This file is a Request for Clarification (RFC) Tracker containing questions and answers exchanged between offerors and the Government regarding Solicitation N0040627R0004 for USNS WALLY SCHIRRA (T-AKE 8) FY27 Mid-Term Availability (MTA). The tracker documents 16 clarification requests received between October 1-7, 2026, with responses provided on the same dates across four amendments. Key technical clarifications addressed include vessel draft specifications (9 meters expected), electrical shore power requirements (portable generators acceptable if meeting amperage requirements), crane services transition from per-lift to daily rate pricing, mobile phone alternatives for IT services, tank cleaning scope limited to marked tanks, Woodward Governor maintenance specifications with photographic documentation, motor capacity specifications for various equipment (vane axial fans ranging from 15-100 HP, ASD fan motors at 1/3 HP), gauge calibration references, and firefighting system inspection documentation. The Government declined to extend the proposal submission deadline due to an accelerated award schedule tied to the Period of Performance start date. Additional clarifications specified that oil replacement for cargo crane inspection is contractor-furnished material, exterior platform preservation requires sectional staging on two sides approximately 10 feet high, air compressor serial numbers are available for the scope of work, weatherdeck preservation encompasses approximately 21,000 square feet for both painting and blasting operations, and last inspection reports for firefighting and life-saving systems are available. The solicitation is for non-commercial ship repair services under NAICS 336611 with a firm fixed price contract structure and full and open competition.

View the file

Other files

File Type Posted
2.1.3 J-3 Contractor Price Breakdown R1.xlsx XLSX spreadsheet
2.1.3 J-1A Work Item Specification Package R1 MSC AWP – N0040626R0003.pdf PDF
2.1.3 SOL AMDNT 6 - J-5 RFC Answers.xlsx XLSX spreadsheet
2.1.3 SOL AMDNT 6 - N0040627R00040006 Conformed.pdf PDF
2.1.3 SOL AMDNT 6 - N0040627R00040006 SF 30.pdf PDF
2.1.3 SOL AMDNT 2 - J-5 RFC Answers.xlsx XLSX spreadsheet
2.1.3 SOL AMDNT 2 - N0040627R00040002 Conformed.pdf PDF
2.1.3 SOL AMDNT 1 - J-5 RFC Answers.xlsx XLSX spreadsheet
2.1.3 SOL AMDNT 5 - J-5 RFC Answers.xlsx XLSX spreadsheet
2.1.3 SOL AMDNT 1 - N0040627R00040001 SF 30.pdf PDF
2.1.1 SOL - N0040627R0004.pdf PDF
2.1.3 SOL AMDNT 5 -N0040627R00040005 SF 30.pdf PDF
2.1.3 SOL AMDNT 2 - N0040627R00040002 SF 30.pdf PDF
2.1.3 SOL AMDNT 5 - N0040627R00040005 Conformed.pdf PDF
2.1.3 SOL AMDNT 1 - N0040627R00040001 Conformed.pdf PDF
2.1.3 SOL AMDNT 4 - CFRs 0095, 0096, 0097, 0098 & 0144.pdf PDF
2.1.3 SOL AMDNT 4 - N0040627R00040004 Conformed.pdf PDF
2.1.3 SOL AMDNT 4 - N0040627R00040004 SF 30.pdf PDF
2.1.3 SOL AMDNT 3 - N0040627R00040003 SF 30.pdf PDF
2.1.3 MDG No.1 thru No.4 Governor Pictures.pdf PDF
2.1.3 SOL AMDNT 3 - N0040627R00040003 Conformed.pdf PDF
2.1.3 J-5 RFC Answers AMDNT 3.xlsx XLSX spreadsheet
2.1.3 SOL AMDNT 2 - N0040627R00040002 Conformed.pdf PDF
2.1.3 SOL AMDNT 2 - N0040627R00040002 SF 30.pdf PDF
2.1.3 J-5 RFC Answers AMDNT 2.xlsx XLSX spreadsheet
2.1.3 SOL AMDNT 1 - N0040627R00040001 SF 30.pdf PDF
2.1.3 SOL AMDNT 1 - N0040627R00040001 Conformed.pdf PDF
2.1.3 J-5 RFC Answers Amendment 1.xlsx XLSX spreadsheet
2.1.1 J-1A WI Specification Package.pdf PDF
2.1.1 Solicitation - N0040627R0004.pdf PDF
2.1.1 J-7 MSC Ship Repair Facility Survey.pdf PDF
2.1.1 J-1B List of Work Items with OEM.pdf PDF
2.1.1 J-3 Contractor Price Breakdown.xlsx XLSX spreadsheet
2.1.1 J-5 Request for Clarification.docx DOCX document
2.1.1 J-6A Instructions Form W-14.pdf PDF
2.1.1 CDRLS DD 1423.pdf PDF
2.1.1 J-2 GFP Attachment.pdf PDF
2.1.1 J-8 Contract Administration Plan.pdf PDF
2.1.1 J-4 Contractor Past Performance Data Sheet.docx DOCX document
2.1.1 J-6 IRS FORM W-14.pdf PDF
Show all 40

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

RFC No.ReceivedAnsweredWI No.Para.WI TitleQuestionAnswer
110/1/2610/2/2026
Amendment 00010003N/ATAKE-SWI-APPROACH BERTHING AND MOORING REQUIREMENTSFor planning of the afloat repair works, please confirm the vessel's lightest achievable operating draft (Forward/Aft/Mean Draft) after deballasting and cargo/fuel consumption, while maintaining safe stability and operational requirements.Expect nine (9) meters.
210/2/2610/2/2026
Amendment 000100117.1.1 & 7.1.25GENERAL SERVICES FOR SHIP7.1.1 Electrical Shore Power: Since our proposed Third Party Port does not have the capacity to provide Electrical Shore Power as required in the work specifications, we would like to propose to provide portable generators that can meet the requirement. This is the same service that we have provided in the previous availabilities of T-AKE ships. Please confirm if this is acceptable.

7.1.25 Crane, Forklift and Transportation Services: Since the ship will be berthing at Third Party Port, crane charges will not be charged on per lift but on a per day basis. We will provide crane daily at the port during the whole duration of the PoP. This is the same arrangement as what we have provided in the previous availabilities. 7.1.1: This is acceptable if it still meets all amperage requirements.

7.1.25: The Government requests more information prior to answering. How will we break the per lift charges down to a daily rate? Do you see any reason why this would require additional funds?

310/2/2610/2/2026
Amendment 000100123.1.1 – 3.1.3INFORMATION TECHNOLOGY SERVICESSince our proposed Third Party Port does not have the existing telephone cable lines, we would like to propose to provide mobile phones as an alternative. This is the same arrangement as what we have provided in the previous availabilities. Please confirm if this is acceptable.This would be acceptable, provided it meets the basic requirements of the work item.
410/2/2610/2/2026
Amendment 00010021ENCLOSURE 2.2.1CLEAN AND GAS FREE TANKS VOIDS COFFERDAMS AND SPACESKindly confirm that not all tanks listed in Enclosure 2.2.1 will be cleaned and gas freed. Only those tanks with “X” on the “Arrival Condition” column will be opened, cleaned and gas free. Please see snippet below for sample.
Yes; only the Tanks with a “X” Next to them will be cleaned, gas freed, and surveyed.
510/2/2610/2/2026

Amendment 0001

10/6/2026 Amendment 0003 (Photos) 0251 3.3.1 WOODWARD GOVERNORS Please provide us with the following information:

-Governor model -Part number -Required quantity to carry out maintenance

If possible, please also provide photos of the governor, as this will help us identify the correct model and prepare an accurate quotation. Please refer to the attached example image for reference. The 5th Governor (spare) will need to be serviced as well.

Photos of Woodward Governors from the ship for the MDG No. 1 through MDG No. 4 are below (PDF also available). Photos of the Spare Governor will follow.

610/2/2610/2/2026
Amendment 000105042.1 & 2.2NO. 2 LTFW & NO. 1 CSW PUMP MOTOR OVHLKindly provide the motor capacity, either in HP or kW, for our pricing reference.This will be under the 60HZ.
710/2/2610/2/2026
Amendment 000105053.1.1MMR VANE AXIAL FANS M1, M2, M3, M4 OVERHAUL REPAIRS & PRESERVATIONKindly provide the motor capacity, either in HP or kW, for our pricing reference:

-Vane axial Fan M1, (2-66-8) -Vane axial Fan M2, (2-66-8) -Vane axial Fan M3, (2-66-8) -Vane axial Fan M4, (2-66-1) -Vane axial Fan M1, (2-66-8) M1 is 100HP -Vane axial Fan M2, (2-66-8) M2 is 75HP -Vane axial Fan M3, (2-66-8) M3 is 15HP -Vane axial Fan M4, (2-66-1) M4 is 75HP

810/2/2610/2/2026
Amendment 00010651B2.3 & 2.4GAUGE CALIBRATIONPlease provide the references 2.3 and 2.4 for the list of items that need calibration:

-2.3 USNS DREW (T-AKE 10) 2.5 Year SMS Calibration List Mechanical

-2.4 USNS DREW (T-AKE 10) 2.5 Year SMS Calibration List ElectricalThis information will be provided in Amendment 0001.
910/2/2610/2/2026
Amendment 000110543.1HIGHLINE SPANWIRE ASD FAN SHROUD AND AIR BLOWER PRESERVATIONKindly provide the motor capacity of ASD fan motor (blower) for stations 1, 3, and 5, either in HP or kW, for our pricing reference.They are driven by 1/3 HP Motor.
1010/2/2610/2/2026
Amendment 0001SF33N/ASolicitation Due DateWe would like to respectfully request an extension of the deadline for the submission of offers for the subject solicitation.

For MTA packages of similar scope and complexity, we are normally provided approximately one (1) month to prepare a comprehensive and competitive proposal. However, for this solicitation, the proposal preparation period is limited to only fourteen (14) days, which presents a significant challenge in completing the necessary technical, commercial, subcontractor (OEM), and supplier evaluations required for an accurate submission.

In view of the above, we kindly request your consideration of an extension to the proposal submission deadline to allow sufficient time for proper preparation of our offer.Thank you for your request. Solicitation extension requests are not being considered currently. Due to the compressed time frame we must award before the Period of Performance begins, an accelerated award schedule has been established to give the successful Offeror sufficient time to mobilize for production.
1110/5/2610/5/2026
Amendment 00020503N/ACargo Crane Inspection (1 Yr)We would appreciate your advice on whether the oil replacement is required. Additionally, could you please advise if the Government is able to furnish the oil for this purpose?

7.5.1.e. Annually

20.Replace the Swing Drive Gear Oil.
21.Replace the Winch Gear Oil.
22.Replace the Hydraulic Oil.The oil will need to be replaced as stated in the WI. The oil will be Contractor Furnished Material (CFM).
1210/5/2610/5/2026
Amendment 00020183N/AExterior Platforms Foundations PreservationFor estimation purposes, kindly furnish photographs and arrangement drawings of the external platforms mentioned in the work specification for our assessment of staging requirements and other related accessory works. Additionally, please confirm the total number of platform/ locations to be preserved.The exterior platforms will be the port/starboard embarkation decks for the lifeboats on the 04 level. This will require sectional staging on the 03 level for any area that will need to be cropped and renewed. For estimating purposes, assume two (2) sections needed on each side approximately ten (10) ft high and big enough to hold two (2) contactors. No pictures are available at this time.
1310/7/2610/7/2026 Amendment 00040501N/ASPERRE Air Compresors OverhaulWe would appreciate it if you could provide the serial number(s) of the air compressor(s) intended for this scope of work.
3.1.1Main Machinery Room 5-66-0 One (1) Start Air Compressor.
3.1.2Propulsion Motor Room 5-75-0 One (1) Ships Service Air Compressor.Serial Number For Start Air Compressor from our Database is 1601263 will confirm with ship.

Serial number for Ships Service from our database is 270795, will confirm with ship.

1410/7/2610/7/2026 Amendment 00040165N/ALow Profile Non-Slip Weatherdeck PreservationWe would appreciate your advice on below points:
1.Kindly advise the which total area quantity to consider.

Para 3.1 stated 5600 + 550 + 750 + 750 + 4300 + 7500=19,450ft2 while para 3.2 stated 21,000ft2.

2.Kindly confirm the quantity 10,000ft2 in para 7.10 is the area quantity for blasting.
Assume approximately 21,000 sq/ft for painting and 21,000 sq/ft for blasting.
1510/7/2610/7/2026 Amendment 00040563B/0577,0565B,0567A,0568A,0575X,0656N/AVarious Firefighting and Life-saving work itemsKindly provide the last inspection/service reports for the following work items:

0563B/0577 - SCBA COMPRESSOR AND FILLING STATION INSPECTION AND MAINTENANCE (2YR)/(15YR)

0565A - FIXED GAS FIREFIGHTING SYSTEM INSPECTION AND TEST (1 YR)

0567A - FIXED FOAM FIREFIGHTING SYSTEM INSPECTION AND TEST (1 YR)

0568A - WATER MIST-SPRAY-SPRINKLER SYSTEM INSPECTION AND TEST (1 YR)

0575X - WATER MIST FIREFIGHTING SYSTEM - INSPECTION AND TEST (1 YR)

0656 – ANNUAL LIFERAFT CERTIFICATIONCFR’s 0095, 0096, 0097, 0098, & 0144 show the last inspection/Service reports.
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30

image1.png image2.png image3.png image4.png image5.png image6.png image7.png image8.png

File details come from the government source that posted it. Updated .