2.1.1 Solicitation - N0040627R0004.pdf

PDF 3 MB Posted

Attached to
USNS WALLY SCHIRRA (T-AKE 8) FY27 MID-TERM AVAILABILITY (MTA)
Solicitation number
N0040627R0004
Issued by

About this file

This is a Solicitation (RFP) for ship repair and maintenance services for the USNS WALLY SCHIRRA (T-AKE 8), a Navy replenishment ship. The solicitation number is N0040627R0004, issued by NAVSUP Fleet Logistics Center Puget Sound. The contract requires completion of a Mid-Term Availability (MTA) from January 25, 2027, through March 15, 2027, at an OCONUS location within the U.S. 7th Fleet Area of Responsibility, with performance strictly excluded from India. Proposals are due by October 16, 2026, at 09:00 AM Eastern Daylight Time, submitted electronically per Section L instructions.

The procurement includes three contract line items (CLINs): CLIN 0001 for the base Mid-Term Availability work package on a Firm Fixed Price basis, CLIN 0002 for Over and Above (O&A) growth work also Firm Fixed Price (projected at 27% of base work for both labor hours and material), and CLIN 0003 for Contract Data Requirement Lists (CDRLs) at no separate price. The contractor must provide a detailed price breakdown in Attachment J-3 including fixed, fully-burdened ship repair labor rates and material handling rates applicable to both baseline and O&A work. Work items are defined in the MSC specification package AWP N0040626R0003, which will be provided via DoD SAFE. The contractor must submit fixed labor rates and material handling percentages that apply to all direct production hours and physical materials, with support functions (supervision, QA, planning, administration) bundled into the labor rate. For O&A work, the contractor must follow a Condition Found Report (CFR) process, obtaining written authorization from the Contracting Officer before proceeding. A blanket work authorization may be issued at award establishing administrative thresholds and dollar limitations for routine CFRs. The contractor must notify the Government when cumulative O&A work exceeds 80% of obligated funds and submit weekly tracking reports and a final settlement report. Payment will be made via Wide Area WorkFlow (WAWF) using the specified DoDAAC and routing data. Small business set-asides do not apply due to the OCONUS performance location. The contract includes mandatory compliance with higher-level quality standards (ABS standards), detailed technical and safety certifications (welding, coatings inspection, fall protection, NDT), and comprehensive management, scheduling, quality control, and hazardous waste management plans.

View the file

Other files

File Type Posted
2.1.3 J-1A Work Item Specification Package R1 MSC AWP – N0040626R0003.pdf PDF
2.1.3 J-3 Contractor Price Breakdown R1.xlsx XLSX spreadsheet
2.1.3 SOL AMDNT 6 - N0040627R00040006 Conformed.pdf PDF
2.1.3 SOL AMDNT 6 - J-5 RFC Answers.xlsx XLSX spreadsheet
2.1.3 SOL AMDNT 6 - N0040627R00040006 SF 30.pdf PDF
2.1.3 SOL AMDNT 1 - N0040627R00040001 SF 30.pdf PDF
2.1.3 SOL AMDNT 5 - J-5 RFC Answers.xlsx XLSX spreadsheet
2.1.3 SOL AMDNT 2 - J-5 RFC Answers.xlsx XLSX spreadsheet
2.1.3 SOL AMDNT 5 - N0040627R00040005 Conformed.pdf PDF
2.1.3 SOL AMDNT 5 -N0040627R00040005 SF 30.pdf PDF
2.1.3 SOL AMDNT 2 - N0040627R00040002 Conformed.pdf PDF
2.1.3 SOL AMDNT 2 - N0040627R00040002 SF 30.pdf PDF
2.1.3 SOL AMDNT 1 - N0040627R00040001 Conformed.pdf PDF
2.1.3 SOL AMDNT 1 - J-5 RFC Answers.xlsx XLSX spreadsheet
2.1.1 SOL - N0040627R0004.pdf PDF
2.1.3 SOL AMDNT 4 - CFRs 0095, 0096, 0097, 0098 & 0144.pdf PDF
2.1.3 SOL AMDNT 4 - J-5 RFC Tracker Answers.xlsx XLSX spreadsheet
2.1.3 SOL AMDNT 4 - N0040627R00040004 Conformed.pdf PDF
2.1.3 SOL AMDNT 4 - N0040627R00040004 SF 30.pdf PDF
2.1.3 SOL AMDNT 3 - N0040627R00040003 Conformed.pdf PDF
2.1.3 SOL AMDNT 3 - N0040627R00040003 SF 30.pdf PDF
2.1.3 J-5 RFC Answers AMDNT 3.xlsx XLSX spreadsheet
2.1.3 MDG No.1 thru No.4 Governor Pictures.pdf PDF
2.1.3 SOL AMDNT 2 - N0040627R00040002 Conformed.pdf PDF
2.1.3 SOL AMDNT 2 - N0040627R00040002 SF 30.pdf PDF
2.1.3 J-5 RFC Answers AMDNT 2.xlsx XLSX spreadsheet
2.1.3 SOL AMDNT 1 - N0040627R00040001 SF 30.pdf PDF
2.1.3 J-5 RFC Answers Amendment 1.xlsx XLSX spreadsheet
2.1.3 SOL AMDNT 1 - N0040627R00040001 Conformed.pdf PDF
2.1.1 J-1A WI Specification Package.pdf PDF
2.1.1 J-5 Request for Clarification.docx DOCX document
2.1.1 J-7 MSC Ship Repair Facility Survey.pdf PDF
2.1.1 J-6A Instructions Form W-14.pdf PDF
2.1.1 CDRLS DD 1423.pdf PDF
2.1.1 J-2 GFP Attachment.pdf PDF
2.1.1 J-6 IRS FORM W-14.pdf PDF
2.1.1 J-8 Contract Administration Plan.pdf PDF
2.1.1 J-4 Contractor Past Performance Data Sheet.docx DOCX document
2.1.1 J-1B List of Work Items with OEM.pdf PDF
2.1.1 J-3 Contractor Price Breakdown.xlsx XLSX spreadsheet
Show all 40

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION

15A. NAME AND

ADDRESS

OF OFFEROR

SOLICITATION, OFFER, AND AWARD 1. This Contract is a Rated Order under the Defense Priorities and Allocations System (DPAS) - Code of Federal Regulations - at 15 CFR 700.

RATING PAGE OF PAGES

2. CONTRACT NUMBER 3. SOLICITATION NUMBER 4. TYPE OF SOLICITATION 5. DATE ISSUED 6. REQUISITION/PURCHASE NUMBER

CODE7. ISSUED BY 8. ADDRESS OFFER TO (If other than item 7)

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

SOLICITATION

9. Sealed offers in original and copies for furnishings the supplies or services in the Schedule will be received at the place specified in item 8, or if hand carried, in the depository located in until local time

CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision Number 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.

10. FOR

INFORMATION

CALL:

A. NAME B. TELEPHONE (NO COLLECT CALLS)

AREA CODE NUMBER EXTENSION

C. EMAIL ADDRESS

11. TABLE OF CONTENTS

(X) DESCRIPTION PAGE(S) (X) SECTION PAGE(S)DESCRIPTION

A B C D E F G H

I

J

K

L

M EVALUATION FACTORS FOR AWARD

INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS

REPRESENTATIONS, CERTIFICATIONS AND OTHER

STATEMENTS OF OFFERORS

PART IV - REPRESENTATIONS AND INSTRUCTIONS

LIST OF ATTACHMENTS

PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

CONTRACT CLAUSESSOLICITATION/CONTRACT FORM

SUPPLIES OR SERVICES AND PRICES/COSTS

DESCRIPTION/SPECIFICATIONS/WORK STATEMENT

PACKAGING AND MARKING

INSPECTION AND ACCEPTANCE

DELIVERIES OR PERFORMANCE

CONTRACT ADMINISTRATION DATA

SPECIAL CONTRACT REQUIREMENTS

NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.

OFFER (Must be fully completed by offeror)

12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the set opposite each item, delivered at the designated point(s), within the time specified in the schedule.

13. DISCOUNT FOR PROMPT PAYMENT

(See Section I, Clause Number 52.232-8)

14. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the SOLICITATION for offerors and related documents numbered and dated):

10 CALENDAR DAYS (%) 20 CALENDAR DAYS (%) 30 CALENDAR DAYS (%) CALENDAR DAYS (%)

DATEAMENDMENT NUMBERAMENDMENT NUMBER DATE

CODE FACILITY 16. NAME AND THE TITLE OF PERSON AUTHORIZED TO SIGN OFFER

(Type or print)

15B. TELEPHONE NUMBER

AREA CODE NUMBER EXTENSION

15C. CHECK IF REMITTANCE ADDRESS IS

DIFFERENT FROM ABOVE - ENTER

SUCH ADDRESS IN SCHEDULE.

17. SIGNATURE 18. OFFER DATE

AWARD (To be completed by Government)

19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION

22. AUTHORITY FOR USING OTHER THAN FULL OPEN COMPETITION UNDER THE

UNITED STATES CODE AT:

10 U.S.C. 3204(a) ( )41 U.S.C. 3304(a)

24. ADMINISTERED BY (If other than Item 7)

26. NAME OF CONTRACTING OFFICER (Type or print)

IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.

AUTHORIZED FOR LOCAL REPRODUCTION

Previous edition is unusable

23. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

25. PAYMENT WILL BE MADE BY

27. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

28. AWARD DATE

CODE

ITEM

STANDARD FORM 33 (REV. 12/2022)

Prescribed by GSA - FAR (48 CFR) 53.214 (c)

SEALED BID (IFB) INVITATION FOR BID

NEGOTIATED (RFP) REQUEST FOR

PROPOSAL

(Hour) (Date)

PART I - THE SCHEDULE PART II - CONTRACT CLAUSES

Section A - Solicitation/Contract Form

USNS WALLY SCHIRRA (T-AKE 8) FY27 MID-TERM AVAILABILITY (MTA)

1. USNS WALLY SCHIRRA (T-AKE 8): NAVSUP Fleet Logistics Center Puget Sound (NAVSUP FLCPS) has a new requirement in support of the USNS WALLY SCHIRRA (T-AKE 8). The repair and maintenance package of work items are included as Work Item Specification Package Military Sealift Command (MSC)

AWP N0040626R0003.

2. PERIOD OF PERFORMANCE: 25 January 2027 through 15 March 2027

3. PLACE OF PERFORMANCE: The place of performance shall be entirely Outside the Contiguous United States (OCONUS), within the U.S. 7th Fleet Area of Responsibility (AOR), with a geographical restriction strictly excluding performance in India in accordance with MSC Memorandum dated 18 September 2025.

4. SUBMISSION OF OFFERS: Offerors must provide all information required by Section L of this solicitation no later than 16 October 2026 at 09:00 AM Eastern Daylight Time. Proposals shall be submitted in accordance with the electronic submission instructions set forth in Section L.

5. WORK ITEM INFORMATION:

a. Any work item priced based on an estimated quantity/scope will be balanced at the completion of the availability via a contract modification.

b. Work Items and references in the Work Items will be provided to offerors via DoD SAFE (a web based tool that provides users the capability to securely send and receive large files, including files that are too large to be transmitted via email.) Please email request for Work Items and references to: Bailey Butler, Contract Specialist, bailey.a.butler2.civ@us.navy.mil and Shawn Comparto, Contracting Officer, shawn.k.comparto.

civ@us.navy.mil

6. CONDITIONAL PROVISIONS AND CLAUSES: This solicitation contains the mandatory provisions and clauses, as well as conditional provisions and clauses (e.g., clause at H-3.0 Applicable to Contracts Performed in Japan; clause at H-4.0, Applicable to Contracts Performed in Korea). Conditional provisions and clauses are self-deleting if the contractors proposed place of performance is outside the specified jurisdiction.

7. In accordance with FAR RFO 19.000(b)(1) and the approved Market Research Memorandum, optional small business programs (including small business set-asides) and Small Business Subcontracting Plans (FAR RFO 19.302) are not applicable to this solicitation because contract performance will take place entirely outside the United States and its outlying areas (FAR RFO 19.109(b)(3)).

N0040627R0004

Section B - Supplies or Services & Prices or Costs

Additional Information/Notes

NOTE A: FIXED SHIP REPAIR LABOR AND MATERIAL HANDLING RATES FOR OVER AND ABOVE (GROWTH) WORK

1. The Contractor's fixed, fully burdened ship repair labor rate set forth in Attachment J-3 will be used for negotiating and settling over and above work to be performed under this Contract. The fully burdened labor rate and material rate identified in Attachment J-3 (Contractor Price Breakdown).

The Contractor agrees that the number of hours included in its price proposal submitted in response to Contract Change Order (CCO), shall include only direct production hours. For these purposes, direct production hours are for skilled labor at the journeyman level expended in direct production including but not limited to the following functions:

Abrasive cleaning/blasting Fire Watch Welding Burning Brazing Carpentry Machinists (inside and outside) Electrical Work Electronic Work Engineering Design Support Lagging Ship-fitting Boiler-making Painting Sheet-metal Work Pipefitting Rigging General Labor Staging/Scaffolding Diesel Mechanics

2. The fully burdened ship repair labor rate proposed by the contractor and identified in Attachment J-3, includes all costs associated with support functions (whether charged directly or indirectly by the Contractor's accounting systems) provided in support of the direct production functions listed in Note A paragraph 1 above. Support functions are considered to be included in the Contractor's fully burdened ship repair labor rate for direct production hours. Labor hours for support functions shall not be separately proposed, billed, or deducted from Over and Above allocations, including support provided to subcontractors. Support functions include, and are not limited to, those types listed below:

Testing Quality Assurance Execution Planning Cleaning (except tank cleaning) Supervision (all types, including, but not limited to supervision of trades, support personnel and subcontractors) Security Surveying Administration Transportation Purchasing Staff Lofting Other indirect support Handling & Warehousing Safety/Environmental Program Management

3. The fully burdened ship repair labor rate is a fixed hourly rate that includes all wages, (i.e. straight time, overtime, shift differential, holiday time, etc.), overhead, all other indirect costs, general and administrative expenses, Facilities Capital Cost of Money (FCCOM) and profit. The fully burdened ship repair labor rate represents a blended rate including labor transferred between divisions, subsidiaries, or affiliates of the contractor under a common control.

4. Consumable materials are goods used in the ordinary course of work performance such as office supplies, paper, rags, vehicle or equipment fuel costs, cleaning chemicals, disposable tools, welding rods, paint buckets, paint brushes, protective clothing, etc., that are consumed/used in the process of repair and do not become an integral part of the repaired vessel. Consumable material shall be included in the Contractor's fully burdened ship repair labor rate and shall not be separately priced or reimbursed under any Over and Above work.

5. Physical materials are goods that become incorporated into the repaired vessel in the course of the repair, such as replacement steel, pipes, paint, and fasteners. The material handling rate applies to physical materials but not to consumable materials. The material handling rate will be applied to the actual cost of the physical material. Actual cost does not include handling charges, general and administrative cost, overhead, profit, or any other indirect cost.

6. For over and above work involving subcontractors, subcontractor quotes will only be subject to the material handling fee rate identified in Attachment J-3. Subcontractor quotes must be competitively acquired and submitted with the contractor's pricing proposal in response to CCOs, if applicable, issued by the Contracting Officer (KO). At no time will the proposed total to be performed by the prime contractor combined with subcontractor quote, material quote, and applicable material handling fee be allowed to cost more than it would have, had the prime contractor directly provided all material and labor. If the Contractor intends to subcontract a CCO for procurement of material only, the Contractor shall notify the KO prior to submitting its CCO pricing stating the reason subcontracting the CCO is the best value to the Government. The proposed total pricing restriction addressed in the preceding sentence does not apply in any case where the work is required to be performed by Original Equipment Manufacturers (OEMs), or Government directed subcontractors. CCOs that are subcontracted for material only (no associated labor required within the CCO) shall not be subject to the material handling fee. Any material handling fee rate applied to new work shall be approved at the discretion of the KO, upon receipt of supporting documentation in accordance with FAR / RFO 15.404-1(b).

7. The Contract fixed fully burdened ship repair labor rate and material handling rate identified in Attachment J-3 shall be used for negotiating over and above work during the availability and up to three (3) months after the Contract Complete date.

NOTE B: AVAILABILITY SCHEDULE PERFORMANCE

1. The Contractor shall schedule the performance of all items in the work package, including all Base Items, Option Items, and Over and Above work--so as to accommodate scope increases up to the total labor hours and material dollars identified in the Over and Above CLIN 0002.

2. The Contractor agrees that Over and Above labor hours and materials, when authorized by the Contracting Officer, shall be performed, purchased and installed concurrently with the Work Items (WIs), without impacting, accelerating, or causing delay or disruption to the critical path, the redelivery date, or to any other work in progress for the Government.

NOTE C: OVER AND ABOVE WORK PROCEDURES - SHIP REPAIR

In accordance with DFARS Subpart 217.77 and DFARS clause 252.217-7028 (Over and Above Work), CLIN 0002 is established as a funded Over and Above line item to accommodate emerging work, repairs discovered during opening and inspection, and within-scope growth requirements:

The Contractor agrees to provide Over and Above effort in the performance of identified growth work under CLIN 0002 as follows:

CLIN Growth Associated with CLIN HOURS MATERIAL

0002 0001 27% CLIN 0001 27% CLIN 0001

1. Scope and Authority:

The Contractor shall perform additional required Over and Above work as authorized by the Contracting Officer in accordance with DFARS 252.217- 7028 and this Note C. These efforts are deemed warranted as over and above normal maintenance requirements or general repairs for equipment identified in the baseline CLIN 0001. Over and Above work includes, but is not limited to, the removal and replacement of worn or damaged components with OEM or commercially available parts, replacement of lubricants, filters, seals, and any additional mechanical, electrical, structural, or piping repairs required for complete machinery and system overhaul discovered during "open, clean, and inspect" evolutions.

2. Condition Found Reports (CFR) and Work Requests:

Whenever the Contractor discovers discrepancies, hidden damage, excessive wear, or determines that additional parts/work beyond the baseline specification are required, the Contractor shall immediately notify the Contracting Officer and Principal Port Engineer (PPE) via email and submit a formal Work Request / Condition Found Report (CFR). Each CFR shall include:

Identification of the specific WI and equipment discrepancy disclosed;

Precise shipboard location of the discrepancy;

Detailed description of the technical scope and corrective action proposed; and A Firm-Fixed-Price quote/proposal detailing estimated direct production labor hours and direct material costs necessary to correct the condition, supported by other than certified cost or pricing data and vendor quotes.

3. Authorization Requirement & Blanket Work Authorizations:

The Contractor shall not proceed with any Over and Above work or invoice against CLIN 0002 until authorized in writing by the Contracting Officer.

However, the Contracting Officer may issue a Blanket Work Authorization at time of contract award establishing administrative thresholds, standardized procedures, and an aggregate dollar limitation under which individual routine CFRs may be expedited and authorized.

4. Joint Review and Proposal Evaluation:

The Contracting Officer and the MSC Principal Port Engineer (PPE) will promptly review all CFRs, technical justifications, and cost proposals. If not covered by an active blanket authorization, the Contracting Officer will formally authorize the work via a written Direction Letter (DL) or bilateral /unilateral contract modification. Pricing shall be strictly determined by multiplying direct production hours by the fixed hourly labor rate and applying the fixed Material Handling Percentage (%) to direct material costs, as established in Attachment J-3.

5. Mandatory 80% Obligation Notification:

The Contractor shall notify the Contracting Officer and the Principal Port Engineer in writing via email immediately when cumulative authorized Over and Above work under CLIN 0002 exceeds 80% of the total amount obligated under the CLIN.

6. Scope Disputes and Continued Performance:

If the Contractor believes that any directed effort calls for work outside the scope of the contract, the Contractor shall notify the Contracting Officer in writing within two (2) business days of receipt of direction. In the event of an urgency or cost dispute, the Contracting Officer may unilaterally authorize hours and material against CLIN 0002. The Contractor shall promptly proceed with directed Over and Above work without delay, pending final resolution of any dispute in accordance with RFO 52.233-1 (Alternate I), "Disputes."

7. Allowable Direct Production Deductions:

Only actual, authorized direct production labor hours expended shall be deducted from the CLIN 0002 labor hour allocation. In accordance with Note A, all supervisory, QA, planning, and administrative labor is bundled into the fixed labor rate and shall not be deducted. Contractor quotes shall not include allowances for technical representatives unless specifically directed by the Contracting Officer.

8. Allowable Direct Material Deductions:

Only authorized direct material dollars and approved subcontractor costs shall be deducted from the CLIN 0002 material dollar allocation. In accordance with Note A, the Contractor shall not add handling fees, overhead, G&A, or profit to the settled acquisition cost of materials deducted from the allocation.

9. Final Settlement and 100% De-obligation of Unexpended Funds:

Following redelivery of the vessel and receipt of the Contractor's final availability report, the Contracting Officer will issue a final contract modification settling all Over and Above labor hours and material dollars. Once settled, neither party shall be entitled to an adjustment because actual expended hours or costs differed from the settled amount (except for fraud, gross mistakes, or latent defects). Any unexpended, unobligated balance of labor hours and material funds remaining on CLIN 0002 shall be unilaterally de-obligated by the Government at 100% value.

Item Supplies/Service Quantity Unit Unit Price Amount

USNS WALLY SCHIRRA (T-AKE 8) MTA

Complete the Mid-Term Availability (MTA) of USNS WALLY SCHIRRA (T-AKE 8) as described IAW Military Sealift Command (MSC) specification, AWP - N0040626R0003, under Section J, Attachment J-1. This is a total of subline items as described in Attachment J-3 Contractor Price Breakdown.

All prices stated shall be in NET US Dollars inclusive of all applicable charges.

The contractor shall submit an itemized breakdown of the price for each work item on the form provided in Section J, Attachment J-3.

Pricing Arrangement: Firm Fixed Price

1 Job

OVER AND ABOVE (O&A) FOR CLIN 0001

IAW DFARS Subpart 217.77 and DFARS clause 252.217-7028 (Over and Above Work), CLIN 0002 is established as a funded O&A line item to accommodate emerging work, repairs discovered during opening and inspection, and within-scope growth requirements.

Additional O&A labor & material projected at 27% of Basic Work Items for CLIN 0001 to accomplish the MTA of USNS WALLY SCHIRRA (T-AKE 8) as described IAW MSC specification, AWP - N0040626R0003, under Section J, Attachment J-1.

All prices stated shall be in NET US Dollars inclusive of all applicable charges.

The contractor shall submit pre-priced rates for O&A labor & material on the form provided in Section J, Attachment J-3.

*Contractor shall not incur any costs under this CLIN until a formal written authorization is issued by the Contracting Officer.

Pricing Arrangement: Firm Fixed Price

1 Job

Contract Data Requirement Lists (CDRLs) IAW MSC specification, AWP - N0040626R0003, under Section J, Attachment J-1.

1 Job

CLIN is Not Separately Priced (NSP).

Pricing Arrangement: Firm Fixed Price

Section C - Description/Specifications/Statement of Work

C-1 GENERAL

The Contractor shall prepare for and accomplish the attached Work Items (WIs) as specified herein and in accordance with (IAW) the Specification Package Military Sealift Command (MSC) AWP - N0040626R0003 as provided herein, test procedures and other detailed data provided by the Government.

The Contractor shall perform planning, document preparation, engineering, procurement, prefabrication and shipyard production work, and/or any other work necessary to prepare for and accomplish the alterations, repairs, maintenance and routine work specified herein. These requirements include, but are not limited to, the following:

(a) Management

Provide the management, procurement, production, testing, quality assurance, technical capability and resources necessary to prepare for and accomplish the repairs and alterations IAW the requirements stated herein, the contract work specifications, and the additional work specifications, if necessary, within the availability time period specified in Section F.

(b) Scheduling and Progress Measurement

1. Accomplish planning and scheduling to ensure timely procurement of Contractor Furnished Material/Contractor Furnished Property (CFM/CFP) and receipt, storage, and installation of Government Furnished Material/Government Furnished Property (GFM/GFP) and CFM /CFP.

2. Apply progress measurement systems to determine the physical progress of completed work for each of the elements in the contractor's scheduling plan, including material and manpower control, engineering, production, tests and trials IAW the Contractor's own Technical Proposal, and the work item package. The progressing system shall permit a direct comparison of the physical progress of completed work to the planned performance measurement baseline for each of the elements in the scheduling plan.

3. Establish management procedure and systems to identify behind schedule conditions and unfavorable schedule variance, using the scheduling plan performance measurement baseline, each of the elements in the baseline, and the progress measurement systems. The applied systems and procedures shall provide timely identification of scheduling problem areas to permit prompt management action to correct unsatisfactory conditions.

4. Develop a performance milestone schedule/critical path chart to measure scheduled performance. Deviations from the milestone schedule/critical path chart must be submitted to and approved by the Contracting Officer (KO). The Contractor warrants that all work required by Section C of this contract shall be completed within the performance period stated in Section F of the Contract. A performance milestone schedule and critical path chart shall be developed and submitted IAW the Work Item Package.

(c) Quality Contract Plans

1. Quality Control Plan: Provide a detailed Quality Control (QC) Plan to address the method in compliance with WI 0004. Identify the individuals who will perform the OQ function to include other duties, if any, to be performed by QC personnel. Include method of documentation (e.g. logs, notebooks, records) Present the test failure recover plan.

2. Quality Procedures: Apply approved quality control procedures as required by this contract and the work item package to ensure procured material and performed production work conforms to the required quality standards.

3. Heavy Weather Plan: Provide a Heavy Weather Plan IAW WI 0006. The plan shall include a description of the protection arrangement available and the preventive measures that will be taken to ensure the safety of the ship from potential heavy weather conditions.

4. Cold Weather Plan: Provide a Cold Weather Plan IAW WI 0007. The Cold Weather Plan shall include a description of the protection arrangements available and the preventive measures that will be taken to ensure the safety of the ship from potential cold weather conditions.

(d) Hazardous Waste Management Plan

Provide a copy of the facility's Hazardous Waste Spill Response Plan to include the following:

1. Identified key shipyard personnel associated with hazardous waste management including, but not limited to, personnel associated with employee training, hazardous waste identification, and manifest documentation.

2. Identify any subcontractors associated with removal, handling, and disposal of hazardous waste, including but not limited to, subcontractors responsible for removing, storing, transporting, recycling, reclaiming, or otherwise disposing of hazardous waste. All permits or other applicable credentials associated with safe and proper disposal of hazardous waste should be included. If a hazardous waste subcontractor is changed for any reason, the Hazardous Waste Management Plan shall be amended prior to the new subcontractor beginning work on the vessel.

3. Identify all agencies associated with the disposal of hazardous waste.

4. Outline procedures used by the facility to accomplish removal, handling, storage, and disposal of hazardous waste IAW facility and location requirements.

5. All steps procedure to reduce the volume and toxicity of hazardous waste generated during the performance of the contract. This is to include but not be limited to a description of management of hazardous waste generation, process controls utilized to ensure that effective minimization techniques are maintained, and any technological resources available to reduce either the toxicity or the volume of hazardous waste.

(e) Certifications

1. Welding: The offeror shall submit current ABS/IACS member welder certifications utilizing the GMAW weld procedures. The contractor shall provide a listing of welders that will perform welding work and applicable weld certifications. Welder Certifications shall provide justification for the Currency of the specified Weld Procedures IAW American Welding Society D1.2 paragraph 3.23, ASME Code Sect IX for CUNI 90/10 (1.5-6.1mm), ASTM A335 P22 (1.5-17.48mm) welding process 141 with unlimited piping diameters, welder continuity/currency logs shall be submitted. The welder certifications shall be valid for the duration of the physical work occurring onboard the vessel. The offeror shall provide the policy establishing its condition found report (CFR) process and deck plate process to control their material traceability for use during this availability. Traceability shall include material certifications, ABS approved repair plans, weld filler material certifications, welder certifications and weld processes.

2. Paint & Coatings: The offeror shall provide a list of all personnel performing paint work as well as current certifications that are valid for the duration of the physical work occurring onboard the vessel in the following:

NACE/NBPI or FROSIO Level III Certified Coatings Inspector Certification OR submit a coatings inspector certification that covers the following minimum course topics:

i. Corrosion and corrosion control

ii. Inspection of corrosion

iii. Chemical or detergent cleaning methods

iv. Mechanical cleaning methods

v. Abrasive blast cleaning

vi. Water-jetting and alternative surface preparation methods

vii. Surface preparation method selection

viii. Coatings

ix. Safety

x. Coating application

xi. Coating defects and failures

xii. Specialty coatings and surfaces

xiii. Coating inspector preparation

xiv. Condition assessment

xv. Coatings inspection instrument exercises and workshops

xvi. Organizational Blasting Operations

xvii. Spray Paint Certification

xviii. Blaster Certification for Personnel Accomplishing Blasting Operations

xix. Blasting Certification for personnel Accomplishing Ultra High Pressure Water Jetting Operations

3. Safety: The offeror shall submit the following safety documentation for all prime and sub-contractor personnel that will be operating man-lifts, working at heights requiring fall protection and operating personnel lifts. All training and safety certificates shall be current and valid throughout the solicited period of performance.

i. Fall Protection Training Certifications (for personnel)

ii. Man-Lift Operator Training Certifications (for personnel)

iii. Personnel Lift Safety Certifications (for machines)

4. Non-Destructive Testing Inspection (NDT):The offeror shall submit documentation showing that all prime and sub-contractor personnel have satisfactorily met all requirements per ABS for NDT inspections and that they are current in certification. All training and NDT certificates shall be current and valid throughout the solicited period of performance.

i. Penetrant Testing (PT)

ii. Ultrasonic Testing (UT)

iii. Magnetic Particle Testing (MT)

(f) Apply procedures to ensure that the ship's equipment and systems remain configured to existing baselines with regard to procured material, production work, and software.

(g) Apply stringent configuration control procedures to ensure that configuration baselines are maintained for procured material and production work.

(h) Provide for staging and storing of Long Lead Time Material (LLTM) for use in the availability, as required by the Work Item Package.

(i) Comply with all security requirements and measures called for on the DD Form 254, if the form is listed in Section J and attached hereto.

(j) DATA REQUIRED FOR CONTRACT CHANGE ORDER (CCO):

For all generated CCOs (O&A, New Work, New Work Growth), the Contractor shall provide all CCO pricing proposals to the KO within five (5) calendar days of receipt, unless otherwise specified on an individual CCO. A Contractor's CCOs price proposal shall remain valid for a minimum of 14 calendar days, unless otherwise specified on an individual CCO. If the Contractor intends to request settlement of a CCOs price prior to 14 calendar days, the Contractor shall notify the KO, in writing, prior to submitting the CCOs price proposal stating the reason the CCOs price proposal must be settled in less than 14 calendar days and propose a revised timeline. The request will be accepted or rejected at the discretion of the KO. The Contractor shall list as part of the CCOs price proposal any specific terms and conditions related to completion of the change order to include impact to milestones, sequencing of adjacent WIs, and revised completion date(s) for impacted work item(s). Any proposed change to a schedule milestone shall include a proposed revised date. If such items are not included as part of the CCOs price proposal (where applicable), the CCOs price proposal will not be considered timely received.

The pricing of the CCOs proposal shall include at a minimum:

a. Labor hours to be performed by the Contractor $_________________________________

b. Subcontractor Quote (If applicable) $_________________________________

c. Material Quote (If applicable) $_________________________________

Proposed labor hours to be performed by the Contractor shall be provided broken down by paragraph and/or task, trade and Note 1 - Labor Hours:

labor hour mix as contained in the J-3 pricing attachment(s).

Material pricing shall include a list detailing the source, part number, description, unit cost, quantities, total cost and underlying Note 2 - Material:

vendor quotes for each line item.

Subcontractor quotes shall include labor hours, labor rate, material (part number, description, unit cost, quantity, total Note 3 - Subcontractor Quotes:

cost, and vendor quotes for each line item), and tiered subcontractor quotes (if applicable). The Contractor shall submit documentation establishing the price reasonableness of each subcontractor quote per RFO 15.404-8(a).

The requirements for complete submission of a CCOs price stated above represents the minimum and does not Note 4 - Supporting Documentation:

limit the Government from requesting additional information. In the event the KO is unable to make a fair and reasonable determination based on the original CCO pricing submission, the Contractor shall comply with RFO 15.402(a)(2) which requires the Contractor to provide data the KO needs in order to determine a fair and reasonable price.

The above documentation must accompany the CCO proposal to be considered submitted to the KO. The number of days Note 5 - Late Submissions:

a Contractor's CCO's price proposal remains valid does not begin until the CCOs price proposal is considered received by the KO.

If circumstances arise where the Contractor is unable to submit a CCO's proposal within three (3) business days, the Contractor shall notify the KO in writing of the specific circumstances and provide a revised date in which a CCOs price proposal will be submitted. Additional time needed to complete a CCO's price proposal may be granted solely at the discretion of the KO. The new timeframe granted solely at the discretion of the KO and which may differ from the Contractor's request, shall be met by the Contractor. Notification of a late CCO's price proposal does not exempt the Contractor from meeting its requirement but will be considered by the Government when conducting a CPARS evaluation and utilized for past performance ratings on future contracts. Late submission of CCO's may result in deductions assessed. Furthermore, all CCO's will be adjudicated within three (3) business days of receipt of the CCO's by the Government. If bilateral agreement cannot be met a unilateral settlement will occur at the price of the Independent Government Estimate (IGE). The Government may continue to negotiate in hopes of reaching a bilateral agreement with the Contractor. If a bilateral agreement is not met the Contractor can submit documentation IAW RFO 52.233-1 (Alternate I), "Disputes.".

If clarification is needed in response to a CCO, the Contractor must submit a Request for Clarification (RFC) Note 6 - Requests for Clarification:

within two (2) business days of receipt of the Government's CCOs. Once a RFC is submitted, the Contractor, KO and Principal Port Engineer (PPE) will meet the following business day to clarify the scope of work. If, as a result of the meeting, a CCOs revision is required, the Contractor's CCOs price submission will run from the date of receipt of the revised CCO. If an RFC is received after the two (2) business day deadline, it is at the KO's discretion whether to accept the submission.

(k) DESCOPING OF REQUIREMENTS: The Government reserves the right to change or terminate this contract. CCO changes to descope work specifications are incorporated into the contract via descope CCOs and may consist of partial deletion of paragraph(s) from a work

. The Government will rely on the labor rates and prices entered in Attachment J-3, for specification or deletion of a work item in its entirety negotiating and settling descope CCOs.

Pricing of Deletion CCOs: The Contractor agrees to descope changes CCOs at the same labor rate awarded in Attachment J-3, as follows:

1. Partial or Full Basic Work Package Deletions: Partial or full work item descoping from the Basic Work package (CLIN 0001) will be descoped at the awarded labor rate on the Work Item Index tab of Attachment J-3.

2. Over and Above Deletions: Partial or full work item descoping from settled O&A work items (CLIN 0002) will be descoped at the Partial or Full agreed-upon fixed labor rate entered in Attachment J-3.

3. Partial or Full New Work Deletions: Partial or full work item descoping from settled New Work items will be descoped at the agreed-upon fixed labor rate entered in Attachment J-3.

4. Partial or Full New Work Growth Deletions: Partial or full work item descoping from settled New Work Growth items will be descoped at the agreed-upon fixed labor rate entered in Attachment J-3.

(l) AUTHORIZED CHANGES ONLY BY THE CONTRACTING OFFICER: Except as specified in the paragraph below, no order, statement, or conduct of Government personnel who visit the Contractor's facilities or in any other manner communicates with Contractor personnel during the performance of this contract shall constitute a change under the "Changes" clause of this contract.

The Contractor shall not comply with any order, direction or request of Government personnel unless it is issued in writing and signed by the Contracting Officer or is pursuant to specific authority otherwise included as a part of this contract.

The Contracting Officer is the only person authorized to approve changes in any of the requirements of this contract and, notwithstanding provisions contained elsewhere in this contract, said authority remains solely the Contracting Officer's. In the event the Contractor effects any change at the direction of any person other than the Contracting Officer, the change will be considered to have been made without authority and no adjustment will be made in the contract price and/or schedule to cover any increase in charges incurred as a result thereof. The only exception to this is if the Contractor is ordered to stop work for a safety reason. In the event the Contractor is asked to stop work for safety reasons, the Contractor shall notify the Contracting Officer in writing of the circumstances surrounding the stop work.

If the Contractor believes it has been directed to perform work outside the scope of the contract, it must notify the Contracting Officer immediately.

(m) ACCOUNTABILITY OF OVER AND ABOVE CLIN 0002

For accountability of the O&A WIs under CLIN 0002, in addition to the specific requirements of the job order or contract, the Contractor shall accomplish the following:

1. Condition Found Reports (CFR) and Work Requests:

Upon discovering discrepancies, hidden damage, or necessary repairs during "open, clean, and inspect" evolutions, the Contractor shall submit a written Condition Found Report (CFR) / Work Request via email to the Contracting Officer and the MSC Principal Port Engineer (PPE). Each CFR shall detail the discrepancy, specific shipboard location, recommended technical solution, and a firm-fixed-price proposal incorporating direct production labor hours and direct material costs IAW Section C.

2. Scope Limitation: tasking under CLIN 0002 shall only be used to accomplish within-scope growth, emerging repairs, and machineO&A /component overhauls resulting from Base Work Items associated with CLIN 0001. It shall not be used to accomplish new work outside the scope of the competitively awarded procurement.

3. Authorization Requirement: The Contracting Officer and the MSC Principal Port Engineer will promptly review the CFR and associated quote. The Contractor shall not proceed with any work or invoice against CLIN 0002 until authorized in writing by the Contracting Officer via an O&A Authorization to Proceed (ATP), Direction Letter (DL), or contract modification.

4. Blanket Work Authorizations: IAW Section B Note C, the Contracting Officer may issue a Blanket Work Authorization at time of award setting forth standardized procedures, administrative thresholds, and a total dollar limitation under which routine CFRs may be expedited.

5. Estimate Adjudication & NAVSUP FLCPS Resolution: In the event the Contractor's estimate differs from the Government estimate prepared by NAVSUP FLCPS and MSC, labor hours and material costs shall be negotiated promptly. If agreement cannot be reached before work must proceed to prevent schedule delay, the KO may issue a unilateral direction to proceed at a directed labor hour/price level. The Contractor shall proceed immediately with directed work. Any remaining disagreement shall be resolved IAW RFO 52.233-1 (Alternate I), "Disputes."

6. Mandatory 80% Obligation Notification: The Contractor shall notify the Contracting Officer and Principal Port Engineer in writing via email immediately when cumulative authorized work under CLIN 0002 exceeds 80% of the total funds obligated under the CLIN.O&A

7. Weekly O&A Tracking Reports: The Contractor shall submit one legible electronic copy of a weekly report listing all CFRs and CCO items O&A to the PPE and KO. The report shall contain: Work Item number; CFR/CCO number; title/description; direct labor hours and material dollars negotiated/authorized; cumulative amounts authorized against CLIN 0002; and the remaining unexpended balance of labor hours and material dollars allocated under the CLIN.

8. Final O&A Settlement Report: The Contractor shall submit a final cumulative report no later than five (5) calendar days following O&A completion of the availability / vessel redelivery to the KO and PPE.

9. Final Settlement & 100% Recoupment: Following redelivery and review of the final report, the KO will issue a final contract modification settling all labor hours and material costs. Once settled, neither party will be entitled to an adjustment based on actual expended hours or costs (except O&A for fraud, gross mistakes, or latent defects). Any unexpended, unobligated balance of labor hours and material funds remaining on CLIN 0002 shall be unilaterally de-obligated by the Government at 100% value.

C-2 TESTING AND QUALITY CONTROL

Provide and maintain an inspection system acceptable to the Government IAW the Specification Package MSC AWP - N0040626R0003 as provided herein and additional requirements contained herein.

A. Nonconforming Material

The Contractor shall establish and maintain a positive system for controlling material which is not in conformance with contractor requirements. The system shall identify and segregate nonconforming material.

B. Subcontractor Control and Evaluation

1. The Contractor shall require subcontractors and suppliers to invoke adequate inspection systems that ensure the required quality of materials, parts, components, and services for end-use in this ship repair. The Government shall be permitted to monitor the Contractor's system for inspecting subcontractors.

2. The Contractor is reminded of the requirements associated with subcontracting with contractors that are debarred, suspended or proposed for debarment contained at RFO 52.209-6. As with all FAR / RFO requirements, please ensure familiarity with those requirements prior to submitting their offer.

C. Calibration

1. Only calibrated equipment shall be used to perform tests and inspections.

2. Test and measuring equipment shall be within industry standard limits and shall be calibrated against standards traceable to the National Bureau of Standards.

3. Calibrated equipment shall be identified with a label stating date of calibration, due date and certifying agency.

4. Calibrated equipment shall be used for all pressure and weight testing, measurements of electrical waves, balancing operations, tachometers and other indirect measuring devices used for inspection or to record data or dimensions required by specifications.

C-3 MANAGEMENT/STAFFING PLAN

Provide an organization chart of the significant positions who will be assigned for this availability within 10 days after award. The chart shall include the positions in upper management, program managers, negotiators, estimators, scheduling personnel, engineering personnel, key production personnel by trade, and the lead position in the shipyard safety organization, testing organization, and the quality control organization.

C-4 GENERAL TECHNICAL REQUIREMENTS

The following COMSC Instruction is hereby incorporated into this Contract by reference: COMSC Instruction 4700.16 Series, "General Technical Requirements." Copies of this instruction are available at https://flankspeed.sharepoint-mil.us/sites/USFF-MSC via search for "COMSC Instruction

4700.16 Series." In the event that the instruction cannot be found, please reach out to the assigned Contracting Officer.

C-5 LATENT CONDITIONS, OVER AND ABOVE WORK, AND NEW WORK DISTINCTIONS

1. Notice of Discrepancies and Latent Conditions: The Contractor is required to notify the Contracting Officer via email regarding O&A and new work within 30 days of discovery of any apparent errors or omissions in the contract package (specifications, drawings, etc.) or conflicts between the contract package and actual conditions observed during ship checks or contract execution.

2. Over and Above Work Distinctions: Growth work under CLIN 0002 is synonymous with work, which is governed by DFARS subpart O&A

217.77 and DFARS 252.217-7028 (Over and Above Work) and it is administered via the Condition Found Report (CFR) process in Section C and Section B.

3. New Work Distinction: New Work is distinguished from work and is outside the scope of the competitively procured requirement, identified O&A as an additional work item not part of the awarded package. New Work will be approved IAW RFO Part 6 and associated agency policies and procedures.

4. Pre-Award Ambiguities: The Government will not negotiate modifications to increase the contract price to address errors, ambiguities, or omissions to the contract package which were reasonably apparent to the contractor prior to proposal submission.

Addendum to Performance Work Statement:

9.1 Over and Above (O&A) Work:

9.1.1 The Contractor shall perform additional required work as authorized by the Contracting Officer in accordance with DFARS 252.217-O&A 7028 and the procedures contained below. These types of efforts are deemed warranted as the normal service requirements or general repairs O&A for equipment already identified in the applicable CLINs. The work may include but is not limited to any removal and replacement of parts O&A with OEM or commercially available parts, OEM part replacement, grease, oil, filters, and/or any other components required for machine repair, maintenance, or overhaul.

9.1.2 In the event the Contractor identifies any discrepancies or determines that additional parts and/or services other than what is listed on this PWS /SOW are needed, the Contractor shall notify the Contracting Officer via email and supply a work request/Conditional Found Report (CFR) detailing the type of discrepancy disclosed, specific location of the discrepancy, description of work proposed to address the discrepancy, and a quoteO&A /proposal with the estimated labor hours and material necessary to correct it.

9.1.3 The Contractor shall not proceed with any additional work or invoice for work until authorized by the Contracting Officer. However, the O&A Contracting Officer may provide a blanket authorization for work at the time of award describing the matter in which individual work O&A O&A requests will be administered and setting forth a dollar limitation for all work under the contract.O&A

9.1.4 The Contracting Officer and Principal Port Engineer will promptly review any work requests/CFRs and associated quotes and authorize, if not previously authorized by through a blanket work authorization, work as necessary to satisfactorily complete the overhaul, repair, or O&A maintenance work. The Contractor shall submit a firm-fixed price quote/proposal for any proposed work that includes a cost breakdown for O&A labor rate and hours, travel costs, and material costs as necessary to support a work request/CFR along with any other than certified cost or pricing data to support the quote/proposal.

9.1.5 The Contractor shall notify the Contracting Officer and Principal Port Engineer when work under this contract exceeds 80% of the O&A amount obligated under the applicable CLIN.O&A

Requirements This requirement is for the USNS WALLY SCHIRRA (T-AKE 8) FY27 MID-TERM AVAILABILITY (MTA) with a Period of Performance from 25 January 2027 - 15 March 2027.

Section D - Packaging and Marking

Section E - Inspection and Acceptance

FAR Clauses Incorporated by Reference

Number Title Effective Date

Alternate/ Deviation

Variation Effective Date

52.246-2 Inspection of Supplies-Fixed-Price. Aug 1996 52.246-16 Responsibility for Supplies. Apr 1984

FAR Clauses Incorporated by Full Text

52.246-11 Higher-Level Contract Quality Requirement. (Tailored) (Dec 2014)

Higher-Level Contract Quality Requirement (Dec 2014)

(a) The Contractor shall comply with the higher-level quality standard(s) listed below.

Higher level quality requirements are detailed in the individual work items and include ABS standards.

Work Item No.

Description

0001 TAKE-SWI-SCOPE GENERAL REQUIREMENTS AND DEFINITIONS

0002 TAKE-SWI-TECHNICAL AND MANUFACTURERS REPRESENTATIVE

0003 TAKE-SWI-APPROACH BERTHING AND MOORING REQUIREMENTS

0004 TAKE-SWI-TESTING AND QUALITY ASSURANCE

0005 TAKE-SWI-HIGH VOLTAGE ELECTRICAL SAFETY PROCEDURE REQUIREMENTS (2)

0006 TAKE-SWI-HEAVY WEATHER PLAN

0007 TAKE-SWI-COLD WEATHER PLAN

0010 TAKE_SWI_FURNISH OFFICE FOR OMT (OCONUS)

TAKE-SWI-GENERAL SERVICES FOR SHIP

TAKE-SWI-INFORMATION TECHNOLOGY SERVICES

TAKE-SWI-INTEGRATED PROJECT PLANNING AND PRODUCTION STATUS MONITORING REPORTS

TAKE-SWI-WEIGHT AND MOMENT REPORT

TAKE-SWI-ILS-GFM

TAKE-SWI-FIRE PROTECTION AND SHIPS SAFETY PROGRAM

0017A

TAKE-SWI-HANDLING SHIPS STORES - STORING

TAKE-SWI-DELIVERY AND REDELIVERY OF THE VESSEL

TAKE-SWI-SHIPBOARD ACCESS AND SECURITY

TAKE-SWI-GAS FREE CERTIFICATES

TAKE-SWI-CLEAN AND GAS FREE TANKS VOIDS COFFERDAMS AND SPACES

TAKE-SWI-MACHINERY SPACE TURN-OVER DOCK TRIALS AND SEA TRIALS

TAKE-SWI-HAZARDOUS WASTE DISPOSAL AT A CONTRACTOR FACILITY

TAKE-SWI-OCONUS FORCE PROTECTION

TAKE-CCSI-ABS ANNUAL SURVEY - TANK INSPECTION

0152B

0152B T-AKE Ultrasonic Thickness Gauging (Ballast Piping) Rev A

0165 Low Profile Non-Slip Weatherdeck Preservation

0173A

TAKE-CCSI-PRESERVE AND PAINT 2K SQFT TOPSIDE (1YR)

0173B

TAKE-CCSI-PRESERVE AND PAINT 2K SQFT MACHINERY SPACES (1YR)

TAKE-CCSI-MOORING STRUCTURE PRESERVATION (10 YR)

TAKE-CCSI-TOPSIDE CRADLES AND FOUNDATIONS PRESERVATION (10 YR)

Solid Cargo Deck NonSkid Repairs

Exterior Platforms Foundations Preservation

Cargo Hold No 3 Ladders Preservation

Cargo Pedestal Preservation

Exterior Platforms Structural Repairs

Preservation of Lifeboats & RHIB Davits

Kick Pipes Stuffing Tubes Repairs

Ballast Tanks Sounding Caps

0651B

TAKE-CCSI-ANNUAL LIFEBOAT DAVIT INSPECTION (TAKE 1-12)

TAKE-CSI-MDE CONTROL SAFETY INSPECTION AND TEST (1 YR) (SCSI)

TAKE-CSI-AUTOMATION AND PROPULSION CONTROL INSPECTION AND TEST (1 YR) (SCSI)

TAKE-CSI-VULKAN COUPLING INSPECTIONS (1 YR) (SCSI)

TAKE-CCSI-WOODWARD GOVERNORS (18K HRS) (SCSI)

TAKE-CSI-PLC SURVEY (2 YR)

TAKE-CSI-EMERGENCY GENERATOR - INSPECT AND SERVICE (2.5 YR) (SCSI)

TAKE-CCSI-THERMOGRAPHIC SURVEY (1 YR)

Bridge Windows Repairs

TAKE-CSI-CALIBRATE ELECTRONIC TEST EQUIPMENT (GPETE) (1 YR)

TAKE-CSI-ANNUAL INTEGRATED BRIDGE EQUIPMENT SERVICE AND CERTIFICATION (SCSI)

TAKE-CCSI-ANNUAL GYRO SYSTEM PM

TAKE-CCSI-ANNUAL VDR RECERTIFICATION

TAKE-CCSI-ANNUAL RADIO COMMUNICATION EQUIPMENT RECERTIFICATION

TAKE-CCSI-ANNUAL INSPECTION OF MANUALLY OPERATED ALARMS

0501_A_SPERRE Air Compresors Overhaul

Misc Interior Drain Piping Renewal

TAKE-CSI-CARGO CRANE INSPECTION (1 YR) (SCSI)

0504_A_No 2 LTFW & No 1 CSW Pump Motor OVHL

M1 M2 M3 M4 Damper Vane Axial Fan Mor OVHL

TAKE-CSI-EMERGENCY DIESEL GENERATOR -ANNUAL TESTING AND INSPECTION (1 YR) (SCSI)

Industrial Assistance (NSWCPD)

0512A

TAKE-CSI-MAGAZINE SPRINKLER GAUGE CALIBRATION (1 YR)