REQUEST FOR SPECIFICATION CLARIFICATION
#0021
NAME OF CONTRACTOR:
SPECIFICATION ITEM NO.: 501 & 1001
PARAGRAPH / SECTION NO: All TITLE: Aft AFFF Piping Sprinkling System & Flight Deck Nonskid
QUESTION:
After further assessment of both work items, contractor has concern of successfully accomplishing the AFFF flight deck piping and nozzle renewal while renewing the flight deck nonskid in the 45 day availability of this Period of performance.
Recommend MSC defer either the flight deck nozzle renewal or the nonskid renewal to a later availability.
ANSWER:
Flight Deck nozzles that run Port and Starboard of the Flight Deck and outside of the Fishplate, piping will not be in the way of the Flight Deck renewal.
For bidding purposes, Flight Deck Nozzles found flush on the Flight Deck Non-skid, shall be bid to replace piping up-to the flange as seen on Detail 70-C (Last flange before the Flush deck nozzles ).
Detail 70-C has two mating flanges. The top flange shall stay with the existing material (Carbon Steel), while the Bottom Flange shall be replaced as CUNI (as described in the Basic Work Item).
ATTACHMENT J – 8
Elizabeth.waller@navy.mil