MILITARY SEALIFT COMMAND
N00033-13-R-7508
QUESTIONS AND ANSWERS
The following are answers to questions received from potential offerors. The answers provide clarification only and DO NOT constitute an amendment to the solicitation.
10. Will MSC grant an extension of proposals submission deadline?
ANSWER: Yes.
11. Work Item 631:
a. Sheet 2 of Reference 2.1 – Plan View 11-C upper right corner has two (2) notes “OVERHEAD LIGHTING FIXTURE (RELOCATED TO B=90”)” and “CONDENSATE DRAIN (RELOCATED TO B= 90”)”. Please define the meaning of B=90”? In addition, please identify in what way or how the light fixture and condensate drain are to be relocated?
ANSWER: B is the distance from the deck to the bottom of the equipment in question. Both the light and condensate drain as currently installed interfere with the installation of the BERP and need to be raised to a height of 90 inches off the deck so as not to impact the BERP install.
b. Sheet 3 of Reference 2.1 – Elevation 23-A shows a measurement arrow at the top and the bottom of the bulkhead opening that should serve to locate where the new horizontal are to be installed. Please provide those dimensions?
ANSWER: What is being called a measurement arrow is actually a stiffener, similar to the others in the view. However the horizontals are dimensioned slightly to the right of the stiffeners in question (24 ½” for the top and 12” for the bottom)
c. Sheet 3 of Reference 2.1 – Plan View 17-A identifies piece #7 as “PADEYE (30 PLACES)”, however the quantity of piece #7 in the List of Material shows a quantity of 2. Please verify that the quantity of padeyes to be installed on the BERP is two (2) and the number of bolt holes in the BERP is thirty (30)?
ANSWER: Yes, the padeye quantity is two (2) and the bolt holes quantity is thirty (30). Drawing 8394032 has been updated to reflect.
12. Work Item 526:
Paragraph 7.1.9 directs contractor to “Provide all drawing titles and numbers (including applicable sub-tier), and technical documentation used to accomplish the requirements of Paragraph 3.1.”
a. Paragraph 3.1 only lists the location of the JP-5 pump room. Please indicate what requirements are referred to in this paragraph.
ANSWER: Work Items 526 and 527 have been updated to clarify the requirements.
b. “Sub-tier” normally refers to subcontractors rather than drawings. Please clarify what is required here.
ANSWER: Work Items 526 and 527 have been updated to clarify the requirements.
13. Work Item 105 – Para. 3.2.1 refers to bill of material list in reference 2.1. Please verify and furnish bill of material.
ANSWER: Work Item updated to delete 3.2.1 and modify 3.2.2.
14. Work Item 105 – Para. 2.2, please furnish MSC standard drawing 803-7080803.
ANSWER: MSC Standard Drawing 803-7080803, Computer Aided Designed (CAD) Drawing Standard, is provided with Amendment 0004 and is a general reference for the entire work package
15. Work Item 105 – Para. 7.3.2.b, Install closure devices on all vent pipes on the 01 level – see attached list; Please provide list.
ANSWER: Work Item modified to include locations in Enclosure 2.2.1.
16. Work Item 512 – Spec (para 7.3.4.c) calls for using heated “safe acid” to chemically clean the coolers. We use RYDLYME, a biodegradable descaler, which is not to be heated. This descaler is approved for USN, USCG, and commercial ship coolers and heat exchanger cleaning. Will this be an acceptable descaler for this project?
ANSWER: The word heated has been removed, the approval of a given chemical and process will occur when procedure is submitted IAW Para 7.3.3. Work Item has been updated to reflect.
17. Work Item 613 – Reference 2.1, drawing 643-8393965 of the work item contains a List of Materials (LOM) on the first page. Items 1-7 of the LOM provide under the column heading “NSN or MFR PART NO” the number 600-8391689 and list the Manufacturer as SPEC-BUILT SYS, INC. In order for a competitive bid to be provided, please make the document 600-8391689 available or designate an “or equal” specification that can be used. This same LOM designation has been used in many of the habitability items, so a competitive bid for this furniture can have a significant impact on pricing.
ANSWER: Drawing 600-8391689 is provided.