Level of Effort Spreadsheet.xlsx
XLSX spreadsheet 38 KB Posted
- Attached to
- Berthing and Messing Program Services
- Solicitation number
- N0018926RL013
About this file
This is a Level of Effort Spreadsheet that outlines the labor, materials, and other direct costs (ODCs) for a berthing and messing program services contract spanning approximately 5.5 years. The contract includes a one-year base period (August 1, 2026 – July 31, 2027), four one-year option periods (August 1, 2027 – July 31, 2031), and a partial period under FAR 52.217-8 (August 1, 2031 – January 31, 2032). The spreadsheet contains four cost line items (CLINs) for each period: Labor (CLIN X001), Materials (CLIN X002), Other Direct Costs (CLIN X003), and Travel (CLIN X004). All CLIN values are currently listed at $0.00, indicating this is a template awaiting cost data completion.
The labor section details 15 distinct occupational categories with estimated hours and full-time equivalent (FTE) staffing levels for each period. The base year and option years one through four each specify identical labor requirements: 1st Fore Person/Supervisor (2,440 hours, 1 FTE), 1st Lead Person/Assistant Supervisor (6,592 hours, 3 FTE), Administrative Assistant (1,920 hours, 1 FTE), Supply Technician (1,920 hours, 1 FTE), System Support Specialist (11,784 hours, 5 FTE), Warehouse Specialist (4,672 hours, 2 FTE), and various maintenance specialists including electricians, HVAC mechanics, painters, pipefitters, plumbers, sheet metal workers, telecommunications mechanics, and welders. The FAR 52.217-8 period reflects approximately half the labor hours of the annual periods. The spreadsheet also includes a materials and supplies section listing 30+ line items for vessel maintenance, including mooring lines, valve replacements, deck preservation, fire safety equipment, HVAC components, and various cleaning and certification services with estimated quantities and labor dollars budgeted at $100,000 and $250,000 for specific repair categories.
View the file
Other files
Show all 32
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Summary
| Base Year Period Period of Performance: 01 August 2026 - 31 July 2027 | |
| CLIN | Total CLIN Value |
| CLIN 0001 Labor | $0.00 |
| CLIN 0002 Materials | $0.00 |
| CLIN 0003 ODCs | $0.00 |
| CLIN 0004 Travel | $0.00 |
| Base Total | $0.00 |
| Option Year 1 Period of Performance : 01 August 2027 - 31 July 2028 | |
| CLIN | Total CLIN Value |
| CLIN 1001 Labor | $0.00 |
| CLIN 1002 Materials | $0.00 |
| CLIN 1003 ODCs | $0.00 |
| CLIN 1004 Travel | $0.00 |
| Option 1 Total | $0.00 |
| Option Year 2 Period of Performance : 01 August 2028 - 31 July 2029 | |
| CLIN | Total CLIN Value |
| CLIN 2001 Labor | $0.00 |
| CLIN 2002 Materials | $0.00 |
| CLIN 2003 ODCs | $0.00 |
| CLIN 2004 Travel | $0.00 |
| Option 2 Total | $0.00 |
| Option Year 3 Period of Performance : 01 August 2029 - 31July 2030 | |
| CLIN | Total CLIN Value |
| CLIN 3001 Labor | $0.00 |
| CLIN 3002 Materials | $0.00 |
| CLIN 3003 ODCs | $0.00 |
| CLIN 3004 Travel | $0.00 |
| Option 3 Total | $0.00 |
| Option Year 4 Period of Performance : 01 August 2030 - 31 July 2031 | |
| CLIN | Total CLIN Value |
| CLIN 4001 Labor | $0.00 |
| CLIN 4002 Materials | $0.00 |
| CLIN 4003 ODCs | $0.00 |
| CLIN 4004 Travel | $0.00 |
| Option 4 Total | $0.00 |
| FAR 52.217-8 Period of Performance : 01 August 2031 - 31 January 2032 | |
| CLIN | Total CLIN Value |
| CLIN 5001 Labor | $0.00 |
| CLIN 5002 Materials | $0.00 |
| CLIN 5003 ODCs | $0.00 |
| CLIN 5004 Travel | $0.00 |
| FAR 52.217-8 Total | $0.00 |
| ContractTotal |
_x000D_&1#&"Calibri"&10&K0000FF Information in this document/e-mail is considered Business Use Only. Please treat accordingly.
Materials
| Supplies/Services | Est Qty | Unit | Unit | |||
| Price | Amount | |||||
| A | 102AE | Deliver a Turnkey Hotel and Utility Hookup Solution to include but not limited to sewage, potable water, steam, shore power, telephone, fire main, gangways and cable television connections (Down River) | 50 | EA | ||
| A | 102AG | Supply 1 inch KEVLAR mooring lines (150 ft. in length). With 6' loop in both ends, with Chafing gear installed. | 60 | EA | ||
| A | 102AH | Supply 2 inch KEVLAR mooring lines (200 ft. in length). With 6' loop in both ends, with Chafing gear installed. | 20 | EA | ||
| A | 104AC | Deliver a Turnkey CHT System Overhaul, resulting in a system certified as safe for entry and hot work, fully inspected, tested, and upgraded with four (4) new floats. (YR, YRBM, YRBM(L), and all APL's except for APL-61) | 10 | SY | ||
| A | 106AA | Deliver newly installed and operational Commercial-Grade Garbage Disposal. | 4 | EA | ||
| A | 110AC | Procure a Turnkey Replacement for 2-4 inch diameter Copper-Nickel (CU-NI) Valves. | 800 | LF | ||
| A | 113AC | Deliver a newly preserved interior deck surface (90% Interior Compartments, 10% Wet Spaces) | 100,000 | SF | ||
| A | 115AA | Material (in support of ELIN 115) to Deliver repairs identified during testing, as well as itmes identified on the trouble call log | 100000 | US Dollars | ||
| A | 103AB | Deliver clean and sanitize the entire Craft (YRBM Class) | 10 | EA | ||
| A | 103AC | Deliver clean and sanitize the entire Craft (YRBM(L) Class) | 15 | EA | ||
| A | 103AD | Deliver clean and sanitize the entire Craft (YRBM(57) Class) | 4 | EA | ||
| A | 103AG | Deliver clean and sanitize the entire Craft (APL-66, 67, 71, 73 Class) | 12 | EA | ||
| A | 103AH | Deliver cllean using Crygenic (Dry Ice) entire Galley Exhaust Ventilation (YR Class) | 10 | EA | ||
| A | 103AI | Deliver cllean using Crygenic (Dry Ice) entire Galley Exhaust Ventilation (APL Class) except APL-66, 67, 71, 73 Class | 5 | EA | ||
| A | 105AC | Procure new dry chemical fire extinguishers, 20 lbs. | 500 | EA | ||
| A | 105AD | Deliver Annual Inspection and Certification of Gaylord Hood system | 25 | EA | ||
| A | 105AF | Deliver Annual Inspection and Certification of Fire and Flooding Alarm Panel and System, including all attached equipment for legacy IC/SM Systems. | 25 | EA | ||
| A | 105AG | Deliver Annual Inspection and Certification of Fire and Flooding Alarm Panel and System, including all attached equipment for Siemens Systems. | 25 | EA | ||
| A | 105AH | Deliver Annual Inspection and Certification of Fire and Flooding Alarm Panel and System, including all attached equipment for Notifier Systems. | 25 | EA | ||
| A | 105AK | Provide Certificate of Calibration for specified gage | 1000 | EA | ||
| A | 106AA | Deliver newly installed and operational Commercial-Grade Garbage Disposal. | 4 | EA | ||
| A | 111AB | Material (in support of ELIN 111) to Deliver repairs to A/C and refrigeration equipment (for bidding purposes only) | 250000 | US Dollars | ||
| A | 111AD | Deliver newly installed 12 in. x 20 in. Ventilation Duct Assembly | 300 | LF | ||
| A | 111AN | Deliver OEM-Certified HVAC Condenser Coils Inspection, Preservation and Cleaning Package - MITSUBISHI YRBM(L) | 75 | EA | ||
| A | 111AO | Provide Condensing Coil Cleaning, Preservation and Certification Package for Walk-in Reefer/Freezer Units | 10 | EA | ||
| A | 111AP | Deliver OEM-Certified HVAC Units and Compressor Cleaning Package ( YR, YRBM, YRBM(L) ) | 10 | EA | ||
| A | 112AK | Deliver Terrazzo Deck Replacement Solution. | 2,500 | SF |
Base Year
| Estimated Level of Effort: 01 August 2026 - 31 July 2027 | |||||||||||||||
| Labor Category | Total Hours | FTE | Direct Labor Rate | Fringe % | Fringe $ | DL + Fringe | Overhead % | Overhead $ | G&A % | G&A $ | Subtotal | Fee % | Fee $ | Fully Burdened Labor Rate | Total Labor Cost (FBLR x Hours) |
| 1st FORE PERSON/SUPERVISOR | 2440 | 1 | |||||||||||||
| 1ST LEAD PERSON/ ASSISTANT SUPERVISOR | 6592 | 3 | |||||||||||||
| ADMINISTRATIVE ASSISTANT | 1920 | 1 | |||||||||||||
| SUPPLY TECHNICIAN | 1920 | 1 | |||||||||||||
| SYSTEM SUPPORT SPECIALIST | 11784 | 5 | |||||||||||||
| WAREHOUSE SPECIALIST | 4672 | 2 | |||||||||||||
| ELECTRICIAN, MAINTENANCE | 7112 | 3 | |||||||||||||
| ENGINEERING TECHNICIAN VI | 11784 | 5 | |||||||||||||
| HEATING, REFRIGERATION, AND AIR CONDITIONING MECHANIC | 9448 | 4 | |||||||||||||
| PAINTER, MAINTENANCE | 4360 | 2 | |||||||||||||
| PIPEFITTER, MAINTENANCE | 7112 | 3 | |||||||||||||
| PLUMBER, MAINTENANCE | 7112 | 3 | |||||||||||||
| SHEET-METAL WORKER, MAINTENANCE | 7112 | 3 | |||||||||||||
| TELECOMMUNICATIONS MECHANIC II | 4360 | 2 | |||||||||||||
| WELDER, COMBINATION, MAINTENANCE | 9448 | 4 |
Option Year 1
| Estimated Level of Effort: 01 August 2027 - 31 July 2028 | |||||||||||||||
| Labor Category | Total Hours | FTE | Direct Labor Rate | Fringe % | Fringe $ | DL + Fringe | Overhead % | Overhead $ | G&A % | G&A $ | Subtotal | Fee % | Fee $ | Fully Burdened Labor Rate | Total Labor Cost (FBLR x Hours) |
| 1st FORE PERSON/SUPERVISOR | 2440 | 1 | |||||||||||||
| 1ST LEAD PERSON/ ASSISTANT SUPERVISOR | 6592 | 3 | |||||||||||||
| ADMINISTRATIVE ASSISTANT | 1920 | 1 | |||||||||||||
| SUPPLY TECHNICIAN | 1920 | 1 | |||||||||||||
| SYSTEM SUPPORT SPECIALIST | 11784 | 5 | |||||||||||||
| WAREHOUSE SPECIALIST | 4672 | 2 | |||||||||||||
| ELECTRICIAN, MAINTENANCE | 7112 | 3 | |||||||||||||
| ENGINEERING TECHNICIAN VI | 11784 | 5 | |||||||||||||
| HEATING, REFRIGERATION, AND AIR CONDITIONING MECHANIC | 9448 | 4 | |||||||||||||
| PAINTER, MAINTENANCE | 4360 | 2 | |||||||||||||
| PIPEFITTER, MAINTENANCE | 7112 | 3 | |||||||||||||
| PLUMBER, MAINTENANCE | 7112 | 3 | |||||||||||||
| SHEET-METAL WORKER, MAINTENANCE | 7112 | 3 | |||||||||||||
| TELECOMMUNICATIONS MECHANIC II | 4360 | 2 | |||||||||||||
| WELDER, COMBINATION, MAINTENANCE | 9448 | 4 |
Option Year 2
| Estimated Level of Effort: 01 August 2028 - 31 July 2029 | |||||||||||||||
| Labor Category | Total Hours | FTE | Direct Labor Rate | Fringe % | Fringe $ | DL + Fringe | Overhead % | Overhead $ | G&A % | G&A $ | Subtotal | Fee % | Fee $ | Fully Burdened Labor Rate | Total Labor Cost (FBLR x Hours) |
| 1st FORE PERSON/SUPERVISOR | 2440 | 1 | |||||||||||||
| 1ST LEAD PERSON/ ASSISTANT SUPERVISOR | 6592 | 3 | |||||||||||||
| ADMINISTRATIVE ASSISTANT | 1920 | 1 | |||||||||||||
| SUPPLY TECHNICIAN | 1920 | 1 | |||||||||||||
| SYSTEM SUPPORT SPECIALIST | 11784 | 5 | |||||||||||||
| WAREHOUSE SPECIALIST | 4672 | 2 | |||||||||||||
| ELECTRICIAN, MAINTENANCE | 7112 | 3 | |||||||||||||
| ENGINEERING TECHNICIAN VI | 11784 | 5 | |||||||||||||
| HEATING, REFRIGERATION, AND AIR CONDITIONING MECHANIC | 9448 | 4 | |||||||||||||
| PAINTER, MAINTENANCE | 4360 | 2 | |||||||||||||
| PIPEFITTER, MAINTENANCE | 7112 | 3 | |||||||||||||
| PLUMBER, MAINTENANCE | 7112 | 3 | |||||||||||||
| SHEET-METAL WORKER, MAINTENANCE | 7112 | 3 | |||||||||||||
| TELECOMMUNICATIONS MECHANIC II | 4360 | 2 | |||||||||||||
| WELDER, COMBINATION, MAINTENANCE | 9448 | 4 |
Option Year 3
| Estimated Level of Effort: 01 August 2029 - 31 July 2030 | |||||||||||||||
| Labor Category | Total Hours | FTE | Direct Labor Rate | Fringe % | Fringe $ | DL + Fringe | Overhead % | Overhead $ | G&A % | G&A $ | Subtotal | Fee % | Fee $ | Fully Burdened Labor Rate | Total Labor Cost (FBLR x Hours) |
| 1st FORE PERSON/SUPERVISOR | 2440 | 1 | |||||||||||||
| 1ST LEAD PERSON/ ASSISTANT SUPERVISOR | 6592 | 3 | |||||||||||||
| ADMINISTRATIVE ASSISTANT | 1920 | 1 | |||||||||||||
| SUPPLY TECHNICIAN | 1920 | 1 | |||||||||||||
| SYSTEM SUPPORT SPECIALIST | 11784 | 5 | |||||||||||||
| WAREHOUSE SPECIALIST | 4672 | 2 | |||||||||||||
| ELECTRICIAN, MAINTENANCE | 7112 | 3 | |||||||||||||
| ENGINEERING TECHNICIAN VI | 11784 | 5 | |||||||||||||
| HEATING, REFRIGERATION, AND AIR CONDITIONING MECHANIC | 9448 | 4 | |||||||||||||
| PAINTER, MAINTENANCE | 4360 | 2 | |||||||||||||
| PIPEFITTER, MAINTENANCE | 7112 | 3 | |||||||||||||
| PLUMBER, MAINTENANCE | 7112 | 3 | |||||||||||||
| SHEET-METAL WORKER, MAINTENANCE | 7112 | 3 | |||||||||||||
| TELECOMMUNICATIONS MECHANIC II | 4360 | 2 | |||||||||||||
| WELDER, COMBINATION, MAINTENANCE | 9448 | 4 |
Option Year 4
| Estimated Level of Effort: 01 August 2030 - 31 July 2031 | |||||||||||||||
| Labor Category | Total Hours | FTE | Direct Labor Rate | Fringe % | Fringe $ | DL + Fringe | Overhead % | Overhead $ | G&A % | G&A $ | Subtotal | Fee % | Fee $ | Fully Burdened Labor Rate | Total Labor Cost (FBLR x Hours) |
| 1st FORE PERSON/SUPERVISOR | 2440 | 1 | |||||||||||||
| 1ST LEAD PERSON/ ASSISTANT SUPERVISOR | 6592 | 3 | |||||||||||||
| ADMINISTRATIVE ASSISTANT | 1920 | 1 | |||||||||||||
| SUPPLY TECHNICIAN | 1920 | 1 | |||||||||||||
| SYSTEM SUPPORT SPECIALIST | 11784 | 5 | |||||||||||||
| WAREHOUSE SPECIALIST | 4672 | 2 | |||||||||||||
| ELECTRICIAN, MAINTENANCE | 7112 | 3 | |||||||||||||
| ENGINEERING TECHNICIAN VI | 11784 | 5 | |||||||||||||
| HEATING, REFRIGERATION, AND AIR CONDITIONING MECHANIC | 9448 | 4 | |||||||||||||
| PAINTER, MAINTENANCE | 4360 | 2 | |||||||||||||
| PIPEFITTER, MAINTENANCE | 7112 | 3 | |||||||||||||
| PLUMBER, MAINTENANCE | 7112 | 3 | |||||||||||||
| SHEET-METAL WORKER, MAINTENANCE | 7112 | 3 | |||||||||||||
| TELECOMMUNICATIONS MECHANIC II | 4360 | 2 | |||||||||||||
| WELDER, COMBINATION, MAINTENANCE | 9448 | 4 |
FAR 52.217-8
| Estimated Level of Effort: 01 August 2031 - 31 January 2032 | |||||||||||||||
| Labor Category | Total Hours | FTE | Direct Labor Rate | Fringe % | Fringe $ | DL + Fringe | Overhead % | Overhead $ | G&A % | G&A $ | Subtotal | Fee % | Fee $ | Fully Burdened Labor Rate | Total Labor Cost (FBLR x Hours) |
| 1st FORE PERSON/SUPERVISOR | 1220 | 1 | |||||||||||||
| 1ST LEAD PERSON/ ASSISTANT SUPERVISOR | 3296 | 3 | |||||||||||||
| ADMINISTRATIVE ASSISTANT | 960 | 1 | |||||||||||||
| SUPPLY TECHNICIAN | 960 | 1 | |||||||||||||
| SYSTEM SUPPORT SPECIALIST | 5892 | 5 | |||||||||||||
| WAREHOUSE SPECIALIST | 2336 | 2 | |||||||||||||
| ELECTRICIAN, MAINTENANCE | 3556 | 3 | |||||||||||||
| ENGINEERING TECHNICIAN VI | 5892 | 5 | |||||||||||||
| HEATING, REFRIGERATION, AND AIR CONDITIONING MECHANIC | 4724 | 4 | |||||||||||||
| PAINTER, MAINTENANCE | 2180 | 2 | |||||||||||||
| PIPEFITTER, MAINTENANCE | 3556 | 3 | |||||||||||||
| PLUMBER, MAINTENANCE | 3556 | 3 | |||||||||||||
| SHEET-METAL WORKER, MAINTENANCE | 3556 | 3 | |||||||||||||
| TELECOMMUNICATIONS MECHANIC II | 2180 | 2 | |||||||||||||
| WELDER, COMBINATION, MAINTENANCE | 4724 | 4 |
File details come from the government source that posted it. Updated .