N00024-19-R-4447.pdf

PDF 1 MB Posted

Attached to
USS CHOSIN (CG 65) and USS CAPE ST. GEORGE (CG 71) Modernization Period (MODPRD) Availabilities
Solicitation number
N00024-19-R-4447
Issued by

About this file

N00024-19-R-4447 RFP

View the file

Other files

File Type Posted
S-3_USS_CHO_PPI_QA5_FINAL.xlsm XLSM spreadsheet
S-3_USS_CHO_PPI_QA4_FINAL.xlsm XLSM spreadsheet
S-13_USS_CSG_PPI_QA4_FINAL.xlsm XLSM spreadsheet
S-13_USS_CSG_PPI_QA3_FINAL.xlsm XLSM spreadsheet
N00024-19-R-4447_A0006.pdf PDF
N00024-19-R-4447_conformed_through_A0006.pdf PDF
N00024-19-R-4447_conformed_though_A0005.pdf PDF
S-3_USS_CHO_PPI_QA3_FINAL.xlsm XLSM spreadsheet
N00024-19-R-4447_A0005.pdf PDF
N00024-19-R-4447_conformed_through_0004.pdf PDF
N00024-19-R-4447_0004.pdf PDF
S-3_USS_CHOSIN_PPI_QA2_FINAL.xlsm XLSM spreadsheet
N00024-19-R-4447_0003.pdf PDF
S-13_USS_CSG_PPI_QA2.xlsm XLSM spreadsheet
N00024-19-R-4447_conformed_through_0003.pdf PDF
N00024-19-R-4447_Conformed_through_0002.pdf PDF
S-13_USS_CSG_PPI_QA1_final.xlsm XLSM spreadsheet
N00024-19-R-4447_0002.pdf PDF
S-3_USS_CHOSIN_PPI_QA1_final.xlsm XLSM spreadsheet
S-7_Proposal_Assessment_CG65CG71.xlsx XLSX spreadsheet
S-8_Pier_and_Drydock_Graphical_Representation_Template.xlsx XLSX spreadsheet
N00024-19-R-4447_Amendment_0001.pdf PDF
N00024-19-R-4447_conformed_through_0001.pdf PDF
S-6_(C&C)_Value_Adjusted_Total_Evaluated_Price_rev5.xlsx XLSX spreadsheet
S-1__Manpower_Utilization_Data_Sheet.xlsx XLSX spreadsheet
S-4__Manpower_Plan_to_Actual_Data_Sheet.xlsx XLSX spreadsheet
S-13_BQ_PPI_CAPE_ST_GEORGE_CG71.xlsm XLSM spreadsheet
J-15_QASP_CSG_MODPRD.docx DOCX document
S-2__Dry-Dock_Utilization_Data_Sheet.xlsx XLSX spreadsheet
S-3_BQ_PPI_CHOSIN_CG65.xlsm XLSM spreadsheet
S-5_Eligibility_Criteria_Data_Sheet_CHO_CSG.docx DOCX document
J-5_QASP_CHO_MODPRD.docx DOCX document
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N0002419R4447

Section B - Supplies or Services and Prices

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

CLIN

Number

1 Lot

Base TYCOM WIs

FFP

PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF

THE USS CHOSIN (CG 65) DURING FY20 MODPRD (Modernization Period) (Non-prorated WIs – See attachment J-4 for list)

The Contractor shall prepare for and accomplish repair and modernization during the MODERNIZATION PERIOD (MODPRD) onboard USS CHOSIN (CG 65) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes B, D, E, and G

NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

FOB: Destination

PURCHASE REQUEST NUMBER: N0002419FR93063

PSC CD: J999

NET AMT

FFP

PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF

specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes B, D, E, and G

NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

FOB: Destination

FFP

PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF

specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes B, D, E, and G

NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

FFP

PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF

specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes B, D, E, and G

NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

DATA

FFP

CONTRACT DATA REQUIREMENTS LIST (CDRLs) FOR ALL CLINs, INCLUDING OPTION CLINS, IF EXERCISED

The data to be furnished hereunder shall be prepared and submitted in accordance with the Contract Data Requirements List, DD Form 1423, Exhibits A, B and C attached hereto. The CDRLs form a part of the schedule of this solicitation.

Not Separately Priced (NSP).

NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

FOB: Destination

OPTION Option TYCOM WIs

FFP

PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF

specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes B, C, D, E, and G NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

FOB: Destination

FFP

PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF

specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes B, C, D, E, and G NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

FFP

PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF

specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes B, C, D, E, and G NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

FFP

PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF

specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes B, C, D, E, and G NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

FFP

PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF

specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes B, C, D, E, and G NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

FFP

PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF

specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes B, C, D, E, and G NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

FFP

PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF

specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes B, C, D, E, and G NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

FFP

PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF

specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes B, C, D, E, and G NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

FFP

PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF

specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes B, C, D, E, and G NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

FFP

PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF

specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes B, C, D, E, and G NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

FFP

PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF

specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes B, C, D, E, and G NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

FFP

PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF

specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes B, C, D, E, and G NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

FFP

PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF

specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes B, C, D, E, and G NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

OPTION Option TYCOM WIs - RESERVED

FFP

PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF

specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes B, C, D, E, and G NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

FFP

PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF

specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes B, C, D, E, and G NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

FFP

PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF

specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes B, C, D, E, and G NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

FFP

PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF

specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes B, C, D, E, and G NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

FFP

PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF

specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes B, C, D, E, and G NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

FFP

PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF

specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes B, C, D, E, and G NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

FFP

PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF

specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes B, C, D, E, and G NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

FFP

PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF

specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes B, C, D, E, and G NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

OPTION Growth Reservation

FFP

Growth Reservation associated with CLIN 0001. See attachment J-4.

See Notes A, B, C, D, E, F, and G.

NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

FFP

Growth Reservation associated with CLIN 0001. See attachment J-4.

See Notes A, B, C, D, E, F, and G.

NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

FFP

Growth Reservation associated with CLIN 0002. See attachment J-4.

See Notes A, B, C, D, E, F, and G.

NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

FFP

Growth Reservation associated with CLIN 0003. See attachment J-4.

See Notes A, B, C, D, E, F, and G.

NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

FFP

Growth Reservation associated with CLIN 0004. See attachment J-4.

See Notes A, B, C, D, E, F, and G.

NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

FFP

Growth Reservation associated with CLIN 0006. See attachment J-4.

See Notes A, B, C, D, E, F, and G.

NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

FFP

Growth Reservation associated with CLIN 0007. See attachment J-4.

See Notes A, B, C, D, E, F, and G.

NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

FFP

Growth Reservation associated with CLIN 0008. See attachment J-4.

See Notes A, B, C, D, E, F, and G.

NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

FFP

Growth Reservation associated with CLIN 0009. See attachment J-4.

See Notes A, B, C, D, E, F, and G.

NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

FFP

Growth Reservation associated with CLIN 0010. See attachment J-4.

See Notes A, B, C, D, E, F, and G.

NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

FFP

Growth Reservation associated with CLIN 0011. See attachment J-4.

See Notes A, B, C, D, E, F, and G.

NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

FFP

Growth Reservation associated with CLIN 0012. See attachment J-4.

See Notes A, B, C, D, E, F, and G.

NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

FFP

Growth Reservation associated with CLIN 0013. See attachment J-4.

See Notes A, B, C, D, E, F, and G.

NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

FFP

Growth Reservation associated with CLIN 0014. See attachment J-4.

See Notes A, B, C, D, E, F, and G.

NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

FFP

Growth Reservation associated with CLIN 0015. See attachment J-4.

See Notes A, B, C, D, E, F, and G.

NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

FFP

Growth Reservation associated with CLIN 0016. See attachment J-4.

See Notes A, B, C, D, E, F, and G.

NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

FFP

Growth Reservation associated with CLIN 0017. See attachment J-4.

See Notes A, B, C, D, E, F, and G.

NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

FFP

Growth Reservation associated with CLIN 0018. See attachment J-4.

See Notes A, B, C, D, E, F, and G.

NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

FFP

Growth Reservation associated with CLIN 0020. See attachment J-4.

See Notes A, B, C, D, E, F, and G.

NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

FFP

Growth Reservation associated with CLIN 0021. See attachment J-4.

See Notes A, B, C, D, E, F, and G.

NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

FFP

Growth Reservation associated with CLIN 0022. See attachment J-4.

See Notes A, B, C, D, E, F, and G.

NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

FFP

Growth Reservation associated with CLIN 0023. See attachment J-4.

See Notes A, B, C, D, E, F, and G.

NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

FFP

Growth Reservation associated with CLIN 0024. See attachment J-4.

See Notes A, B, C, D, E, F, and G.

NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

FFP

Growth Reservation associated with CLIN 0025. See attachment J-4.

See Notes A, B, C, D, E, F, and G.

NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

FFP

Growth Reservation associated with CLIN 0026. See attachment J-4.

See Notes A, B, C, D, E, F, and G.

NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

30 Days

OPTION Daily Extensions

FFP

Additional Days in Dock requiring Availability Extension. See attachment J-4.

See Notes B, C, D, E, and G.

NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

5 Days

FFP

Additional Days in Dock NOT requiring Availability Extension. See attachment J- 4.

See Notes B, C, D, E, and G.

NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

85 Days

FFP

Additional Days Pierside requiring Availability Extension. See attachment J-4.

See Notes B, C, D, E, and G.

NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

OPTION Base TYCOM WIs

FFP

PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF

THE USS CAPE ST. GEORGE (CG 71) DURING FY20 MODPRD

(Modernization Period) (Non-prorated WIs – See attachment J-14 for list) the MODERNIZATION PERIOD (MODPRD) onboard USS CAPE ST. GEORGE (CG 71) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-11 and J-12.

See Notes B, D, E, and G

NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

FFP

PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF

(CG 71) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-11 and J-12.

See Notes B, D, E, and G

NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

FFP

PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF

(CG 71) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-11 and J-12.

See Notes B, D, E, and G

NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

FFP

PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF

(CG 71) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-11 and J-12.

See Notes B, D, E, and G

NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

OPTION DATA

FFP

CONTRACT DATA REQUIREMENTS LIST (CDRLs) FOR ALL CLINs, INCLUDING OPTION CLINS, IF EXERCISED

The data to be furnished hereunder shall be prepared and submitted in accordance with the Contract Data Requirements List, DD Form 1423, Exhibits A, B and C attached hereto. The CDRLs form a part of the schedule of this solicitation.

Not Separately Priced (NSP).

NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

FFP

PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF

(CG 71) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-11 and J-12.

See Notes B, C, D, E, and G NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

FFP

PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF

(CG 71) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-11 and J-12.

See Notes B, C, D, E, and G NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

FFP

PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF

(CG 71) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-11 and J-12.

See Notes B, C, D, E, and G NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

FFP

PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF

(CG 71) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-11 and J-12.

See Notes B, C, D, E, and G NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

FFP

PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF

(CG 71) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-11 and J-12.

See Notes B, C, D, E, and G NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

FFP

PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF

(CG 71) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-11 and J-12.

See Notes B, C, D, E, and G NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

FFP

PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF

(CG 71) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-11 and J-12.

See Notes B, C, D, E, and G NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

FFP

PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF

(CG 71) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-11 and J-12.

See Notes B, C, D, E, and G NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

FFP

PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF

(CG 71) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-11 and J-12.

See Notes B, C, D, E, and G NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

FFP

PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF

(CG 71) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-11 and J-12.

See Notes B, C, D, E, and G NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

FFP

PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF

(CG 71) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-11 and J-12.

See Notes B, C, D, E, and G NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

FFP

PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF

(CG 71) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-11 and J-12.

See Notes B, C, D, E, and G NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

FFP

PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF

(CG 71) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-11 and J-12.

See Notes B, C, D, E, and G NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

FFP

Growth Reservation associated with CLIN 0101. See attachment J-14.

See Notes A, B, C, D, E, F, and G.

NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

FFP

Growth Reservation associated with CLIN 0101. See attachment J-14.

See Notes A, B, C, D, E, F, and G.

NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

FFP

Growth Reservation associated with CLIN 0102. See attachment J-14.

See Notes A, B, C, D, E, F, and G.

NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

FFP

Growth Reservation associated with CLIN 0103. See attachment J-14.

See Notes A, B, C, D, E, F, and G.

NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

FFP

Growth Reservation associated with CLIN 0103. See attachment J-14.

See Notes A, B, C, D, E, F, and G.

NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

FFP

Growth Reservation associated with CLIN 0104. See attachment J-14.

See Notes A, B, C, D, E, F, and G.

NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

FFP

Growth Reservation associated with CLIN 0106. See attachment J-14.

See Notes A, B, C, D, E, F, and G.

NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

FFP

Growth Reservation associated with CLIN 0107. See attachment J-14.

See Notes A, B, C, D, E, F, and G.

NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

FFP

Growth Reservation associated with CLIN 0108. See attachment J-14.

See Notes A, B, C, D, E, F, and G.

NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

FFP

Growth Reservation associated with CLIN 0109. See attachment J-14.

See Notes A, B, C, D, E, F, and G.

NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

FFP

Growth Reservation associated with CLIN 0110. See attachment J-14.

See Notes A, B, C, D, E, F, and G.

NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

FFP

Growth Reservation associated with CLIN 0111. See attachment J-14.

See Notes A, B, C, D, E, F, and G.

NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

FFP

Growth Reservation associated with CLIN 0112. See attachment J-14.

See Notes A, B, C, D, E, F, and G.

NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

FFP

Growth Reservation associated with CLIN 0113. See attachment J-14.

See Notes A, B, C, D, E, F, and G.

NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

FFP

Growth Reservation associated with CLIN 0114. See attachment J-14.

See Notes A, B, C, D, E, F, and G.

NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

FFP

Growth Reservation associated with CLIN 0115. See attachment J-14.

See Notes A, B, C, D, E, F, and G.

NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

FFP

Growth Reservation associated with CLIN 0116. See attachment J-14.

See Notes A, B, C, D, E, F, and G.

NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

FFP

Growth Reservation associated with CLIN 0117. See attachment J-14.

See Notes A, B, C, D, E, F, and G.

NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

FFP

Growth Reservation associated with CLIN 0118. See attachment J-14.

See Notes A, B, C, D, E, F, and G.

NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

30 Days

FFP

Additional Days in Dock requiring Availability Extension. See attachment J-14.

See Notes B, C, D, E, and G.

NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

5 Days

FFP

Additional Days in Dock NOT requiring Availability Extension. See attachment J- 14.

See Notes B, C, D, E, and G.

NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

85 Days

FFP

Additional Days Pierside requiring Availability Extension. See attachment J-14.

See Notes B, C, D, E, and G.

NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

LEVEL OF EFFORT TO COMPLETION

NOTE A: LEVEL OF EFFORT TO COMPLETION –SHIP REPAIR

1. The Contractor agrees to provide the level of effort to completion in the performance of growth

CLINs.

• 194,235 hours and $3,981,243 materials for the USS CHOSIN (CG65) FY20 MODPRD

• 166,248 hours and $3,736,889 materials for the USS CAPE ST. GEORGE (CG71) FY21 MODPRD

2. The total level of effort to completion for the performance of the above CLINs shall be man-hours of direct labor and the associated material required to support that labor and effort. The mix of labor and material may be adjusted, but may not exceed the dollar value of each CLIN listed above.

3. Effort performed in fulfilling the level of effort to completion obligations specified above shall only include effort performed in direct support of this contract and shall not include time and effort expended on such things as (local travel to and from an employee’s usual work location), uncompensated effort while on travel status, truncated lunch periods, work (actual or inferred) at an employee’s residence or other non-work locations.

4. LOE to Completion labor hours and material are within the general scope of the work stated in the contract and may not be used to: (1) direct a change as defined in, "FAR 52.243-1 CHANGES FIXED -PRICE clause of this contract or (2) change any of the terms or conditions of the contract.

5. If, in the opinion of the Contractor, any effort directed in the Growth Management Request Form calls for effort outside the scope of the contract, the Contractor shall notify the Contracting Officer in writing within two (2) working days after the receipt of any such direction. The Contractor shall not proceed with the work affected by the Growth Management Request Form unless and until the Contractor is notified by the Contracting Officer that the directed work is within the scope of this contract. Thereafter, any remaining disagreement on the scope issue shall be a dispute under the Disputes clause; however, nothing in this clause shall excuse the Contractor from proceeding with the subject growth work as directed by the Contracting Officer.

LABOR & MATERIAL BURDEN RATES

NOTE B: FIXED SHIP REPAIR LABOR AND MATERIAL BURDEN RATES FOR GROWTH AND NEW

WORK

SCHEDULE OF PRICES / RATES: SHIP REPAIR LABOR RATE (FULLY BURDENED)

1. The Contractor’s fully burdened ship repair labor rate will be used for negotiating growth and new work to be performed under this contract. The contractor agrees that the number of hours included in its price proposal for contract modifications shall include only direct production hours. For these purposes, direct production hours are for skilled labor at the journeyman level expended in direct production including but not limited to the following functions:

Abrasive cleaning/blasting Fire Watch Welding Burning Brazing Carpentry Machinists (inside and outside) Electrical Work Electronic Work Engineering Design Support Lagging Ship-fitting Boiler-making Painting Sheet-metal Work Pipefitting Rigging General Labor Staging/Scaffolding Diesel Mechanics

2. The fully burdened ship repair labor rate proposed by the contractor listed in paragraph 7 below shall include all costs associated with support functions (whether charged directly or indirectly by the offeror’s accounting systems) provided in support of the direct production functions listed in paragraph 1 above. Support functions shall be considered to be included in the offeror’s fully burdened ship repair labor rate for direct production hours. Labor hours for the below support functions shall not be separately proposed in any circumstance, including in support of subcontractors. Support functions include, and are not limited to, those types listed below:

Testing Quality Assurance Execution Planning Cleaning (except tank cleaning) Supervision Security Surveying

Administration Transportation Purchasing Staff Lofting Other indirect support Handling & Warehousing Safety/Environmental

3. The fully burdened ship repair labor rate is a fixed hourly rate that includes all wages, overhead, all other indirect costs, general and administrative expenses, Facilities Capital Cost of Money (FCCOM) and profit. The fully burdened ship repair labor rate represents a blended rate including labor transferred between divisions, subsidiaries, or affiliates of the contractor under a common control.

4. Consumable materials are goods used in the ordinary course of work performance such as office supplies, paper, rags, vehicle or equipment fuel costs, cleaning chemicals, disposable tools, welding rods, paint buckets, paint brushes, protective clothing, etc. that are consumed/used in the process of repair and do not become an integral part of the repaired vessel. Consumable material shall be included in the contractor’s fully burdened ship repair labor rate and not separately priced.

5. Physical materials are goods that become an integral part of the repaired vessel in the course of the repair, such as equipment, replacement steel, pipes, paint, and fasteners. The material burden rates apply to physical materials but not to consumable materials. The material burden rate will be applied to the actual cost of the physical material. Actual cost does not include handling charges, general and administrative cost, overhead, profit, or any other indirect cost.

6. For contract changes involving subcontractors, subcontractor quotes will be treated as Other Direct Costs (ODCs) and will be subject to the contract material burden rate shown in paragraph (7) below. Subcontractor quotes must be competitively acquired and submitted with the contractor’s Change Order Price Analysis (COPA) in response to Request for Contract Changes (RCCs) and Reservation Task Requests (RTRs) issued by the Contracting Officer. At no time will the proposed total to be performed by the prime contractor combined with subcontractor quote, material quote, and applicable burdens be allowed to cost more than it would have, had the prime contractor directly provided all material and labor. The proposed total pricing restriction addressed in the preceding sentence does not apply in any case where the work is required to be performed by Original Equipment Manufacturers (OEMs), Government directed subcontractors, Government authorized vendors, or any other work at the sole discretion of the Administrative Contracting Officer. RCCs and RTRs that are subcontracted for material only (no associated labor required within the RCC) shall not be subject to the Material Burden Rate.

7. The contract fixed fully burdened ship repair labor rate and material burden rate are shown below. These fixed rates shall be used for negotiating growth and new work during the entire availability including any extension to the delivery date:

USS CHOSIN FY20 MODPRD

Fully burdened Ship Repair Labor Rate TBD Material Burden Rate TBD

USS Cape St. George FY21 MODPRD

Fully burdened Ship Repair Labor Rate TBD Material Burden Rate TBD

OPTION ITEM FAR 52.217-7

NOTE C: OPTION ITEM FAR 52.217-7

Option item to which the option clause FAR 52.217-7 applies and which is to be supplied only if and to the extent said option is exercised.

GROWTH RESERVATION

NOTE D: GROWTH RESERVATION

The growth reservation hours and material dollar requirements listed in Section B, NOTE A, are a part of this contract under the original solicitation and award. The hour reservation shall include prime contractor hours. The balance of hours and material remaining in the reservation CLINs after negotiations have concluded, and when it is evident that no additional growth will be directed in accordance with NOTE A, is subject to a decrease change order.

Only actual production hours expended will be considered towards the contractor’s obligation to provide the defined reservation hour effort. While supervision, quality assurance, and other nonproduction labor should be included in the pricing for reservation items in the original bid, they shall not count towards satisfying the contractor’s obligation to provide reserved hours. The labor hour reservation shall not include any allowance for technical representatives or for any other Government directed source unless specifically addressed. Material dollars shall be based on actual costs to the prime Contractor of acquiring the materials provided and total cost of subcontractor efforts proposed. Material dollars may include freight or duties which would be reflected on the invoice for the material. The Contractor shall not be allowed to add material handling charges, overhead (including G&A), or profit into the actual cost of materials expended toward the reservation. The information received in the consolidated final report required by Section C Paragraph 6 will be used by the Contracting Officer in the issuance of one contract modification, which will be a final settlement for all reservation Work. This reservation is Level of Effort to Completion. Once the scope of work for a task has been listed and a mutually agreeable number of hours or material has been agreed to, neither party will be entitled to an adjustment based on actual hours or material dollars required.

Each task shall receive approval by the Navy Project Manager and the Administrative Contracting Officer (ACO).

SCHEDULE OF PRICES / RATES

NOTE E: SCHEDULE OF PRICES / RATES FOR THE PURPOSES OF A GOVERNMENT REQUIRED

EXTENSION; DAILY RATES FOR PIERSIDE AND DRY-DOCKING (FULLY BURDENED)

• CLINS 0052-0054 for USS CHOSIN (CG 65) FY20 MODPRD

• CLINS 0138-0140 for…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.