S-5_Eligibility_Criteria_Data_Sheet_CHO_CSG.docx
DOCX document 19 KB Posted
- Attached to
- USS CHOSIN (CG 65) and USS CAPE ST. GEORGE (CG 71) Modernization Period (MODPRD) Availabilities
- Solicitation number
- N00024-19-R-4447
About this file
S-5 Eligibility Criteria Data Sheet CHO CSG
View the file
Other files
Show all 32
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
USS CHOSIN (CG 65) & USS CAPE ST. GEORGE (CG 71) MODPRDs
ELGIBILITY CRITERIA DATA SHEET
MASTER SHIP REPAIR AGREEMENT (MSRA)
MSRA Contract Number:
| Electric Power |
| See Enclosure 1 |
| Non-Potable Water |
| See Enclosure 1 |
| Potable Water |
| See Enclosure 1 |
| Compressed Air |
| See Enclosure 1 |
| Telephone |
| See Enclosure 1 |
| Oily Waste Water |
| See Enclosure 1 |
| Waste Water (CHT) |
| See Enclosure 1 |
| T-1 |
| T-1 line capable of delivering Non-secure Internet Protocol Router Network (NIPRNET) and Secure Internet Protocol Router Network (SIPRNET) service |
CG 47 TICONDEROGA CLASS CAPABLE PIER proposed for use for the USS CHOSIN (CG 65) FY20 EDSRA and USS CAPE ST GEORGE (CG 71) FY21 EDSRA Pier Name/Identification:
Pier Owner:
Pier POC:
POC Phone Number:
POC Email Address:
The proposed pier is capable of berthing CG 65 & CG 71 and has met the minimum characteristics stated in enclosure (1): YES NO
Note - Offerors only need to certify that their proposed pier meets the requirements provided in Enclosure 1. No further documentation is required.
CG 47 TICONDEROGA CLASS CAPABLE DRY-DOCK proposed for use for the USS CHOSIN (CG 65) FY20 EDSRA and USS CAPE ST GEORGE (CG 71) FY21 EDSRA Dock Name/Identification:
Dock Owner:
Dock POC:
POC Phone Number:
POC Email Address:
The proposed dry-dock is capable of docking CG 65 & CG 71 and has, at minimum, the following characteristics:
Be certified to dock CG 47 Class ships YES NO in accordance with MIL-STD-1625D(SH) dated 27 August 2009:
FOR GOVERNMENT USE ONLY:
| MSRA MEETS ELIGIBILITY REQUIREMENT: | YES | NO | |
| PIER MEETS ELIGIBILITY REQUIREMENT: | YES | NO | |
| DOCK MEETS ELIGIBILITY REQUIREMENT: | YES | NO |
Attachment S-5
File details come from the government source that posted it.