N00421-19-R-0003 Amendment 0007.pdf

PDF 2 MB Posted

Attached to
AIR-4. 11, N00421-19-R-0003 Irregular Air Platform Engineering supporting AD-4. 11. 6
Solicitation number
N00421-19-R-0003
Issued by

About this file

This sources sought announcement solicits capability statements for an indefinite delivery indefinite quantity cost-plus-fixed-fee contract supporting irregular air platform engineering. The Naval Air Warfare Center Aircraft Division will procure services including program management, research, analysis, design, installation, testing, training, and operational support. The scope includes integrating sensors, communications, weapons, and control technologies onto various manned and unmanned airborne platforms. Interested businesses must submit capability statements by July 9th, 2018 demonstrating experience with efforts of similar size and scope, and the ability to perform over 50% of the tasks described in the draft statement of work, obtain necessary security clearances, and begin work upon award. The contract will have a five year ordering period and be conducted primarily on-site at Naval Air Station Patuxent River and Webster Field, with some work potentially performed at Yuma Proving Grounds.

View the file

Other files

File Type Posted
N00421-19-R-0003 Amendment 0010.pdf PDF
N00421-19-R-0003 Amendment 0009 Conform.pdf PDF
Attachment P3 - P3 Hourly Burdened Rates-Rev 1.xlsx XLSX spreadsheet
Attachment P8 - DoD SAFE Help.pdf PDF
N00421-19-R-0003-0008 Conform.pdf PDF
Attachment 04 - OCI List.docx DOCX document
N00421-19-R-0003 Amendment 0006.pdf PDF
N00421-19-R-0003 Amendment 0005 Conform.pdf PDF
N00421-19-R-0003 Amendment 0004.pdf PDF
N00421-19-R-0003_Amendment_0003.pdf PDF
N00421-19-R-0003_Amendment_0002.pdf PDF
N00421-19-R-0003__Amendment_0001.pdf PDF
Attachment_P3_-_P3_Hourly_Burdened_Rates.xlsx XLSX spreadsheet
Attachment_P1_-_P1_Past_Performance_Information_Form.pdf PDF
Attachment_P4_-_P4_Reserved.docx DOCX document
Attachment_P6_-_Cost_Summary.xlsx XLSX spreadsheet
Attachment_11_-_MFR_Implementing_PGI_204.7108(d)(12).pdf PDF
Exhbit_A_-_Contract_Data_Requirements_List.xlsx XLSX spreadsheet
Attachment_05_-_Authorized_Subcontractors.docx DOCX document
Attachment_04_-_OCI_List.docx DOCX document
Attachment_09_-_COMR_CDRL_Template.xlsx XLSX spreadsheet
Attachment_10_-_Sexual_Assault_and_Sexual_Harassment_Training_Criteria.docx DOCX document
Attachment_P5_-_P5_Reserved.docx DOCX document
N00421-19-R-0003_Final.pdf PDF
Attachment_06_-_Authorized_Key_Personnel.docx DOCX document
Attachment_08_-_COMR_CDRL_Template_(COR).xlsx XLSX spreadsheet
Attachment_01_-_DD254_signed.pdf PDF
Attachment_P7_-_Subcontractor_Cost_Summary.xlsx XLSX spreadsheet
Attachment_P2_-_P2_Contractor_Performance_Assessment.pdf PDF
Attachment_02_-_CSP_QASP.docx DOCX document
Attachment_07_-_COR_Appointment_Letter.docx DOCX document
Attachment_03_-_Data_Item_Transmittal.docx DOCX document
Attachment_06_-_Authorized_Key_Personnel.doc DOC document
Attachment_P3_Streamlined_Rates.xlsx XLSX spreadsheet
Attachment_07_-_COR_Appointment_Letter.doc DOC document
Attachment_03_-_Data_Transmittal.docx DOCX document
Attachment_04_-_OCI_List.docx DOCX document
Attachment_02_-_CSP_QASP.docx DOCX document
Attachment_01_-_DD254_signed.pdf PDF
Attachment_P5_RESERVED.docx DOCX document
IAPE_Draft_Solicitation_FBO_.pdf PDF
Exhibit_A_-_Contract_Data_Requirements_List.xlsx XLSX spreadsheet
Attachment_05_-_Subcontractors.docx DOCX document
Attachment_09_-_COMR_CDRL_Template_(COR).xlsx XLSX spreadsheet
Attachment_P7_Subcontractor_Cost_Summary.xlsx XLSX spreadsheet
Attachment_08_-_COMR_CDRL_Template.xlsx XLSX spreadsheet
Attachment_P4_RESERVED.docx DOCX document
Attachment_P6_Cost_Summary.xlsx XLSX spreadsheet
IAPE-LOE.pdf PDF
IAPE-SOW.pdf PDF
Show all 50

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CODE

(Hour)

PAGE(S)

until 12:00 PM local time 25 Nov 2019

X

A X B X C X D

EX

X

G F 131 - 139

140 - 170 X H 171 - 177 coryn.hansell@navy.mil

RATING PAGE OF PAGES

7. ISSUED BY

(Date)

IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.

Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)

Prescribed by GSA FAR (48 CFR) 53.214(c)

1 177

(If other than Item 7)

15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO

AND

ADDRESS

SIGN OFFER (Type or print)

OF

OFFEROR

AMENDMENT NO. DATE

15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS

IS DIFFERENT FROM ABOVE - ENTER

SUCH ADDRESS IN SCHEDULE.

18. OFFER DATE

1. THIS CONTRACT IS A RATED ORDER

UNDER DPAS (15 CFR 700)

2. CONTRACT NO.

N00421 8. ADDRESS OFFER TO

See Item 7

9. Sealed offers in original and 3 copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in

CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and

See Section L conditions contained in this solicitation.

10. FOR INFORMATION

CALL:

A. NAME (NO COLLECT CALLS)

CORYN HANSELL 301-342-4186

11. TABLE OF CONTENTS

SOLICITATION/ CONTRACT FORM

SUPPLIES OR SERVICES AND PRICES/ COSTS

1 - 10 11 - 28

X I CONTRACT CLAUSES

DESCRIPTION/ SPECS./ WORK STATEMENT X

PACKAGING AND MARKING

29 - 72 73 - 74

J LIST OF ATTACHMENTS

INSPECTION AND ACCEPTANCE

DELIVERIES OR PERFORMANCE

75 - 76 77 - 79

X K

REPRESENTATIONS, CERTIFICATIONS AND

OTHER STATEMENTS OF OFFERORS

CONTRACT ADMINISTRATION DATA 80 - 85 X

SPECIAL CONTRACT REQUIREMENTS

OFFER (Must be fully completed by offeror) 86 - 112 X M

L INSTRS., CONDS., AND NOTICES TO OFFERORS

EVALUATION FACTORS FOR AWARD

NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.

is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.

13. DISCOUNT FOR PROMPT PAYMENT

(See Section I, Clause No. 52.232-8)

14. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments

AMENDMENT NO. DATE

to the SOLICITATION for offerors and related documents numbered and dated):

FACILITY

12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period

SOLICITATION, OFFER AND AWARD

X

(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)

PART I - THE SCHEDULE

26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE

EMAIL:TEL: (Signature of Contracting Officer)

CODE CODE

B. TELEPHONE (Include area code) C. E-MAIL ADDRESS

AWARD (To be completed by Government)

19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION

22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:

10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)

23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE

PART IV - REPRESENTATIONS AND INSTRUCTIONS

PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

113 - 129

PART II - CONTRACT CLAUSES

NAVAL AIR WARFARE CENTER AD

CODE 2.5.1.3, BLDG 433, 47060 LILJENCRANTZ RO

PATUXENT RIVER MD 20670

FAX:

TEL:

FAX:

TEL:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

SOLICITATION

6. REQUISITION/PURCHASE NO.5. DATE ISSUED

09 Oct 2019

4. TYPE OF SOLICITATION

SEALED BID (IFB)

NEGOTIATED (RFP)

[ X ]

3. SOLICITATION NO.

N0042119R0003

Section A - Solicitation/Contract Form

GOVERNMENT POINTS OF CONTACT

Irregular Air Platform Engineering (IAPE)

Contract Specialist: Coryn M. Hansell Phone: 301-342-4186 Email: coryn.hansell@navy.mil

Contracting Officer: Carolyn A. Emmart Phone: 301-757-4074 Email: carolyn.emmart@navy.mil

Procuring Contracting Officer: Thomas E. Stann Phone: 301-757-0031 Email: thomas.stann@navy.mil

CONTRACT TYPE:

The Contract resulting from this solicitation will be a Single-Award Indefinite Delivery/Indefinite Quantity contract utilizing Cost-Plus-Fixed-Fee (CPFF) CLINs for Labor (Term and Completion). Cost Reimbursable CLINs will be used for Other Direct Costs (Travel and Material). Firm-Fixed-Price CLINs will be used for Operational Flight Hours. The anticipated ordering period is four (4) years and 364 days.

ANTICIPATED NUMBER OF TASK ORDERS/CLINS:

The following information is the Government’s best estimate and is provided for situational awareness only. The Government anticipates that the first Task Order will be issued approximately 30 days after contract award.

-CPFF Level of Effort (LOE) tasking demands may yield approximately 10 Task Orders (TOs) per year with 15 CLINs on each TO for a total of 150 CLINs. The total number of CLINs for the duration of the contract will be approximately 750 CLINs.

-CPFF Completion Tasking demands may yield approximately three (3) Task Orders (TOs) per year with six (6) CLINs. The total number of CLINs for the duration of the contract will be approximately 90 CLINs.

CPFF Term Labor and FFP Operational Flight Hour tasking is restricted to a PoP of less than five (5) years.

VERBIAGE & TERMINOLOGY:

For clarification purposes, throughout this solicitation, Cost-Plus-Fixed-Fee (CPFF) Term, Cost-Plus-Fixed-Fee (CPFF) Level of Effort, and Cost Plus Fixed-Fee Non-Performance Based are used interchangeably. For clarification purposes, throughout this solicitation, Cost-Plus-Fixed-Fee (CPFF) Completion and Cost-Plus-Fixed- Fee (CPFF) Performance Based are used interchangeably.

PRODUCT SERVICE CODE:

The basic contract of this Single-Award Indefinite Delivery/Indefinite Quantity, Cost-Plus-Fixed-Fee, Firm- Fixed- Price and Cost Reimbursable vehicle will have an associated Product Service Code (PSC) of AC15, Defense Aircraft – Operational Systems Development.

NOT SEPARATELY PRICED CLINS:

Not Separately Price (NSP) Appropriation Type CLINs and a NSP Data CLIN will be on the Basic IDIQ Contract, whereas, at the Task Order Level, CLINs will be separately priced along with NSP Data CLINs. At the IDIQ level, CLINs 0001, 0006, 0011, 0016, 0021, and 0026 will contain the overall ceiling for CLINs 0002-0005, 0007-0010, 0012-0015, 0017-0020, 0022-0025, and 0027-0030 respectively.

COLLABORATION LANGUAGE:

The Government expects a significant amount of interplay between three large acquisitions (Irregular Airborne Platform Engineering (IAPE), Advanced Sensor System Development and Execution (ASSDE) and Advanced Software, Computer, and Network Development and Integration (ASCNDI)) being procured by Naval Air Warfare Center Aircraft Division (NAWCAD) Webster Outlying Field (WOLF), Airborne Systems Integration (ASI) Division. The demands of the projects and the inherent nature of rapid technological development necessitates cooperative contractor interaction to achieve the successful completion of each individual effort and an overall unified outcome. Therefore, while these efforts represent three distinct contracts, offerors are advised that all awarded contractors and their subcontractors will be expected to collaborate and work with the contractors and subcontractors for the other efforts.

Furthermore, it is anticipated that the ASI Division will have additional acquisitions other than the three large acquisitions identified above. All awarded contractors and their subcontractors supporting any of the ASI Division procurements are expected to collaborate and work with the contractors and subcontractors for the other ASI Division procurements.

AMENDMENT 0001

Changes made to Solicitation N00421-19-R-0003 and responses to questions from industry via Amendment 0001 are outlined below. The proposal due date and time has not changed; all submissions shall be in accordance with Block 9 of the Solicitation cover page.

1. Question 1): Is the IAPE solicitation a small business set aside or full and open?

Answer 1): Please refer to the FBO synopsis for the IAPE solicitation which states, “This procurement will be a full and open competition.”

2. Question 2): Can you please make an Interested Vendors tab available for subcontractors who cannot be the Prime on this effort?

Answer 2): An Interested Vendors tab is available for interested vendors to provide their business information. Please provide the following information in order to be added to the Interested Vendors tab:

1. Company Name

2. Company Address

3. Phone Number

4. Point of Contact

5. Email

Additional Changes made by the Government

1. Section M, Part C, Section 3.0, Table 4 PERFORMANCE CONFIDENCE ASSESSMENT RATINGS has been modified to correct the descriptions for Satisfactory Confidence and Neutral Confidence.

AMENDMENT 0002

Changes made to Solicitation N00421-19-R-0003 and responses to questions from industry via Amendment 0002 are outlined below. The proposal due date and time has not changed; all submissions shall be in accordance with

Question 1: Considering the extensive and detailed requirements contained in the 55-page total for the SOW/PWS Approach and Sample Tasks, will the Government consider an extension to the due date for Offerors’ responses?

Answer 1: The proposal due date remains unchanged.

Question 2: Section C paragraph 3.3.2 includes many requirements for management of material/inventory.

This RFP discusses the management of material/inventory. Will the Government confirm that there will be SCA category positions such as Warehouse Specialist or Shipping/Receiving Clerk to handle associated responsibilities?

Answer 2: The responsibilities associated with management of material/inventory fall under the existing labor categories of Logistician, Journeyman, 13-1081 and Logistician, Junior, 13-1081, included in Section C, paragraph 3.4.7. No additional labor categories will be added to the RFP to support material/inventory functions.

Question 3: The CPFF Labor Hours tables in Section L 3.6.3.1.1-3.6.3.2.2 on pages 151-160 compute to approximately 60% hours performed at Government sites and 40% hours performed at Contractor sites, which conflicts with the percentages reported in Section C paragraph 3.1.2.1. We request the Government clarify which of the aforementioned section’s work hours percentages are correct.

Answer 3: The CPFF Labor Hours tables in Section L paragraphs 3.6.3.1.1, 3.6.3.1.2, 3.6.3.2.1, and

3.6.3.2.2 are correct in allotting 60% of the labor hours under Government sites and 40% under Contractor sites. Section C, paragraph 3.1.2.1 of the RFP is corrected to reflect that approximately 60% of the work will be performed at Government sites and 40% of the work will be performed at the Contractor sites.

Question 4: The Statement of Work/Performance Work Statement includes a significant amount of work requiring specialized aircraft systems knowledge. Would the Government consider adding aviation technical disciplines such as Airborne Radar Systems, Airborne Data Link Systems and other related categories?

Answer 4: Section C, paragraph 3.4.7 includes several labor categories which cover various aviation disciplines. The Aerospace Engineer (Flight Test Engineer), Senior, 17-2011; Aerospace Engineer, Journeyman, 17-2011; First Line Supervisor of Air Crew Members, Senior, 55-2011; Air Crew Officer (Aircraft Quality Assurance), Journeyman, 55-1011; Engineer, Journeyman, 17-2199; and the Engineer (Systems Engineer), Journeyman and Junior, 17-2199 positions require broad knowledge across many aviation disciplines. No additional labor categories will be added to the RFP to support specialized aircraft systems knowledge.

Question 5: Request that the Government add missing paragraph 3.6.1.1 to Section L on page 150 of the solicitation.

Answer 5: Section L, paragraph 3.6.1.1 was not missing, rather Section L, paragraph 3.6.1.2 was incorrectly numbered. What was previously Section L, Paragraph 3.6.1.2 is now Section L, Paragraph

3.6.1.1. As a result, there is no longer a Section L, paragraph 3.6.1.2.

Question 6: The total sum of the 5 years of hours in the table in solicitation Section L paragraph 3.6.3.1.1 are not equal to the amount in the right hand column of the “total” row on page 168. Would the Government please re-confirm the total numbers in this table?

Answer 6: Section L, Paragraph 3.6.3.1.1 has been revised to reflect the correct hours in the “Total” row.

The Government site hours for Aerospace Engineering and Operations Technologists and Technicians (Systems and Mission Dependent), Journeyman, 17-3021 were revised from 3,840 hours per year to 3,456 hours per year changing the labor category total Government site hours from 19,200 to 17,280. The Government site hours for Electro-Mechanical and Mechatronics Technologists and Technicians, Journeyman, 17-3024 was revised from 3,840 hours per year to 3,571 hours per year changing the labor category total Government site hours from 19,200 to 17,855. The Government site total labor hours per year in the “Total” row of the chart in Section L, Paragraph 3.6.3.1.1 has been revised from 53,756 hours per year to 53,103 per year which then revises the total labor category hours for all years (Years 1-5) from 266,168 to 265,515.

Question 7: The table in paragraph 3.6.3.1.2 in Section L has columns for years 1 - 5 showing 34,749 hours each, which would result in a 5-year POP of 173,745 hours. This is a different total than the number provided in the right hand column. Request that the Government confirm the accuracy of the hours in the POP years or correct the total sum.

Answer 7: Section L, Paragraph 3.6.3.1.2 has been revised to reflect the correct hours in the “Total” row.

The Contractor site hours for Aerospace Engineering and Operations Technologists and Technicians (Systems and Mission Dependent), Journeyman, 17-3021 was revised from 1,920 hours per year to 2,304 hours per year changing the labor category total Contractor site hours from 9,600 to 11,520. The Contractor site hours for Electro-Mechanical and Mechatronics Technologists and Technicians, Journeyman, 17-3024 was revised from 2,112 hours per year to 2,381 hours per year changing the labor category total Government site hours from 11,636 to 11,905. The Contractor site total labor hours per year in the “Total” row of the chart in Section L, paragraph 3.6.3.1.2 has been revised from 34,749 hours per year to 35,402 per year which then revises the total labor category hours for all years (Years 1-5) from 176,357 to 177,010.

Question 8: Paragraph 3.2 in RFP Section M appears to be missing. Would the Government please add the missing paragraph to the solicitation?

Answer 8: Section M, Paragraph 3.2 has been added as, “Reserved.”

Question 9: Would the Government please confirm that the Sample Demonstration Report required per Section L paragraph 1.1.2.2.1.7 does not count against the Sample Tasks’ 30-page limit?

Answer 9: The sample demonstration report required per Section L, Paragraph 1.1.2.2.1.7 is part of and expected to be within the Sample Task page limit. As of Amendment 0002 the Sample Task page limit as stated in Section L, Part A, Paragraph 3.3 is 40 pages Total for both Sample Tasks (Combined).

Question 10: On pages 153, 155-156, 158, and 159, the solicitation references the Operations Research Analyst (Systems Specialist), Senior category as a Key labor category submittal, but it is not referenced anywhere else in solicitation. Is the Operations Research Analyst (Systems Specialist), Senior category a Key labor category that requires a resume?

Answer 10: The labor category of Operations Research Analyst (Systems Specialist), Senior is not a Key labor category. Tables in Section L paragraphs 3.6.3.1.1, 3.6.3.1.2, 3.6.3.2.1 and 3.6.3.2.2 have been updated to accurately reflect the Operations Research Analyst (Systems Specialist), Senior position as non- Key by removing the “(Key)” descriptor that was previously included.

Question 11: In the draft solicitation, the government referred to a 15 page Understanding of the Work - Statement of Work/Performance Work Statement Approach and two undefined sample tasks. With the final release of the RFP, the Understanding of the Work requirement increased by 10 pages and the sample tasks have a significant complexity. Would the USG consider an extension of at least 1 week so that industry can provide adequate proposals responses for Government evaluation and better competition?

Answer 11: The proposal due date remains unchanged.

Question 12: The USG refers to a Government/Contractor in 3.1.2.1 Work Location (page 24) site mix of “Approximately 40% of work will be performed at Government sites and 60% of work to be performed at Contractor site.” However in tables within 3.6.3 CPFF Labor Hours (starting page 151), the hours show an inverse of 60% Government (345,083 hrs) and 40% Contractor (228,962 hrs). Which section is correct?

Answer 12: The CPFF Labor Hours tables in Section L paragraphs 3.6.3.1.1, 3.6.3.1.2, 3.6.3.2.1 and

3.6.3.2.2 are correct in allotting 60% of the labor hours under Government sites and 40% under Contractor sites. Section C, paragraph 3.1.2.1 of the RFP is corrected to reflect that approximately 60% of the work will be performed at Government sites and 40% of the work will be performed at the Contractor sites.

Question 13: Section M, 2.0 Past Performance, page 167 does not provide a definition of magnitude for evaluation criteria. Can the Government provide either cost or hour definition for magnitude?

Answer 13: The Government is not providing an additional cost or hour definition for magnitude. The second paragraph in Section M, 2.0 Past Performance states, “When evaluating relevancy, which includes the similarity of scope, complexity, and magnitude of the past performance to the current solicitation…”

Question 14: Please provide the appropriate wage determinations as referenced in the RFP.

Answer 14: Wage determinations are intentionally not included as an attachment to the RFP. The McNamara-O’Hara Service Contract Act (SCA) is not applicable to this contract in accordance with 29 C.F.R. Part 541. SCA labor categories are provided in Section C, paragraph 3.4.8 solely for the purpose of offerors locating the functional description for the labor categories.

Question 15: The SCA section 3.4.8 (pg. 65) is contradicting and confusing. The first statement says “The following lists the SCA labor categories for this effort” but then the first sentence under the chart states “The…SCA is not applicable to this contract. The labor categories/codes in the table above have been listed in order to locate the functional description for the labor categories described by the DOL’s SCA Directory of Occupations.”

Answer 15: The Government has updated Section C, Paragraph 3.4.8 in the RFP to state “This is not a SCA designated contract. The table below lists the SCA labor categories required for this effort and has been provided solely to locate the functional job descriptions for the labor categories as described by the Department of Labor’s SCA Directory of Occupations. The McNamara-O’Hara Service Contract Act (SCA) is not applicable to this contract in accordance with 29 C.F.R. Part 541 and wage determinations are not included as an attachment.”

Question 16: FedBizOpps will no longer be functional in the near future. Will this affect the way we see the RFP posting?

Answer 16: FedBizOpps.gov (FBO) is moving to beta.SAM.gov beginning 08 November 2019.

Contractors are required to have a beta.SAM.gov account in order to see RFP activity as of the transition date. Please refer to the Contractor Quick Start Guide posted on FBO’s website Home Page for directions on how to navigate your account to beta.SAM.gov.

Question 17: Section L, Paragraph 2.1.4 states “The primary source of past performance information will be PPIRS. If a Contractor Performance Assessment Report (CPAR) exists for multiple years for the same contract/order, all periods of performance for that contract/order will be used for evaluation. In the event a CPAR does not exist for a past performance reference, the Offeror shall submit a Contractor Performance Assessment Questionnaire (CPAQ), Attachment P2, to the Program Manager who is the Assessing Official.

The Offeror shall include instructions for the Program Manager to send completed questionnaires within two weeks of its receipt via e-mail to Coryn Hansell, Contract Specialist, at coryn.hansell@navy.mil AND Carolyn Emmart, Contracting Officer at carolyn.emmart@navy.mil thereby allowing the customer approximately two weeks to complete their response. All CPAQs shall be submitted as part of the Offeror’s Volume 2.

Can you please clarify if the completed CPAQs should be submitted with our Volume 2 and also submitted directly to you and Ms. Emmart?

Answer 17: Completed CPAQs do not need to be included in Volume 2. All completed CPAQs should be submitted by the Program Manager via email directly to Ms. Coryn Hansell and Ms. Carolyn Emmart. The last sentence in Section L, Paragraph 2.1.4 of the RFP has been revised to state “All CPAQs should be received by Coryn Hansell and Carolyn Emmart by the solicitation due date.”

Question 18: Are subcontractors required to complete Section K, 5252.209-9511 Organizational Conflicts of Interest Representation (Services)?

Answer 18: Yes, both the Prime Contractor and all of the proposed Subcontractors are required to complete Section K, 5252.209-9511 Organization Conflicts of Interest Representation (Services) and include the assertion in their proposal submission.

In addition to addressing the questions received from Industry, it was determined that the following revisions were necessary to the solicitation.

Additional Changes made by the Government:

1. An Interested Vendors tab will be available for interested vendors to provide their business information. The Interested Vendor tab will be updated when required via Amendments because the Interested Vendors tab is not available for selection in the Governmentwide Point of Entry (GPE) (e.g. FBO, beta.SAM.gov) website. Please provide the following information to Coryn Hansell and Carolyn Emmart in order to be added to the Interested Vendors tab:

Company Name Company Address Phone Number Point of Contact Email

2. Table under Section L, paragraph 3.3 has been updated to reflect an increase in the page limitation total (now 40 pages) for both Sample Tasks combined.

3. Clause 52.204-7 has been moved from Section I to Section L.

4. Clause 52.204-24 has been moved from Section I to Section K.

5. Clauses 52.216-20 has been deleted from the RFP.

6. Clauses 52.245-1, 252.203-7004 and 252.245-7003 appeared in Section I of the RFP twice. The duplicative clauses have been removed from Section I.

7. Clauses 52.247-11 and 252.211-7007 have been added by reference to Section I of the RFP.

8. Provisions 52.223-22 and 52.225-25 were deleted from Section K because they are included within provision 52.204-8 and therefore not required to be listed separately.

9. The second paragraph in Section L, paragraph 1.1.2.1, Sample Task 1 has been revised from, “…Successful installation is predicated upon a thorough understanding of the Federal Aviation Administration (FAA) type certification process, NAVAIR Flight Clearance process, aircraft modification requirements, modernization requirements, operational constraints, and flight testing requirements.” to “…Successful installation is predicated upon a comprehensive understanding of the Federal Aviation Administration (FAA) type certification process, NAVAIR Flight Clearance process, aircraft modification requirements, modernization requirements, operational constraints, and flight testing requirements.”

10. The second paragraph in Section L, paragraph 1.1.2.2, Sample Task 2 has been revised from, “…Successful completion of this effort is predicated upon a thorough understanding of range operations requirements, NAVAIR

Flight Clearance process, ability to interface with non-traditional companies in support of the ASI Division, clear and articulate report documentation skills, and risk management.” To “…Successful completion of this effort is predicated upon a comprehensive understanding of range operations requirements, NAVAIR Flight Clearance process, ability to interface with non-traditional companies in support of the ASI Division, clear and articulate report documentation skills, and risk management.

AMENDMENT 0003

Changes made to Solicitation N00421-19-R-0003 and responses to questions from industry via Amendment 0003 are outlined below. The proposal due date has changed; all submissions shall be in accordance with Block 9 of the Solicitation cover page.

It was determined that the following revisions were necessary therefore generating an amendment to the IAPE solicitation:

Q1: We respectfully request a deadline extension from the current November 12th to November 26th, a ten

(10) business day extension.

A1: The proposal submission deadline has been extended from Novermber 12th at 12:00pm to November 25th at 12:00pm.

AMENDMENT 0004

Changes made to Solicitation N00421-19-R-0003 and responses to questions from Industry via Amendment 0004 are outlined below. The proposal due date and time has not changed; all submissions shall be in accordance with Block 9 of the Solicitation cover page.

Question 1: The table in Section L, under 3.0 Proposal Content and Volumes, indicates that 1 original, 1 paper, and 1 electronic copy is required for Annex 2, Past Performance Supporting Documents. 2.1.3 of Section L states “The Offeror shall provide one electronic copy of the Statement of Work (SOW)/Performance Work Statement (PWS) in Annex 2 for each contract reference”. Please clarify if a paper copy of each SOW is required as part of the Annex 2 submission, or if SOWs are to be submitted in electronic form only.

Answer 1: Section L, paragraph 2.1.3 has been revised to say, “The Offeror shall provide a copy of the Statement of Work (SOW)/Performance Work Statement (PWS) in Annex 2 for each contract reference…” The Government requests that offerors please refer to the “Copies Required” column within the chart in Section L, paragraph 3.3 for further instructions on the submission of Past Performance Supporting Documents.

AMENDMENT 0005

Changes made to Solicitation N00421-19-R-0003 and responses to questions from industry via Amendment 0005 are outlined below. The proposal due date and time has not changed; all submissions shall be in accordance with

Question 1: In RFP Amendment 0004, Section 3.3.7.g, (i); Pages 152/153 of 175 it states: “If it is the contractor’s/subcontractor’s policy to invoice Foreign-Area Allowances as a Labor cost, the contractor/subcontractor shall utilize the worksheet titled CPFF Foreign-area within the Attachment P6/P7 and use the CPFF Foreign-area Summary worksheet to identify the total proposed costs for CLIN 0011 in

Section B.” However, there are no tabs in the P6/P7 Cost spreadsheets called “CPFF Foreign-area.” Can you please clarify the discrepancy?

Answer 1: Section L, paragraph 3.3.7, subparagraph g) (i) has been revised from:

If it is the contractor’s/subcontractor’s policy to invoice Foreign-Area Allowances as a Labor cost, the contractor/subcontractor shall utilize the worksheet titled CPFF Foreign-area within the Attachment P6/P7 and use the CPFF Foreign-area Summary worksheet to identify the total proposed costs for CLIN 0011 in Section B. The Cost CLIN, CLIN 0016, for Foreign-Area Allowances shall be zero ($0.00).

To:

If it is the contractor’s/subcontractor’s policy to invoice Foreign-Area Allowances as a Labor cost, the contractor/subcontractor shall utilize the worksheets titled CPFF Allowances (Years 1-5) within the Attachment P6/P7 and use the CPFF Allowances Summary worksheet to identify the total proposed costs for CLIN 0011 in Section B. The Cost CLIN, CLIN 0016, for Foreign-Area Allowances shall be zero ($0.00).

Additionally, Section L, paragraph 3.3.1 has been revised from:

Offerors shall submit their fully completed price/cost proposal utilizing the Cost Summary Spreadsheet (Attachments P6 and P7 for the Prime and Subcontractor respectively). Attachments P6 and P7 shall be provided separately in MS Office 2016 Excel format on CD-ROM media. Offerors shall ensure the digital copy of Attachment P6 and P7 submitted is unprotected and unlocked, with formulae intact to show mathematical operations. The spreadsheet shall also be formatted on letter size (8.5 X 11) paper, printed, and included in the Offeror’s cost narrative Volume 3 Price/Cost proposal submittal. The Offeror shall use the CPFF Labor Term Summary worksheet, CPFF Labor Completion Summary worksheet, FFP Operational Flight Hours worksheet, CPFF Foreign-Area summary worksheet, and ODC worksheet to breakout total proposed costs by CLINs.

To:

Offerors shall submit their fully completed price/cost proposal utilizing the Cost Summary Spreadsheet (Attachments P6 and P7 for the Prime and Subcontractor respectively). Attachments P6 and P7 shall be provided separately in MS Office 2016 Excel format on CD-ROM media. Offerors shall ensure the digital copy of Attachment P6 and P7 submitted is unprotected and unlocked, with formulae intact to show mathematical operations. The spreadsheet shall also be formatted on letter size (8.5 X 11) paper, printed, and included in the Offeror’s cost narrative Volume 3 Price/Cost proposal submittal. The Offeror shall use the CPFF Labor Term Summary worksheet, CPFF Labor Completion Summary worksheet, FFP Operational Flight Hours worksheet, CPFF Allowances Summary worksheet, and ODC worksheet to breakout total proposed costs by CLINs.

Question 2: We have Subcontractors included on our team. In order to comply with Section L, Section 3.0, Paragraph 3.2.3 and subsequent Paragraphs in 3.3, we respectfully request clarification on how Subcontractors shall submit this responsive information.

Answer 2: The Government requests that offerors submit proposals in accordance with the chart in Section L, paragraph 3.3. Subcontractor Price/Cost proposals shall be submitted per the Copies Required information listed in Volume 3 of the chart in Section L, paragraph 3.3. Physical copies of subcontractor Price/Cost proposals shall be submitted in sealed envelopes with the Prime Price/Cost proposals, or subcontractors can provide the requested copies of their Price/Cost proposals directly to the Government at the proposal receipt location. Please be advised that the Prime offeror will ultimately be responsible for the subcontractor’s submission of Price/Cost data.

AMENDMENT 0006

The Government has made the following changes to the RFP:

1. Attachment 04 - OCI List, specifically the supplier/contractor title "Cherokee Nation Technologies" and address "777 West Cherokee St., Catoosa, OK 74015" have been changed to "Cherokee Nation Strategic Programs" and "10838 E. Marshall St. Ste 200 E, Tulsa, OK 74116.”

AMENDMENT 0007

Changes made to Solicitation N00421-19-R-0003 and responses to questions from industry via Amendment 0007 are outlined below. The proposal due date and time has not changed; all submissions shall be in accordance with Block 9 of the Solicitation cover page.

Question 1: We respectfully request an extension to the current RFP submittal deadline of 11/25 @ 12:00 EST for the Navy Irregular Air Platform Solicitation.

Answer 1: The Government will not be extending the dealine for proposal submission. The proposal due date remains unchanged.

Section B - Supplies or Services and Prices

B-1 I. Hourly Burdened Composite Labor Rates (excluding fee) and Streamlined Ordering Procedures for Cost Plus Fixed Fee (CPFF) (Labor Term) CLINs and/or Orders

(a) Hourly Burdened Composite Labor Rates (provided within the tables in paragraphs (c) and (d) below) applicable to CLINs 0001-0005 only:

(1) The rates below are the Hourly Burdened Composite Labor Rates for each labor category, exclusive of prime fee on both prime and subcontractor labor.

i. Hourly Burdened Composite Labor Rates shall include direct labor rates plus all applicable burdens, to include indirect rates, applicable escalation, subcontractor fee on subcontractor labor, and subcontractor pass-through costs (exclusive of prime fee on subcontractor's labor).

ii. Hourly Burdened Composite Labor Rates shall not include prime fee on prime labor, prime fee on subcontractor labor, Foreign-Area Allowances, Other Direct Costs (ODCs) such as Travel and Material, and Cost of Money costs (if proposed).

iii. The Hourly Burdened Composite Labor Rate would be the sum of both the prime and all subcontractor labor costs, as described above, for that labor category divided by the total number of labor hours for that labor category.

(2) The Hourly Burdened Composite Labor Rates in paragraphs (c) and (d) are estimates, and invoicing will be based on actual costs incurred.

(b) Task Orders (TOs) that include CPFF Labor Term CLINs will be issued under this contract using the following streamlined ordering procedures:

(1) For each proposed order that includes CPFF Labor Term CLINs, the contracting officer will provide the contractor a TO and an Independent Government Cost Estimate (IGCE). The IGCE is an estimate of labor hours by labor category utilizing the Hourly Burdened Composite Labor Rates provided in paragraphs (c) and (d) below, to calculate the total estimated cost for the proposed CLINs and/or TO.

i. The TO fixed fee is calculated using Section G Clause 5252.232-9510 PAYMENT OF

FIXED FEE (NAVAIR).

ii. Ceiling for ODCs will be priced in accordance with the Government estimate.

iii. TOs crossing multiple years will be estimated by the Government using the Hourly

Burdened Composite Labor Rates for each year in proportion to the Period of Performance (PoP) of the TO.

(2) Within three (3) working days of receipt of the TO and IGCE, the contractor shall respond:

i. If the contractor agrees that it can perform the TO within the parameters of the IGCE, they will sign and return the DD 1155 to the contracting officer. If the requirement remains valid, a priced order will be issued to the contractor.

ii. If the contractor does not agree with the TO and/or IGCE, the contractor shall acknowledge its disagreement within three (3) working days. Additionally, a proposal shall be submitted to the contracting officer within five (5) working days of receipt of the TO and IGCE, addressing only the specific areas of difference in labor categories and/or hours in the IGCE. Once the differences are resolved between the contracting officer and the contractor, and the requirement remains valid, a priced order will be issued to the contractor.

(c) Hourly Burdened Composite Labor Rates for Government Site

LABOR TERM (Government Site Hours) Hourly Burdened Composite Labor Rates (Regardless of Clearance or if Key)

Contract Labor Category Year I Year II Year III Year IV Year V Government Site Hours 03/03/2020-

03/01/2021* 03/03/2021- 03/01/2022*

03/03/2022- 03/01/2023*

03/03/2023- 03/01/2024*

03/03/2024- 03/01/2025*

General and Operations Manager (Program Manager), Senior, 11-1021

General and Operations Manager

11-1021, (Overtime)

Project Management Specialist, Senior, 13-1082

Junior, 13-1082

Financial Specialist, Journeyman, 13-2099

Engineer (Systems Engineer), Senior, 17-2199

Senior, 17-2199, (Overtime)

Journeyman, 17-2199

Journeyman, 17-2199, (Overtime)

Junior,17-2199

Junior, 17-2199, (Overtime)

Engineering Technician III, 17-3029, SCA 30083

17-3029, SCA 30083, (Overtime)

Engineering Technician I, 17-3029, SCA 30081

17-3029, SCA 30081, (Overtime)

Aerospace Engineer (Flight Test Engineer), Senior, 17-2011

Engineer), Senior, 17-2011, (Overtime)

Aerospace Engineer, Journeyman, 17-2011

17-2011, (Overtime)

Logistician, Journeyman, 13-1081

Logistician, Junior, 13-1081 Air Crew Officer (Aircraft Quality Assurance), Journeyman, 55-1011, 55-1011, (Overtime)

Business Operations Specialist (Operations Security Analyst), Journeyman, 13-1199

First Line Supervisor of Aircrew Members, Senior, 55-2011

Occupational Health and Safety Specialist, Journeyman, 19-5011

Engineering Technician V, 17-3029, SCA 30085

17-3029, SCA 30085, (Overtime)

Aerospace Engineering and Operations Technologists and Technicians (System and Mission Dependent), Journeyman, 17-

Information Security Analyst, Journeyman, 15-1212

Operations Research Analyst (Systems Specialist), Senior, 15-2031

Electrical and Electronics Repairers, Commercial and Industrial Equipment, Journeyman, 49-2094

Journeyman, 49-2094, (Overtime)

Technical Writer (Librarian), Journeyman, 27-3042

Technical Writer II, 27-3042, SCA 30462

Technical Writer I, 27-3042, SCA 30461

Avionics Technician, Journeyman, 49-2091

Journeyman, 49-2091, (Overtime)

Avionics Technician, Junior, 49-

2091, (Overtime)

Management Analyst (Configuration Management Analyst), Journeyman, 13-1111

(Configuration Management Analyst), Journeyman, 13-1111, Commercial Pilot, Senior, 53-

Air Crew Member, Journeyman, 55-3011

Air Crew Member, Junior, 55-

3011, (Overtime)

Engineer, Journeyman, 17-2199 Electronics Technician Maintenance II, 17-3023, SCA 23182

Drafter/CAD Operator II, 17-3012, SCA 30062

Drafter/CAD Operator I, 17-3012, SCA 30061

Captains, Mates, and Pilots of Water Vessels, Journeyman, 53-5021

Electro-Mechanical and Mechatronics Technologists and Technicians, Journeyman, 17-

*Dates to be adjusted at contract award.

(d) Hourly Burdened Composite Labor Rates for Contractor Site

LABOR TERM (Contractor Site Hours) Hourly Burdened Composite Labor Rates (Regardless of Clearance or if Key)

Contract Labor Category Year I Year II Year III Year IV Year V Contractor Site Hours 03/03/2020-

03/01/2021* 03/03/2021- 03/01/2022*

03/03/2022- 03/01/2023*

03/03/2023- 03/01/2024*

03/03/2024- 03/01/2025*

General and Operations Manager

11-1021

General and Operations Manager

11-1021, (Overtime)

Senior, 13-1082

Junior, 13-1082

Financial Specialist, Journeyman, 13-2099

Senior, 17-2199

Senior, 17-2199, (Overtime)

Journeyman, 17-2199

Journeyman, 17-2199, (Overtime)

Junior,17-2199

Junior, 17-2199, (Overtime)

17-3029, SCA 30083

17-3029, SCA 30083, (Overtime)

17-3029, SCA 30081

17-3029, SCA 30081, (Overtime)

Engineer), Senior, 17-2011

Engineer), Senior, 17-2011, 17-2011

17-2011, (Overtime)

Logistician, Journeyman, 13-1081 Logistician, Junior, 13-1081 Air Crew Officer (Aircraft

55-1011

55-1011, (Overtime)

Business Operations Specialist (Operations Security Analyst), Journeyman, 13-1199

First Line Supervisor of Aircrew Members, Senior, 55-2011

Occupational Health and Safety Specialist, Journeyman, 19-5011

17-3029, SCA 30085

17-3029, SCA 30085, (Overtime)

Aerospace Engineering and Operations Technologists and Technicians (System and Mission Dependent), Journeyman, 17-

Information Security Analyst, Journeyman, 15-1212

Operations Research Analyst (Systems Specialist), Senior, 15-2031

Repairers, Commercial and

Journeyman, 49-2094

Journeyman, 49-2094, (Overtime)

Technical Writer (Librarian), Journeyman, 27-3042

Technical Writer II, 27-3042, SCA 30462

Technical Writer I, 27-3042, SCA 30461

Journeyman, 49-2091

Journeyman, 49-2091, (Overtime)

2091, (Overtime)

Analyst), Journeyman, 13-1111

Analyst), Journeyman, 13-1111, Commercial Pilot, Senior, 53-

Air Crew Member, Journeyman, 55-3011

3011, (Overtime)

Engineer, Journeyman, 17-2199 Electronics Technician Maintenance II, 17-3023, SCA 23182

Drafter/CAD Operator II, 17-3012, SCA 30062

Drafter/CAD Operator I, 17-3012, SCA 30061

Captains, Mates, and Pilots of Water Vessels, Journeyman, 53-5021

Electro-Mechanical and Mechatronics Technologists and Technicians, Journeyman, 17-

*Dates to be adjusted at contract award.

II. Ordering Procedures for Completion CLINs (CPFF) and Firm Fixed Price Operational Flight CLINs

(a) Task Orders shall be issued in accordance with Section H 5252.216-9534 Ordering

Procedures.

B-2 FEE:

CPFF Labor Term - Fixed fee will be calculated based on fee per hour and in accordance with 5252.232-9510 Payment of Fixed Fee (NAVAIR)(OCT 2005). The fee per hour is the total fee proposed for all periods divided by the total number of hours for all periods (442,525). The CPFF Labor Term fee per hour is $_[To be determined at contract award]_.

CPFF Labor Completion - Fixed fee will be a percentage calculated based on the total fee proposed for all periods divided by the total proposed cost for all periods, and in accordance with 5252.232-9510 Payment of Fixed Fee (NAVAIR)(OCT 2005). The CPFF Labor Completion fee percentage is _[To be determined at contract award]_.%.

B-3 MAN-HOURS:

CPFF Labor Term (CLIN 0001) The Government estimate is 442,525 man-hours, inclusive of Overtime, for the entire work effort of CPFF Term tasking. A work year is defined as 1,920 hours exclusive of holidays and leave.

CPFF Labor Completion (CLIN 0006) The Government estimate is 131,520 man-hours for the entire work effort of CPFF Completion tasking. A work year is defined as 1,920 hours exclusive of holidays and leave.

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 1 Lot Labor - Term - In Support of the SOW/PWS

CPFF

Services in accordance with Section C, Statement of Work (SOW)/Performance Work Statement (PWS) paragraphs 3.3.1, 3.3.4, 3.3.5, and 3.3.6 FOB: Destination

ESTIMATED COST

FIXED FEE

TOTAL EST COST + FEE

Labor - Term - RDT&E

CPFF

Not Separately Priced (NSP) from CLIN 0001

Labor - Term - O&M

CPFF

Labor - Term - Procurement

CPFF

Labor - Term - NWCF

CPFF

0006 Lot Labor -Completion- In Support of SOW/PWS

CPFF

Services in accordance with Section C, Statement of Work (SOW)/Performance Work Statement (PWS) paragraphs 3.3.2, 3.3.3, and 3.3.7

Labor - Completion - RDT&E

CPFF

Not Separately Priced (NSP) from CLIN 0006

Labor - Completion - O&M

CPFF

Labor - Completion - Procurement

CPFF

Labor - Completion - NWCF

CPFF

0011 1 Lot Foreign-Area Allowances

CPFF

Foreign-Area Allowances in accordance with Section C, Statement of Work (SOW)/Performance Work Statement (PWS) paragraph 3.1.4.1.5 to support services in accordance with Section C, SOW/PWS paragraphs 3.3.1, 3.3.2, 3.3.3, 3.3.4, 3.3.5, 3.3.6, and 3.3.7

Foreign-Area Allowances - RDT&E

CPFF

Not Separately Priced (NSP) from CLIN 0011

Foreign-Area Allowances - O&M

CPFF

Foreign-Area Allowances - Procurement

CPFF

Foreign-Area Allowances - NWCF

CPFF

0016 1 Lot Foreign-Area Allowances

COST

Foreign-Area Allowances in accordance with Section C, Statement of Work (SOW)/Performance Work Statement (PWS) paragraph 3.1.4.1.5 to support services in accordance with Section C, SOW/PWS paragraphs 3.3.1, 3.3.2, 3.3.3, 3.3.4, 3.3.5, 3.3.6, and 3.3.7

Foreign-Area Allowances - RDT&E

COST

Not Separately Priced (NSP) from CLIN 0016

Foreign-Area Allowances - O&M

COST

Foreign-Area Allowances - Procurement

COST

Foreign-Area Allowances - NWCF

COST

0021 1 Lot Operational Flight Hours

FFP

Services in accordance with Section C, Statement of Work (SOW)/Performance Work Statement (PWS) paragraph 3.3.6, paragraph 3.1.5 Other Direct Costs (ODCs), 5252.232-9509 Travel Approval and Reimbursement Procedures, and 5252.242-9515 (Variation), H-1 Restriction on the Direct Charging of Material.

NET AMT

Operational Flight Hours - RDT&E

FFP

Not Separately Priced (NSP) from CLIN 0021

Operational Flight Hours - O&M

FFP

Operational Flight Hours - Procurement

FFP

Operational Flight Hours - NWCF

FFP

0026 1 Lot ODC - Travel/Material supporting SOW/PWS

COST

Other Direct Cost (ODC) in support of CLINs 0001 and 0006 in accordance with Section C, Statement of Work (SOW)/Performance Work Statement (PWS) paragraph 3.1.5 Other Direct Costs (ODCs) and 5252.232-9509 Travel Approval and Reimbursement Procedures, and 5252.242-9515 (Variation), H-1 Restriction of the Direct Charging of Material

ODC - Travel/Material - RDT&E

COST

Other Direct Cost (ODC). Not Separately Priced (NSP) from CLIN 0026

ODC - Travel/Material - O&M

COST

ODC - Travel/Material - Procurement

COST

ODC - Travel/Material - NWCF

COST

0031 1 Lot NSP Technical Data

COST

In support of Labor (Term and Completion), Operational Flight Hours, and ODC CLINs. Not Separately Priced (NSP) Technical Data In Accordance With (IAW) Section C, Statement of Work (SOW)/Performance Work Statement (PWS)

CLAUSES INCORPORATED BY FULL TEXT

5252.211-9503 LEVEL OF EFFORT (COST REIMBURSEMENT)(NAVAIR)(VARIATION)(SEP 2019)

(a) The level of effort estimated to be ordered during the term of this contract is 442,525 man-hours of direct labor including authorized subcontract labor, if any. The contractor shall not, under any circumstances, exceed one hundred (100%) percent of the total level of effort specified in the contract/order. The total man-hours of direct labor is as follows:

CLIN TOTAL

0001 442,525

Totals

(b) The estimated level of effort for each individual order will be established at the task order level.

(c) FAR Clause 52.232-20, "Limitation of Cost" applies to fully funded orders and FAR Clause 52.232-22, "Limitation of Funds" applies to incrementally funded orders. Nothing in this clause amends the rights or responsibilities of the parties hereto under either of those two clauses. In addition, the notifications required by this clause are separate and distinct from any specified in either FAR Clause 52.232-20 or FAR Clause 52.232-22.

(d) In the event that less than one hundred (100%) percent of the established level of effort of the contract/order is actually expended by the end of the performance period, the Government shall have the option of:

(1) Requiring the Contractor to continue performance, subject to the provisions of the FAR Clause 52.232-20 or 52.232-22, as applicable, until the effort expended equals 100% of the established Level of Effort specified in paragraph above, at no increase in the fee of the contract/order; or

(2) Effecting a reduction in the fixed fee by the percentage by which the total expended man-hours is less than one hundred (100%) percent of the established Level of Effort.

(e) The contractor agrees that effort performed in fulfillment of level of effort obligations under this contract shall include only verifiable effort in direct support of the work specified. It shall not include efforts such as work performed in transit to or from an employee's usual workplace, work during lunchtime activities, or effort performed at other non-work locations.

(f) In performing the contract/order, the contractor may use any reasonable combination of hours for the labor categories in support of section C of this contract/order.

Section C - Descriptions and Specifications

STATEMENT OF WORK

IRREGULAR AIR PLATFORM ENGINEERING STATEMENT OF WORK/PERFORMANCE WORK

STATEMENT

1.0 SCOPE

The Department of Navy (DoN), Naval Air Warfare Center Aircraft Division (NAWCAD) Webster Outlying Field (WOLF), Airborne Systems Integration (ASI) Division provides the rapid insertion and transition of advanced technologies, systems, sensors, and weapons to enable programs of record, as well as deliver direct insertion of capabilities to meet urgent fleet needs. The ASI Division is responsible for a number of advanced technology development, engineering, implementation, and fielding projects for the Department of Defense (DoD). These responsibilities include project management, research of both basic and applied applications, evaluation of new technologies, development of cutting edge systems, and administrative tasks. This Statement of Work (SOW)/Performance Work Statement (PWS) defines the requirements to support the ASI Division.

Specifically, the ASI Division has a requirement to procure services in support of the integration of airborne capabilities to include, but not limited to, sensors, communications systems, weapons systems, and control technologies for a variety of manned and unmanned airborne platforms. This SOW/PWS will provide the requirements necessary for the Contractor to complete and support these integrations, to include, but not limited to, project management; research; analysis; design; parts and materials procurement; installation and integration; test and evaluation; user and maintainer training; and on-demand operational support of urgent limited objective experiments.

2.0 APPLICABLE DOCUMENTS

2.1 DoD Specifications

2.1.1 DoD 5220.22-M, National Industrial Security Program Operating Manual, (NISPOM) 28 Feb 2006.

2.1.2 SECNAV M-5510.36 Information Security Program, 30 Jun 2006.

2.1.3 DoDM 5200.01 (DoD Information Security Program: Controlled Unclassified Information (CUI)) Vol. 4 (enclosure 3 pages 11-18) 24 Feb 2012.

2.1.4 DoD 5400.7-R, Freedom of Information Program Chapter 3 (pages 31-42) Sep 1998.

2.1.5 DoDD 5230.24 Distribution Statements on Technical Documents, Change 1, Effective 28 Apr 2016.

2.1.6 SECNAV M-5510.30 Personnel Security Program Jun 2006.

2.1.7 OPNAVINST 3440.17A Navy Installation Emergency Management Program, 1 Aug 2014.

2.1.8 SECNAVINST 5239.1 Navy Information Assurance (IA) Program.

2.1.9 SECNAVINST 5239.3B Department of the Navy Information Assurance (IA) Policy.

2.1.10 SECNAVINST 5510.36A DON Information Security Program Instruction.

2.1.11 OPNAVINST 5239.1C Navy Information Assurance (IA) Program.

2.2 DoD Standards

2.2.1 DODM 4161.2-M DOD Manual for the Performance of Contract Property Administration.

2.2.2 DODM 5200.2-R Personnel Security Program.

2.2.3 DODM 5200.01 DoD Information Security Program: Controlled Unclassified Information (CUI).

2.2.4 DODM 5220.22M National Industrial Security Program: Procedures for Government Activities Relating to Foreign Ownership, Control, or Influence (FOCI).

2.2.5 DODM 5400.7-R, Freedom of Information Program.

2.2.6 DODINST 6055.17 DoD Installation Emergency Management (IEM) Program.

2.2.7 DODINST 8510.01 Risk Management Framework for DoD Information Technology (IT).

2.2.8 DODINST 8500.01 Cybersecurity.

2.2.9 DODINST 8500.2 Information Assurance.

2.2.10 DODINST 8520.2 Public Key Infrastructure & Public Key Enabling.

2.2.11 DOD Regulation 5200.1-R Information Security Regulation.

2.2.12 DOD Directives 5230.24 Distribution Statements on Technical Documents.

2.2.13 DOD Directives 8500.1 Information Assurance.

2.2.14 DOD Directives 8140.01 Cyberspace Workforce Management.

2.2.15 DTM 17-001 Cybersecurity in the Defense Acquisition System.

2.2.16 DTM 08-027 Security of Unclassified DoD Information…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .