This file is a Request for Clarifications (RFC) Questions and Answers document for the USNS WALLY SCHIRRA (T-AKE 8) FY27 Mid-Term Availability (MTA) contract opportunity. The document contains 23 RFC entries with questions submitted by potential offerors between October 1-8, 2026, and corresponding government responses provided through Amendment 0006 (issued October 13, 2026). The RFCs address technical specifications, equipment details, work item clarifications, and contractual requirements across various ship repair and maintenance work items for the T-AKE 8 vessel.

Key technical clarifications include vessel operating draft specifications (9 meters), electrical shore power alternatives via portable generators, mobile phone communications as alternatives to cable lines, tank cleaning and gas-freeing procedures (only tanks marked with "X" in arrival condition), equipment specifications (Woodward Governors, air compressors, vane axial fans with horsepower ratings, crane services), and material handling equipment requirements. Administrative clarifications address solicitation deadline extension requests (denied), pricing methodology for work items with compressed timeframes, oil replacement and contractor-furnished material requirements, FOB destination delivery terms and contractor responsibilities, warranty notification procedures (90-day notification window from discovery), and compliance requirements for foreign contractors regarding FAR/DFARS clauses, cost accounting standards applicability, proposal adequacy checklists, and supporting documentation for contractor responsibility. Amendments 0001-0006 also included revised specifications for Work Items 0452 and 0501, revised J-3 contractor price breakdown, and photographic documentation of equipment. The responses indicate this is a firm fixed-price (FFP) competitive solicitation for non-commercial ship repair services using full and open competition procedures.

View the file

Other files

File Type Posted
2.1.3 J-3 Contractor Price Breakdown R1.xlsx XLSX spreadsheet
2.1.3 J-1A Work Item Specification Package R1 MSC AWP – N0040626R0003.pdf PDF
2.1.3 SOL AMDNT 6 - N0040627R00040006 Conformed.pdf PDF
2.1.3 SOL AMDNT 6 - N0040627R00040006 SF 30.pdf PDF
2.1.3 SOL AMDNT 2 - J-5 RFC Answers.xlsx XLSX spreadsheet
2.1.3 SOL AMDNT 2 - N0040627R00040002 Conformed.pdf PDF
2.1.3 SOL AMDNT 1 - J-5 RFC Answers.xlsx XLSX spreadsheet
2.1.3 SOL AMDNT 5 - J-5 RFC Answers.xlsx XLSX spreadsheet
2.1.3 SOL AMDNT 1 - N0040627R00040001 SF 30.pdf PDF
2.1.1 SOL - N0040627R0004.pdf PDF
2.1.3 SOL AMDNT 5 -N0040627R00040005 SF 30.pdf PDF
2.1.3 SOL AMDNT 2 - N0040627R00040002 SF 30.pdf PDF
2.1.3 SOL AMDNT 5 - N0040627R00040005 Conformed.pdf PDF
2.1.3 SOL AMDNT 1 - N0040627R00040001 Conformed.pdf PDF
2.1.3 SOL AMDNT 4 - CFRs 0095, 0096, 0097, 0098 & 0144.pdf PDF
2.1.3 SOL AMDNT 4 - N0040627R00040004 Conformed.pdf PDF
2.1.3 SOL AMDNT 4 - N0040627R00040004 SF 30.pdf PDF
2.1.3 SOL AMDNT 4 - J-5 RFC Tracker Answers.xlsx XLSX spreadsheet
2.1.3 SOL AMDNT 3 - N0040627R00040003 SF 30.pdf PDF
2.1.3 MDG No.1 thru No.4 Governor Pictures.pdf PDF
2.1.3 SOL AMDNT 3 - N0040627R00040003 Conformed.pdf PDF
2.1.3 J-5 RFC Answers AMDNT 3.xlsx XLSX spreadsheet
2.1.3 SOL AMDNT 2 - N0040627R00040002 Conformed.pdf PDF
2.1.3 SOL AMDNT 2 - N0040627R00040002 SF 30.pdf PDF
2.1.3 J-5 RFC Answers AMDNT 2.xlsx XLSX spreadsheet
2.1.3 SOL AMDNT 1 - N0040627R00040001 SF 30.pdf PDF
2.1.3 SOL AMDNT 1 - N0040627R00040001 Conformed.pdf PDF
2.1.3 J-5 RFC Answers Amendment 1.xlsx XLSX spreadsheet
2.1.1 J-1A WI Specification Package.pdf PDF
2.1.1 Solicitation - N0040627R0004.pdf PDF
2.1.1 J-7 MSC Ship Repair Facility Survey.pdf PDF
2.1.1 J-1B List of Work Items with OEM.pdf PDF
2.1.1 J-3 Contractor Price Breakdown.xlsx XLSX spreadsheet
2.1.1 J-5 Request for Clarification.docx DOCX document
2.1.1 J-6A Instructions Form W-14.pdf PDF
2.1.1 CDRLS DD 1423.pdf PDF
2.1.1 J-2 GFP Attachment.pdf PDF
2.1.1 J-8 Contract Administration Plan.pdf PDF
2.1.1 J-4 Contractor Past Performance Data Sheet.docx DOCX document
2.1.1 J-6 IRS FORM W-14.pdf PDF
Show all 40

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

RFC No.ReceivedAnsweredWI No.Para.WI TitleQuestionAnswer
110/1/2610/2/2026
Amendment 00010003N/ATAKE-SWI-APPROACH BERTHING AND MOORING REQUIREMENTSFor planning of the afloat repair works, please confirm the vessel's lightest achievable operating draft (Forward/Aft/Mean Draft) after deballasting and cargo/fuel consumption, while maintaining safe stability and operational requirements.Expect nine (9) meters.
210/2/2610/2/2026
Amendment 000100117.1.1 & 7.1.25GENERAL SERVICES FOR SHIP7.1.1 Electrical Shore Power: Since our proposed Third Party Port does not have the capacity to provide Electrical Shore Power as required in the work specifications, we would like to propose to provide portable generators that can meet the requirement. This is the same service that we have provided in the previous availabilities of T-AKE ships. Please confirm if this is acceptable.

7.1.25 Crane, Forklift and Transportation Services: Since the ship will be berthing at Third Party Port, crane charges will not be charged on per lift but on a per day basis. We will provide crane daily at the port during the whole duration of the PoP. This is the same arrangement as what we have provided in the previous availabilities. 7.1.1: This is acceptable if it still meets all amperage requirements.

7.1.25: The Government requests more information prior to answering. How will we break the per lift charges down to a daily rate? Do you see any reason why this would require additional funds?

310/2/2610/2/2026
Amendment 000100123.1.1 – 3.1.3INFORMATION TECHNOLOGY SERVICESSince our proposed Third Party Port does not have the existing telephone cable lines, we would like to propose to provide mobile phones as an alternative. This is the same arrangement as what we have provided in the previous availabilities. Please confirm if this is acceptable.This would be acceptable, provided it meets the basic requirements of the work item.
410/2/2610/2/2026
Amendment 00010021ENCLOSURE 2.2.1CLEAN AND GAS FREE TANKS VOIDS COFFERDAMS AND SPACESKindly confirm that not all tanks listed in Enclosure 2.2.1 will be cleaned and gas freed. Only those tanks with “X” on the “Arrival Condition” column will be opened, cleaned and gas free. Please see snippet below for sample.
Yes; only the Tanks with a “X” Next to them will be cleaned, gas freed, and surveyed.
510/2/2610/2/2026

Amendment 0001

10/6/2026 Amendment 0003 (Photos) 0251 3.3.1 WOODWARD GOVERNORS Please provide us with the following information:

-Governor model -Part number -Required quantity to carry out maintenance

If possible, please also provide photos of the governor, as this will help us identify the correct model and prepare an accurate quotation. Please refer to the attached example image for reference. The 5th Governor (spare) will need to be serviced as well.

Photos of Woodward Governors from the ship for the MDG No. 1 through MDG No. 4 are below (PDF also available). Photos of the Spare Governor will follow.

610/2/2610/2/2026
Amendment 000105042.1 & 2.2NO. 2 LTFW & NO. 1 CSW PUMP MOTOR OVHLKindly provide the motor capacity, either in HP or kW, for our pricing reference.This will be under the 60HZ.
710/2/2610/2/2026
Amendment 000105053.1.1MMR VANE AXIAL FANS M1, M2, M3, M4 OVERHAUL REPAIRS & PRESERVATIONKindly provide the motor capacity, either in HP or kW, for our pricing reference:

-Vane axial Fan M1, (2-66-8) -Vane axial Fan M2, (2-66-8) -Vane axial Fan M3, (2-66-8) -Vane axial Fan M4, (2-66-1) -Vane axial Fan M1, (2-66-8) M1 is 100HP -Vane axial Fan M2, (2-66-8) M2 is 75HP -Vane axial Fan M3, (2-66-8) M3 is 15HP -Vane axial Fan M4, (2-66-1) M4 is 75HP

810/2/2610/2/2026
Amendment 00010651B2.3 & 2.4GAUGE CALIBRATIONPlease provide the references 2.3 and 2.4 for the list of items that need calibration:

-2.3 USNS DREW (T-AKE 10) 2.5 Year SMS Calibration List Mechanical

-2.4 USNS DREW (T-AKE 10) 2.5 Year SMS Calibration List ElectricalThis information will be provided in Amendment 0001.
910/2/2610/2/2026
Amendment 000110543.1HIGHLINE SPANWIRE ASD FAN SHROUD AND AIR BLOWER PRESERVATIONKindly provide the motor capacity of ASD fan motor (blower) for stations 1, 3, and 5, either in HP or kW, for our pricing reference.They are driven by 1/3 HP Motor.
1010/2/2610/2/2026
Amendment 0001SF33N/ASolicitation Due DateWe would like to respectfully request an extension of the deadline for the submission of offers for the subject solicitation.

For MTA packages of similar scope and complexity, we are normally provided approximately one (1) month to prepare a comprehensive and competitive proposal. However, for this solicitation, the proposal preparation period is limited to only fourteen (14) days, which presents a significant challenge in completing the necessary technical, commercial, subcontractor (OEM), and supplier evaluations required for an accurate submission.

In view of the above, we kindly request your consideration of an extension to the proposal submission deadline to allow sufficient time for proper preparation of our offer.Thank you for your request. Solicitation extension requests are not being considered currently. Due to the compressed time frame we must award before the Period of Performance begins, an accelerated award schedule has been established to give the successful Offeror sufficient time to mobilize for production.
1110/5/2610/5/2026
Amendment 00020503N/ACargo Crane Inspection (1 Yr)We would appreciate your advice on whether the oil replacement is required. Additionally, could you please advise if the Government is able to furnish the oil for this purpose?

7.5.1.e. Annually

20.Replace the Swing Drive Gear Oil.
21.Replace the Winch Gear Oil.
22.Replace the Hydraulic Oil.The oil will need to be replaced as stated in the WI. The oil will be Contractor Furnished Material (CFM).
1210/5/2610/5/2026
Amendment 00020183N/AExterior Platforms Foundations PreservationFor estimation purposes, kindly furnish photographs and arrangement drawings of the external platforms mentioned in the work specification for our assessment of staging requirements and other related accessory works. Additionally, please confirm the total number of platform/ locations to be preserved.The exterior platforms will be the port/starboard embarkation decks for the lifeboats on the 04 level. This will require sectional staging on the 03 level for any area that will need to be cropped and renewed. For estimating purposes, assume two (2) sections needed on each side approximately ten (10) ft high and big enough to hold two (2) contactors. No pictures are available at this time.
1310/7/2610/7/2026

Amendment 0004

10/13/2026 Amendment 0006 (Updated) 0501 N/A SPERRE Air Compressors Overhaul We would appreciate it if you could provide the serial number(s) of the air compressor(s) intended for this scope of work.

3.1.1 Main Machinery Room 5-66-0 One (1) Start Air Compressor.

3.1.2 Propulsion Motor Room 5-75-0 One (1) Ships Service Air Compressor. #2 Ship Service Air Compressor Type: HV27270A S/N: 270777

#2 Start Air Compressor Type: HL27160 S/N: 1601124

1410/7/2610/7/2026
Amendment 00040165N/ALow Profile Non-Slip Weatherdeck PreservationWe would appreciate your advice on below points:

1. Kindly advise the which total area quantity to consider.

Para 3.1 stated 5600 + 550 + 750 + 750 + 4300 + 7500=19,450ft2 while para 3.2 stated 21,000ft2.

2. Kindly confirm the quantity 10,000ft2 in para 7.10 is the area quantity for blasting.

Assume approximately 21,000 sq ft for painting and 21,000 sq ft for blasting.
1510/7/2610/7/2026
Amendment 00040563B/0577, 0565B, 0567A, 0568A, 0575X, 0656N/AVarious Firefighting and Life-Saving Work ItemsKindly provide the last inspection/service reports for the following work items:

-0563B/0577 - SCBA COMPRESSOR AND FILLING STATION INSPECTION AND MAINTENANCE (2YR)/(15YR)

-0565A - FIXED GAS FIREFIGHTING SYSTEM INSPECTION AND TEST (1 YR)

-0567A - FIXED FOAM FIREFIGHTING SYSTEM INSPECTION AND TEST (1 YR)

-0568A - WATER MIST-SPRAY-SPRINKLER SYSTEM INSPECTION AND TEST (1 YR)

-0575X - WATER MIST FIREFIGHTING SYSTEM - INSPECTION AND TEST (1 YR)

-0656 – ANNUAL LIFERAFT CERTIFICATIONCFR’s 0095, 0096, 0097, 0098, & 0144 show the last inspection/service reports.C16H14B16:I16B16:I16H14B16:I16A16:I16XFD16:I16A16:I16
1610/8/2610/8/2026
Amendment 00050666N/ATAKE-CCSI-ABS ANNUAL SURVEY - TANK INSPECTIONEquipment – Aerial Work Platform (1YR)

With respect to the above-referenced work item, the Contractor respectfully requests the following information:

Please provide the equipment serial number of the subject MHE (Material Handling Equipment).

Please provide the engine type of the subject MHE, including the manufacturer and model number.

This information is required to support accurate planning, parts identification, and vendor quotation for the inspection, testing, and certification scope.ERROR:#VALUE!
1710/7/2610/8/2026

Amendment 0005

10/13/2026 Amendment 0006 (Updated) 0501 N/A SPERRE Air Compressors Overhaul We would appreciate it if you could provide the serial number(s) of the air compressor(s) intended for this scope of work.

3.1.1 Main Machinery Room 5-66-0 One (1) Start Air Compressor.

3.1.2 Propulsion Motor Room 5-75-0 One (1) Ships Service Air Compressor. This is an error on the Work Item and will be corrected with a revised WI 0501 specification. It states in the WI they are #1 compressors, but they are #2 compressors. The #2 Ship Service and #2 Start Air Compressor's must be overhauled, information is as follows:

#2 Ship Service Air Compressor Type: HV27270A S/N: 270777

#2 Start Air Compressor Type: HL27160 S/N: 1601124

1810/8/2610/13/2026
Amendment 00060452N/ACIVILIAN MARINER (CIVMAR) WIRELESS INTERNET (WIN) INSTALLATION T-ALT 689RThe J-3 spreadsheet (row 132-135) format seems wrong on WI 0452 CIVILIAN MARINER (CIVMAR) WIRELESS INTERNET (WIN) INSTALLATION T-ALT 689R of Category "B", on which I have to input price per day and automatically calculate 15 times of daily price on total.

As shown on the work spec., the work items doesn't take fifteen (15) days and can't evenly calculate the price daily basis, as the work item is "unit work", differently with general services of continuation.

Please check and advise in return, with revised J-3 file if required.A revised J-3 Contractor Price Breakdown is attached in Amendment 0006 revising WI 0452 from CAT B to CAT A. There is also a revised WI 0452 specification reflecting the corrected CAT A designation.
1910/8/2610/13/2026
Amendment 0006SF33N/ASolicitation Section F

FAR 52.247-34 F.o.b. Destination.

Clarification of “Destination and Place of Performance” and Contractor’s role & responsibility Typically, the solicitations we have reviewed have specified FOB Origin as the applicable delivery term. However, the subject solicitation specifies FOB Destination.

FOB Origin and FOB Destination are clearly different delivery terms. Under the generally understood meaning of FOB Destination, the Contractor is responsible for the transportation of the supplies to the designated destination, with risk of loss and title generally remaining with the Contractor until delivery at the specified destination.

However, upon reviewing the ‘Line Item Guide’ quoted below, we identified information that appears to be inconsistent with the general understanding of the ‘FOB Destination’ term described above.

[Line Item Guide Page 41]

Specifically, on Section 13, “Destination and Place of Performance (Uniform Contract Format Section F),” states that the destination and place of performance identify where a supply is to be delivered or where a service is to be performed. It further indicates that, for services, the place of performance may require identification of the physical location where the work is to be performed.

In this regard, we would appreciate clarification as to how “Destination and Place of Performance” under Section 13 should be interpreted in conjunction with the FOB Destination delivery term specified in the solicitation.

Specifically, please clarify the Contractor’s roles and responsibilities under the FOB Destination term, including, but not limited to, transportation, risk of loss, and responsibility for delivery to the designated destination/place of performance.

Please also clarify whether the “Destination” identified under Section 13 is intended to represent the same physical location as the Contractor’s place of performance, or whether these are separate and distinct requirements under this solicitation.Contractors should bid based on the location of their respective shipyard. All Contractor Furnished Material (CFM) delivery responsibilities will be placed on the contractor to ensure material is delivered to the ship’s location. The “Destination,” identified under Section 13 is intended to represent the same physical location as the Contractor’s place of performance.
2010/8/2610/13/2026
Amendment 0006SF33N/ASolicitation Section I

FAR 52.246-19 Warranty of Systems and Equipment under Performance Specifications or Design Criteria.

Clarification of Warranty Conditions 1. The clause “(b) Contractor’s obligations – (1) The Contractor’s warranties under this clause shall apply only to those defects discovered by either the Government or the Contractor” is clear in contract terms.

Please clarify what “TBD AT AWARD” means at the end of the clause.

2. According to DFARS 252.217-7013 Guarantees, warranty period is “90 days” from the date of redelivery of the vessel(s).

Please clarify how to interpret the clause “(b) Contractor’s obligations – (3) the Contracting Officer shall promptly notify the Contractor of the defect, in writing, within 90 calendar days after discovery of the defect.” in conjunction with the warranty period description on DFARS 252.217-7013. 1. The term “TBD AT AWARD,” was included in clause FAR/RFO 52.246-19 Warranty of Systems and Equipment under Performance Specifications or Design Criteria as an error. It should read, “within 90 days from the date of redelivery of the vessel(s),”. This has been corrected in Amendment 0006.

2. The ninety (90) day notification clause is the "reporting administrative window"—it gives the Contracting Officer (CO) up to ninety (90) days from the actual day of discovery to formally put the Contractor on notice. The notification requirement cannot extend the overall warranty window; it merely defines how quickly the Government must act once a valid defect is discovered.

2110/8/2610/13/2026
Amendment 0006SF33N/ASolicitation Section K

Various Clauses

Application of FAR/DFARS on Foreign Contractor Above five (5) FAR/DAFRS regulations are newly added on the Solicitation, differently with the Solicitations issued by FLCY Singapore site before, and we can’t fill out the check boxes on the Solicitation because our company is operating in Republic of Korea under Korean regulation, not United States.

Our understanding is that Cost Accounting Standard (CAS) doesn’t apply to firm-fixed-price (FFP) contracts awarded on the basis of adequate price competition.

Please clarify if the regulations are applied to foreign entities with the FFP based competitive bidding process and how to prepare the bidding document.

These clauses apply as context dictates and are included to ensure compliance for any contractors subject to these requirements. After proposal evaluation, any clauses that are not applicable will be removed from the award.
2210/8/2610/13/2026
Amendment 0006SF33N/ASolicitation Section L

L-3.4 VOLUME 4

Clarification of Supporting Documentation per RFO Subpart 9.1 The clause “4. Documentation supporting general contractor responsibility per RFO Subpart 9.1.” is newly added on the Solicitation, differently with the Solicitations issued by FLCY Singapore site before.

Please clarify what kind of supporting documentation is required to support general contractor responsibility per RFO Subpart 9.1, as active MSRA holder.Supporting documentation includes but is not limited to competitive material quotes, competitive subcontractor quotes, previous purchases, and historical awards. Contractors must submit verifying documentation to justify that the proposed pricing is fair and reasonable.
2310/8/2610/13/2026
Amendment 0006SF33N/ASolicitation Section L

DFARS 252.215-7993 Proposal Adequacy Checklist Requirement

Checklist Completion Requirement The requirement of proposal adequacy checklist completion is newly added on the Solicitation, differently with the Solicitations issued by FLCY Singapore site before.

Please clarify if the checklist completion is required for foreign entities with a competitive bidding process of which place of performance is OCONUS. Yes, please complete the checklist as this is intended to ensure contractors proposals are in line with solicitation requirements.