Clarification 25

View the file

Other files for this federal contract opportunity

Other files attached to USNS RICHARD E. BYRD, ROH/DD, newest first.
File Type Posted
Clarification_24.doc DOC document
Clarification_23.doc DOC document
Clarification_27.doc DOC document
Clarification_26.doc DOC document
Amendment_0004.pdf.pdf PDF
J_-_4_Government_Furnished_Property_Revised_3-9-15.pdf PDF
Clarifications_23_-_27.zipx ZIPX file
Amendment_0003.pdf PDF
J_-_2_Category_A_Items_Revised_3-2-15.xls XLS spreadsheet
J_-_4_Government_Furnished_Property_Revised.xlsx XLSX spreadsheet
WI__Index_Revised.doc DOC document
Amendment_0002.doc.pdf PDF
J_-_2_Category_A_Items_Revised.xls XLS spreadsheet
J-A_-_ROH-DD_USNS_RICHARD_E__BYRD__AMENDMENT_0001_-_REDACTED.pdf PDF
Clarification_0005.doc DOC document
Clarification_0004.doc DOC document
Clarification_0022.doc DOC document
Clarification_0017.doc DOC document
Clarification_0003.doc DOC document
Clarification_0014.doc DOC document
Clarification_0010.doc DOC document
Clarification_0015.doc DOC document
Clarification_0009.doc DOC document
Clarification_0007.doc DOC document
Clarification_0013.doc DOC document
Clarification_0012.doc DOC document
Clarification_0006.doc DOC document
Clarification_0008.doc DOC document
Clarification_0019.doc DOC document
Clarification_0016.doc DOC document
Clarification_0020.doc DOC document
Clarification_0011.doc DOC document
Clarification_0018.doc DOC document
Clarification_0002.doc DOC document
Clarification_0021.doc DOC document
Clarification_0001.pdf PDF
Amendment_0001.pdf PDF
J_-_12_Past_Performance_Data.doc DOC document
J_-_10_Interport_Differential_West_Coast.doc DOC document
J_-_11_Dry_Dock_Evaluation_Form.docx DOCX document
N32205-15-R-3000.pdf PDF
J_-_13__PAST_PERFORMANCE_QUESTIONNAIRE.docx DOCX document
J_-_9_Disclosure_of_Lobbying_Activities_SF-LLL.doc DOC document
J_A_FBO_Post.PDF PDF
J_-_3_Category_B_Items.xls XLS spreadsheet
J_-_14_Technical_Data_Non-Disclosure.docx DOCX document
J_-_6_WI_015_CDRL.pdf PDF
J_-_8_Request_for_Spec_Clarification.doc DOC document
J_-_4_Government_Furnished_Property.xlsx XLSX spreadsheet
Show all 49

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR SPECIFICATION CLARIFICATION

#0025

NAME OF CONTRACTOR:

SPECIFICATION ITEM NO.: 0904 .

PARAGRAPH / SECTION NO: Para. 7.6.3 .

TITLE: PROPELLER SHAFT AND STERN TUBE INSPECTION (ABS)(REV 5)

QUESTION:

1. Is para. 7.6.3 to erect Platform/Staging required or necessary to accomplish this work? The Standard Operation Procedure has always been to rig out using pad eyes and chainfalls to accomplish this work.

7.6.3 Erect a platform/staging under the stern frame capable of carrying the tail shaft weight. Provide necessary blocking and rigging on the platform to support the tail shaft during removal operations. The platform/staging will be required until the tail shaft is drawn far enough past the stern frame to be handled by a crane

ANSWER:

Bids shall be prepared in accordance with the specification as written. The OEM will determine if the standard of operation is no longer current at the time the shaft is removed and an RFP will be issued if a change is required.