USNS SUPPLY
(T-AOE 6)
WORK ITEM INDEX – 28 AUGUST 2013
AMENDMENT 0003
| WI |
| T-ALT |
| Work Item Title |
| Category |
| Revision Date |
| 0001 |
| - |
| Intent, Scope, General Requirements, and Definitions |
| NSP |
| 10-May-13 |
| 0002 |
| - |
| Technical and Manufacturer’s Representatives |
| NSP |
| 10-May-13 |
| 0003 |
| - |
| Approach, Berth, and Mooring Requirements |
| NSP |
| 8-Jul-13 |
| 0004 |
| - |
| Testing and Quality Assurance |
| NSP |
| 10-May-13 |
| 0005 |
| - |
| Electrical Safety Procedure Requirements |
| NSP |
| 10-May-13 |
| 0006 |
| - |
| Heavy Weather Plan |
| NSP |
| 10-May-13 |
| 0007 |
| - |
| Cold Weather Plan |
| NSP |
| 10-May-13 |
| 0010 |
| - |
| Furnish Office for Overhaul Management Team (OMT) |
| A |
| 10-May-13 |
| 0011 |
| - |
| General Services for the Ship |
| A |
| 10-May-13 |
| 0012 |
| - |
| Telephone Services |
| A |
| 10-May-13 |
| 0013 |
| - |
| Project Planning; Production Status Monitoring Reports; Test Planning and Lessons Learned AMEND 0002 |
| A |
| 20-Aug-13 |
| 0014 |
| - |
| Preparation of Weight and Moment Report |
| A |
| 10-May-13 |
| 0015 |
| - |
| Integrated Logistics and GFM Support Requirements |
| A |
| 10-May-13 |
| 0016 |
| - |
| Fire Protection and Ship’s Safety Program |
| A |
| 10-May-13 |
| 0017 |
| - |
| Furnish General Services for Government Contractors |
| A |
| 10-May-13 |
| 0018 |
| - |
| Delivery and Redelivery |
| A |
| 10-May-13 |
| 0019 |
| - |
| Shipboard Access and Security |
| A |
| 10-May-13 |
| 0020 |
| - |
| Gas Free Certificates |
| A |
| 10-May-13 |
| 0021 |
| - |
| Clean and Gas Free Tanks, Voids, Cofferdams & Spaces |
| A |
| 10-May-13 |
| 0022 |
| - |
| Dock Trials and Sea Trials |
| A |
| 10-May-13 |
| 0023 |
| - |
| Hazardous Waste Disposal at a Contractor’s Facility |
| A |
| 10-May-13 |
| 0025 |
| - |
| Offloading and Storage of Ships Fuel and Lube Oil |
| B |
| 24-May-13 |
| 0030 |
| - |
| Continuation of Services |
| B |
| 10-May-13 |
| 0101 |
| - |
| Tank Testing |
| A |
| 14-May-13 |
| 0103 |
| - |
| Mast Ladder and Climber Safety Rail Repair |
| A |
| 10-May-13 |
| 0104 |
| - |
| FAS, RAS and Weatherdeck Handrail Replacement |
| A |
| 10-May-13 |
| 0105 |
| - |
| Modifications for Load Line |
| A |
| 1-Jun-13 |
| 0106 |
| 201 |
| Install GTE Intake Maintenance BERP |
| A |
| 24-Jul-13 |
| 0107 |
| 088 |
| Tank Modifications for Improved Surveyor Access |
| A |
| 30-May-13 |
| 0108 |
| 050 |
| Degaussing Cable Penetration Inserts |
| A |
| 10-May-13 |
| 0109 |
| 212 |
| Potable Water Tank Vent Mod AMEND 0003 |
| A |
| 22-Aug-13 |
| 0110 |
| 206 |
| Airlock to CHT Room No. 1 |
| A |
| 27-Jun-13 |
| 0111 |
| 207 |
| Catwalk Installation 04 Level House Front |
| A |
| 11-Jul-13 |
| 0112 |
| 204 |
| Upgrade FAS Station Oil Containments |
| A |
| 10-Jul-13 |
| 0113 |
| 203 |
| Install Permanent Tonnage Markings |
| A |
| 21-Mar-13 |
| 0114 |
| 180 |
| SSDG Enclosure Door Replacement |
| A |
| 10-May-13 |
| 0115 |
| - |
| 01 Level Handrail Modifications |
| A |
| 27-Jun-13 |
| 0116 |
| 213 |
| Vertical Ladder, Drain & Guard Rail 04-566-1 Install |
| A |
| 10-Jul-13 |
| 0117 |
| - |
| Freeing Ports, Main Deck-Frs 695 to 715, Modifications |
| A |
| 27-Jun-13 |
| 0118 |
| - |
| Installation of QAWT Door for Equipment Removal Route from AMR (3-105-0-E) to Main Deck via Escape Trunk (3-146-1-T) |
| A |
| 2-Jul-13 |
| 0119 |
| 12-002 |
| Accommodation Ladder “J” Davit Modifications |
| A |
| 10-Jul-13 |
| 0120 |
| - |
| AMR Bilges; Gauging and Steel Replacement |
| A |
| 14-May-13 |
| 0122 |
| - |
| Cargo Watertight Door Repair |
| A |
| 10-Jul-13 |
| 0123 |
| - |
| 03 LVL Gun Platform Replacement |
| A |
| 14-May-13 |
| 0124 |
| - |
| Main Mast (FWD) Preservation and Maintenance |
| A |
| 14-May-13 |
| 0125 |
| - |
| SY Support for ABS Close-Up Inspection |
| A |
| 14-May-13 |
| 0126 |
| - |
| JP-5 Pump Room Bilge Preservation |
| A |
| 14-May-13 |
| 0127 |
| - |
| DFM Pump Room Bilge Preservation |
| A |
| 14-May-13 |
| 0128 |
| - |
| Degaussing Control Room Deck Preservation |
| A |
| 13-May-13 |
| 0129 |
| - |
| Inspect and Preserve Bilge Wells in Fuel Tanks |
| A |
| 25-May-13 |
| 0133 |
| - |
| 04 Level Bridge Wings, Platform Replacement |
| A |
| 14-May-13 |
| 0134 |
| - |
| DFM Service Tank Preservation |
| A |
| 14-May-13 |
| 0135 |
| - |
| Installation of BERP on AMR Upper Level in Escape Trunk 3-146-1-T |
| A |
| 2-Jul-13 |
| 0136 |
| - |
| Expansion of Ladderway Deck Opening on Upper Level of AMR |
| A |
| 2-Jul-13 |
| 0202 |
| - |
| Gas Turbine Intake Inspection and Repair |
| A |
| 21-May-13 |
| 0203 |
| - |
| Gas Turbine Change Out Support (GTM 1A) |
| A |
| 24-Jul-13 |
| 0205 |
| - |
| Line Shaft Bearings; Rebabbit, Relocate |
| B |
| 15-May-13 |
| 0206 |
| 184 |
| MCS Replacement Shipyard Support |
| A |
| 9-Jan-13 |
| 0207 |
| - |
| Line Shaft Bearings - Inspect |
| A |
| 13-May-13 |
| 0208 |
| - |
| Thrust Bearing Open and Inspect (ABS) |
| B |
| 13-May-13 |
| 0209 |
| - |
| Refurbish and Align Propulsion Shaft Bulkhead Seals |
| A |
| 13-May-13 |
| 0218 |
| - |
| Gas Turbine Layup |
| A |
| 13-May-13 |
| 0220 |
| - |
| Overhaul Leslie RRG Temperature Regulating Valves |
| A |
| 13-May-13 |
| 0221 |
| - |
| Overhaul Bleed Air Relief Valves |
| A |
| 3-Jun-13 |
| 0222 |
| 121 |
| Lube & Fuel Oil Unloader Valve Controller Replacement |
| A |
| 10-May-13 |
| 0223 |
| 181 |
| REDGEAR LO Purifier Controls Modification |
| A |
| 22-July-13 |
| 0301 |
| - |
| Replace SSDG No. 1 Hoses |
| A |
| 13-May-13 |
| 0302 |
| - |
| Distribution Breaker Cleaning |
| B |
| 13-May-13 |
| 0304 |
| - |
| Multiple Cable Transit Repairs |
| A |
| 13-May-13 |
| 0305 |
| - |
| Weather Deck Electrical Wire Stand Offs |
| A |
| 20-May-13 |
| 0306 |
| - |
| Stuffing Tube Replacement |
| A |
| 20-May-13 |
| 0311 |
| 159 |
| Shore Power Monitoring |
| A |
| 10-May-13 |
| 0313 |
| 166 |
| Central Seawater System Suction Valve Control Modifications |
| A |
| 27-Jun-13 |
| 0314 |
| 041 |
| 450V Service in Fork Truck Shop |
| A |
| 16-Jul-13 |
| 0401 |
| - |
| INMARSAT B HSD Preventative Maintenance |
| A |
| 15-Jul-13 |
| 0402 |
| - |
| Radar Preventative Maintenance |
| A |
| 13-May-13 |
| 0403 |
| - |
| GMDSS Safety Radio Certification |
| A |
| 13-May-13 |
| 0404 |
| - |
| Antenna Preventative Maintenance |
| A |
| 13-May-13 |
| 0405 |
| - |
| TV-DTS and TV Distribution System PM |
| A |
| 20-May-13 |
| 0406 |
| - |
| Underwater Speed Log PM |
| A |
| 20-May-13 |
| 0407 |
| - |
| OE-82B/WSC-1(V) Antenna Group Maintenance |
| A |
| 20-May-13 |
| 0408 |
| - |
| UHF Transceiver Groom |
| A |
| 20-May-13 |
| 0409 |
| - |
| Gyro Repeater Groom |
| A |
| 20-May-13 |
| 0410 |
| - |
| NGW SATCOM System Support |
| A |
| 13-May-13 |
| 0411 |
| 167 |
| Reefer Plant Monitoring Unit Installation and Testing |
| A |
| 27-Jun-13 |
| 0412 |
| 200 |
| COMSEC KIV-7M |
| A |
| 13-May-13 |
| 0413 |
| 182 |
| Installation of General Alarm System Contact Makers |
| A |
| 11-Jun-13 |
| 0414 |
| 144 |
| Simplified Voyage Data Recorder Installation |
| A |
| 30-May-13 |
| 0415 |
| 167 |
| AC Plant Monitoring (ACMS) Unit Installation |
| A |
| 27-Jun-13 |
| 0417 |
| 169 |
| Fire and Smoke Detection System Installation |
| A |
| 27-Jun-13 |
| 0419 |
| 168 |
| SSDG Module Fire Detection System |
| A |
| 27-Jun-13 |
| 0420 |
| 163 |
| Steering Gear Monitoring Mods |
| A |
| 17-Jan-13 |
| 0421 |
| 193 |
| Surface Search Radar Systems Replacement (ABS) |
| A |
| 30-May-13 |
| 0422 |
| 09-050 |
| ECDIS Upgrade |
| A |
| 25-Jun-13 |
| 0423 |
| 13-001 |
| Gyrocompass Upgrade (ABS) |
| A |
| 1-May-13 |
| 0424 |
| 210 |
| AN/URT-23D(V) Radio Transmitter System Replacement |
| A |
| 7-Jun-13 |
| 0501 |
| - |
| HP Start Air Flask Examination |
| A |
| 20-May-13 |
| 0502 |
| - |
| Cargo Reefer Isolation Valve Replacement |
| A |
| 20-May-13 |
| 0503 |
| - |
| Repair Miscellaneous Valves |
| A |
| 20-May-13 |
| 0504 |
| - |
| Replace General Salt Water Strainers |
| A |
| 20-May-13 |
| 0505 |
| - |
| Replace Steering Gear Hoses |
| A |
| 13-May-13 |
| 0506 |
| - |
| Auxiliary Boiler Inspection |
| A |
| 20-May-13 |
| 0507 |
| - |
| Replace 100 Feet of Seawater Piping |
| A |
| 21-May-13 |
| 0508 |
| - |
| Misc Equipment and Motor Overhaul |
| B |
| 21-May-13 |
| 0509 |
| - |
| DFM Cargo Pump Piping Repair |
| A |
| 21-May-13 |
| 0510 |
| - |
| Lagging and Insulation Repairs |
| B |
| 13-May-13 |
| 0511 |
| - |
| JP-5 Piping Repairs at FAS Station 7 |
| A |
| 21-May-13 |
| 0512 |
| - |
| Clean and Perform Eddy Current Exam of Heat Exchangers |
| A |
| 13-May-13 |
| 0513 |
| - |
| Main Deck Chilled Water Piping Insulation Renewal |
| A |
| 22-May-13 |
| 0514 |
| - |
| CHT Tanks Cleaning, Repair and Painting |
| A |
| 22-May-13 |
| 0515 |
| - |
| FWD & AFT MSD V1 and V2 Tanks Cleaning and Painting |
| A |
| 3-Jun-13 |
| 0516 |
| - |
| Assist Ships Force |
| B |
| 22-May-13 |
| 0520 |
| - |
| General Saltwater Cooling System Cleaning |
| A |
| 13-May-13 |
| 0522 |
| - |
| Groom and Weight Test Port and Stbd RHIB Davits |
| A |
| 22-May-13 |
| 0524 |
| - |
| Weatherdeck Drain Piping Repairs |
| B |
| 13-May-13 |
| 0526 |
| - |
| JP-5 Motor and Pump Overhaul |
| B |
| 3-Jun-13 |
| 0527 |
| - |
| Cargo and Motor Pump Overhaul |
| B |
| 3-Jun-13 |
| 0528 |
| - |
| Repair Leslie Regulating Valves |
| A |
| 22-May-13 |
| 0529 |
| - |
| Replace CHT Piping in 605 Tanks |
| A |
| 14-May-13 |
| 0534 |
| - |
| No. 1 SSDG Fuel Fill Line Installation |
| A |
| 10-May-13 |
| 0538 |
| - |
| SCBA Compressor and Refill Station Annual Servicing |
| A |
| 13-May-13 |
| 0539 |
| 179 |
| Halon Fire Dampers Installation |
| A |
| 27-Jun-13 |
| 0547 |
| 153 |
| A/C Drain Modification |
| A |
| 31-May-13 |
| 0548 |
| 153 |
| A/C Drain Modification |
| B |
| 31-May-13 |
| 0549 |
| 195 |
| Refrigeration Compressor Suction Accumulator Installation |
| A |
| 10-May-13 |
| 0550 |
| 160 |
| Firemain Valve Spare Triad Wiring Installation |
| A |
| 20-May-13 |
| 0551 |
| 162/164 |
| RCC Vane Status & RCC/RRG LO Control & Monitoring, RCC Fill and Drain Valves Including Piping Mods AMEND 0003 |
| A |
| 22-Aug-13 |
| 0553 |
| 165 |
| HPAC Monitoring and Control Unit Design Installation |
| A |
| 27-Jun-13 |
| 0555 |
| 104 |
| Installation of MSD Pump Bypass |
| A |
| 6-Jun-13 |
| 0556 |
| 157 |
| Ballast Tank Fill System Modification |
| A |
| 12-Jun-13 |
| 0557 |
| 183 |
| JP-5 Helo Refueling Meter Installation |
| A |
| 10-May-13 |
| 0561 |
| 102 |
| MMR1 FO Purifier Piping for Storage TK Recirc |
| A |
| 6-Jun-13 |
| 0562 |
| 101 |
| MMR2 FO Purifier Piping for Storage TK Recirc |
| A |
| 6-Jun-13 |
| 0601 |
| - |
| Helo Deck Non-Skid Renewal |
| A |
| 23-May-13 |
| 0603 |
| - |
| Flight Deck Safety Nets Repair AMEND 0003 |
| A |
| 28-Aug-13 |
| 0604 |
| - |
| Cargo Weapons Elevators J-Door Refurbishment |
| A |
| 13-May-13 |
| 0605 |
| - |
| Accommodation Ladders Refurbish and Weight Test |
| A |
| 23-May-13 |
| 0607 |
| - |
| Replace Interior Main Deck Non-Skid |
| A |
| 24-May-13 |
| 0608 |
| 209 |
| Replacement/Removal of Four (4) Steam Laundry Presses |
| A |
| 11-Jun-13 |
| 0611 |
| 191 |
| Crew Smoking Lounge 2-645-3-Q, Habitability Modifications |
| A |
| 27-Jun-13 |
| 0612 |
| 191 |
| Crew Living Space 02-162-0-L, Crew Lounge 02-161-1-L, and Crew WR, WC & Shower 02-154-1-L, Habitability Modifications |
| A |
| 27-Jun-13 |
| 0613 |
| 191 |
| Crew Living Space 02-473-3-L, Crew WR, WC & Shower 02-496-1-L, and Shower and Drying Area 02-492-1-L, Habitability Modification |
| A |
| 27-Jun-13 |
| 0614 |
| 191 |
| Crew Living Space 01-532-2-L, Crew Lounge 01-510-2-L, Crew WR, WC & Shower 01-523-2-L, Habitability Modifications |
| A |
| 27-Jun-13 |
| 0615 |
| 191 |
| Crew WR, WC Spaces 2-150-1-L & 2-150-2-L, and Shower and Drying Areas 2-150-3-L & 2-150-4-L, Habitability Modifications |
| A |
| 27-Jun-13 |
| 0617 |
| 191 |
| Crew Berthing Spaces 2-163-1-L & 2-163-2-L and Crew Lounges 2-163-3-L & 2-163-4-L, Habitability Modifications |
| A |
| 27-Jun-13 |
| 0618 |
| 191 |
| Crew Living Spaces 2-565-5-L & 2-565-10-L and Crew Lounges 2-565-3-L & 2-576-2-L, Habitability Modifications |
| A |
| 27-Jun-13 |
| 0619 |
| 191 |
| Crew WR, WC Spaces 2-565-1-L & 2-565-2-L and SH & Drying Areas 2-565-3-L & 2-565-4-L, Habitability Modifications |
| A |
| 27-Jun-13 |
| 0621 |
| 191 |
| Crew Living Space 2-605-0-L, Crew WR & WC 2-616-0-L and Crew SH & Drying Area 2-616-2-L, Habitability Modifications |
| A |
| 27-Jun-13 |
| 0622 |
| 191 |
| Crew Living Space 2-625-01-L, Crew WR,WC & SH 2-625-0-L, and Shower & Drying Area 2-625-2-L, Habitability Modifications |
| A |
| 27-Jun-13 |
| 0623 |
| 191 |
| Crew Lounge 3-155-2-L, Habitability Modifications |
| A |
| 27-Jun-13 |
| 0624 |
| 191 |
| Gang Berthing Circuit 14 TV Distribution Install |
| A |
| 27-Jun-13 |
| 0625 |
| - |
| Crew Habitability Modifications – Steel & Piping Inspections/Repairs |
| B |
| 27-Jun-13 |
| 0626 |
| 191 |
| Second Deck Access Trunk Modifications |
| A |
| 27-Jun-13 |
| 0627 |
| 191 |
| Crew Laundry 2-163-2-L, Habitability Modifications |
| A |
| 27-Jun-13 |
| 0629 |
| 191 |
| Deck WR, WC 01-144-1-L, Habitability Modifications |
| A |
| 27-Jun-13 |
| 0631 |
| - |
| BERP Installation from Passageway 2-532-1-T to Machine Shop 2-510-3-Q |
| A |
| 27-Jun-13 |
| 0632 |
| 191 |
| Dept Head Staterooms 03-496-7-L & 03-549-1-L, Sea Cabin 04-145-3-L, and Officer Stateroom 04-187-1-L, Habitability Modifications |
| A |
| 27-Jun-13 |
| 0633 |
| 191 |
| SECDET Lounge 05-150-1-L, SECDET Quiet Room 05-166-1-L, and SECDET T/S 05-169-1-L, Habitability Modifications |
| A |
| 27-Jun-13 |
| 0634 |
| 191 |
| Fitness Center 05-150-2-L, Habitability Modifications |
| A |
| 27-Jun-13 |
| 0635 |
| 191 |
| Master Day Room 03-128-0-L and CHENG Day Room 03-128-6-L, Habitability Modifications |
| A |
| 27-Jun-13 |
| 0636 |
| 120 |
| CPO Spaces, Habitability Repairs |
| A |
| 27-Jun-13 |
| 0638 |
| 223 |
| DFM Pump Room Safety Net Installation |
| A |
| 13-May-13 |
| 0639 |
| - |
| Galley/Scullery Equipment Maintenance |
| A |
| 13-May-13 |
| 0640 |
| - |
| 40 Gallon Steam Kettle Replace |
| A |
| 13-May-13 |
| 0641 |
| - |
| Interior CPC Deck Replacement |
| A |
| 13-May-13 |
| 0642 |
| - |
| Replace 02 Level Non-Skid |
| A |
| 25-May-13 |
| 0643 |
| - |
| Foc’sle Non-Skid Deck Replacement |
| A |
| 13-May-13 |
| 0644 |
| - |
| Replace Interior 01 Level Non-Skid |
| A |
| 13-May-13 |
| 0801 |
| - |
| Habitability Spaces Ventilation Systems Cleaning |
| A |
| 27-May-13 |
| 0802 |
| - |
| Replace Back Draft Dampers, Cargo Pumprooms |
| A |
| 27-May-13 |
| 0901 |
| - |
| Dry-Docking and Undocking Vessel |
| A |
| 9-Jul-13 |
| 0902 |
| - |
| Dry-Docking and Undocking Vessel |
| B |
| 3-Jun-13 |
| 0903 |
| - |
| Sea Valves |
| A |
| 3-Jun-13 |
| 0904 |
| - |
| Sea Suction and Discharge Lines |
| A |
| 27-May-13 |
| 0906 |
| - |
| Anchor Chain and Locker Painting & Marking |
| A |
| 13-May-13 |
| 0907 |
| - |
| Clean and Polish Propellers |
| A |
| 27-May-13 |
| 0908 |
| - |
| Rudder and Stern Frame Examination |
| A |
| 27-May-13 |
| 0909 |
| - |
| Underwater Hull Cleaning and Painting |
| A |
| 18-Jul-13 |
| 0910 |
| - |
| Blast and Coat Tanks |
| A |
| 29-May-13 |
| 0911 |
| - |
| Steel Renewal |
| B |
| 27-May-13 |
| 0912 |
| - |
| Main Propulsion Shafting |
| A |
| 13-May-13 |
| 0913 |
| - |
| Zinc Renewal |
| A |
| 3-Jun-13 |
| 0914 |
| - |
| Shell Plate Welding and Repair |
| B |
| 3-Jun-13 |
| 0915 |
| - |
| Forepeak Tank Preservation and TLI Repairs |
| A |
| 13-May-13 |
| 0916 |
| 198 |
| UWILD Hull Modifications and Markings |
| A |
| 10-May-13 |
| 0917 |
| - |
| Hull Freeboard Cleaning and Painting |
| A |
| 13-May-13 |
| 0918 |
| - |
| Cathodic Protection System Maintenance |
| A |
| 3-Jun-13 |
| 0919 |
| - |
| Bilge Keel Examination |
| A |
| 27-May-13 |
| 0920 |
| - |
| Ultra-Sonic Testing |
| A |
| 13-May-13 |
| 0921 |
| - |
| Ultra-Sonic Testing |
| B |
| 27-May-13 |
| 0927 |
| - |
| Install Propulsion Stern Tube Shaft Tracks |
| A |
| 13-May-13 |
| 0928 |
| - |
| Potable Water Tanks Cleaning and Painting |
| A |
| 3-Jun-13 |
| 0930 |
| - |
| Replace Stern Tube Shaft Bearing Liners |
| B |
| 13-May-13 |
| 0932 |
| - |
| Reserve Feed and Condensate Tank Painting |
| A |
| 1-Jun-13 |
| 1001 |
| - |
| High Pressure Air Relief Valve Calibration |
| A |
| 10-May-13 |
| 1002 |
| - |
| Sliding Block Drive Chain Replacement and Guide Rail Refurb |
| A |
| 17-Jul-13 |
| 1003 |
| - |
| Spanwire Anti-Slack Device Electric Motor Repair |
| A |
| 10-May-13 |
| 1004 |
| - |
| Spanwire Winch Electric Motor Repair |
| A |
| 11-Jul-13 |
| 1005 |
| - |
| Sliding Block Electric Motor/Brake Assembly Refurbishment |
| A |
| 11-Jul-13 |
| 1006 |
| - |
| 3-2 Speed Saddle Winch Brake Repair and Test |
| A |
| 31-May-13 |
| 1007 |
| - |
| UNREP Winch Transmission Replenishment Pump Electric Motor Overhaul |
| A |
| 10-May-13 |
| 1008 |
| - |
| ASD Blower Motor Overhaul and New Shroud Refurbishment |
| A |
| 10-May-13 |
| 1009 |
| - |
| Ram Tensioner Lower Sheave Assy Refurbishment |
| A |
| 10-May-13 |
| 1010 |
| - |
| Ram Tensioner Crossover Pipe Refurbishment |
| A |
| 10-May-13 |
| 1011 |
| - |
| UNREP Winch Controlex Cable Replacement |
| A |
| 10-May-13 |
| 1012 |
| - |
| Fairlead Block Refurbishment and Overhaul |
| A |
| 10-May-13 |
| 1013 |
| - |
| Remove and Repair Double Probe Receiver Swivel Assemblies |
| A |
| 10-May-13 |
| 1014 |
| - |
| Winch Controllex Cable Riser (Controllex Cable Guard) Refurbishment |
| A |
| 10-May-13 |
| 1015 |
| - |
| Sliding Block Hoist Drive Chain and Guide Rail Cleaning and Greasing |
| A |
| 10-May-13 |
| 1016 |
| - |
| Quadrennial Survey of Cargo Booms |
| A |
| 10-May-13 |
| 1017 |
| - |
| Shipyard Support for Replacing Ram Packing |
| A |
| 10-May-13 |
| 1018 |
| 225 |
| RAS Station No. 11 Removal |
| A |
| 11-Jul-13 |
| 1019 |
| - |
| Ram Tensioner Upper Sheave Assy RefurbishmentAMEND 0002 |
| A |
| 20-Aug-13 |
| 1020 |
| - |
| UNREP Light Bracket Replacement AMEND 0002 |
| A |
| 20-Aug-13 |
| 1021 |
| - |
| Provide Test Weights and Conduct SOT III TestingAMEND 0002 |
| A |
| 20-Aug-13 |
| 1022 |
| - |
| Elevator Hoist Wire Rope Replacement AMEND 0002 |
| A |
| 20-Aug-13 |
| 1023 |
| - |
| Elevator Brake Disc Replacement AMEND 0002 |
| A |
| 20-Aug-13 |