This is a Questions and Answers (Q&A) document from Amendment 0001 to Request for Clarifications (RFC) for solicitation N0040627R0004, addressing 10 offeror inquiries regarding the USNS WALLY SCHIRRA (T-AKE 8) FY27 Mid-Term Availability (MTA) contract. The document contains clarifications on technical specifications, work scope requirements, and scheduling related to afloat ship repair services.

Key technical clarifications addressed include confirmation that the vessel's target lightest operating draft is 9 meters, that portable generators are acceptable as an alternative to shore-provided electrical power if amperage requirements are met, and that mobile phones are acceptable as a telecommunications alternative if basic requirements are satisfied. For tank cleaning operations, the Government confirmed only tanks marked with an "X" in the Arrival Condition column of Enclosure 2.2.1 will be opened and gas-freed. Specific motor capacity information was provided for equipment overhauls, including vane axial fans rated at 100HP (M1), 75HP (M2), 15HP (M3), and 75HP (M4), and ASD fan motors rated at 1/3 HP. The Government deferred responses on additional details regarding Woodward Governor specifications, per-lift to daily crane rate conversions, and calibration reference lists, indicating these would be provided separately. Notably, the Government rejected an offeror request for a solicitation deadline extension, citing the need for an accelerated award schedule to allow the successful contractor sufficient mobilization time before the Period of Performance begins. The 14-day proposal preparation window was maintained as mandatory.

View the file

Other files

File Type Posted
2.1.3 J-3 Contractor Price Breakdown R1.xlsx XLSX spreadsheet
2.1.3 J-1A Work Item Specification Package R1 MSC AWP – N0040626R0003.pdf PDF
2.1.3 SOL AMDNT 6 - J-5 RFC Answers.xlsx XLSX spreadsheet
2.1.3 SOL AMDNT 6 - N0040627R00040006 Conformed.pdf PDF
2.1.3 SOL AMDNT 6 - N0040627R00040006 SF 30.pdf PDF
2.1.3 SOL AMDNT 2 - J-5 RFC Answers.xlsx XLSX spreadsheet
2.1.3 SOL AMDNT 2 - N0040627R00040002 Conformed.pdf PDF
2.1.3 SOL AMDNT 1 - J-5 RFC Answers.xlsx XLSX spreadsheet
2.1.3 SOL AMDNT 5 - J-5 RFC Answers.xlsx XLSX spreadsheet
2.1.3 SOL AMDNT 1 - N0040627R00040001 SF 30.pdf PDF
2.1.1 SOL - N0040627R0004.pdf PDF
2.1.3 SOL AMDNT 5 -N0040627R00040005 SF 30.pdf PDF
2.1.3 SOL AMDNT 2 - N0040627R00040002 SF 30.pdf PDF
2.1.3 SOL AMDNT 5 - N0040627R00040005 Conformed.pdf PDF
2.1.3 SOL AMDNT 1 - N0040627R00040001 Conformed.pdf PDF
2.1.3 SOL AMDNT 4 - CFRs 0095, 0096, 0097, 0098 & 0144.pdf PDF
2.1.3 SOL AMDNT 4 - N0040627R00040004 Conformed.pdf PDF
2.1.3 SOL AMDNT 4 - N0040627R00040004 SF 30.pdf PDF
2.1.3 SOL AMDNT 4 - J-5 RFC Tracker Answers.xlsx XLSX spreadsheet
2.1.3 SOL AMDNT 3 - N0040627R00040003 SF 30.pdf PDF
2.1.3 MDG No.1 thru No.4 Governor Pictures.pdf PDF
2.1.3 SOL AMDNT 3 - N0040627R00040003 Conformed.pdf PDF
2.1.3 J-5 RFC Answers AMDNT 3.xlsx XLSX spreadsheet
2.1.3 SOL AMDNT 2 - N0040627R00040002 Conformed.pdf PDF
2.1.3 SOL AMDNT 2 - N0040627R00040002 SF 30.pdf PDF
2.1.3 J-5 RFC Answers AMDNT 2.xlsx XLSX spreadsheet
2.1.3 SOL AMDNT 1 - N0040627R00040001 SF 30.pdf PDF
2.1.3 SOL AMDNT 1 - N0040627R00040001 Conformed.pdf PDF
2.1.1 J-1A WI Specification Package.pdf PDF
2.1.1 Solicitation - N0040627R0004.pdf PDF
2.1.1 J-7 MSC Ship Repair Facility Survey.pdf PDF
2.1.1 J-1B List of Work Items with OEM.pdf PDF
2.1.1 J-3 Contractor Price Breakdown.xlsx XLSX spreadsheet
2.1.1 J-5 Request for Clarification.docx DOCX document
2.1.1 J-6A Instructions Form W-14.pdf PDF
2.1.1 CDRLS DD 1423.pdf PDF
2.1.1 J-2 GFP Attachment.pdf PDF
2.1.1 J-8 Contract Administration Plan.pdf PDF
2.1.1 J-4 Contractor Past Performance Data Sheet.docx DOCX document
2.1.1 J-6 IRS FORM W-14.pdf PDF
Show all 40

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

RFC No.ReceivedAnsweredWI No.Para.WI TitleQuestionAnswer
110/1/2610/2/2026
Amendment 00010003N/ATAKE-SWI-APPROACH BERTHING AND MOORING REQUIREMENTSFor planning of the afloat repair works, please confirm the vessel's lightest achievable operating draft (Forward/Aft/Mean Draft) after deballasting and cargo/fuel consumption, while maintaining safe stability and operational requirements.Expect 9 meters.
210/2/2610/2/2026
Amendment 000100117.1.1 & 7.1.25GENERAL SERVICES FOR SHIP7.1.1 Electrical Shore Power: Since our proposed Third Party Port does not have the capacity to provide Electrical Shore Power as required in the work specifications, we would like to propose to provide portable generators that can meet the requirement. This is the same service that we have provided in the previous availabilities of T-AKE ships. Please confirm if this is acceptable.

7.1.25 Crane, Forklift and Transportation Services: Since the ship will be berthing at Third Party Port, crane charges will not be charged on per lift but on a per day basis. We will provide crane daily at the port during the whole duration of the PoP. This is the same arrangement as what we have provided in the previous availabilities. 7.1.1: This is acceptable if it still meets all amperage requirements.

7.1.25: The Government requests more information prior to answering. How will we break the per lift charges down to a daily rate? Do you see any reason why this would require additional funds?

310/2/2610/2/2026
Amendment 000100123.1.1 – 3.1.3INFORMATION TECHNOLOGY SERVICESSince our proposed Third Party Port does not have the existing telephone cable lines, we would like to propose to provide mobile phones as an alternative. This is the same arrangement as what we have provided in the previous availabilities. Please confirm if this is acceptable.This would be acceptable, provided it meets the basic requirements of the work item.
410/2/2610/2/2026
Amendment 00010021ENCLOSURE 2.2.1CLEAN AND GAS FREE TANKS VOIDS COFFERDAMS AND SPACESKindly confirm that not all tanks listed in Enclosure 2.2.1 will be cleaned and gas freed. Only those tanks with “X” on the “Arrival Condition” column will be opened, cleaned and gas free. Please see snippet below for sample.
Yes; only the Tanks with a “X” Next to them will be cleaned, gas freed, and surveyed.
510/2/2610/2/2026
Amendment 000102513.3.1WOODWARD GOVERNORSPlease provide us with the following information:

-Governor model -Part number -Required quantity to carry out maintenance

If possible, please also provide photos of the governor, as this will help us identify the correct model and prepare an accurate quotation. Please refer to the attached example image for reference.The 5th Governor (spare) will need to be serviced as well. The Government get back with this information and will work on pictures from the crew.
610/2/2610/2/2026
Amendment 000105042.1 & 2.2NO. 2 LTFW & NO. 1 CSW PUMP MOTOR OVHLKindly provide the motor capacity, either in HP or kW, for our pricing reference.This will be under the 60HZ.
710/2/2610/2/2026
Amendment 000105053.1.1MMR VANE AXIAL FANS M1, M2, M3, M4 OVERHAUL REPAIRS & PRESERVATIONKindly provide the motor capacity, either in HP or kW, for our pricing reference:

-Vane axial Fan M1, (2-66-8) -Vane axial Fan M2, (2-66-8) -Vane axial Fan M3, (2-66-8) -Vane axial Fan M4, (2-66-1) -Vane axial Fan M1, (2-66-8) M1 is 100HP -Vane axial Fan M2, (2-66-8) M2 is 75HP -Vane axial Fan M3, (2-66-8) M3 is 15HP -Vane axial Fan M4, (2-66-1) M4 is 75HP

810/2/2610/2/2026
Amendment 00010651B2.3 & 2.4GAUGE CALIBRATIONPlease provide the references 2.3 and 2.4 for the list of items that need calibration:

-2.3 USNS DREW (T-AKE 10) 2.5 Year SMS Calibration List Mechanical

-2.4 USNS DREW (T-AKE 10) 2.5 Year SMS Calibration List ElectricalThis information will be provided.
910/2/2610/2/2026
Amendment 000110543.1HIGHLINE SPANWIRE ASD FAN SHROUD AND AIR BLOWER PRESERVATIONKindly provide the motor capacity of ASD fan motor (blower) for stations 1, 3, and 5, either in HP or kW, for our pricing reference.They are driven by 1/3 HP Motor.
1010/2/2610/2/2026
Amendment 0001SF33N/ASolicitation Due DateWe would like to respectfully request an extension of the deadline for the submission of offers for the subject solicitation.

For MTA packages of similar scope and complexity, we are normally provided approximately one (1) month to prepare a comprehensive and competitive proposal. However, for this solicitation, the proposal preparation period is limited to only fourteen (14) days, which presents a significant challenge in completing the necessary technical, commercial, subcontractor (OEM), and supplier evaluations required for an accurate submission.

In view of the above, we kindly request your consideration of an extension to the proposal submission deadline to allow sufficient time for proper preparation of our offer.Thank you for your request. Solicitation extension requests are not being considered currently. Due to the compressed time frame we must award before the Period of Performance begins, an accelerated award schedule has been established to give the successful Offeror sufficient time to mobilize for production.
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30

image1.png image2.png image3.png image4.png

File details come from the government source that posted it. Updated .