QandA_-_N00033-13-R-7508_Q38-40_Sep_20.docx

DOCX document 21 KB Posted

Attached to
USNS SUPPLY (T-AOE 6) Maintenance and Repair Upgrade (MARUP)
Solicitation number
N00033-13-R-7508
Issued by

View the file

Other files

File Type Posted
N00033-13-R-7508-0006.doc DOC document
AMEND0006_Work_Items.zip ZIP file
QandA_-_N00033-13-R-7508_Q18-37_Sep_19.docx DOCX document
N00033-13-R-7508-0005.doc DOC document
AMEND0005_J-4_GFM_LIST.pdf PDF
AMEND0005_Work_Items.zip ZIP file
AMEND0005_J-2_Contractor_Price_Breakdown.xls XLS spreadsheet
QandA_-_N00033-13-R-7508_Q10-17_Sep_12.docx DOCX document
AMEND0004_Work_Items.zip ZIP file
N00033-13-R-7508-0004.doc DOC document
AMEND0004_J-4_GFM_LIST.pdf PDF
AMEND0004_J-2_Contractor_Price_Breakdown.xls XLS spreadsheet
QandA_-_N00033-13-R-7508_Sep_09.docx DOCX document
QandA_-_N00033-13-R-7508_Aug_30.docx DOCX document
N00033-13-R-7508-0003.doc DOC document
AMEND0003 0109_A_Potable Water Tank Vent Mod.docx DOCX document
AMEND0003 0551_A_RCC Vane Status - RCC-RRG LO Control and Monitoring RCC Fill and Drain Valves Including Piping Mods.doc DOC document
AMEND0003_J-3_NDA_for_Gov_Tech_Data.docx DOCX document
AMEND0003 0603_A_ Flight Deck Safety Nets Repair.doc DOC document
AMEND0003 - USNS SUPPLY 2014 MARUP WORK PACKAGE INDEX.docx DOCX document
AMEND0002_J-4_GFM_LIST.pdf PDF
AMEND0002_Work_Items.zip ZIP file
N00033-13-R-7508-0002.pdf PDF
AMEND0002_J-6_SUPPLY_MARUP_CDRL.docx DOCX document
AMEND0002_J-2_Contractor_Price_Breakdown.xls XLS spreadsheet
N00033-13-R-7508-0001.pdf PDF
N00033-13-R-7508.pdf PDF
N00033-13-R-7508_J-Attachments.zip ZIP file
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MILITARY SEALIFT COMMAND

N00033-13-R-7508

QUESTIONS AND ANSWERS

The following are answers to questions received from potential offerors. The answers provide clarification only and DO NOT constitute an amendment to the solicitation.

38. Work Item 414:

Paragraph 7.4.1 a. directs to remove electrical equipment using reference 2.1 as guidance. Reference 2.1, drawing 436-8389999 indicates on sheet 2 of 6 in the area of 15 & 16 E removal of four (4) antennas, identified as R-3. In the table labeled LIST OF REMOVED MATERIAL of the referenced drawing on sheet 1 of 6, the quantity listed for R-3 is 1. Please clarify the quantity of antennas to be removed.

ANSWER:

Sheet 2 of reference drawing 436-8389999 shows a “typical” antenna removal diagram for the entire T-AOE 6 Class. The quantity listed in the table LIST OF REMOVED MATERIAL on sheet 1 of reference drawing 436-8389999 (quantity one (1)) for R-3 (Ross VHF Antenna) is correct for the USNS SUPPLY.

39. Work Item 600:

Given the designated vessel availability period and the required Government approvals required by the Habitability 600 Work Items prior to material order, prior to material fabrication and prior to beginning work, we have these questions.

a. Several Habitability 600 Work Items require contractor to “Prepare a color coordination manual and submit to MSCREP for approval prior to ordering materials.”

If the Government does not provide a color coordination manual will the Government commit to review and return the contractor’s color coordination manual within five (5) calendar days of submittal to the Government?

ANSWER: Paragraph 7.6.1 of work items 611, 612, 613, 614, 615, 617, 618, 619, 621, 622, 623, 626, 627, 629, 630, 632, 633, 634, and 635 is revised by adding the following: “The Government will commit to review and return the contractor’s color coordination manual within five (5) business days of submittal to the Government.” See Amendment 0006.

b. Several Habitability 600 Work Items require contractor to “Provide manufacturer’s drawings for review and approval before fabricating furnishings.” Since there is no Government Furnished material for these habitability modifications, and given the long lead time for the furniture and furnishings specified, will the Government commit to review and return comments/approvals to the manufacturer’s drawings within five (5) calendar days of submittal to the Government so as to not jeopardize delivery?

ANSWER: Paragraph 7.6.3 of work items 611, 617, 618, 623, 633, and 635; and paragraph 7.6.4 of work items 612, 613, 614, 619, 621, and 622 are revised by adding the following: “The Government will commit to review and return comments/approvals to the manufacturer’s drawings within ten (10) business days of submittal to the Government.” See Amendment 0006.

c. Several Habitability 600 Work Items require contractor to “Provide working drawings showing proposed furniture and equipment layout in all habitability spaces and submit to MSCREP for approval prior to beginning work.”

If the government requires the contractor to prepare and submit layout drawings prior to beginning work, will the Government commit to review and return comments/approvals to the contractors’ drawings within five (5) calendar days of submittal to the Government so as to not jeopardize delivery?

ANSWER: Paragraph 7.6.2 of work items 611, 615, 617, 618, 623, 627, 629, 632, 633, 634, and 635; and paragraph 7.6.3 of work items 612, 613, 614, 619, 621, 622, and 630 are revised by adding the following: “The Government will commit to review and return comments/approvals to the contractor’s drawings within ten (10) business days of submittal to the Government.” See Amendment 0006.

40. Will MSC grant an extension of proposals submission deadline?

ANSWER:

Yes. The proposal submission deadline will be extended in Amendment 0006 to 02 October 2013, 1400 local time Washington, D.C.