |
| MSC Dwg. No. 604-8389513, Rev A, 2-58-02 2nd Deck Plenum Mods P/S |
| 104 |
| 2.2.2 |
| MSC Dwg. No. 510-8389516, Rev A, 2-58-02 2nd Deck Piping Installation Details |
| 104 |
| 2.2.3 |
| MSC Dwg. No. 606-8389518, Rev B, 2-58-01 2nd Deck Vestibule Deck Installation Details |
| 104 |
| 2.2.4 |
| MSC Dwg. No. 510-8389520, Rev A, 2-58-01 2nd Deck Vestibule Pipe Mod Details |
| 104 |
| 2.2.5 |
| T-1 Deck Drain System Check Valve Replacement, Rev A |
| 104 |
| 2.2.6 |
| Phenolic Block Installation Details, Rev A |
| 104 |
| 2.2.7 |
| Loop Seal Installation Details |
| 104 |
| 2.2.8 |
| T-2 Additional Material List |
| 106 |
| 2.1.1 |
| NAVSEA DWG 5038593, Rev -, Improved Point Detection System – Lifecycle Replacement Drawings |
| 106 |
| 2.1.2 |
| NAVSEA DWG 5038594, Rev -, Improved Point Detection System – Lifecycle Replacement Drawings |
| 106 |
| 2.1.3 |
| NAVSEA DWG 5038595, Rev -, Improved Point Detection System – Lifecycle Replacement Drawings |
| 106 |
| 2.1.4 |
| NAVSEA DWG 5038596, Rev -, Improved Point Detection System – Lifecycle Replacement Drawings |
| 106 |
| 2.1.5 |
| NAVSEA DWG 5038597, Rev -, Improved Point Detection System – Lifecycle Replacement Drawings |
| 106 |
| 2.1.6 |
| NAVSEA DWG 5038598, Rev -, Improved Point Detection System – Lifecycle Replacement Drawings |
| 106 |
| 2.1.7 |
| NAVSEA DWG 5038599, Rev -, Improved Point Detection System – Lifecycle Replacement Drawings |
| 107 |
| 2.1 |
| NASSCO Dwg No. 471-346-0105SK, Lighting Sketch Topside Lighting. |
| 107 |
| 2.2 |
| NAVSEA Dwg No. 320-7488777, NASSCO Dwg No. 471-346-0002, Electrical System One Line Diagram. |
| 109 |
| 2.1.1 |
| Steel Structures Painting Council, Good Painting Practice, Volume 1, Fourth Edition. |
| 109 |
| 2.1.2 |
| Steel Structures Painting Council, Systems and Specifications, Volume 2, Eighth Edition. |
| 109 |
| 2.1.3 |
| SSPC-PA 2, Measurement of Dry Coating Thickness with Magnetic Gages. |
| 109 |
| 2.1.4 |
| SSPC-VIS-3 Visual Standard for Power and Hand Tool Cleaned Steel. |
| 109 |
| 2.1.5 |
| Surface Conductivity Testing Procedure “Cell Retrieval Method Bresle Patch ISO 8502-6 |
| 109 |
| 2.1.6 |
| SSPC SP11, Power cleaning to Bare Metal. |
| 109 |
| 2.1.7 |
| Stainless Steel Fixed Window Style CC-1646, Dwg No. CC10104 Rev C, CORNELL-CARR. |
| 110 |
| 2.1 |
| Naval Ships’ Technical Manual (NSTM) Chapter 634 (“Deck Coverings”). |
| 110 |
| 2.2 |
| T-AKE 1 Non-Skid Arrangement, NAVSEA Dwg 631-7489177(B). |
| 110 |
| 2.3 |
| Surface Preparation Standard SSPC-SP11, Power Tool Cleaning To Bare Metal. |
| 110 |
| 2.4 |
| Surface Preparation Standard, SSPC-SP-12/NACE 5, Surface Preparation and Cleaning of Metals by Water-jetting Prior to Recoating. |
| 110 |
| 2.5 |
| Surface Preparation Standard SSPC-SP3, Power Tool Cleaning |
| 111 |
| 2.1.1 |
| NAVSEA Dwg 582-7488906, Rev H, T-AKE 1 Class Mooring Arrangement Fwd Plan |
| 111 |
| 2.1.2 |
| NAVSEA Dwg 100-7489051, Rev E, Forecastle (FS Zone) |
| 111 |
| 2.1.3 |
| NASSCO ECN 90 (for Dwg 471-321-1749) |
| 111 |
| 2.2.1 |
| Attachment 1 – Stiffener Location |
| 111 |
| 2.2.2 |
| Sketch of Full Moon Fairlead |
| 203 |
| 2.1.1 |
| FME PROCEDURE M12702096 – INSTRUCTIONS, INSTALLATION, AND TAKE UPGRADE. |
| 203 |
| 2.1.2 |
| FME PROCEDURE M12701960 - PROCEDURE, PRE & POST COMMISSIONING SAFETY CHECKS. |
| 203 |
| 2.1.3 |
| FME DWG M12702099 - ASSEMBLIES, EXTENSION SACOS CABLE, T-AKE UPGRADE |
| 203 |
| 2.1.4 |
| FME DWG M12702240 - TEST JUNCTION BOX, T-AKE UPGRADE |
| 203 |
| 2.1.5 |
| FME DWG M12702248 - TEST JUNCTION BOX |
| 203 |
| 2.1.6 |
| FME DWG M12702249 - CABLE, 12 METER |
| 203 |
| 2.1.7 |
| FME DWG M12702250 - CABLE 17 METER |
| 203 |
| 2.1.8 |
| FME DWG 10570989 - INTERCONNECT DIAGRAM, ENGINE CONTROL SYSTEM, T-AKE UPGRADE |
| 203 |
| 2.1.9 |
| FME DWG 10570990 - ELECTRICAL SCHEMATIC, ALARM PRE-PROCESSING SYSTEM, T-AKE UPGRADE |
| 203 |
| 2.1.10 |
| FME DWG 10570991 - ELECTRICAL SCHEMATIC, SAFETY SYSTEM, T-AKE UPGRADE |
| 203 |
| 2.1.11 |
| FME DWG 10570992 - CABLE LIST, T-AKE UPGRADE |
| 203 |
| 2.1.12 |
| FME DWG 10570993 - CABLING ELECTRICAL UNITS ON ENGINE, T-AKE UPGRADE |
| 203 |
| 2.1.13 |
| FME DWG 10570994 - ELECTRICAL SCHEMATIC, ENGINE CONTROL SYSTEM, T-AKE UPGRADE |
| 203 |
| 2.1.14 |
| NAVSEA DWG 802-7488866 Rev N, SRD GENERAL ARRANGEMENT, SHT 7 |
| 203 |
| 2.2.1 |
| TEST JUNCTION BOX SHIP CHECK T-AKE #2, T-AKE #5, & T-AKE #12 (Provided upon request) |
| 304 |
| 2.1.1 |
| EATON Cable Replacement Procedure, Dated 15 February 2010. |
| 304 |
| 2.1.2 |
| T-AKE Notice 5.PDF. |
| 401 |
| 2.1.1 |
| FURUNO FS-2570 GMDSS MF/HF Radio Technical manual (Provided with new Radio) |
| 401 |
| 2.1.2 |
| SPERRY/FURUNO FS-5000 GMDSS TERMINAL Technical manual (Onboard ship) |
| 402 |
| 2.1.1 |
| MSC Drawing No. 180-8392109, Rev. B, CBSP-ULV Foundation Details |
| 402 |
| 2.1.2 |
| MSC Drawing No. 401-8392113, Rev. B, CBSP-ULV Arrangement Details |
| 402 |
| 2.1.3 |
| NAVSEA ANTENNA NUMBERING INSTRUCTION 09405-001A |
| 403 |
| 2.1 |
| AB-1298 foundation replacement sketch |
| 403 |
| 2.2 |
| Shakespeare 6390 Fabrication foundation DWG. Details |
| 403 |
| 2.3 |
| 409R Installation Mounting Kit Spec Sheet |
| 403 |
| 2.4 |
| MSC Drawing No. 802-8387002, General Arrangement |
| 403 |
| 2.1.1 |
| NAVSHIPS Drawing No. 804-4563125 Rev C, Climber Safety Rail Notched Tube Type Arrangement and Details |
| 501 |
| 2.1.1 |
| MSC Dwg 555-8195582 Rev -, SRD Foam Firefighting System Diagram |
| 501 |
| 2.1.2 |
| MSC Dwg 800-8390862 Rev -, Aft AFFF Piping Replacement |
| 501 |
| 2.1.3 |
| MSC General Technical Requirements (GTRs) Dwg 803-7081122 |
| 501 |
| 2.1.4 |
| MSFSC SMS Procedure 2.1-004-all, Tagout/Lockout |
| 501 |
| 2.1.5 |
| EUM0 001O 01_X ASB SHEET 1 |
| 501 |
| 2.1.6 |
| EUM 001 O 01_X ASB SHEET 2 |
| 502 |
| 2.1.1 |
| MSC Dwg 555-8195582 Rev -, SRD Foam Firefighting System Diagram |
| 502 |
| 2.1.2 |
| MSC Dwg 800-8390862 Rev -, Aft AFFF Piping Replacement |
| 502 |
| 2.1.3 |
| MSC General Technical Requirements (GTRs) Dwg 803-7081122 |
| 502 |
| 2.1.4 |
| MSFSC SMS Procedure 2.1-004-all, Tagout/Lockout |
| 502 |
| 2.1.5 |
| EUM0 001O 01_X ASB SHEET 1 |
| 502 |
| 2.1.6 |
| EUM 001 O 01_X ASB SHEET 2 |
| 503 |
| 2.1.1 |
| MSC Drawing No. 800-8389569 Rev B, T-AKE 1 CLASS CHLOROPAC INSTALLATION (Mark Up for GFM) |
| 503 |
| 2.1.2 |
| MSC Drawing No. 320-8386993 Rev -, ALAN SHEPARD Electrical System One Line Diagram |
| 503 |
| 2.1.3 |
| MSC Drawing No. 521-8386998 Rev -, ALAN SHEPARD Fire Main System Diagram |
| 503 |
| 2.1.4 |
| MSC DRAWING No. 551-8387015 Rev -, ALAN SHEPARD Ship Service & Control Air System Diagram |
| 503 |
| 2.1.5 |
| SIEMENS Drawing No. 68159, Copper Ion Protection System |
| 504 |
| 2.1.1 |
| MSC DWG 516-8386780; Cargo Refrigeration Secondary Coolant Circ System Diagram |
| 505 |
| 2.1.2 |
| NAVSEA Dwg No. 528-7488743, Vacuum Sewage and Plumbing Drains System Diagram |
| 506 |
| 2.1.1 |
| MSC Drawing No. 500-8389976, Cargo Crane Cooling Modification Diagram |
| 506 |
| 2.1.2 |
| MSC Dwg No. 256-8386972, Rev – ALAN SHEPARD Auxiliary Seawater Services System Diagram |
| 506 |
| 2.1.3 |
| MSC Dwg No. 521-8386998, ALAN SHEPARD Firemain System Diagram |
| 506 |
| 2.1.4 |
| MSC Dwg No. 514-8386970, ALAN SHEPARD A/C Chilled Water System Diagram |
| 508 |
| 2.1 |
| NAVSEA Dwg No. 516-7488756, Cargo Refrigeration Secondary Coolant Circulation System Diagram |
| 509 |
| 2.1.1 |
| NAVSEA Drawing No. 521-7488717 Rev H, Firemain System Diagram. |
| 509 |
| 2.1.2 |
| NAVSEA Drawing No. 802-7488866 Rev T, General Arrangement. |
| 509 |
| 2.1.3 |
| NAVSEA Drawing No. 635-7489072 Rev B, Insulation Schedule Pipe and Vent |
| 514 |
| 2.1.1 |
| NAVSEA Dwg 556-7488740, Hydraulic Piping systems Diagram |
| 514 |
| 2.1.2 |
| MSC Dwg 556-8390670, Bow Thruster Lube Oil System Mod |
| 514 |
| 2.1.3 |
| T9568-A2-MMC-010, Bow Thruster Installation Manual, Type TT2200 |
| 514 |
| 2.1.4 |
| MSC General Technical Requirements (GTR) Dwg 803-7081122. |
| 514 |
| 2.1.5 |
| DWG 505-7488748, Flushing Criteria and Guidelines |
| 518 |
| 2.1 |
| NAVSEA 551-7488862, Rev G, Selected Record Drawing, T-AKE Class, High Pressure Air System Diagram |
| 518 |
| 2.2 |
| MSC Standard Drawing 803-7081122, Military Sealift Command General Technical Requirements (GTRs) |
| 608 |
| 2.1 |
| MSC DRAWING NO. 510-8391501 GALLEY HVAC MODIFICATIONS. |
| 608 |
| 2.2 |
| MSC DRAWING NO. 300-8391502 GALLEY HVAC ELECTRICAL MODIFICATIONS. |
| 608 |
| 2.3 |
| MSC Drawing No. 100-8194753 Rev C Fast Serve Line Structural Mods. |
| 801 |
| 2.1.1 |
| Carrier- Fan Coil Product Data Model 42CG |
| 801 |
| 2.1.2 |
| Carrier- Installation, Start Up and Service Data, Model 42CG |
| 801 |
| 2.1.3 |
| MSC Dwg 526- 8387021, Weather Deck and Miscellaneous Drains System Diagram |
| 801 |
| 2.1.4 |
| MSC Dwg 514- 8386970, AC Chilled Water System Diagram |
| 801 |
| 2.1.5 |
| MSC Dwg 514-8390392, COSAL Storeroom Fan Coil Unit Installation |
| 801 |
| 2.1.6 |
| MSC Dwg 320-8386993, Rev – Electrical System One-Line Diagram |
| 802 |
| 2.1 |
| MSCLANT Standard Item No. 15, “Cleaning Ventilation Systems” (Revised 2 April 1993) |
| 802 |
| 2.2 |
| MSCLANT Standard Item No. 16, “Cleaning Ventilation Filter Screens” (Revised 2 April 1993 |
| 802 |
| 2.3 |
| NAVSEA Drawing 512-7488750, Rev J; HVAC Diagram Accommodation Spaces |
| 803 |
| 2.1.2 |
| NAVSEA Drawing 512-7488750, Rev J; HVAC Diagram Accommodation Spaces (Sheets 1, 12 and 17 only) |
| 803 |
| 2.1.3 |
| MSC Drawing 500-8194018, HVAC System Mods (sheet 3) |
| 803 |
| 2.1.4 |
| MSC Drawing 500-8194022, Scullery, Fast Serve Line, and Duty Mess HVAC Mods (Sheet 3) |
| 805 |
| 2.1.1 |
| Dwg. No. 8393719rA: IHVACR Upgrade T-AKE Class |
| 805 |
| 2.1.2 |
| Dwg. No. 31108-897-0034r-: Shipyard Support Schedule, ships 2-9 |
| 805 |
| 2.1.3 |
| T-AKE 1 Rigging Booklet 1.pdf |
| 805 |
| 2.1.4 |
| T-AKE 1 Installation Process Booklet 1.pdf |
| 806 |
| 2.1 |
| MSC Dwg No. 8399919, Water Mist Pump Power Mod |
| 806 |
| 2.2 |
| MSC Dwg No. 8389918, Water Mist ABT |
| 806 |
| 2.1.1 |
| Dwg. No. 8393719rA: IHVACR Upgrade T-AKE Class |
| 806 |
| 2.1.2 |
| Dwg. No. 31108-897-0034r-: Shipyard Support Schedule, ships 2-9 |
| 806 |
| 2.1.3 |
| T-AKE 1 Installation Process Booklet 1 |
| 806 |
| 2.1.4 |
| Ceiling opening drawing |
| 901 |
| 2.1.1 |
| Trim & Stability Booklet, Dwg. 835-8195241 Rev-. |
| 901 |
| 2.1.2 |
| Docking Plan, Dwg. 801- 8387023 Rev - |
| 901 |
| 2.1.3 |
| Capacity Plan, Dwg 801- 8387014 Rev - |
| 904 |
| 2.1.1 |
| NAVSEA Dwg 243-7488962 Rev F, Shaft Arrangement |
| 904 |
| 2.1.4 |
| Wartsila Dwg W084837233 Rev E, Assy Sterntube |
| 904 |
| 2.1.5 |
| Bot Groningen Dwg 1.1262/1/1 A1, Rudder Project Arrangement |
| 904 |
| 2.1.6 |
| Bot Groningen Dwg 3.1265/1.1 A3, Rudder Trunk Summary |
| 904 |
| 2.1.7 |
| Bot Groningen Dwg 2.1263/1.1 A3, Rudder Cone Coupling |
| 904 |
| 2.1.8 |
| Bot Groningen Dwg 2.1264/1.1 A3, Rudder Hydraulic Nut Summary |
| 904 |
| 2.1.9 |
| Wartsila Dwg W084827066, Assy Propeller Cap |
| 904 |
| 2.1.10 |
| Wartsila Dwg W084836779, Propeller Boss |
| 904 |
| 2.1.11 |
| Wartsila Dwg W084838596, Assy Propeller Hydraulic Nut |
| 904 |
| 2.1.12 |
| NASSCO Dwg 471-351-4984, Rope Guard Installation |
| 904 |
| 2.1.13 |
| Wartsila Dwg W084837232, Arrangement Shafting |
| 904 |
| 2.1.14 |
| Wartsila Dwg W007420313, Round Nut Locking |
| 904 |
| 2.1.15 |
| Wartsila Dwg 9AK30410AS3, Shaft Flange-9FC6-58 AS3 |
| 904 |
| 2.1.16 |
| Wartsila Drawing for Manufacture of New Bearing Retaining Ring |
| 907 |
| 2.1.1 |
| NAVSEA Drawing No. 243-7488962 Rev. G, “Dry Cargo/Ammunition Ship, T-AKE 1 Class, Shaft Arrangement” |
| 907 |
| 2.1.2 |
| Riverhawk Company, Drawing No. 34664 Rev. B, “Integrated D Probe IPS34664” |
| 907 |
| 2.1.3 |
| Riverhawk Company, Drawing No. 34940 Rev.-, “Indiprox Module IPM34940” |
| 907 |
| 2.1.4 |
| “Data Recorder and Display Information for the Reference Cells and Wear Down Indicator”, (PDF) |
| 907 |
| 2.1.5 |
| Maritech, LLC, 1071-6111-110R, “Field Installation Instruction, Transmit Power Supply for the DIN Standard [144 mm x 144 mm] Data Recorder” |
| 909 |
| 2.1 |
| MSC Standard Item 90, Underwater Hull Recoat 5 Year Ablative |
| 909 |
| 2.2 |
| NAVSEA Dwg. 603-7488868, Paint Lines and Draft Marks. |
| 909 |
| 2.3 |
| Surface Preparation Standard SSPC-SP-12/NACE 5, Surface Preparation and cleaning of Metals by Water Jetting Prior to Coating. |
| 909 |
| 2.4 |
| PPG-PMC MSC Handbook |
| 912 |
| 2.1 |
| NAVSEA Dwg. 085-7488873, Rev M, Shell Expansion |
| 923 |
| 2.1.1 |
| Wartsila Doc No DMFE000003 Propeller Cap De-Mounting Procedure |
| 923 |
| 2.1.2 |
| Wartsila Dwg No. W084827066 Assembly Propeller Cap |
| 923 |
| 2.1.3 |
| Wartsila Dwg No. WLP001616-001 Assembly Propeller Cap |
| 1001 |
| 2.1.2 |
| Naval Air Warfare Center, Visual Landing Aids Installation T-AKE Class Ships – 627928 |
| 1005 |
| 2.1 |
| NAVSEA DWG. 570-7489006, Single Probe Delivery |
| 1005 |
| 2.2 |
| NAVSEA DWG. 570-7489007, Double Probe Delivery |
| 1005 |
| 2.3 |
| NAVSEA DWG. 5210545, Standard Painting Procedures for UNREP Equipment |
TECHMANUAL /REFERENCE INDEX
USNS ALAN SHEPARD (T-AKE 3)
| Work Item |
| Reference |
| TECHMANUAL / Reference Title |
| 004 |
| 2.1 |
| MIL-I-45208 (series), Inspection Systems |
| 015 |
| 2.1 |
| Department of Defense Security Manual for Safeguarding Classified Information, DOD Manual 5220.22-M |
| 023 |
| 2.1.5 |
| OPNAVINST 5090.1 Series |
| 201 |
| 2.1.1 |
| T/M T9233-CF-IMC-010; Diesel Engines, Main Power Generation, Models 9L 48/60 and 8L 48/60, Volume B1, Engine Operating Instructions |
| 201 |
| 2.1.2 |
| T/M T9233-CF-IMC-020; Diesel Engines, Main Power Generation, Models 9L 48/60 and 8L 48/60, Volume B2, Engine Working Instructions |
| 201 |
| 2.1.3 |
| T/M T9233-CF-IMC-040; Diesel Engines, Main Power Generation, Models 9L 48/60 and 8L 48/60, Volume B3, Spare Parts |
| 201 |
| 2.1.4 |
| T/M T9233-CF-IMC-070; Diesel Engines, Main Power Generation, Models 9L 48/60 and 8L 48/60, Volume E1-E4, Engine Operating Instructions. |
| 201 |
| 2.1.5 |
| T/M T9233-CF-IMC-030; Diesel Engines, Main Power Generation, Models 9L 48/60 and 8L 48/60, Volumes C1, C2, C3, Turbocharger Operating and Working Instructions/Spare Parts Catalog |
| 202 |
| 2.1 |
| Tech Manual T9233-CF-IMC-130, Diesel Engines, Main Power Generation, Model 9L 48/60 and 8L 48/60, Volume E Section 7 |
| 202 |
| 2.2 |
| Tech Manual, Vulkan Coupling, Tech Dock DOKU1G531W0013E |
| 202 |
| 2.3 |
| T-AKE Class Notice #15, Main Diesel Generator Couplings |
| 301 |
| 2.1 |
| T/M T9235-AG-MMC-010, Propulsion Motor, Synchronous, Motor Design M3HSX 305-126/16 |
| 302 |
| 2.1.1 |
| NAVSEA T/M T9235-AL-MCC-010, Main Power Switchboard, 6.6 KV, 2500A |
| 302 |
| 2.1.2 |
| NAVSEA T/M T9324-BU-MMC-010, Switchboards Ships Service 480V |
| 302 |
| 2.1.3 |
| NAVSEA T/M T9324-BT-MMC-010, Emergency Switchboard 480V Dwg 2838 For TAKE |
| 302 |
| 2.1.4 |
| Cutler Hammer, I.B. 32-255-1G, Instructions for Installation, Operation and Maintenance of Type VCP-W Vacuum Circuit Breakers |
| 302 |
| 2.1.5 |
| Cutler Hammer, I.B. 48002, Instructions for 36" Wide Vacuum-Break Starters Rated 360 Amperes, 7200 Volts, Roll Out Type |
| 304 |
| 2.1 |
| T9235-AK-MMC-010- Generator, Synchronous, 6600 V, 60 HZ, including Generator Excitation Control Panel |
| 304 |
| 2.2 |
| T9235-AN-MMC-010 – Propulsion Control System |
| 304 |
| 2.3 |
| T9235-AM-MMC-010- Transformers, Propulsion, Type THT 12 HN 7M2/N |
| 401 |
| 2.1.1 |
| FURUNO FS-2570 GMDSS MF/HF Radio Technical manual (Provided with new Radio Onboard Ship) |
| 401 |
| 2.1.2 |
| SPERRY/FURUNO FS-5000 GMDSS TERMINAL Technical manual (Onboard ship) |
| 505 |
| 2.1.1 |
| NAVSEA Tech Manual T9593-AC-MMC-010, Marine Sanitation Device and Vacuum Collection, Holding and Transfer System for T-AKE |
| 505 |
| 2.1.3 |
| Rydlyme Marine MSDS Jan 2007 pdf |
| 506 |
| 2.1.5 |
| TG811-BL-MMC-010; BOOM CRANE, ELECTRO-HYDRAULIC, MODEL, EB270-87-47 |
| 606 |
| 2.1.1 |
| Technical Manual TS800-AE-MMC-010, Life Boat with Winch and Davit, Fassmer Type CL-C 11.5 |
| 606 |
| 2.1.2 |
| Technical Manual T9583-A8-MMC-010, Boat, Rescue With Davit and Winches |
| 606 |
| 2.1.3 |
| IMO MSC.1/Circ.1206, Measures to Prevent Accidents with Lifeboats |
| 606 |
| 2.1.4 |
| IMO MSC.1/Circ.1277 Interim Recommendation On Conditions for Authorization of Service Providers for Lifeboats, Launching Appliances and On Load Release Gear |
| 901 |
| 2.1.4 |
| Safety Certification Program for Dry-docking |
Facilities and Shipbuilding Ways for U.S. Navy Ships, MIL-STD 1625C(SH)
| 901 |
| 2.1.5 |
| COMSC Instruction 9997.1A, Dry dock Standards for MSC Ship Availabilities |
| 904 |
| 2.1.2 |
| T/M T9243-AZ-MMC-010 Fixed Pitch Propeller and Shafting with Bearings Model W084836780 |
| 904 |
| 2.1.3 |
| T9561-BR-MMC-010 Steering Gear Rotary Vane, Model # RV 2150-3, and Shorthorn Rudder |
| 904 |
| 2.1.17 |
| MIL-STD 2199A Coverings for Waterborne Main Propulsion Shafting |
| 905 |
| 2.1.1 |
| T/M T9243-AX-MMC-010, SHAFT SEAL, STERN TUBE, TYPE MD FOR USNS LEWIS AND CLARK (T-AKE 1) CLASS, INSTALLATION, OPERATION AND MAINTENANCE INSTRUCTIONS. |
| 910 |
| 2.1.1 |
| T/M T9633-AS-MMC-010, Cathodic Protection System Impressed Current |
| 917 |
| 2.1.1 |
| T/M S9243-BY-MMA-010/3AB25, Maintenance Manual for 200 Amp Electronic Grounding Unit |
| 1001 |
| 2.1.1 |
| Naval Ships’ Technical Manual (NSTM) Chapter 634, Deck Coverings |
| 1001 |
| 2.1.5 |
| Air Capable Ship Aviation Facilities Bulletin No. 1K |