Attachment_02_-_CSP_QASP.docx

DOCX document 69 KB Posted

Attached to
AIR-4. 11, N00421-19-R-0003 Irregular Air Platform Engineering supporting AD-4. 11. 6
Solicitation number
N00421-19-R-0003
Issued by

About this file

This sources sought notice and draft statement of work describe a potential single award indefinite delivery indefinite quantity contract for irregular air platform engineering services. The Naval Air Warfare Center Aircraft Division seeks to procure program management, research, analysis, design, logistics, installation, testing, training and operational support services for sensor, communication, weapons and control system integration onto manned and unmanned airborne platforms. Key details include:

  • The estimated 5-year period of performance and cost-plus-fixed-fee, firm-fixed-price and cost reimbursable contract types.

  • Performance locations of 70% at NAS Patuxent River, 15% at Webster Field Annex, and 15% at Yuma Proving Grounds.

  • Eligible small business NAICS code 541330 with a $38.5 million size standard.

  • Capability statements are due by July 9, 2018 and shall demonstrate experience in areas such as engineering, program management, logistics and installation support relevant to airborne platform integration.

DRAFT Attachment 02

View the file

Other files

File Type Posted
N00421-19-R-0003 Amendment 0010.pdf PDF
N00421-19-R-0003 Amendment 0009 Conform.pdf PDF
Attachment P3 - P3 Hourly Burdened Rates-Rev 1.xlsx XLSX spreadsheet
Attachment P8 - DoD SAFE Help.pdf PDF
N00421-19-R-0003-0008 Conform.pdf PDF
N00421-19-R-0003 Amendment 0007.pdf PDF
Attachment 04 - OCI List.docx DOCX document
N00421-19-R-0003 Amendment 0006.pdf PDF
N00421-19-R-0003 Amendment 0005 Conform.pdf PDF
N00421-19-R-0003 Amendment 0004.pdf PDF
N00421-19-R-0003_Amendment_0003.pdf PDF
N00421-19-R-0003_Amendment_0002.pdf PDF
N00421-19-R-0003__Amendment_0001.pdf PDF
Attachment_P3_-_P3_Hourly_Burdened_Rates.xlsx XLSX spreadsheet
Attachment_P1_-_P1_Past_Performance_Information_Form.pdf PDF
Attachment_P4_-_P4_Reserved.docx DOCX document
Attachment_P6_-_Cost_Summary.xlsx XLSX spreadsheet
Attachment_11_-_MFR_Implementing_PGI_204.7108(d)(12).pdf PDF
Exhbit_A_-_Contract_Data_Requirements_List.xlsx XLSX spreadsheet
Attachment_05_-_Authorized_Subcontractors.docx DOCX document
Attachment_04_-_OCI_List.docx DOCX document
Attachment_09_-_COMR_CDRL_Template.xlsx XLSX spreadsheet
Attachment_10_-_Sexual_Assault_and_Sexual_Harassment_Training_Criteria.docx DOCX document
Attachment_P5_-_P5_Reserved.docx DOCX document
N00421-19-R-0003_Final.pdf PDF
Attachment_06_-_Authorized_Key_Personnel.docx DOCX document
Attachment_08_-_COMR_CDRL_Template_(COR).xlsx XLSX spreadsheet
Attachment_01_-_DD254_signed.pdf PDF
Attachment_P7_-_Subcontractor_Cost_Summary.xlsx XLSX spreadsheet
Attachment_P2_-_P2_Contractor_Performance_Assessment.pdf PDF
Attachment_02_-_CSP_QASP.docx DOCX document
Attachment_07_-_COR_Appointment_Letter.docx DOCX document
Attachment_03_-_Data_Item_Transmittal.docx DOCX document
Attachment_06_-_Authorized_Key_Personnel.doc DOC document
Attachment_P3_Streamlined_Rates.xlsx XLSX spreadsheet
Attachment_07_-_COR_Appointment_Letter.doc DOC document
Attachment_03_-_Data_Transmittal.docx DOCX document
Attachment_04_-_OCI_List.docx DOCX document
Attachment_01_-_DD254_signed.pdf PDF
Attachment_P5_RESERVED.docx DOCX document
IAPE_Draft_Solicitation_FBO_.pdf PDF
Exhibit_A_-_Contract_Data_Requirements_List.xlsx XLSX spreadsheet
Attachment_05_-_Subcontractors.docx DOCX document
Attachment_09_-_COMR_CDRL_Template_(COR).xlsx XLSX spreadsheet
Attachment_P7_Subcontractor_Cost_Summary.xlsx XLSX spreadsheet
Attachment_08_-_COMR_CDRL_Template.xlsx XLSX spreadsheet
Attachment_P4_RESERVED.docx DOCX document
Attachment_P6_Cost_Summary.xlsx XLSX spreadsheet
IAPE-LOE.pdf PDF
IAPE-SOW.pdf PDF
Show all 50

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation #N00421-19-R-0003

QASP/CSP

Enclosure (6)

Quality Assurance Surveillance Plan and Contract Surveillance Plan for Irregular Air Platform Engineering

1. Purpose This requirement consists of both performance based and non-performance based orders; therefore, a Quality Assurance Surveillance Plan (QASP) and a Contract Surveillance Plan (CSP) are both required. The QASP/CSP is used to ensure that the Contractor performs in accordance with the performance standards and definitions/metrics and the Government receives the quality of services called for in the contract.

This hybrid QASP/CSP is a Government developed and applied document used to ensure systematic quality assurance methods are used in the administration and surveillance of performance based and non-performance based tasking under the contract. The intent is to ensure the Contractor performs in accordance with the performance based standards and definitions and non-performance based required Level of Effort (LOE), and the Government receives the quality of services called for in each Task Order (TO) Performance Work Statement (PWS)/Statement of Work (SOW).

The contract requirement is to procure services in support of the integration of airborne capabilities to include, but not limited to, sensors, communications systems, weapons systems and control technologies for a variety of manned and unmanned airborne platforms. Specifically, requirements will include, but not limited to, program management, research, analysis, design, parts and materials procurement, installation/integration, test and evaluation, user/maintainer training, and on-demand operational support of urgent limited objective experiments. The resultant contract is anticipated to be Single Award Indefinite Delivery, Indefinite Quantity (IDIQ) contract that will include Cost Plus Fixed Fee (CPFF) and Firm Fixed Price (FFP) tasking. The contract will consist of a five (5) year ordering period.

A properly executed QASP/CSP will assist the Government in achieving the objectives of this procurement.

2. Authority Authority for issuance of this hybrid surveillance document is provided under Contract Section E – Inspection and Acceptance, which provides for inspections and acceptance of the services and documentation called for in the contract, which will be executed by the Contracting Officer (KO) or a duly authorized representative.

3. Scope To fully understand the roles and responsibilities of the parties, it is important to first define the distinction in terminology between Quality Control Plan and the QASP/CSP. The Contractor, and not the Government, is responsible for the Quality Control Plan, which defines the management and quality control actions necessary to meet the quality standards set forth in the contract and all resultant orders.

The hybrid QASP/CSP provides Government surveillance oversight of the Contractor’s efforts to assure they are timely, effective and delivering the results specified in the contract and each TO.

4. Government Resources The following definitions for Government resources are applicable to this plan:

KO: A person duly appointed with the authority to enter into a contract (Procuring Contracting Officer (PCO)), or a person with the authority to administer contracts (Administrative Contracting Officer (ACO)), and make related determinations and findings on behalf of the Government. The PCO for this contract is AIR-2.5.1.3. The ACO will be designated in the resulting contract. KOs are designated via a written warrant that sets forth limitations of authority.

Contracting Officer’s Representative (COR): An individual appointed in writing by the PCO to act as their authorized representative to assist in administering the contract. The COR will be appointed in the resulting contract. The limitations of authority are contained in the letter of appointment.

Alternate Contracting Officer’s Representative (ACOR): An individual appointed in writing by the PCO to act as their authorized representative, in the absence of the COR, to assist in administering the contract. The ACOR will be appointed in the resulting contract. The limitations of authority are contained in a written letter of appointment.

Government Project Lead (GPL): The COR designates an individual GPL to assist in administering of specific efforts under the contract.

5. Responsibilities The following Government resources shall have responsibility for the implementation of this hybrid QASP/CSP surveillance plan:

KO: The KO (either the PCO or ACO) ensures performance of all necessary actions for effective contracting, ensures compliance with the terms of the contract, and safeguards the interests of the U.S. in the contractual relationship. The KO assures the Contractor receives impartial, fair, and equitable treatment under the contract. The KO is ultimately responsible for the final determination of the adequacy of the Contractor’s performance.

COR: The COR is responsible for technical administration of the contract and assures proper Government surveillance of the Contractor’s performance. The COR is not empowered to make any contractual commitments or to authorize any changes on the Government’s behalf. Any changes that the Contractor deems may affect contract price, terms, or conditions shall be referred to the KO for action.

ACOR: The ACOR assists the COR for technical administration of the contract and assures proper Government surveillance of the Contractor’s performance. The ACOR is not empowered to make any contractual commitments or to authorize any changes on the Government’s behalf. Any changes that the Contractor deems may affect contract price, terms or conditions shall be referred to the KO for action.

GPL: The GPL is responsible for assisting in administering of specific efforts under the contract. A GPL cannot, in any manner, alter the scope of the contract, make commitments or authorize any changes on the Government’s behalf.

6.Methods of QA Surveillance
a.Contractor Performance Assessment Reporting System (CPARS): The marketplace for integration of airborne capabilities for a variety of manned and unmanned airborne platforms is very competitive. As such, the successful offeror has a vested interest in the Government-generated CPARS under this contract. Additionally, an evaluation using the CPARS format will be performed annually at the end of each ordering year. This evaluation will be one determinant in the award of future contracts or TOs. The Government will address the quality of product or service, schedule, cost control, business relations, management, utilization of small business, and other areas for this procurement. Some of the monitoring methods to be used will be Government observation, review of reports, customer feedback, and review of Contractor Data Requirements Lists (CDRLs). As this information may affect future source selections throughout the Department of Defense (DoD), as well as continuation of this tasking, the annual Government assessment will be used appropriately as an additional performance oversight and communication tool within the policies of this hybrid QASP/CSP.
b.QASP/CSP: This document will be used by the COR, ACOR, and GPL in the technical administration of this contract. In addition to the below instructions, the form to be used for documentation of quality assurance surveillance is the hybrid checklist provided herein.
7.Surveillance

Enclosures (1) through (3) set forth the performance standards, incentives, and surveillance methods for the contractor, the COR/ACOR, and the GPL while enclosures (4) through (6) provides the checklist and means for the COR to document the results of the surveillance and will be provided to the KO.

8. Documentation In addition to providing reports to the KO, the COR will maintain a complete Quality Assurance file. The file will contain copies of all reports, evaluations, recommendations, and any actions related to the Government’s performance of the quality assurance function, including the originals of the Surveillance Activity Checklists. All such records will be maintained for the life of the contract. The COR shall forward these records to the KO at termination or completion of the contract.

9. Enclosures Enclosure (1) Quality Standards by PWS (Performance Based) / SOW (Non-Performance Based) Enclosure (2) CDRL Data Quality Standards (Performance Based) Enclosure (3) Incentives Enclosure (4) Surveillance Activity Checklist (Level of Effort and Performance Based) Enclosure (5) Contract Surveillance by CDRLs (Level of Effort and Performance Based) Solicitation #N00421-19-R-0003

QASP/CSP

Solicitation #N00421-19-R-0003

QASP/CSP

Enclosure (6) Annual Surveillance Summary

ENCLOSURE (1)

QUALITY STANDARDS BY PWS – PERFORMANCE BASED

Required Service (Performance Requirements)
Standard (Performance Standards) / Maximum Allowable Degree of Deviation
Method of Surveillance (Quality Assurance)
Incentives
Integrated Logistics Support (ILS) Support IAW PWS/SOW Para 3.3.2
Based upon feedback from the Government Project Leads, 95% of the services and products provided must be deemed comprehensive, timely, and technically acceptable. Metrics are provided in the TO SOW and will be used as a Baseline in the evaluation.

100% Inspection by COR/ACOR and/or GPL.

See Enclosure (3)

Project and Contract Support IAW PWS/SOW Para 3.3.3
Based upon feedback from the Government Project Leads, 95% of the services and products provided must be deemed comprehensive, timely, and technically acceptable. Metrics are provided in the TO SOW and will be used as a Baseline in the evaluation.

100% Inspection by COR/ACOR and/or GPL.

See Enclosure (3)

Security IAW PWS/SOW Para 3.3.7
Based upon feedback from the Government Project Leads, 95% of the services and products provided must be deemed comprehensive, timely, and technically acceptable. Metrics are provided in the TO SOW and will be used as a Baseline in the evaluation.

100% Inspection by COR/ACOR and/or GPL.

See Enclosure (3)

QUALITY STANDARDS BY SOW – NON-PERFORMANCE BASED

Required Service (Performance Requirements)
Standard (Performance Standards) / Maximum Allowable Degree of Deviation Requirement
Method of Surveillance (Quality Assurance)
Incentives
Scientific and Engineering Support IAW PWS/SOW Para 3.3.1
Based upon feedback from the Government Project Leads, 95% of the services and products provided must be deemed comprehensive, timely, and technically acceptable.
100% Inspection by COR/ACOR and/or GPL.

See Enclosure (3)

Special Products and Prototyping Support IAW PWS/SOW Para 3.3.4
Based upon feedback from the Government Project Leads, 95% of the services and products provided must be deemed comprehensive, timely, and technically acceptable.
100% Inspection by COR/ACOR and/or GPL.

See Enclosure (3)

Modeling, Analysis, Simulation, Test, Training, and Human Signatures Research Support IAW PWS/SOW Para 3.3.5
Based upon feedback from the Government Project Leads, 95% of the services and products provided must be deemed comprehensive, timely, and technically acceptable. Metrics are provided in the TO SOW and will be used as a Baseline in the evaluation.

100% Inspection by COR/ACOR and/or GPL.

See Enclosure (3)

Contractor Flight and Ground Operations for CO/CO and GO/CO Aircraft Conducting Public Aircraft Operations IAW PWS/SOW Para 3.3.6
Based upon feedback from the Government Project Leads, 95% of the services and products provided must be deemed comprehensive, timely, and technically acceptable. Metrics are provided in the TO SOW and will be used as a Baseline in the evaluation.

100% Inspection by COR/ACOR and/or GPL.

See Enclosure (3)

Solicitation #N00421-19-R-0003

Enclosure (1)

ENCLOSURE (2)

CDRL DATA QUALITY STANDARDS (PERFORMANCE BASED AND LEVEL OF EFFORT)

Description
Standard
Acceptable Quality Level
Surveillance/

Method/ Measure Incentives

Presentation Material A001
Submission is in accordance with the Data Item Description (DID) cited in the CDRL.
95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR, and/or GPL
See Enclosure (3)
Test Procedures A002
Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR, and/or GPL
See Enclosure (3)
Test Plan A003
Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR, and/or GPL
See Enclosure (3)
Airworthiness-Related Substantiation Data A004
Submission is in accordance with the format detailed in BLK 16 of the CDRL.
95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR, and/or GPL
See Enclosure (3)
Contractor's Standard Operating Procedures, Flight Operating Procedures A005
Submission is in accordance with the format detailed in BLK 16 of the CDRL.
95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR, and/or GPL
See Enclosure (3)
Contractor's Standard Operating Procedures, Ground Operating Procedures A006
Submission is in accordance with the format detailed in BLK 16 of the CDRL.
95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR, and/or GPL
See Enclosure (3)

System/ Equipment Specifications A007

Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR, and/or GPL
See Enclosure (3)
Product Drawings/Models And Associated Lists A008
Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR, and/or GPL
See Enclosure (3)
Software Development Plan A009
Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR, and/or GPL
See Enclosure (3)
Contracting Officer's Management Report, A010
Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR, and/or GPL
See Enclosure (3)
Contract Summary Report A012
Submission is in accordance with the format detailed in BLK 16 of the CDRL.
A one-time deliverable at each TO close. Must be on time, with no more than one revision per submission.
100% Inspection by COR, ACOR, and/or GPL
See Enclosure (3)
Phase-Out Transition Plan A013
Submission is in accordance with the DID cited in the CDRL.
A one-time deliverable. Must be on time, with no more than one revision.
100% Inspection by COR, ACOR, and/or GPL
See Enclosure (3)
Management Plan, Configuration Management Plan A014
Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR, and/or GPL
See Enclosure (3)
Safety Assessment Report (SAR) A015
Submission is in accordance with the format detailed in BLK 16 of the CDRL.
95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR, and/or GPL
See Enclosure (3)
Trip/Travel Report A016
Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR, and/or GPL
See Enclosure (3)

Report, Record of Meeting/ Minutes A017

Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR, and/or GPL
See Enclosure (3)
Management Plan A018
Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR, and/or GPL
See Enclosure (3)
Operations Security (OPSEC) Plan A021
Submission is in accordance with the format detailed in BLK 16 of the CDRL.
A one-time deliverable. Must be on time, with no more than one revision.
100% Inspection by COR, ACOR, and/or GPL
See Enclosure (3)
Management Plan, Logistics and Material Support Plan A022
Submission is in accordance with the format detailed in BLK 16 of the CDRL.
95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR, and/or GPL
See Enclosure (3)
Accident/Incident Report A023
Submission is in accordance with the format detailed in BLK 16 of the CDRL.
95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR, and/or GPL
See Enclosure (3)
Contractor’s Safety Manual A024
Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR, and/or GPL
See Enclosure (3)
Scientific & Technical Reports Summary A025
Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR, and/or GPL
See Enclosure (3)
Test/Inspection Report, Test Report A026
Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR, and/or GPL
See Enclosure (3)
Test/Inspection Report, Aircraft/Systems Unscheduled Maintenance Report A027
Submission is in accordance with the format detailed in BLK 16 of the CDRL.
95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR, and/or GPL
See Enclosure (3)

Technical Manual Verification Discrepancy/ Disposition Record A028

Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR, and/or GPL
See Enclosure (3)
Engineering Change Proposal (ECP) A029
Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR, and/or GPL
See Enclosure (3)
Waiver Or Deviation System Safety Report (WDSSR) A030
Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR, and/or GPL
See Enclosure (3)
Notice Of Revision (NOR) A031
Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR, and/or GPL
See Enclosure (3)
Specification Change Notice (SCN) A032
Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR, and/or GPL
See Enclosure (3)

Scientific & Technical Reports Summary, Computer-Aided Design/ Manufacturing (CAD/CAM Data) A033

Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR, and/or GPL
See Enclosure (3)
Computer Operation Manual (COM) A034
Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR, and/or GPL
See Enclosure (3)
Scientific & Technical Reports Summary, Ad-Hoc Technical Reports/Memos A035
Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR, and/or GPL
See Enclosure (3)
Source/Vendor List A036
Submission is in accordance with the format detailed in BLK 16 of the CDRL.
95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR, and/or GPL
See Enclosure (3)
DOD Information Assurance Certification and Accreditation Process (DIACAP) and Risk Management Framework (RMF) Deliverable Data A037
Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR, and/or GPL
See Enclosure (3)

Enclosure (2)

ENCLOSURE (3)

INCENTIVES

Assessment Period
Acceptable Performance Definition
How Measured
Incentives
Ordering Year 1:
Not more than one of the measurement areas rated below “Satisfactory”. None of the measurement areas are rated below “Marginal”.
End of the first assessment period using the CPARS format.
(+) Meet the acceptable performance definition as a condition for additional tasking. *

(-) Does not meet the acceptable performance definition as a condition for additional tasking.*

Ordering Year 2:
Not more than one of the measurement areas rated below “Satisfactory”. None of the measurement areas are rated below “Marginal”.
End of the second assessment period using the CPARS format covering the previous 12 months.
(+) Meet the acceptable performance definition as a condition for additional tasking. *

(-) Does not meet the acceptable performance definition as a condition for additional tasking.*

Ordering Year 3:
Two or more of the measurement areas rated “Very Good” or above. None rated below “Satisfactory”.
End of the third assessment period using the CPARS format covering the previous 12 months.
(+) Meet the acceptable performance definition as a condition for additional tasking. *

(-) Does not meet the acceptable performance definition as a condition for additional tasking.*

Ordering Year 4:
Two or more of the measurement areas rated “Very Good” or above. None of the measurement areas are below “Satisfactory”.

End of the fourth assessment period evaluation using the CPARS format covering the previous 12 months.

(+) Meet the acceptable performance definition as a condition for additional tasking. * (-) Does not meet the acceptable performance definition as a condition for additional tasking.*

Ordering Year 5:
Two or more of the measurement areas rated “Very Good” or “Exceptional”. None of the measurement areas are rated “Marginal” or below.
End of the fifth assessment period using the CPARS format covering the previous 12 months.
(+) Meet the acceptable performance definition as a condition for satisfactory or better Final CPARS rating.

(-) Does not meet the acceptable performance definition which will result in a marginal or unsatisfactory final CPARS rating.

Final CPAR Review

After completion of all TOs.
(+) Meet the acceptable performance definition as a condition for satisfactory or better Final CPARS rating.

(-) Does not meet the acceptable performance definition` which will result in a marginal or unsatisfactory Final CPARS rating.

*The Government may not award additional tasking (orders) unless all regulatory requirements are met and the contractor meets the acceptable performance definition.

All PWS/SOW and CDRL tasks, including sub-tasks, will be assessed focusing on the following:

Quality of Product or Service – Assess the contractor’s effort to transform operational needs and requirements into an integrated solution. Areas of focus may include the planning and management of program efforts, the quality of support provided throughout all phases of contract execution, the integration of program management specialties, management of interfaces, and the management of a totally integrated effort of all program management concerns to meet cost, performance, and schedule objectives. Assess how successfully the contractor meets program quality.

Schedule – Assess the contractor’s adherence to the required delivery schedule by assessing the contractor’s efforts during the assessment period that contribute to or effect the schedule variance. Also address significance of scheduled events (i.e., design reviews), discuss causes, and assess the effectiveness of contractor corrective actions.

Cost Control – Assess the contractor’s effectiveness in forecasting, managing, and controlling contract cost. Is the contractor experiencing cost growth or under run? If so, discuss the causes and contractor-proposed solutions for the cost overruns. For contracts where task or contract sizing is based upon contractor provided person-hour estimates, the relationship of these estimates to ultimate cost should be assessed. In addition, the extent to which the contractor demonstrates a sense of cost responsibility, through the efficient use of resources in each work effort should be assessed.

Business Relations – Assess the timelines, completeness and quality of problem identification, corrective action plans, proposal submittals, the contractor’s reasonable and cooperative behavior, effective business relations, and customer satisfaction.

Management – Assess the contractor’s success with timely award and management of subcontracts, including whether the contractor met small/small disadvantage and women-owned business participation goals. Discuss the extent to which the contractor discharges its responsibility for integration and coordination of all activity needed to execute the contract; identifies and applies resources required to meet schedule requirements; assigns responsibility for tasks/actions required by contract; communicates appropriate information to affected program elements in a timely manner. Assess the contractor’s risk mitigation plans. If applicable, identify any other management areas that are unique to the contract.

Utilization of Small Business – Assess the contractor’s success in utilizing and meeting small business goals/concerns.

Other areas – Assess additional evaluation areas unique to the contract or that cannot be captured elsewhere.

The evaluation ratings are as follows:

Exceptional (5). Contractor’s performance meets contract requirements and significantly exceeds contract requirements to the Government's benefit. For example, the contractor implemented innovative business process reengineering techniques, which resulted in added value to the Government. The contractual performance of the element or sub-element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor were highly effective.

Very Good (4). Contractor’s performance meets contractual requirements and exceeds some to the Government's benefit. The contractual performance of the element or sub-element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.

Satisfactory (3). Contractor’s performance of most contract requirements meets the acceptable standards with some tangible or intangible benefits to the Government (e.g., improved quality, responsiveness, increased timeliness, or generally enhanced effectiveness of operations). Although there are some areas of very good or excellent performance, these are more or less offset by unsatisfactory performance in other areas.

Marginal (2). Contractor’s performance does not meet some contractual requirements. The contractual performance of the element or sub-element being assessed reflects a serious problem for which the contractor has submitted minimal corrective actions, if any. The contractor’s proposed actions appear only marginally effective or were not fully implemented.

Unsatisfactory (1). Contractor’s performance does not meet contractual requirements and recovery is not likely in a timely or cost effective manner. The contractual performance of the element or sub-element contains serious problem(s) for which the contractor's corrective actions appear or were ineffective.

Solicitation #N00421-19-R-0003

QASP/CSP

Enclosure (3) For Level of Effort TOs, hours delivered by each order as compared to the order required hours will be evaluated and will influence the ratings awarded above. Cost variances greater than 10% cannot earn an Exceptional or Very Good for Cost Control evaluation criteria.

ENCLOSURE (4)

SURVEILLANCE ACTIVITY CHECKLIST – LEVEL OF EFFORT AND PERFORMANCE BASED

Quarterly Surveillance:

The COR will perform a quarterly assessment of Quality, Schedule, Cost Control, Business Relations, Management, Utilization of Small Business and Other Areas as applicable utilizing the CPARS evaluation rating definitions listed in enclosure (3).

QUARTERLY EVALUATION – BY PWS/SOW

Description
Surveillance Method/Measure
Dates
Quality
Schedule
Cost

Control Business Relations

Mgmt
Utilization

of Small Business Other

Scientific and Engineering Support IAW PWS/SOW Para 3.3.1
100% inspection by COR, ACOR, and/or GPL
Integrated Logistics Support (ILS) Support IAW PWS/SOW Para 3.3.2
100% inspection by COR, ACOR, and/or GPL
Program and Project Support IAW PWS/SOW Para 3.3.3
100% inspection by COR, ACOR, and/or GPL
Special Products and Prototyping Support IAW PWS/SOW Para 3.3.4
100% inspection by COR, ACOR, and/or GPL
Modeling, Analysis, Simulation, Test, Training, and Human Signatures Research Support IAW PWS/SOW Para 3.3.5
100% inspection by COR, ACOR, and/or GPL
Contractor Flight and Ground Operations for CO/CO and GO/CO Aircraft Conducting Public Aircraft Operations IAW PWS/SOW Para 3.3.6
100% inspection by COR, ACOR, and/or GPL
Information Assurance Support IAW PWS/SOW Para 3.3.7
100% inspection by COR, ACOR, and/or GPL

PMT # N00421-18-RFPREQ-4K0000T-0004

Attachment_11_IAPE_QASP_CSP copy Enclosure (4) Solicitation #N00421-19-R-0003

Enclosure (4)

ENCLOSURE (5)

QUARTERLY EVALUATION BY CDRLS, FORM DD 1423

Description
Surveillance Method / Measure
Dates Due
Dates Completed
No. Submittals
No. of Req’d Rework
Percentage On Time
Comments
Presentation Material A001
100% inspection by COR, ACOR, and/or GPL
Test Procedures A002
100% inspection by COR, ACOR, and/or GPL
Test Plan A003
100% inspection by COR, ACOR, and/or GPL
Airworthiness-Related Substantiation Data A004
100% inspection by COR, ACOR, and/or GPL
Contractor's Standard Operating Procedures, Flight Operating Procedures A005
100% inspection by COR, ACOR, and/or GPL
Contractor's Standard Operating Procedures, Ground Operating Procedures A006
100% inspection by COR, ACOR, and/or GPL

System/ Equipment Specifications A007 100% inspection by COR, ACOR, and/or GPL

Product Drawings/Models And Associated Lists A008
100% inspection by COR, ACOR, and/or GPL
Software Development Plan A009
100% inspection by COR, ACOR, and/or GPL
Contracting Officer's Management Report, Segregation of Costs and Invoice Requirements Report A010
100% inspection by COR, ACOR, and/or GPL
Contract Summary Report A012
100% inspection by COR, ACOR, and/or GPL
Phase-Out Transition Plan A013
100% inspection by COR, ACOR, and/or GPL
Management Plan, Configuration Management Plan A014
100% inspection by COR, ACOR, and/or GPL
Safety Assessment Report (SAR) A015
100% inspection by COR, ACOR, and/or GPL
Trip/Travel Report A016
100% inspection by COR, ACOR, and/or GPL

Report, Record of Meeting/ Minutes A017 100% inspection by COR, ACOR, and/or GPL

Management Plan A018
100% inspection by COR, ACOR, and/or GPL
Operations Security (OPSEC) Plan A021
100% inspection by COR, ACOR, and/or GPL
Management Plan, Logistics and Material Support Plan A022
100% inspection by COR, ACOR, and/or GPL
Accident/Incident Report A023
100% inspection by COR, ACOR, and/or GPL
Contractor’s Safety Manual A024
100% inspection by COR, ACOR, and/or GPL
Scientific & Technical Reports Summary A025
100% inspection by COR, ACOR, and/or GPL
Test/Inspection Report, Test Report A026
100% inspection by COR, ACOR, and/or GPL
Test/Inspection Report, Aircraft/Systems Unscheduled Maintenance Report A027
100% inspection by COR, ACOR, and/or GPL

Technical Manual Verification Discrepancy/ Disposition Record A028 100% inspection by COR, ACOR, and/or GPL

Engineering Change Proposal (ECP) A029
100% inspection by COR, ACOR, and/or GPL
Waiver Or Deviation System Safety Report (WDSSR) A030
100% inspection by COR, ACOR, and/or GPL
Notice Of Revision (NOR) A031
100% inspection by COR, ACOR, and/or GPL
Specification Change Notice (SCN) A032
100% inspection by COR, ACOR, and/or GPL

Scientific & Technical Reports Summary, Computer-Aided Design/ Manufacturing (CAD/CAM Data) A033 100% inspection by COR, ACOR, and/or GPL

Computer Operation Manual (COM) A034
100% inspection by COR, ACOR, and/or GPL
Scientific & Technical Reports Summary, Ad-Hoc Technical Reports/Memos A035
100% inspection by COR, ACOR, and/or GPL
Source/Vendor List A036
100% inspection by COR, ACOR, and/or GPL
DOD Information Assurance Certification and Accreditation Process (DIACAP) and Risk Management Framework (RMF) Deliverable Data A037
100% inspection by COR, ACOR, and/or GPL

Metric Summary:Current Period Cumulative

Total Number of Deliverables Submitted:

Total Number of Deliverables Submitted Late:

Total Number of Deliverables Requiring Revision:

Percentage of Deliverables Submitted Late:

Percentage of Deliverables Requiring Revision:

Enclosure (5)

ENCLOSURE (6)

ANNUAL SURVEILLANCE SUMMARY:

The COR will perform an annual assessment of overall contract performance utilizing the CPARS evaluation rating definitions listed in enclosure (3). This assessment will be completed annually covering the previous 12 months.

Description
Surveillance Method/

Measure

Date Planned
Date Completed
Summary Rating/Results
Quality of Product or Service
Review of Monthly Ratings.
Schedule
Review of Monthly Ratings.
Cost Control
Review of Monthly Ratings
Business Relations
Review of Monthly Ratings
Management
Review of Monthly Ratings
Utilization of SB
Review of Monthly Ratings
Other Areas
Review of Monthly Ratings

Annual Surveillance Completed By:

Date Completed: