Attachment 2 Level of Effort Cost Spreadsheet.xlsx
XLSX spreadsheet 37 KB Posted
- Attached to
- N0018926RL009 CNSL MHE
- Solicitation number
- N0018926RL009
About this file
This is a Level of Effort Cost Spreadsheet for a five-year maintenance and overhaul services contract for Commander Naval Surface Force, Atlantic (CNSL) Shipboard Material Handling Equipment (MHE) and Shipboard Mobile Support Equipment (SMSE). The contract includes a base year period of performance from August 30, 2026, to August 29, 2027, followed by four option years with identical annual periods through August 29, 2031, and a final FAR 52.217-8 period from August 30, 2031, to February 29, 2032. The spreadsheet outlines the cost structure across five Contract Line Item Numbers (CLINs) per period: Labor, Materials, Other Direct Costs (ODCs), and Travel, though all CLIN values are currently shown as $0.00 pending detailed cost estimation.
The labor cost estimates detail a comprehensive staffing plan including ten primary labor categories (Program Manager, Shop Supervisor, Senior and Junior Engineering Technicians-Mechanical, Shop Warehouse Electrician, Material Expediter, Administrative Assistant, Production Manager, Senior Engineering Technician-Mechanical Mobile, and Quality Assurance Inspector) with consistent full-time equivalent allocations throughout the base year and option years. Each labor category includes standard annual hours (ranging from 1,040 to 8,320 hours) plus overtime hours, with overhead, fringe benefits, General & Administrative (G&A), and fee percentages to be applied for calculating fully burdened labor rates. The FAR 52.217-8 period reflects reduced staffing at approximately 50 percent of the standard annual hours due to its six-month duration rather than a full fiscal year.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Summary
| Base Year Period of Performance: 30 August 2026 - 29 August 2027 | |
| CLIN | Total CLIN Value |
| CLIN 0001 Labor | $0.00 |
| CLIN 0002 Materials | $0.00 |
| CLIN 0003 ODCs | $0.00 |
| CLIN 0004 Travel | $0.00 |
| Option Year 1 Period of Performance : 30 August 2027 - 29 August 2028 | |
| CLIN | Total CLIN Value |
| CLIN 1001 Labor | $0.00 |
| CLIN 1002 Materials | $0.00 |
| CLIN 1003 ODCs | $0.00 |
| CLIN 1004 Travel | $0.00 |
| Option Year 2 Period of Performance : 30 August 2028 - 29 August 2029 | |
| CLIN | Total CLIN Value |
| CLIN 2001 Labor | $0.00 |
| CLIN 2002 Materials | $0.00 |
| CLIN 2003 ODCs | $0.00 |
| CLIN 2004 Travel | $0.00 |
| Option Year 3 Period of Performance : 30 August 2029 - 29 August 2030 | |
| CLIN | Total CLIN Value |
| CLIN 3001 Labor | $0.00 |
| CLIN 3002 Materials | $0.00 |
| CLIN 3003 ODCs | $0.00 |
| CLIN 3004 Travel | $0.00 |
| Option Year 4 Period of Performance : 30 August 2030 - 29 August 2031 | |
| CLIN | Total CLIN Value |
| CLIN 4001 Labor | $0.00 |
| CLIN 4002 Materials | $0.00 |
| CLIN 4003 ODCs | $0.00 |
| CLIN 4004 Travel | $0.00 |
| FAR 52.217-8 Period of Performance : 30 August 2031 - 29 February 2032 | |
| CLIN | Total CLIN Value |
| CLIN 5001 Labor | $0.00 |
| CLIN 5002 Materials | $0.00 |
| CLIN 5003 ODCs | $0.00 |
| CLIN 5004 Travel | $0.00 |
_x000D_&1#&"Calibri"&10&K0000FF Information in this document/e-mail is considered Business Use Only. Please treat accordingly.
Base Detailed Cost
| Estimated Level of Effort: 30 August 2026 - 29 August 2027 | |||||||||||||||
| Labor Category | Total Hours | FTE | Direct Labor Rate | Fringe % | Fringe $ | DL + Fringe | Overhead % | Overhead $ | G&A % | G&A $ | Subtotal | Fee % | Fee $ | Fully Burdened Labor Rate | Total Labor Cost (FBLR x Hours) |
| Program Manager | 1040 | 1 | |||||||||||||
| Shop Supervisor | 2080 | 1 | |||||||||||||
| Sr.Engineering Tech - Mech | 6240 | 3 | |||||||||||||
| Jr.Engineering Tech - Mech | 8320 | 4 | |||||||||||||
| Shop Warehouse - Elec (Battery) | 2080 | 1 | |||||||||||||
| Material Expediter | 4160 | 2 | |||||||||||||
| Administrative Assistant | 2080 | 1 | |||||||||||||
| Production Manager | 2080 | 1 | |||||||||||||
| Sr. Engineering Tech - Mech Mobile | 4160 | 2 | |||||||||||||
| Quality Assurance Inspector | 2080 | 1 | |||||||||||||
| Labor Category | Total Hours | FTE | Direct Labor Rate | Fringe % | Fringe $ | DL + Fringe | Overhead % | Overhead $ | G&A % | G&A $ | Subtotal | Fee % | Fee $ | Fully Burdened Labor Rate | Total Labor Cost (FBLR x Hours) |
| Shop Supervisor OT | 90 | ||||||||||||||
| Sr.Engineering Tech - Mech OT | 270 | ||||||||||||||
| Jr.Engineering Tech - Mech - OT | 360 | ||||||||||||||
| Shop Warehouse - Elec (Battery) - OT | 60 | ||||||||||||||
| Material Expediter - OT | 120 | ||||||||||||||
| Administrative Assistant - OT | 60 | . | |||||||||||||
| Production Manager - OT | 60 | ||||||||||||||
| Sr. Engineering Tech - Mech Mobile - OT | 180 | ||||||||||||||
| Quality Assurance Inspector - OT | 90 |
OY 1 Detailed Cost
| Estimated Level of Effort: 30 August 2027 - 29 August 2028 | |||||||||||||||
| Labor Category | Total Hours | FTE | Direct Labor Rate | Fringe % | Fringe $ | DL + Fringe | Overhead % | Overhead $ | G&A % | G&A $ | Subtotal | Fee % | Fee $ | Fully Burdened Labor Rate | Total Labor Cost (FBLR x Hours) |
| Program Manager | 1040 | 1 | |||||||||||||
| Shop Supervisor | 2080 | 1 | |||||||||||||
| Sr.Engineering Tech - Mech | 6240 | 3 | |||||||||||||
| Jr.Engineering Tech - Mech | 8320 | 4 | |||||||||||||
| Shop Warehouse - Elec (Battery) | 2080 | 1 | |||||||||||||
| Material Expediter | 4160 | 2 | |||||||||||||
| Administrative Assistant | 2080 | 1 | |||||||||||||
| Production Manager | 2080 | 1 | |||||||||||||
| Sr. Engineering Tech - Mech Mobile | 4160 | 2 | |||||||||||||
| Quality Assurance Inspector | 2080 | 1 | |||||||||||||
| Labor Category | Total Hours | FTE | Direct Labor Rate | Fringe % | Fringe $ | DL + Fringe | Overhead % | Overhead $ | G&A % | G&A $ | Subtotal | Fee % | Fee $ | Fully Burdened Labor Rate | Total Labor Cost (FBLR x Hours) |
| Shop Supervisor OT | 90 | ||||||||||||||
| Sr.Engineering Tech - Mech OT | 270 | ||||||||||||||
| Jr.Engineering Tech - Mech - OT | 360 | ||||||||||||||
| Shop Warehouse - Elec (Battery) - OT | 60 | ||||||||||||||
| Material Expediter - OT | 120 | ||||||||||||||
| Administrative Assistant - OT | 60 | . | |||||||||||||
| Production Manager - OT | 60 | ||||||||||||||
| Sr. Engineering Tech - Mech Mobile - OT | 180 | ||||||||||||||
| Quality Assurance Inspector - OT | 90 |
OY 2 Detailed Cost
| Estimated Level of Effort: 30 August 2028 - 29 August 2029 | |||||||||||||||
| Labor Category | Total Hours | FTE | Direct Labor Rate | Fringe % | Fringe $ | DL + Fringe | Overhead % | Overhead $ | G&A % | G&A $ | Subtotal | Fee % | Fee $ | Fully Burdened Labor Rate | Total Labor Cost (FBLR x Hours) |
| Program Manager | 1040 | 1 | |||||||||||||
| Shop Supervisor | 2080 | 1 | |||||||||||||
| Sr.Engineering Tech - Mech | 6240 | 3 | |||||||||||||
| Jr.Engineering Tech - Mech | 8320 | 4 | |||||||||||||
| Shop Warehouse - Elec (Battery) | 2080 | 1 | |||||||||||||
| Material Expediter | 4160 | 2 | |||||||||||||
| Administrative Assistant | 2080 | 1 | |||||||||||||
| Production Manager | 2080 | 1 | |||||||||||||
| Sr. Engineering Tech - Mech Mobile | 4160 | 2 | |||||||||||||
| Quality Assurance Inspector | 2080 | 1 | |||||||||||||
| Labor Category | Total Hours | FTE | Direct Labor Rate | Fringe % | Fringe $ | DL + Fringe | Overhead % | Overhead $ | G&A % | G&A $ | Subtotal | Fee % | Fee $ | Fully Burdened Labor Rate | Total Labor Cost (FBLR x Hours) |
| Shop Supervisor OT | 90 | ||||||||||||||
| Sr.Engineering Tech - Mech OT | 270 | ||||||||||||||
| Jr.Engineering Tech - Mech - OT | 360 | ||||||||||||||
| Shop Warehouse - Elec (Battery) - OT | 60 | ||||||||||||||
| Material Expediter - OT | 120 | ||||||||||||||
| Administrative Assistant - OT | 60 | . | |||||||||||||
| Production Manager - OT | 60 | ||||||||||||||
| Sr. Engineering Tech - Mech Mobile - OT | 180 | ||||||||||||||
| Quality Assurance Inspector - OT | 90 |
OY 3 Detailed Cost
| Estimated Level of Effort: 30 August 2029 - 29 August 2030 | |||||||||||||||
| Labor Category | Total Hours | FTE | Direct Labor Rate | Fringe % | Fringe $ | DL + Fringe | Overhead % | Overhead $ | G&A % | G&A $ | Subtotal | Fee % | Fee $ | Fully Burdened Labor Rate | Total Labor Cost (FBLR x Hours) |
| Program Manager | 1040 | 1 | |||||||||||||
| Shop Supervisor | 2080 | 1 | |||||||||||||
| Sr.Engineering Tech - Mech | 6240 | 3 | |||||||||||||
| Jr.Engineering Tech - Mech | 8320 | 4 | |||||||||||||
| Shop Warehouse - Elec (Battery) | 2080 | 1 | |||||||||||||
| Material Expediter | 4160 | 2 | |||||||||||||
| Administrative Assistant | 2080 | 1 | |||||||||||||
| Production Manager | 2080 | 1 | |||||||||||||
| Sr. Engineering Tech - Mech Mobile | 4160 | 2 | |||||||||||||
| Quality Assurance Inspector | 2080 | 1 | |||||||||||||
| Labor Category | Total Hours | FTE | Direct Labor Rate | Fringe % | Fringe $ | DL + Fringe | Overhead % | Overhead $ | G&A % | G&A $ | Subtotal | Fee % | Fee $ | Fully Burdened Labor Rate | Total Labor Cost (FBLR x Hours) |
| Shop Supervisor OT | 90 | ||||||||||||||
| Sr.Engineering Tech - Mech OT | 270 | ||||||||||||||
| Jr.Engineering Tech - Mech - OT | 360 | ||||||||||||||
| Shop Warehouse - Elec (Battery) - OT | 60 | ||||||||||||||
| Material Expediter - OT | 120 | ||||||||||||||
| Administrative Assistant - OT | 60 | . | |||||||||||||
| Production Manager - OT | 60 | ||||||||||||||
| Sr. Engineering Tech - Mech Mobile - OT | 180 | ||||||||||||||
| Quality Assurance Inspector - OT | 90 |
OY 4 Detailed Cost
| Estimated Level of Effort: 30 August 2030 - 29 August 2031 | |||||||||||||||
| Labor Category | Total Hours | FTE | Direct Labor Rate | Fringe % | Fringe $ | DL + Fringe | Overhead % | Overhead $ | G&A % | G&A $ | Subtotal | Fee % | Fee $ | Fully Burdened Labor Rate | Total Labor Cost (FBLR x Hours) |
| Program Manager | 1040 | 1 | |||||||||||||
| Shop Supervisor | 2080 | 1 | |||||||||||||
| Sr.Engineering Tech - Mech | 6240 | 3 | |||||||||||||
| Jr.Engineering Tech - Mech | 8320 | 4 | |||||||||||||
| Shop Warehouse - Elec (Battery) | 2080 | 1 | |||||||||||||
| Material Expediter | 4160 | 2 | |||||||||||||
| Administrative Assistant | 2080 | 1 | |||||||||||||
| Production Manager | 2080 | 1 | |||||||||||||
| Sr. Engineering Tech - Mech Mobile | 4160 | 2 | |||||||||||||
| Quality Assurance Inspector | 2080 | 1 | |||||||||||||
| Labor Category | Total Hours | FTE | Direct Labor Rate | Fringe % | Fringe $ | DL + Fringe | Overhead % | Overhead $ | G&A % | G&A $ | Subtotal | Fee % | Fee $ | Fully Burdened Labor Rate | Total Labor Cost (FBLR x Hours) |
| Shop Supervisor OT | 90 | ||||||||||||||
| Sr.Engineering Tech - Mech OT | 270 | ||||||||||||||
| Jr.Engineering Tech - Mech - OT | 360 | ||||||||||||||
| Shop Warehouse - Elec (Battery) - OT | 60 | ||||||||||||||
| Material Expediter - OT | 120 | ||||||||||||||
| Administrative Assistant - OT | 60 | . | |||||||||||||
| Production Manager - OT | 60 | ||||||||||||||
| Sr. Engineering Tech - Mech Mobile - OT | 180 | ||||||||||||||
| Quality Assurance Inspector - OT | 90 |
FAR 52.217-8 Detailed Cost
| Estimated Level of Effort: 30 August 2031 - 29 February 2032 | |||||||||||||||
| Labor Category | Total Hours | FTE | Direct Labor Rate | Fringe % | Fringe $ | DL + Fringe | Overhead % | Overhead $ | G&A % | G&A $ | Subtotal | Fee % | Fee $ | Fully Burdened Labor Rate | Total Labor Cost (FBLR x Hours) |
| Program Manager | 520 | 1 | |||||||||||||
| Shop Supervisor | 1040 | 1 | |||||||||||||
| Sr.Engineering Tech - Mech | 3120 | 3 | |||||||||||||
| Jr.Engineering Tech - Mech | 4160 | 4 | |||||||||||||
| Shop Warehouse - Elec (Battery) | 1040 | 1 | |||||||||||||
| Material Expediter | 2080 | 2 | |||||||||||||
| Administrative Assistant | 1040 | 1 | |||||||||||||
| Production Manager | 1040 | 1 | |||||||||||||
| Sr. Engineering Tech - Mech Mobile | 2080 | 2 | |||||||||||||
| Quality Assurance Inspector | 1040 | 1 | |||||||||||||
| Labor Category | Total Hours | FTE | Direct Labor Rate | Fringe % | Fringe $ | DL + Fringe | Overhead % | Overhead $ | G&A % | G&A $ | Subtotal | Fee % | Fee $ | Fully Burdened Labor Rate | Total Labor Cost (FBLR x Hours) |
| Shop Supervisor OT | 45 | ||||||||||||||
| Sr.Engineering Tech - Mech OT | 90 | ||||||||||||||
| Jr.Engineering Tech - Mech - OT | 130 | ||||||||||||||
| Shop Warehouse - Elec (Battery) - OT | 30 | ||||||||||||||
| Material Expediter - OT | 60 | ||||||||||||||
| Administrative Assistant - OT | 30 | . | |||||||||||||
| Production Manager - OT | 30 | ||||||||||||||
| Sr. Engineering Tech - Mech Mobile - OT | 90 | ||||||||||||||
| Quality Assurance Inspector - OT | 45 |
_x000D_&1#&"Calibri"&10&K0000FF Information in this document/e-mail is considered Business Use Only. Please treat accordingly.
File details come from the government source that posted it. Updated .