- Solicitation number
- N0040627R0004
About this file
This file is a Request for Clarification (RFC) Tracker containing questions and answers exchanged between offerors and the Government regarding Solicitation N0040627R0004 for USNS WALLY SCHIRRA (T-AKE 8) FY27 Mid-Term Availability (MTA). The tracker documents 16 clarification requests received between October 1-7, 2026, with responses provided on the same dates across four amendments. Key technical clarifications addressed include vessel draft specifications (9 meters expected), electrical shore power requirements (portable generators acceptable if meeting amperage requirements), crane services transition from per-lift to daily rate pricing, mobile phone alternatives for IT services, tank cleaning scope limited to marked tanks, Woodward Governor maintenance specifications with photographic documentation, motor capacity specifications for various equipment (vane axial fans ranging from 15-100 HP, ASD fan motors at 1/3 HP), gauge calibration references, and firefighting system inspection documentation. The Government declined to extend the proposal submission deadline due to an accelerated award schedule tied to the Period of Performance start date. Additional clarifications specified that oil replacement for cargo crane inspection is contractor-furnished material, exterior platform preservation requires sectional staging on two sides approximately 10 feet high, air compressor serial numbers are available for the scope of work, weatherdeck preservation encompasses approximately 21,000 square feet for both painting and blasting operations, and last inspection reports for firefighting and life-saving systems are available. The solicitation is for non-commercial ship repair services under NAICS 336611 with a firm fixed price contract structure and full and open competition.
View the file
Other files
Show all 40
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| RFC No. | Received | Answered | WI No. | Para. | WI Title | Question | Answer | |
| 1 | 10/1/26 | 10/2/2026 | ||||||
| Amendment 0001 | 0003 | N/A | TAKE-SWI-APPROACH BERTHING AND MOORING REQUIREMENTS | For planning of the afloat repair works, please confirm the vessel's lightest achievable operating draft (Forward/Aft/Mean Draft) after deballasting and cargo/fuel consumption, while maintaining safe stability and operational requirements. | Expect nine (9) meters. | |||
| 2 | 10/2/26 | 10/2/2026 | ||||||
| Amendment 0001 | 0011 | 7.1.1 & 7.1.25 | GENERAL SERVICES FOR SHIP | 7.1.1 Electrical Shore Power: Since our proposed Third Party Port does not have the capacity to provide Electrical Shore Power as required in the work specifications, we would like to propose to provide portable generators that can meet the requirement. This is the same service that we have provided in the previous availabilities of T-AKE ships. Please confirm if this is acceptable. |
7.1.25 Crane, Forklift and Transportation Services: Since the ship will be berthing at Third Party Port, crane charges will not be charged on per lift but on a per day basis. We will provide crane daily at the port during the whole duration of the PoP. This is the same arrangement as what we have provided in the previous availabilities. 7.1.1: This is acceptable if it still meets all amperage requirements.
7.1.25: The Government requests more information prior to answering. How will we break the per lift charges down to a daily rate? Do you see any reason why this would require additional funds?
| 3 | 10/2/26 | 10/2/2026 | |||
| Amendment 0001 | 0012 | 3.1.1 – 3.1.3 | INFORMATION TECHNOLOGY SERVICES | Since our proposed Third Party Port does not have the existing telephone cable lines, we would like to propose to provide mobile phones as an alternative. This is the same arrangement as what we have provided in the previous availabilities. Please confirm if this is acceptable. | This would be acceptable, provided it meets the basic requirements of the work item. |
| 4 | 10/2/26 | 10/2/2026 | |||
| Amendment 0001 | 0021 | ENCLOSURE 2.2.1 | CLEAN AND GAS FREE TANKS VOIDS COFFERDAMS AND SPACES | Kindly confirm that not all tanks listed in Enclosure 2.2.1 will be cleaned and gas freed. Only those tanks with “X” on the “Arrival Condition” column will be opened, cleaned and gas free. Please see snippet below for sample. |
| Yes; only the Tanks with a “X” Next to them will be cleaned, gas freed, and surveyed. | ||
| 5 | 10/2/26 | 10/2/2026 |
Amendment 0001
10/6/2026 Amendment 0003 (Photos) 0251 3.3.1 WOODWARD GOVERNORS Please provide us with the following information:
-Governor model -Part number -Required quantity to carry out maintenance
If possible, please also provide photos of the governor, as this will help us identify the correct model and prepare an accurate quotation. Please refer to the attached example image for reference. The 5th Governor (spare) will need to be serviced as well.
Photos of Woodward Governors from the ship for the MDG No. 1 through MDG No. 4 are below (PDF also available). Photos of the Spare Governor will follow.
| 6 | 10/2/26 | 10/2/2026 | |||
| Amendment 0001 | 0504 | 2.1 & 2.2 | NO. 2 LTFW & NO. 1 CSW PUMP MOTOR OVHL | Kindly provide the motor capacity, either in HP or kW, for our pricing reference. | This will be under the 60HZ. |
| 7 | 10/2/26 | 10/2/2026 | |||
| Amendment 0001 | 0505 | 3.1.1 | MMR VANE AXIAL FANS M1, M2, M3, M4 OVERHAUL REPAIRS & PRESERVATION | Kindly provide the motor capacity, either in HP or kW, for our pricing reference: |
-Vane axial Fan M1, (2-66-8) -Vane axial Fan M2, (2-66-8) -Vane axial Fan M3, (2-66-8) -Vane axial Fan M4, (2-66-1) -Vane axial Fan M1, (2-66-8) M1 is 100HP -Vane axial Fan M2, (2-66-8) M2 is 75HP -Vane axial Fan M3, (2-66-8) M3 is 15HP -Vane axial Fan M4, (2-66-1) M4 is 75HP
| 8 | 10/2/26 | 10/2/2026 | ||
| Amendment 0001 | 0651B | 2.3 & 2.4 | GAUGE CALIBRATION | Please provide the references 2.3 and 2.4 for the list of items that need calibration: |
-2.3 USNS DREW (T-AKE 10) 2.5 Year SMS Calibration List Mechanical
| -2.4 USNS DREW (T-AKE 10) 2.5 Year SMS Calibration List Electrical | This information will be provided in Amendment 0001. | ||||
| 9 | 10/2/26 | 10/2/2026 | |||
| Amendment 0001 | 1054 | 3.1 | HIGHLINE SPANWIRE ASD FAN SHROUD AND AIR BLOWER PRESERVATION | Kindly provide the motor capacity of ASD fan motor (blower) for stations 1, 3, and 5, either in HP or kW, for our pricing reference. | They are driven by 1/3 HP Motor. |
| 10 | 10/2/26 | 10/2/2026 | |||
| Amendment 0001 | SF33 | N/A | Solicitation Due Date | We would like to respectfully request an extension of the deadline for the submission of offers for the subject solicitation. |
For MTA packages of similar scope and complexity, we are normally provided approximately one (1) month to prepare a comprehensive and competitive proposal. However, for this solicitation, the proposal preparation period is limited to only fourteen (14) days, which presents a significant challenge in completing the necessary technical, commercial, subcontractor (OEM), and supplier evaluations required for an accurate submission.
| In view of the above, we kindly request your consideration of an extension to the proposal submission deadline to allow sufficient time for proper preparation of our offer. | Thank you for your request. Solicitation extension requests are not being considered currently. Due to the compressed time frame we must award before the Period of Performance begins, an accelerated award schedule has been established to give the successful Offeror sufficient time to mobilize for production. | |||
| 11 | 10/5/26 | 10/5/2026 | ||
| Amendment 0002 | 0503 | N/A | Cargo Crane Inspection (1 Yr) | We would appreciate your advice on whether the oil replacement is required. Additionally, could you please advise if the Government is able to furnish the oil for this purpose? |
7.5.1.e. Annually
| 20. | Replace the Swing Drive Gear Oil. | ||||||
| 21. | Replace the Winch Gear Oil. | ||||||
| 22. | Replace the Hydraulic Oil. | The oil will need to be replaced as stated in the WI. The oil will be Contractor Furnished Material (CFM). | |||||
| 12 | 10/5/26 | 10/5/2026 | |||||
| Amendment 0002 | 0183 | N/A | Exterior Platforms Foundations Preservation | For estimation purposes, kindly furnish photographs and arrangement drawings of the external platforms mentioned in the work specification for our assessment of staging requirements and other related accessory works. Additionally, please confirm the total number of platform/ locations to be preserved. | The exterior platforms will be the port/starboard embarkation decks for the lifeboats on the 04 level. This will require sectional staging on the 03 level for any area that will need to be cropped and renewed. For estimating purposes, assume two (2) sections needed on each side approximately ten (10) ft high and big enough to hold two (2) contactors. No pictures are available at this time. | ||
| 13 | 10/7/26 | 10/7/2026 Amendment 0004 | 0501 | N/A | SPERRE Air Compresors Overhaul | We would appreciate it if you could provide the serial number(s) of the air compressor(s) intended for this scope of work. |
| 3.1.1 | Main Machinery Room 5-66-0 One (1) Start Air Compressor. | |
| 3.1.2 | Propulsion Motor Room 5-75-0 One (1) Ships Service Air Compressor. | Serial Number For Start Air Compressor from our Database is 1601263 will confirm with ship. |
Serial number for Ships Service from our database is 270795, will confirm with ship.
| 14 | 10/7/26 | 10/7/2026 Amendment 0004 | 0165 | N/A | Low Profile Non-Slip Weatherdeck Preservation | We would appreciate your advice on below points: | |
| 1. | Kindly advise the which total area quantity to consider. |
Para 3.1 stated 5600 + 550 + 750 + 750 + 4300 + 7500=19,450ft2 while para 3.2 stated 21,000ft2.
| 2. | Kindly confirm the quantity 10,000ft2 in para 7.10 is the area quantity for blasting. | ||||||
| Assume approximately 21,000 sq/ft for painting and 21,000 sq/ft for blasting. | |||||||
| 15 | 10/7/26 | 10/7/2026 Amendment 0004 | 0563B/0577,0565B,0567A,0568A,0575X,0656 | N/A | Various Firefighting and Life-saving work items | Kindly provide the last inspection/service reports for the following work items: |
0563B/0577 - SCBA COMPRESSOR AND FILLING STATION INSPECTION AND MAINTENANCE (2YR)/(15YR)
0565A - FIXED GAS FIREFIGHTING SYSTEM INSPECTION AND TEST (1 YR)
0567A - FIXED FOAM FIREFIGHTING SYSTEM INSPECTION AND TEST (1 YR)
0568A - WATER MIST-SPRAY-SPRINKLER SYSTEM INSPECTION AND TEST (1 YR)
0575X - WATER MIST FIREFIGHTING SYSTEM - INSPECTION AND TEST (1 YR)
| 0656 – ANNUAL LIFERAFT CERTIFICATION | CFR’s 0095, 0096, 0097, 0098, & 0144 show the last inspection/Service reports. |
| 16 | |
| 17 | |
| 18 | |
| 19 | |
| 20 | |
| 21 | |
| 22 | |
| 23 | |
| 24 | |
| 25 | |
| 26 | |
| 27 | |
| 28 | |
| 29 | |
| 30 |
image1.png image2.png image3.png image4.png image5.png image6.png image7.png image8.png
File details come from the government source that posted it. Updated .