Cat A Items
| CATEGORY “A” ITEMS | |||||||||||||
| GENERAL REQUIREMENT | PRIME Contractor | SUB Contractor | Govt Mandated Tech Rep / Sub | OTHER COSTS | TOTAL PRICE | ||||||||
| ITEM NO. | TITLE CAT A ITEM | PRIME L/H | LABOR PRICE | MATERIAL PRICE | SUB L/H | LABOR PRICE | MATERIAL PRICE | Price | TOTAL LABOR HOURS | TOTAL MATERIAL | CLIN | ||
| CATEGORY "A" | |||||||||||||
| 000 | GENERAL REQUIREMENTS | ||||||||||||
| 001 | Intent, Scope, General Requirements, and Definitions | - 0 | $ - 0 | NSP | 0001 | ||||||||
| 002 | Technical and Manufacturer’s Representatives | - 0 | $ - 0 | NSP | 0001 | ||||||||
| 003 | Approach, Berth, and Mooring Requirements | - 0 | $ - 0 | NSP | 0001 | ||||||||
| 004 | Testing and Quality Assurance | - 0 | $ - 0 | NSP | 0001 | ||||||||
| 005 | Electrical Safety Procedure Requirements | - 0 | $ - 0 | NSP | 0001 | ||||||||
| 006 | Heavy Weather Plan | - 0 | $ - 0 | NSP | 0001 | ||||||||
| 007 | Cold Weather Plan | - 0 | $ - 0 | NSP | 0001 | ||||||||
| 10 | Furnish Office for Overhaul Management Team (OMT) | - 0 | $ - 0 | $0 | 0001 | ||||||||
| 11 | General Services for the Ship | - 0 | $ - 0 | $0 | 0001 | ||||||||
| 12 | Telephone Services | - 0 | $ - 0 | $0 | 0001 | ||||||||
| 13 | Project Planning; Production Status Monitoring Reports; Test Planning and Lessons Learned | - 0 | $ - 0 | $0 | 0001 | ||||||||
| 14 | Preparation of Weight and Moment Report | - 0 | $ - 0 | $0 | 0001 | ||||||||
| 15 | Integrated Logistics and GFM Support Requirements | - 0 | $ - 0 | $0 | 0001 | ||||||||
| 16 | Fire Protection and Ship's Safety Program | - 0 | $ - 0 | $0 | 0001 | ||||||||
| 17 | Furnish General Services for Government Contractors | - 0 | $ - 0 | $0 | 0001 | ||||||||
| 18 | Delivery and Redelivery | - 0 | $ - 0 | $0 | 0001 | ||||||||
| 19 | Shipboard Access and Security | - 0 | $ - 0 | $0 | 0001 | ||||||||
| 20 | Gas Free Certificates | - 0 | $ - 0 | $0 | 0001 | ||||||||
| 21 | Clean and Gas Free Tanks, Voids, Cofferdams & Spaces | - 0 | $ - 0 | $0 | 0001 | ||||||||
| 22 | Dock Trials and Sea Trials | - 0 | $ - 0 | $0 | 0001 | ||||||||
| 23 | Hazardous Waste Disposal at a Contractor's Facility | - 0 | $ - 0 | $0 | 0001 | ||||||||
| 100 | HULL STRUCTURES | ||||||||||||
| 101 | Tank Testing | - 0 | $ - 0 | $0 | 0001 | ||||||||
| 103 | Mast Ladder and Climber Safety Rail Repair | - 0 | $ - 0 | $0 | 0014 | ||||||||
| 104 | FAS, RAS and Weatherdeck Handrail Replacement | - 0 | $ - 0 | $0 | 0014 | ||||||||
| 105 | Modifications for Load Line | - 0 | $ - 0 | $0 | 0001 | ||||||||
| 106 | Install GTE Intake Maintenance BERP | - 0 | $ - 0 | $0 | 0001 | ||||||||
| 107 | Tank Modifications For Improved Surveyor Access | - 0 | $ - 0 | $0 | 0001 | ||||||||
| 108 | Degausing Penetration Reinforcement | - 0 | $ - 0 | $0 | 0001 | ||||||||
| 109 | Potable Water Tank Vent Terminal Relocation for CPS | - 0 | $ - 0 | $0 | 0001 | ||||||||
| 110 | Airlock to CHT Room No. 1 | - 0 | $ - 0 | $0 | 0001 | ||||||||
| 111 | Catwalk Installation 04 Level House Front | - 0 | $ - 0 | $0 | 0001 | ||||||||
| 112 | Upgrade FAS Station Oil Containments | - 0 | $ - 0 | $0 | 0001 | ||||||||
| 113 | Install Permanent Tonnage Markings | - 0 | $ - 0 | $0 | 0001 | ||||||||
| 114 | SSDG Enclosure Door Replacement | - 0 | $ - 0 | $0 | 0001 | ||||||||
| 115 | 01 Level Handrail Modifications | - 0 | $ - 0 | $0 | 0001 | ||||||||
| 116 | Vertical Ladder, Drain & Guard Rail 04-566-1 Install | - 0 | $ - 0 | $0 | 0001 | ||||||||
| 117 | Freeing Ports, Main Deck-Frs 695 to 715, Modifications | - 0 | $ - 0 | $0 | 0001 | ||||||||
| 118 | Installation of QAWT Door for Equipment Removal Route from AMR (3-105-0-E) to Main Deck via Escape Trunk (3-146-1-T) | - 0 | $ - 0 | $0 | 0001 | ||||||||
| 119 | Accomodation Ladder "J" Davit Modifications | - 0 | $ - 0 | $0 | 0001 | ||||||||
| 120 | AMR Bilges; Gauging and Steel Replacement | - 0 | $ - 0 | $0 | 0001 | ||||||||
| 122 | Cargo Watertight Door Repair | - 0 | $ - 0 | $0 | 0001 | ||||||||
| 123 | 03 LVL Gun Platform Replacement | - 0 | $ - 0 | $0 | 0001 | ||||||||
| 124 | Main Mast (FWD) Preservation and Maintenance | - 0 | $ - 0 | $0 | 0014 | ||||||||
| 125 | SY Support for ABS Close-Up Inspection | - 0 | $ - 0 | $0 | 0001 | ||||||||
| 126 | JP-5 Pump Room Bilge Preservation | - 0 | $ - 0 | $0 | 0001 | ||||||||
| 127 | DFM Pump Room Bilge Preservation | - 0 | $ - 0 | $0 | 0001 | ||||||||
| 128 | Degaussing Control Room Deck Preservation | - 0 | $ - 0 | $0 | 0001 | ||||||||
| 129 | Inspect and Preserve Bilge Wells in Fuel Tanks | - 0 | $ - 0 | $0 | 0001 | ||||||||
| 133 | 04 Level Bridge Wings, Platform Replacement | - 0 | $ - 0 | $0 | 0001 | ||||||||
| 134 | DFM Service Tank Preservation | - 0 | $ - 0 | $0 | 0001 | ||||||||
| 135 | Installation of BERP on AMR Upper Level in Escape Trunk 3-146-1-T | - 0 | $ - 0 | $0 | 0001 | ||||||||
| 136 | Expansion of Ladderway Deck Opening on Upper Level of AMR | - 0 | $ - 0 | $0 | 0001 | ||||||||
| 200 | MAIN PROPULSION | ||||||||||||
| 202 | Gas Turbine Intake Inspection and Repair | - 0 | $ - 0 | $0 | 0001 | ||||||||
| 203 | Gas Turbine Change Out Support (GTM 1A) | - 0 | $ - 0 | $0 | 0001 | ||||||||
| 206 | MCS Replacement Shipyard Support | - 0 | $ - 0 | $0 | 0001 | ||||||||
| 207 | Line Shaft Bearings - Inspect | - 0 | $ - 0 | $0 | 0001 | ||||||||
| 209 | Refurbish and Align Propulsion Shaft Bulkhead Seals | - 0 | $ - 0 | $0 | 0001 | ||||||||
| 218 | Gas Turbine Layup | - 0 | $ - 0 | $0 | 0001 | ||||||||
| 220 | Overhaul Leslie RRG Temperature Regulating Valves | - 0 | $ - 0 | $0 | 0014 | ||||||||
| 221 | Overhaul Bleed Air Relief Valves | - 0 | $ - 0 | $0 | 0014 | ||||||||
| 222 | Lube & Fuel Oil Unloader Valve Controller Replacement | - 0 | $ - 0 | $0 | 0001 | ||||||||
| 223 | Main Reduction Gear Lube Oil Purifier Modifications | - 0 | $ - 0 | $0 | 0001 | ||||||||
| 300 | ELECTRICAL | ||||||||||||
| 301 | Replace SSDG No. 1 Hoses | - 0 | $ - 0 | $0 | 0001 | ||||||||
| 304 | Multiple Cable Transit Repairs | - 0 | $ - 0 | $0 | 0014 | ||||||||
| 305 | Weather Deck Electrical Wire Stand Offs | - 0 | $ - 0 | $0 | 0001 | ||||||||
| 306 | Stuffing Tube Replacement | - 0 | $ - 0 | $0 | 0001 | ||||||||
| 311 | Shore Power Monitoring | - 0 | $ - 0 | $0 | 0001 | ||||||||
| 313 | Central Seawater System Suction Valve Control Modifications | - 0 | $ - 0 | $0 | 0001 | ||||||||
| 314 | 450 V Service in Fork Truck Shop | - 0 | $ - 0 | $0 | 0001 | ||||||||
| 400 | COMMUNIC ATION & NAV AIDS | ||||||||||||
| 401 | INMARSAT B HSD Preventative Maintenance | - 0 | $ - 0 | $0 | 0014 | ||||||||
| 402 | Radar Preventative Maintenance | - 0 | $ - 0 | $0 | 0014 | ||||||||
| 403 | GMDSS Safety Radio Certification | - 0 | $ - 0 | $0 | 0001 | ||||||||
| 404 | Antenna Preventative Maintenance | - 0 | $ - 0 | $0 | 0014 | ||||||||
| 405 | TV-DTS and TV Distribution System PM | - 0 | $ - 0 | $0 | 0001 | ||||||||
| 406 | Underwater Speed Log PM | - 0 | $ - 0 | $0 | 0001 | ||||||||
| 407 | OE-82/WSC-1(V) Antenna Group Maintenance | - 0 | $ - 0 | $0 | 0014 | ||||||||
| 408 | UHF Transceiver Groom | - 0 | $ - 0 | $0 | 0001 | ||||||||
| 409 | Gyro Repeater Groom | - 0 | $ - 0 | $0 | 0001 | ||||||||
| 410 | NGW SATCOM System Support | - 0 | $ - 0 | $0 | 0001 | ||||||||
| 411 | Refrigeration Plant Monitoring Unit Installation and Testing | - 0 | $ - 0 | $0 | 0001 | ||||||||
| 412 | COMSEC KIV-7M | - 0 | $ - 0 | $0 | 0001 | ||||||||
| 413 | General Alarm Contact Makers | - 0 | $ - 0 | $0 | 0001 | ||||||||
| 414 | Simplified Voyage Data Recorder Installation | - 0 | $ - 0 | $0 | 0001 | ||||||||
| 415 | AC Plant Monitoring Unit Installation | - 0 | $ - 0 | $0 | 0001 | ||||||||
| 417 | Shipwide Fire Detection System | - 0 | $ - 0 | $0 | 0001 | ||||||||
| 419 | Upgrade SSDG Module Fire Detection System | - 0 | $ - 0 | $0 | 0001 | ||||||||
| 420 | Steering Gear Monitoring Mods | - 0 | $ - 0 | $0 | 0001 | ||||||||
| 421 | Surface Search Radar Systems Replacement (ABS) | - 0 | $ - 0 | $0 | 0001 | ||||||||
| 422 | ECDIS Upgrade | - 0 | $ - 0 | $0 | 0001 | ||||||||
| 423 | Replace Gyro Compass with Sperry MK27F | - 0 | $ - 0 | $0 | 0001 | ||||||||
| 424 | AN/URT-23D(V) Radio Transmitter System Replacement | - 0 | $ - 0 | $0 | 0001 | ||||||||
| 500 | AUXILIARY MACHINERY | ||||||||||||
| 501 | HP Start Air Flask Examination | - 0 | $ - 0 | $0 | 0014 | ||||||||
| 502 | Cargo Reefer Isolation Valve Replacement | - 0 | $ - 0 | $0 | 0014 | ||||||||
| 503 | Repair Miscellaneous Valves | - 0 | $ - 0 | $0 | 0014 | ||||||||
| 504 | Replace General Salt Water Strainers | - 0 | $ - 0 | $0 | 0014 | ||||||||
| 505 | Replace Steering Gear Hoses | - 0 | $ - 0 | $0 | 0014 | ||||||||
| 506 | Auxiliary Boiler Inspection | - 0 | $ - 0 | $0 | 0014 | ||||||||
| 507 | Replace 100 Feet of Seawater Piping | - 0 | $ - 0 | $0 | 0001 | ||||||||
| 509 | DFM Cargo Pump Piping Repair | - 0 | $ - 0 | $0 | 0014 | ||||||||
| 511 | JP-5 Piping Repairs at FAS Station 7 | - 0 | $ - 0 | $0 | 0014 | ||||||||
| 512 | Clean and Perform Eddy Current Exam of Heat Exchangers | - 0 | $ - 0 | $0 | 0014 | ||||||||
| 513 | Main Deck Chilled Water Piping Insulation Renewal | - 0 | $ - 0 | $0 | 0014 | ||||||||
| 514 | CHT Tanks Cleaning, Repair and Painting | - 0 | $ - 0 | $0 | 0001 | ||||||||
| 515 | FWD & AFT MSD V1 and V2 Tanks Cleaning and Painting | - 0 | $ - 0 | $0 | 0001 | ||||||||
| 520 | General Saltwater Cooling System Cleaning | - 0 | $ - 0 | $0 | 0014 | ||||||||
| 522 | Groom and Weight Test Port and STBD RHIB Davits | - 0 | $ - 0 | $0 | 0014 | ||||||||
| 528 | Repair Leslie Regulating Valves | - 0 | $ - 0 | $0 | 0014 | ||||||||
| 529 | Replace CHT Piping in 605 Tanks | - 0 | $ - 0 | $0 | 0001 | ||||||||
| 534 | No. 1 SSDG Fuel Fill Line Installation | - 0 | $ - 0 | $0 | 0001 | ||||||||
| 538 | SCBA Compressor and Refill Station Annual Servicing | - 0 | $ - 0 | $0 | 0014 | ||||||||
| 539 | Halon Fire Dampers Installation | - 0 | $ - 0 | $0 | 0001 | ||||||||
| 547 | A/C Drain Modification | - 0 | $ - 0 | $0 | 0001 | ||||||||
| 549 | Refrigeration Compressor Suction Accumulator Installation | - 0 | $ - 0 | $0 | 0001 | ||||||||
| 550 | Firemain Valve Spare Triad Wiring Installation | - 0 | $ - 0 | $0 | 0001 | ||||||||
| 551 | RCC Fill & Drain Valves, Red Hat Control Valves & RCC Vane Status Monitoring & RCC/RRG Lube Oil Monitoring | - 0 | $ - 0 | $0 | 0001 | ||||||||
| 553 | HPAC Controller Replacement | - 0 | $ - 0 | $0 | 0001 | ||||||||
| 555 | Installation of MSD Pump Bypass | - 0 | $ - 0 | $0 | 0001 | ||||||||
| 556 | Ballast Tank Fill System Modification | - 0 | $ - 0 | $0 | 0001 | ||||||||
| 557 | JP-5 Helo Refueling Meter Installation | - 0 | $ - 0 | $0 | 0001 | ||||||||
| 561 | MMR 1 FO Purifier Piping for Storage TK Recirc | - 0 | $ - 0 | $0 | 0001 | ||||||||
| 562 | MMR 2 FO Purifier Piping for Storage TK Recirc | - 0 | $ - 0 | $0 | 0001 | ||||||||
| 600 | HABITABILITY | ||||||||||||
| 601 | Helo Deck Non-Skid Renewal | - 0 | $ - 0 | $0 | 0001 | ||||||||
| 603 | Flight Deck Safety Nets Repair | - 0 | $ - 0 | $0 | 0001 | ||||||||
| 604 | Cargo Weapons Elevators J-Door Refurbishment | - 0 | $ - 0 | $0 | 0001 | ||||||||
| 605 | Accomodation Ladders Refurbish and Weight Test | - 0 | $ - 0 | $0 | 0014 | ||||||||
| 607 | Replace Non-Skid Deck Covering Main Deck | - 0 | $ - 0 | $0 | 0001 | ||||||||
| 608 | Replacement/Removal of Four (4) Steam Laundry Presses | - 0 | $ - 0 | $0 | 0001 | ||||||||
| 611 | Crew Smoking Lounge 2-645-3-Q, Habitability Modifications | - 0 | $ - 0 | $0 | 0001 | ||||||||
| 612 | CLS 02-162-0-L, CL 02-161-1-L & Crew WR,WC & SH 02-154-1-L, Habitability Modification | - 0 | $ - 0 | $0 | 0001 | ||||||||
| 613 | CLS 02-473-3-L, Crew WR, WC & SH 02-496-1-L, and SH & DA 02-492-1-L, Habitiability Modifications | - 0 | $ - 0 | $0 | 0001 | ||||||||
| 614 | CLS 01-532-2-L, CL 01-510-2-L, Crew WR,WC & SH 01-523-2-L, Habitability Modifications | - 0 | $ - 0 | $0 | 0001 | ||||||||
| 615 | Crew WR,WC 2-150-1-L & 2-150-2-L, and SH & DA 2-150-3-L & 2-150-4-L, Habitability Modifications | - 0 | $ - 0 | $0 | 0001 | ||||||||
| 617 | Crew Berthing 2-163-1-L & 2-163-2-L and CL 2-163-3-L & 2-163-4-L, Habitability Modifications | - 0 | $ - 0 | $0 | 0001 | ||||||||
| 618 | CLS 2-565-5-L & 2-565-10-L and CL 2-565-3-L & 2-576-2-L, Habitability Modifications | - 0 | $ - 0 | $0 | 0001 | ||||||||
| 619 | Crew WR, WC 2-565-1-L & 2-565-2-L and SH & DA 2-565-3-L & 2-565-4-L, Habitability Modifications | - 0 | $ - 0 | $0 | 0001 | ||||||||
| 621 | CLS 2-605-0-L, Crew WR,WC & SH 2-616-0-L and SH & DA 2-616-2-L, Habitability Modifications | - 0 | $ - 0 | $0 | 0001 | ||||||||
| 622 | CLS 2-625-01-L, Crew WR, WC & SH 2-625-0-L, and SH & DA 2-625-2-L, Habitabilty Modifications | - 0 | $ - 0 | $0 | 0001 | ||||||||
| 623 | Crew Lounge 3-155-2-L, Habitability Modifications | - 0 | $ - 0 | $0 | 0001 | ||||||||
| 624 | Gang Berthing Circuit 14 TV Distribution Install | - 0 | $ - 0 | $0 | 0001 | ||||||||
| 626 | Second Deck Access Trunk Modifications | - 0 | $ - 0 | $0 | 0001 | ||||||||
| 627 | Crew Laundry 2-163-2-L, Habitability Modifications | - 0 | $ - 0 | $0 | 0001 | ||||||||
| 629 | Deck WR, WC 01-144-1-L Modifications | - 0 | $ - 0 | $0 | 0001 | ||||||||
| 631 | BERP Installation from Passageway 2-532-1-T to Machine Shop 2-510-3-Q | - 0 | $ - 0 | $0 | 0001 | ||||||||
| 632 | Dept Head Staterooms 03-496-7-L & 03-549-1-L, Sea Cabin 04-145-3-L and Officer Stateroom 04-187-1-L, Habitability Modifications | - 0 | $ - 0 | $0 | 0001 | ||||||||
| 633 | SECDET Lounge 05-150-1-L, SECDET Quiet Room 05-166-1-L, and SECDET T/S 05-169-1-L, Habitability Modifications | - 0 | $ - 0 | $0 | 0001 | ||||||||
| 634 | Fitness Center 05-150-2-L, Habitability Modifications | - 0 | $ - 0 | $0 | 0001 | ||||||||
| 635 | Master Day Room 03-128-0-L and CHENG Day Room 03-128-6-L, Habitability Modifications | - 0 | $ - 0 | $0 | 0001 | ||||||||
| 636 | CPO Spaces, Habitability Repairs | - 0 | $ - 0 | $0 | 0001 | ||||||||
| 638 | DFM Pump Room Safety Net Installation | - 0 | $ - 0 | $0 | 0001 | ||||||||
| 639 | Galley/Scullery Equipment Maintenance | - 0 | $ - 0 | $0 | 0014 | ||||||||
| 640 | 40 Gallon Steam Kettle Replace | - 0 | $ - 0 | $0 | 0001 | ||||||||
| 641 | Interior CPC Deck Replacement | - 0 | $ - 0 | $0 | 0001 | ||||||||
| 642 | Replace 02 Level Non-Skid | - 0 | $ - 0 | $0 | 0001 | ||||||||
| 643 | Focsle Non-Skid Deck Replacement | - 0 | $ - 0 | $0 | 0001 | ||||||||
| 644 | Replace Interior 01 LVL Non-Skid | - 0 | $ - 0 | $0 | 0001 | ||||||||
| 800 | HEATING, VENTILATION, AND AIR CONDITIONING | ||||||||||||
| 801 | Habitability Spaces Ventilation Systems Cleaning | - 0 | $ - 0 | $0 | 0001 | ||||||||
| 802 | Replace Back Draft Dampers, Cargo Pumprooms | - 0 | $ - 0 | $0 | 0001 | ||||||||
| 900 | DRYDOCKING AND UNDOCKING | ||||||||||||
| 901 | Dry-Docking and Undocking Vessel | - 0 | $ - 0 | $0 | 0001 | ||||||||
| 903 | Sea Valves | - 0 | $ - 0 | $0 | 0001 | ||||||||
| 904 | Sea Suction and Discharge Lines | - 0 | $ - 0 | $0 | 0001 | ||||||||
| 906 | Anchor Chain and Locker Painting & Marking | - 0 | $ - 0 | $0 | 0001 | ||||||||
| 907 | Clean and Polish Propellers | - 0 | $ - 0 | $0 | 0001 | ||||||||
| 908 | Rudder and Stern Frame Examination | - 0 | $ - 0 | $0 | 0001 | ||||||||
| 909 | Underwater Hull Cleaning and Painting | - 0 | $ - 0 | $0 | 0001 | ||||||||
| 910 | Blast and Coat Tanks | - 0 | $ - 0 | $0 | 0001 | ||||||||
| 912 | Main Propulsion Shafting | - 0 | $ - 0 | $0 | 0001 | ||||||||
| 913 | Zinc Renewal | - 0 | $ - 0 | $0 | 0001 | ||||||||
| 915 | Forepeak Tank Preservation and TLI Repairs | - 0 | $ - 0 | $0 | 0001 | ||||||||
| 916 | UWILD Hull Modifications and Markings | - 0 | $ - 0 | $0 | 0001 | ||||||||
| 917 | Hull Freeboard Cleaning and Painting | - 0 | $ - 0 | $0 | 0001 | ||||||||
| 918 | Cathodic Protection System Maintenance | - 0 | $ - 0 | $0 | 0001 | ||||||||
| 919 | Bilge Keel Examination | - 0 | $ - 0 | $0 | 0001 | ||||||||
| 920 | Ultra-Sonic Testing | - 0 | $ - 0 | $0 | 0001 | ||||||||
| 927 | Install Propulsion Stern Tube Shaft Tracks | - 0 | $ - 0 | $0 | 0001 | ||||||||
| 928 | Potable Water Tanks Cleaning and Painting | - 0 | $ - 0 | $0 | 0001 | ||||||||
| 932 | Reserve Feed and Condensate Tank Painting | - 0 | $ - 0 | $0 | 0001 | ||||||||
| 1000 | UNREP GEAR | ||||||||||||
| 1001 | High Pressure Air Relief Valve Calibration | - 0 | $ - 0 | $0 | 0001 | ||||||||
| 1002 | Sliding Block Hoist Drive Chain Replacement and Guide Rail Refurbishment | - 0 | $ - 0 | $0 | 0001 | ||||||||
| 1003 | Spanwire Anti-Slack Device Electric Motor Repair | - 0 | $ - 0 | $0 | 0001 | ||||||||
| 1004 | Spanwire Winch Electric Motor Repair | - 0 | $ - 0 | $0 | 0001 | ||||||||
| 1005 | Sliding Block Electric Motor/Brake Assembly Refurbishment | - 0 | $ - 0 | $0 | 0001 | ||||||||
| 1006 | 3-2 Speed Saddle Winch Brake Repair and Test | - 0 | $ - 0 | $0 | 0001 | ||||||||
| 1007 | UNREP Winch Transmission Replenishment Pump Electric Motor Overhaul | - 0 | $ - 0 | $0 | 0001 | ||||||||
| 1008 | ASD Blower Motor Overhaul and New Shroud Refurbishment | - 0 | $ - 0 | $0 | 0001 | ||||||||
| 1009 | Ram Tensioner Lower Sheave Assy Refurbishment | - 0 | $ - 0 | $0 | 0001 | ||||||||
| 1010 | Ram Tensioner Crossover Pipe Refurbishment | - 0 | $ - 0 | $0 | 0001 | ||||||||
| 1011 | UNREP Winch Controlex Cable Replacement | - 0 | $ - 0 | $0 | 0001 | ||||||||
| 1012 | Fairlead Block Refurbishment and Overhaul | - 0 | $ - 0 | $0 | 0001 | ||||||||
| 1013 | Remove and Repair Double Probe Receiver Swivel Assemblies | - 0 | $ - 0 | $0 | 0001 | ||||||||
| 1014 | Winch Controllex Cable Riser (Controllex Cable Guard) Refurbishment | - 0 | $ - 0 | $0 | 0001 | ||||||||
| 1015 | Sliding Block Hoist Drive Chain and Guide Rail Cleaning and Greasing | - 0 | $ - 0 | $0 | 0001 | ||||||||
| 1016 | Quadrennial Survey of Cargo Booms | - 0 | $ - 0 | $0 | 0001 | ||||||||
| 1017 | Shipyard Support for Replacing Ram Packing | - 0 | $ - 0 | $0 | 0001 | ||||||||
| 1018 | RAS Station No. 11 Removal | - 0 | $ - 0 | $0 | 0001 | ||||||||
| 1019 | Ram Tensioner Upper Sheave Assy Refurbishment | - 0 | $ - 0 | $0 | 0001 | ||||||||
| 1020 | UNREP Light Bracket Replacement | - 0 | $ - 0 | $0 | 0001 | ||||||||
| 1021 | Provide Test Weights and Conduct SOT III Testing | - 0 | $ - 0 | $0 | 0001 | ||||||||
| 1022 | Elevator Hoist Wire Rope Replacement | - 0 | $ - 0 | $0 | 0001 | ||||||||
| 1023 | Elevator Brake Disc Replacement | - 0 | $ - 0 | $0 | 0001 | ||||||||
| CLIN Number | Total CLIN Price | ||||||||||||
| 0001 | $0 | ||||||||||||
| 0002 | $0 | ||||||||||||
| 0003 | $0 | ||||||||||||
| 0004 | $0 | ||||||||||||
| 0005 | $0 | ||||||||||||
| 0006 | $0 | ||||||||||||
| 0007 | $0 | ||||||||||||
| 0008 | $0 | ||||||||||||
| 0009 | $0 | ||||||||||||
| 0010 | $0 | ||||||||||||
| 0011 | $0 | ||||||||||||
| 0012 | $0 | ||||||||||||
| 0013 | $0 | ||||||||||||
| 0014 | $0 | ||||||||||||
| 0015 | $0 | ||||||||||||
| 0016 | $0 | ||||||||||||
| 0017 | $0 | ||||||||||||
| 0018 | $0 | ||||||||||||
| 0019 | $0 | ||||||||||||
| 0020 | $0 | ||||||||||||
| Rate | Total | ||||||||||||
| 0021 | $0 | ||||||||||||
| 0023 | $0 |
&LUSNS SUPPLY MARUP&CCONTRACTOR PRICE BREAKDOWN
&"Arial,Bold"CATEGORY "A" ITEMS&RN00033-13-R-7508
&CATTACHMENT J-2
&LUSNS SUPPLY MARUP&CCONTRACTOR PRICE BREAKDOWN
&"Arial,Bold"CATEGORY "A" ITEMS&RN00033-13-R-7508
&CATTACHMENT J-2
Cat B Items
| Contractor's price will be broken down for each item of the specification, as follows: | |||||||||||||||||
| CATEGORY “B” ITEMS | |||||||||||||||||
| GENERAL REQUIREMENT | Price / Tank | QTY | UI | Unit Price | Total | PRIME Contractor | SUBCONTRACTOR | OTHER COSTS | |||||||||
| ITEM NO. | TITLE CAT B ITEM | PRIME L/H | LABOR PRICE | MATERIAL PRICE | SUB L/H | LABOR PRICE | MATERIAL PRICE | Total Labor Hours | Total Material | TOTAL PRICE | CLIN | ||||||
| CATEGORY "B" | |||||||||||||||||
| 000 | GENERAL REQUIREMENTS | ||||||||||||||||
| 25 | Ships Fuel and Lube Oil | - 0 | $ - 0 | $0 | 0002 | ||||||||||||
| 30 | Continuation of Services | - 0 | $ - 0 | $0 | 0003 | ||||||||||||
| 200 | MACHINERY, PROPULSION | ||||||||||||||||
| 205 | Line Shaft Bearings; Rebabbit, Relocate | - 0 | $ - 0 | $0 | 0004 | ||||||||||||
| 208 | Thrust Bearing Open and Inspect (ABS) | - 0 | $ - 0 | $0 | 0005 | ||||||||||||
| 300 | ELECTRICAL | ||||||||||||||||
| 302 | Distribution Breaker Cleaning | - 0 | $ - 0 | $0 | 0006 | ||||||||||||
| 500 | MACHINERY, AUXILIARY | ||||||||||||||||
| 508 | Misc Equipment and Motor Overhaul | - 0 | $ - 0 | $0 | 0015 | ||||||||||||
| 510 | Lagging and Insulation Repairs | - 0 | $ - 0 | $0 | 0016 | ||||||||||||
| 516 | Assist Ships Force | - 0 | $ - 0 | $0 | 0017 | ||||||||||||
| 514 | Weatherdeck Drain Piping Repairs | - 0 | $ - 0 | $0 | 0018 | ||||||||||||
| 526 | JP-5 Motor and Pump Overhaul | - 0 | $ - 0 | $0 | 0019 | ||||||||||||
| 527 | Cargo and Motor Pump Overhaul | - 0 | $ - 0 | $0 | 0020 | ||||||||||||
| 548 | A/C Drain Modification | - 0 | $ - 0 | $0 | 0007 | ||||||||||||
| 600 | OUTFIT, FURNISHING & HABITABILITY | ||||||||||||||||
| 625 | Crew Habitability Modifications - Steel & Piping Inspections/Repairs | - 0 | $ - 0 | $0 | 0008 | ||||||||||||
| 900 | DRYDOCKING AND UNDOCKING | ||||||||||||||||
| 902 | Dry-Docking and Undocking Vessel | - 0 | $ - 0 | $0 | 0009 | ||||||||||||
| 911 | Steel Renewal | - 0 | $ - 0 | $0 | 0010 | ||||||||||||
| 914 | Shell Plate Welding and Repair | - 0 | $ - 0 | $0 | 0011 | ||||||||||||
| 921 | Ultra-Sonic Testing | - 0 | $ - 0 | $0 | 0012 | ||||||||||||
| 930 | Replace Stern Tube Shaft Bearing Liners | - 0 | $ - 0 | $0 | 0013 | ||||||||||||
| Total CAT "B" | $0.00 |
&L&14USNS SUPPLY MARUP
&C&14CONTRACTOR PRICE BREAKDOWN
&"Arial,Bold"CATEGORY "B" ITEMS&R&14N00033-13-R-7508
&CATTACHMENT J-2&XAMEND0002&X
&L&14USNS SUPPLY MARUP
&C&14CONTRACTOR PRICE BREAKDOWN
&"Arial,Bold"CATEGORY "B" ITEMS&R&14N00033-13-R-7508
&CATTACHMENT J-2&XAMEND0002&X