S-13_USS_CSG_PPI_QA1_final.xlsm

XLSM spreadsheet 501 KB Posted

Attached to
USS CHOSIN (CG 65) and USS CAPE ST. GEORGE (CG 71) Modernization Period (MODPRD) Availabilities
Solicitation number
N00024-19-R-4447
Issued by

About this file

USS CAPE ST GEORGE PPI QA 1

View the file

Other files

File Type Posted
S-3_USS_CHO_PPI_QA5_FINAL.xlsm XLSM spreadsheet
S-3_USS_CHO_PPI_QA4_FINAL.xlsm XLSM spreadsheet
S-13_USS_CSG_PPI_QA4_FINAL.xlsm XLSM spreadsheet
S-13_USS_CSG_PPI_QA3_FINAL.xlsm XLSM spreadsheet
N00024-19-R-4447_A0006.pdf PDF
N00024-19-R-4447_conformed_through_A0006.pdf PDF
N00024-19-R-4447_conformed_though_A0005.pdf PDF
S-3_USS_CHO_PPI_QA3_FINAL.xlsm XLSM spreadsheet
N00024-19-R-4447_A0005.pdf PDF
N00024-19-R-4447_conformed_through_0004.pdf PDF
N00024-19-R-4447_0004.pdf PDF
S-3_USS_CHOSIN_PPI_QA2_FINAL.xlsm XLSM spreadsheet
N00024-19-R-4447_0003.pdf PDF
S-13_USS_CSG_PPI_QA2.xlsm XLSM spreadsheet
N00024-19-R-4447_conformed_through_0003.pdf PDF
N00024-19-R-4447_Conformed_through_0002.pdf PDF
N00024-19-R-4447_0002.pdf PDF
S-3_USS_CHOSIN_PPI_QA1_final.xlsm XLSM spreadsheet
S-7_Proposal_Assessment_CG65CG71.xlsx XLSX spreadsheet
S-8_Pier_and_Drydock_Graphical_Representation_Template.xlsx XLSX spreadsheet
N00024-19-R-4447_Amendment_0001.pdf PDF
N00024-19-R-4447_conformed_through_0001.pdf PDF
S-6_(C&C)_Value_Adjusted_Total_Evaluated_Price_rev5.xlsx XLSX spreadsheet
S-1__Manpower_Utilization_Data_Sheet.xlsx XLSX spreadsheet
N00024-19-R-4447.pdf PDF
S-4__Manpower_Plan_to_Actual_Data_Sheet.xlsx XLSX spreadsheet
S-13_BQ_PPI_CAPE_ST_GEORGE_CG71.xlsm XLSM spreadsheet
J-15_QASP_CSG_MODPRD.docx DOCX document
S-2__Dry-Dock_Utilization_Data_Sheet.xlsx XLSX spreadsheet
S-3_BQ_PPI_CHOSIN_CG65.xlsm XLSM spreadsheet
S-5_Eligibility_Criteria_Data_Sheet_CHO_CSG.docx DOCX document
J-5_QASP_CHO_MODPRD.docx DOCX document
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

QA1

USS CAPE ST GEORGE (CG 71) MODPRD Pre-Proposal Information (PPI) Questions

Solicitation #:N00024-19-R-4447Phone
TPPCTPPC-CG71-SWRMC20-CN01Justin Lessel, Contract Specialist, justin.d.lessel@navy.mil202-781-4064
Martha Bello, Contracting Officer, martha.bello@navy.mil202-781-3864
The following are answers to questions received from potential offerors. The answers provide clarification only and DO NOT constitute an amendment to the solicitation.
To request references, drawings, RLARs, and Erratas being provided under this Solicitation Question & Answer Set,

please contact Justin Lessel, justin.d.lessel@navy.mil, and Martha Bello, martha.bello@navy.mil.

Work Item No.Document Number/TitleQuestionGovernment Response
N/ARFP-N0002419R4447 Page 98 of 163On page 98 of 163 of the RFP the Contractor notes the Governments inclusion of HQ C-2-0051 SPECIFICATION AND STANDARDS (NAVSEA) (AUG 1994):

(a) Definitions.

(i) A "zero-tier reference" is a specification, standard, or drawing that is cited in the contract (including its attachments).

(ii) A "first-tier reference" is either: (1) a specification, standard, or drawing cited in a zero-tier reference, or (2) a specification cited in a first-tier drawing.

(b) Requirements.

All zero-tier and first-tier references, as defined above, are mandatory for use. All lower tier references shall be used for guidance only.

It is the Contractors understanding that all required references listed in paragraph 2 of a zero-tier specification (work item) are "first tier" references. However, when a zero-tier specification directs to use a first-tier reference as "guidance", bidders should not estimate the reference and only use it to aid in the development of an estimate of references that are to be accomplished.

Please concur or advise on this interpretation.The work spec and all references should be used in developing the estimate. If there is a discrepancy in the references provided, the contractor should ask a bidder's question to help clarify.
VariousRFP-N0002419R4447, Page 81 of 1631.8 GOVERNMENT FURNISHED MATERIAL: Government Furnished Material (GFM) cited in work specification(s) and/or Statement of Work (SOW) will be shipped to the contractor’s facility. The successful offeror is to coordinate delivery of GFM with the Project Manager. Government property permanently removed from a vessel that requires a Property Administrator’s disposition instructions shall be properly prepared for shipment and be delivered as direct by the Property Administrator. GFM will be listed in paragraph 5 of Work Item(s).

1.8.2 The following is applicable to in homeport contractors: Government Furnished Material (GFM) cited in the solicitation will be shipped to the contractor’s facility for NAVSEA items only. The contractor is to coordinate delivery of NAVSEA Government Furnished Material with the Project Manager. The contractor is to coordinate pickup of TYCOM Government Furnished Material from the Naval Base with the Project Manager. This GFM will be available at A-30 from one building on the Naval Base. Contractor shall develop pick up schedule accordingly. Transportations costs shall be included in the contract. Change order will only be issued if there is a Government caused change to the pickup date. Government property permanently removed from a vessel that requires a Property Administrator's disposition instructions shall be properly prepared for shipment and be delivered as directed by the Property Administrator. GFM will be listed in paragraph 5 of the Work Item(s).

Question 1) For the TYCOM GFM will the Government provide a Building Number along with a POC including phone number?

Question 2) For planning purposes can the Government provide a number of crates, boxes and pallets of TYCOM GFM? Q1) kSARIA Corporation, 2055 Sanyo Ave, Suite 200, San Diego, CA 92154, POC: Chris Hensley, Mobile: (619) 600-2155, chensley@ksaria.com Q2) The government is unable to provide number of crates, boxes and pallets.

Various REF-N0002419R4447 1) Since the ship was last painted in a U.S Shipyard, has there been any paint applied outside of the United States?

2) If so, verify that all paint applied outside of the United States met NAVSEA Standard Item FY-19 Change 2, 009-32, table 1 thru 8 requirements?The ship has not had any paint applied outside the united states since the ship was last painted.
N/ARFP N0002419R4447Pages 43 -60, CLIN's 0101, 0102, 0103, 0104, 0106, 0107, 0108, 0109, 0110, 0111, 0112, 0113, 0114, 0115, 0116, 0117 and 0118. All state... See the below statement.

PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF THE USS CAPE ST. GEORGE (CG 71) DURING FY20 MODPRD (Modernization Period) (Non-prorated WIs – See attachment J-14 for list).

Page 72 of 163 LEVEL OF EFFORT TO COMPLETION. See the below statement...

166,248 hours and $3,736,889 materials for the USS CAPE ST. GEORGE (CG71) FY21 MODPRD.

Will the Government issue an Amendment and provide the correct FY for USS Cape St George? (FY-20 or FY21)The RFP has been revised to correct FY 20 to FY 21 via Amendment 0002.
N/ARFP N0002419R4447The current proposal due date of 16 May 2019 is being negatively impacted by preceding solicitations, resulting in a compressed proposal development timeline when coupled with other waterfront solicitation's competing interests. In addition to this solicitation, bidders have received and are planning the USS Lake Champlain (CG-57) DSRA and the USS Decatur (DDG-73) and USS Stethem (DDG-63) EDSRA's. This has saturated the waterfront with nearly 2,000 work items, and having three proposals for five ships due in quick succession is negatively affecting the downstream responsiveness of the subcontractor and material vendor community who are already notifying us of delays in pricing, and several cases, No Bidding key elements of work packages.

The Contractor expects that we will continue to receive Amendments, Errata, and possible Addendums on all RFPs, further stressing the schedule for this proposal.

Question:

In order to depressurize the planning schedule and afford all contractors ample time to prepare/submit accurate proposals, and to allow for adequate time for subcontractor/vendor solicitations/evaluations/selections, request that the proposal due date be extended from 16 May 2019 at 3:00 pm, local time, Washington DC to 30 May 2019 at 3:00 pm, local time, Washington DC. A 14-day proposal due date extension, or roughly ~11 additional planning days.No extension is granted at this time.
243-11-001Title: ***DO NOT TOUCH PER APM***Stern Tube Flax Packing; removeWork Item 243-11-001 is titled,

***DO NOT TOUCH PER APM***Stern Tube Flax Packing; remove.

Contractor is confused about the meaning of "DO NOT TOUCH PER APM" and will not be able to price the specification as written.

Will the Government provide an errata or direction?Work Item 243-11-001 has been revised via Errata 1. Please see Amendment 0002.
VariousVariousQuestion #1 - Please provide missing references listed in Attachment A.References provided in Amendment 0002.
980-90-002PARA 3.8.2 states accomplish 500 square feet of paint sandblasting, paint removal and heavy metal paint abatement as designated by the supervisor.

To insure that all offerors are bidding the same scope of work (which will insure fair competition) please provide the number of locations requiring containment and how many square ft per location to abate (example: 20 locations @ 25 Sqft per location).

This is important as the number of containments needing to be built (and how big they need to be) are a driving factor in cost.Work Item has been revised in Errata 1 via Amendment 0002. Changed to 20 locations @ 25 Sqft per location.
980-90-007PARA 3.17.2 states accomplish 500 square feet of heavy metal paint abatement as designated by the supervisor.

To insure that all offerors are bidding the same scope of work (which will insure fair competition) please provide the number of locations requiring containment and how many square ft per location to abate (example: 20 locations @ 25 Sqft per location).

This is important as the number of containments needing to be built (and how big they need to be) are a driving factor in cost.Work Item has been revised in Errata 1 via Amendment 0002. Changed to 20 locations @ 25 Sqft per location.
980-90-008PARA 3.16.2 states accomplish 300 square feet of heavy metal paint abatement as designated by the supervisor.

To insure that all offerors are bidding the same scope of work (which will insure fair competition) please provide the number of locations requiring containment and how many square ft per location to abate (example: 15 locations @ 20 Sqft per location).

This is important as the number of containments needing to be built (and how big they need to be) are a driving factor in cost.Work Item has been revised in Errata 1 via Amendment 0002. Changed to 15 locations @ 20 Sqft per location.
980-90-010PARA 3.17.2 states accomplish 1000 square feet of heavy metal paint abatement as designated by the supervisor.

To insure that all offerors are bidding the same scope of work (which will insure fair competition) please provide the number of locations requiring containment and how many square ft per location to abate (example: 20 locations @ 50 Sqft per location).

This is important as the number of containments needing to be built (and how big they need to be) are a driving factor in cost.Work Item has been revised in Errata 1 via Amendment 0002. Changed to 20 locations @ 50 Sqft per location.
042-11-002Physical Security at Private Contractor's Facility; accomplishParagraph 3.1 states, "Accomplish the following requirements, in addition to the specific requirements of the 2.1, for work accomplished on naval vessel within a Private Shipyard, either in drydock, on railway, or pierside throughout the entire availability in accordance with 2.2 and 2.3.

*Contractor note that the following (2) references was note provided by the Customer.

-Reference 2.2, 3300, USFF AT OPORD, (CONFIDENTIAL) -Reference 2.3, 251702ZJUN15, Safety/Security/CG LSD Modernization Program EXORD, (CONFIDENTIAL)

Please provide the above listed missing references.Confidential documents cannot be sent. Per Para 4.3 , Reference 2.2 can be reviewed at SWRMC security.
438-90-003ShipAlt CG47-73856.03K, Integrated Ship Controls; accomplishPara 3.2 states Accomplish the requirements of 2.4 through 2.27.

Ref 2.12 drawing 8736021 is an arrangement drawing with rip out and install equipment, and equipment is being ordered on second tier references 2, 3, and 6 of 8736022, which are not called out on the spec.

Please advice who is accomplishing the references listed on drawing 8736022References 2, 3 and 6 of 401-8736021, will be accomplished by PMS-407 AIT. References 2, 3 and 6 identified in 401-8736021 are also are also identified in 980-90-011 Para 3.1 and Attachment One.
438-90-003ShipAlt CG47-73856.03K, Integrated Ship Controls; accomplishPara 3.2 states Accomplish the requirements of 2.4 through 2.27.

Ref 2.13 drawing 8736022 is an arrangement drawing with rip out and install equipment, and equipment is being ordered on second tier references 5, 6, 9, 10, and 23 of 8736022, which are not called out on the spec.

Please advice who is accomplishing the references listed on drawing 8736022References 5, 6, 9, 10, and 23 of 401-8736022, will be accomplished by PMS-407 AIT. References 5, 6, 9, 10, and 23 identified in 401-8736022 are also are also identified in 980-90-011 Para 3.1 and Attachment One.
438-90-003ShipAlt CG47-73856.03K, Integrated Ship Controls; accomplishPara 3.2 states Accomplish the requirements of 2.4 through 2.27.

Ref 2.14 drawing 8736023 is an arrangement drawing with rip out and install equipment, and equipment is being ordered on second tier references 2, 3, 5, 6, 13, and 14 of 8736023, which are not called out on the spec.

Please advice who is accomplishing the references listed on drawing 8736023References 2, 3, 5, 13 and 14 of 401-8736023, will be accomplished by PMS-407 AIT. References 2, 3, 5, 13, and 14 identified in 401-8736023 are also are also identified in 980-90-011 Para 3.1 and attachment One. Reference 6 of 401-8736023 is called out in 438-90-003 ref 2.21
438-90-003ShipAlt CG47-73856.03K, Integrated Ship Controls; accomplishPara 3.2 states Accomplish the requirements of 2.4 through 2.27.

Ref 2.15 drawing 8736024 is an arrangement drawing with rip out and install equipment, and equipment is being ordered on second tier references 3, 4, and 7 of 8736024, which are not called out on the spec.

Please advice who is accomplishing the references listed on drawing 8736024References 3, 4 and 7 of 401-8736024, will be accomplished by PMS-407 AIT. References 3, 4, and 7 identified in 401-8736024 are also are also identified in 980-90-011 Para 3.1 and Attachment One.
438-90-003ShipAlt CG47-73856.03K, Integrated Ship Controls; accomplishPara 3.2 states Accomplish the requirements of 2.4 through 2.27.

Ref 2.16 drawing 8736025 is an arrangement drawing with rip out and install equipment, and equipment is being ordered on second tier references 5, 8, and 11 of 8736025, which are not called out on the spec.

Please advice who is accomplishing the references listed on drawing 8736025References 5, 8 and 11 of 401-8736025, will be accomplished by PMS-407 AIT. References 5, 8, and 11 identified in 401-8736025 are also are also identified in 980-90-011 Para 3.1 and attachment One.
438-90-003ShipAlt CG47-73856.03K, Integrated Ship Controls; accomplishPara 3.2 states Accomplish the requirements of 2.4 through 2.27.

Ref 2.23 drawing 8737354 is an arrangement drawing with rip out and install equipment, and equipment is being ordered on second tier references 6, 7, 9, and 37 of 8737354, which are not called out on the spec.

Please advice who is accomplishing the references listed on drawing 8737354This Work Item has been revised via Errata 1 to state, "Accomplish the requirements of 2.4 through 2.22" See Amendment 002 for revisions.
AllAs of 03/29/19 contractor has 16 unanswered questions. These questions deal with a variety of issues ranging from material concerns, scope clarification, missing information and or missing drawings (102 total). Due to the flow down for this information through subcontractors, vendors and the internal process of reviewing and processing all of this information contractor requests a 3 week extension from the point of receiving answers.
Please concur to bid extension.No extension is granted at this time.
551-11-002Masker Air System; RepairKTR has not bee able to source the Thermometer in paragraph 1.3.1 due to lack of part number information. Masker Air Cooler owner Xchanger Manf Corp. does not sell the thermometer. Please provide known source and part number to procure.MIL-T-19646 bimetallic, remote reading, self-indicating dial with 4-inch bulb and 4.5-inch gauge face and 20 FT flex tube. Possible source:

MOELLER INSTRUMENT COMPANY, INC.

126 MAIN ST

IVORYTON, CT 06442-1102

UNITED STATES

N/A RFP N0002419R4447 The current proposal due date of 16 May 2019 continues to receive pressure from other waterfront bids. This proposal coupled with other solicitation's competing interests on planning USS Lake Champlain (CG-57) DSRA (Due Today 4/1), USS Decatur (DDG-73) and the USS Stethem (DDG-63) EDSRA’s (three pricing scenarios Due 4/22) is negatively affecting the responsiveness of the subcontractor and material vendor community who continue notify us of delays, and in many cases, are No Bidding key elements of work packages due to time constraints from up stream impacts.

We expect that as the planning tempo ramps up on the MODPRD's, we will receive Amendments, Errata, and possible Addendums, further stressing the schedule for this proposal. It is a significant challenge to adjudicate changes in this constrained environment with other proposals also incurring changes.

Question:

In order to ease the pressure on planning efforts and afford all contractors ample time to prepare/submit accurate proposals, and to allow for adequate time for subcontractor/vendor solicitations/evaluations/selections, request that the proposal due date be extended from 16 May 2019 at 3:00 pm, local time, Washington DC to 30 May 2019 at 3:00 pm, local time, Washington DC. A 14-day proposal due date extension, or roughly ~11 additional planning days. No extension is granted at this time.

&P of &N

Attachment A

RFP Technical Document Discrepancies
Proposal Name:TPPC-CG71-SWRMC20-CN01 USS CSG
Date:March 14, 2019.
DISCREPANCIES
DOCUMENT TYPEWORK ITEMDOCUMENT NUMBERDISCREPANCY DESCRIPTIONPM Response:
Technical Manual110-90-005S9CG0-BP-SRM-010 RevBTechnical Document Not Included on CD (Rev "B" not available)"TYPO" should be S9CGO-BP-SRM-010/CG-47 CL, Corrected in Errata 1
NAVSEA Drawing123-11-001110-5919495-UTechnical Document Not Included On CDUploaded in fusion "123-11-001 ref 2.3 110-5919495 Rev T" 03-14-19 15:39
NAVSEA Drawing167-90-001167-8735924-ATechnical Document Not Included On CDUploaded in fusion "MODPRD 167-90-001 Technical documents" 03-14-19 15:20
NAVSEA Drawing331-8735974-ATechnical Document Not Included On CDUploaded in fusion "MODPRD 167-90-001 Technical documents" 03-14-19 15:20
NAVSEA Drawing301-8735975-ATechnical Document Not Included On CDUploaded in fusion "MODPRD 167-90-001 Technical documents" 03-14-19 15:20
NAVSEA Drawing101-8737157-ATechnical Document Not Included On CDUploaded in fusion "MODPRD 167-90-001 Technical documents" 03-14-19 15:20
Technical Manual243-11-001S9243-A6-MMA-010 Rev2Technical Document Not Included On CDUploaded in fusion "MODPRD 167-90-001 Technical documents" 03-14-19 15:20
244-11-00121436 Engineering MemorandumTechnical Document Not Included ON CD_Possible typographical error (21346)"TYPO" should be 21346 corrected in Errata 1
244-12-00121436 Engineerign MemorandumTechnical Document Not Included ON CD_Possible typographical error (21346)"TYPO" should be 21346 corrected in Errata 1
245-11-00324511-4-702-BTechnical Document Not Included On CD"TYPO" should be 24511-3-702 Rev B corrected in Errata 1
Technical Manual251-31-001S9234-AD-MMO-060 Rev13Technical Document Not Included On CDUploaded in fusion "251-31-001 Ref 2.8 S9234-AD-MMO-060 rev 13" 03-14-19 18:17
NAVSEA Drawing251-32-003251-5920560-HTechnical Document Not Included On CD"TYPO" Should be 251-5920560 Rev F corrected in Errata 1
NAVSEA Drawing251-6254052Technical Document Not Included On CDUploaded in fusion "251-32-003 Ref 2.10 251-6254052 " 03-15-19 10:44
NAVSEA Drawing551-5921393-WTechnical Document Not Included On CD"TYPO" should be 251-5921393 Rev U corrected in Errata 1
259-11-02225911-2-700-ATechnical Document Not Included On CD259-11-002 Ref 2.10 Should be 25911-2-700 Rev C corrected in Errata 1
Technical Manual311-30-002S9264-B3-MMO-010 Rev4Technical Document Not Included On CD, Possible typographical Error S9324-B3-MMO-010"TYPO" should be S9234-B3-MMO-010 Rev 5 corrected in Errata 1
Test Procedure324-80-001EATP-11-3785Technical Document Not Included On CDUploaded in fusion "324-80-001 Ref 2.2 EATP-11-3785" 03-15-19 11:05
Technical Manual343-12-001S9234-B3-MMO-010 Rev4Technical Document Not Included On CDUploaded in fusion "343-12-001 Ref 2.4 S9234-B3-MMO-010 Rev 4" 03-15-19 11:26
Test Procedure456-01-00153211-3-700Technical Document Not Included On CDShould be 53211-3-701 corrected in Errata 1
NAVSEA Drawing468-89-001711-5808784-MTechnical Document Not Included On CDShould be 53711-5808784-M corrected in Errata 1
NAVSEA Drawing512-11-002512-6254175-WTechnical Document Not Included On CDDeleted in Errata 1
NAVSEA Drawing512-5921194-NTechnical Document Not Included On CDUploaded in fusion "512-11-002 Ref 2.29 512-5921194 Rev N" 03-15-19 12:20
Standard Drawing512-11-004S3803-53236-FTechnical Document Not Included ON CD_Possible typographical error (S3803-532636-F)"TYPO" should be S3803-532636 Rev F corrected in Errata 1
NAVSEA Drawing512-11-005512-6254175-WTechnical Document Not Included On CD"TYPO" should be 512-5921175 Rev W Corrected in Errata 1
NAVSEA Drawing512-5921194-NTechnical Document Not Included On CDUploaded in fusion "512-11-002 Ref 2.29 512-5921194 Rev N" 03-15-19 12:20
VFI Drawing520-11-001Q-52010-A01Technical Document Not Included On CDDeleted in Errata 1
NAVSEA Drawing521-5921268-YTechnical Document Not Included On CD"TYPO" should be 521-5921268 Rev AA corrected in Errata 1
NAVSEA Drawing528-5921268-YTechnical Document Not Included On CD528-5921268-Y is not a reference called out in 520-11-001
NAVSEA Drawing528-5921292-FMTechnical Document Not Included On CD"TYPO" should be 521-5921272 Rev R corrected in Errata 1
NAVSEA Drawing528-5921292-YTechnical Document Not Included On CDUploaded in fusion "520-11-001 Ref 2.14 528-5921292 Rev Y"
NAVSEA Drawing528-5921292-WTechnical Document Not Included On CD"TYPO" should be 528-5921305 Rev V corrected in Errata 1
NAVSEA Drawing551-5921383-UTechnical Document Not Included On CD"TYPO" should be 551-5921382 Rev U corrected in Errata 1
NAVSEA Drawing526-11-001526-5921287-AATechnical Document Not Included On CDUploaded in fusion "526-11-001 Ref 2.4 526-5921287 Rev AA" 03-14-19 16:45
Technical Manual561-11-001S6226-JX-MMA-010 Rev5Technical Document Not Included On CDUploaded in fusion "561-11-001 Ref 2.5 S6226-JX-MMA-010 Rev 5" 3-15-19 12:31
Test Procedure581-11-001581-04346-ATechnical Document Not Included On CDUploaded in fusion "581-11-001 Ref 2.17 581-04346 Rev A" 03-14-19 16:55
Test Procedure583-11-001583-H05298-BTechnical Document Not Included On CDUploaded in fusion "583-11-001 Ref 2.11 583-H05298 Rev B" 03-14-19 17:02
NAVSEA Drawing612-80-001152-5919537-AATechnical Document Not Included On CD"TYPO" should be 512-5919527 Rev AA Corrected in Errata 1
MIP/MRC624-11-001MIP 6241/S-1, MRC 8HSYTechnical Document Not Included On CDUploaded in fusion 624-11-001 Ref 2.4 MIP-S-1 03-19-19 09:31
NAVSEA Drawing631-11-012110-5919513-WTechnical Document Not Included On CDTYPO should be 110-5919513 Rev AA Corrected in Errata 1
NAVSEA Drawing641-11-001301-8737742-ATechnical Document Not Included On CDUploaded in fusion "MODPRD 641-11-001 Technical documents" 03-14-19 14:38
NAVSEA Drawing320-8737743-ATechnical Document Not Included On CDUploaded in fusion "MODPRD 641-11-001 Technical documents" 03-14-19 14:38
NAVSEA Drawing331-8737744-ATechnical Document Not Included On CDUploaded in fusion "MODPRD 641-11-001 Technical documents" 03-14-19 14:38
NAVSEA Drawing432-8737445-ATechnical Document Not Included On CDUploaded in fusion "MODPRD 641-11-001 Technical documents" 03-14-19 14:38
NAVSEA Drawing512-8737746-ATechnical Document Not Included On CDUploaded in fusion "MODPRD 641-11-001 Technical documents" 03-14-19 14:38
NAVSEA Drawing528-8737747-ATechnical Document Not Included On CDUploaded in fusion "MODPRD 641-11-001 Technical documents" 03-14-19 14:38
NAVSEA Drawing528-8747748-ATechnical Document Not Included On CDUploaded in fusion "MODPRD 641-11-001 Technical documents" 03-14-19 14:38
NAVSEA Drawing533-8747749-ATechnical Document Not Included On CDUploaded in fusion "MODPRD 641-11-001 Technical documents" 03-14-19 14:38
NAVSEA Drawing601-8737750-ATechnical Document Not Included On CDUploaded in fusion "MODPRD 641-11-001 Technical documents" 03-14-19 14:38
NAVSEA Drawing602-8737751-ATechnical Document Not Included On CDUploaded in fusion "MODPRD 641-11-001 Technical documents" 03-14-19 14:38
NAVSEA Drawing621-8737752-ATechnical Document Not Included On CDUploaded in fusion "MODPRD 641-11-001 Technical documents" 03-14-19 14:38
NAVSEA Drawing624-8737753-ATechnical Document Not Included On CDUploaded in fusion "MODPRD 641-11-001 Technical documents" 03-14-19 14:38
NAVSEA Drawing631-8737754-ATechnical Document Not Included On CDUploaded in fusion "MODPRD 641-11-001 Technical documents" 03-14-19 14:38
NAVSEA Drawing634-8737755-ATechnical Document Not Included On CDUploaded in fusion "MODPRD 641-11-001 Technical documents" 03-14-19 14:38
NAVSEA Drawing635-8737756-ATechnical Document Not Included On CDUploaded in fusion "MODPRD 641-11-001 Technical documents" 03-14-19 14:38
NAVSEA Drawing637-8737757-ATechnical Document Not Included On CDUploaded in fusion "MODPRD 641-11-001 Technical documents" 03-14-19 14:38
NAVSEA Drawing637-8737758-ATechnical Document Not Included On CDUploaded in fusion "MODPRD 641-11-001 Technical documents" 03-14-19 14:38
NAVSEA Drawing640-8737759-ATechnical Document Not Included On CDUploaded in fusion "MODPRD 641-11-001 Technical documents" 03-14-19 14:38
NAVSEA Drawing640-8737760-ATechnical Document Not Included On CDUploaded in fusion "MODPRD 641-11-001 Technical documents" 03-14-19 14:38
NAVSEA Drawing640-8737761-ATechnical Document Not Included On CDUploaded in fusion "MODPRD 641-11-001 Technical documents" 03-14-19 14:38
NAVSEA Drawing101-8738043-ATechnical Document Not Included On CDUploaded in fusion "MODPRD 641-11-001 Technical documents" 03-14-19 14:38
NAVSEA Drawing304-8738160-ATechnical Document Not Included On CDUploaded in fusion "MODPRD 641-11-001 Technical documents" 03-14-19 14:38
NAVSEA Drawing643-11-001185-8737673-ATechnical Document Not Included On CDUploaded in fusion "MODPRD 643-11-001 Technical documents" 03-14-19 14:54
NAVSEA Drawing301-8737697-ATechnical Document Not Included On CDUploaded in fusion "MODPRD 643-11-001 Technical documents" 03-14-19 14:54
NAVSEA Drawing301-8737699-ATechnical Document Not Included On CDUploaded in fusion "MODPRD 643-11-001 Technical documents" 03-14-19 14:54
NAVSEA Drawing301-8737700-ATechnical Document Not Included On CDUploaded in fusion "MODPRD 643-11-001 Technical documents" 03-14-19 14:54
NAVSEA Drawing320-8737703-ATechnical Document Not Included On CDUploaded in fusion "MODPRD 643-11-001 Technical documents" 03-14-19 14:54
NAVSEA Drawing320-8737704-ATechnical Document Not Included On CDUploaded in fusion "MODPRD 643-11-001 Technical documents" 03-14-19 14:54
NAVSEA Drawing331-8737707-ATechnical Document Not Included On CDUploaded in fusion "MODPRD 643-11-001 Technical documents" 03-14-19 14:54
NAVSEA Drawing331-8737709-ATechnical Document Not Included On CDUploaded in fusion "MODPRD 643-11-001 Technical documents" 03-14-19 14:54
NAVSEA Drawing331-8737710-ATechnical Document Not Included On CDUploaded in fusion "MODPRD 643-11-001 Technical documents" 03-14-19 14:54
NAVSEA Drawing331-8737711-ATechnical Document Not Included On CDUploaded in fusion "MODPRD 643-11-001 Technical documents" 03-14-19 14:54
NAVSEA Drawing331-8737712-ATechnical Document Not Included On CDUploaded in fusion "MODPRD 643-11-001 Technical documents" 03-14-19 14:54
NAVSEA Drawing432-8737713-ATechnical Document Not Included On CDUploaded in fusion "MODPRD 643-11-001 Technical documents" 03-14-19 14:54
NAVSEA Drawing512-8737716-ATechnical Document Not Included On CDUploaded in fusion "MODPRD 643-11-001 Technical documents" 03-14-19 14:54
NAVSEA Drawing528-8737717-ATechnical Document Not Included On CDUploaded in fusion "MODPRD 643-11-001 Technical documents" 03-14-19 14:54
NAVSEA Drawing528-8737718-ATechnical Document Not Included On CDUploaded in fusion "MODPRD 643-11-001 Technical documents" 03-14-19 14:54
NAVSEA Drawing528-8737719-ATechnical Document Not Included On CDUploaded in fusion "MODPRD 643-11-001 Technical documents" 03-14-19 14:54
NAVSEA Drawing528-8737720-ATechnical Document Not Included On CDUploaded in fusion "MODPRD 643-11-001 Technical documents" 03-14-19 14:54
NAVSEA Drawing528-8737722-ATechnical Document Not Included On CDUploaded in fusion "MODPRD 643-11-001 Technical documents" 03-14-19 14:54
NAVSEA Drawing533-8737724-ATechnical Document Not Included On CDUploaded in fusion "MODPRD 643-11-001 Technical documents" 03-14-19 14:54
NAVSEA Drawing533-8737725-ATechnical Document Not Included On CDUploaded in fusion "MODPRD 643-11-001 Technical documents" 03-14-19 14:54
NAVSEA Drawing602-8737727-ATechnical Document Not Included On CDUploaded in fusion "MODPRD 643-11-001 Technical documents" 03-14-19 14:54
NAVSEA Drawing624-8737728-ATechnical Document Not Included On CDUploaded in fusion "MODPRD 643-11-001 Technical documents" 03-14-19 14:54
NAVSEA Drawing631-8737729-ATechnical Document Not Included On CDUploaded in fusion "MODPRD 643-11-001 Technical documents" 03-14-19 14:54
NAVSEA Drawing640-8737731-ATechnical Document Not Included On CDUploaded in fusion "MODPRD 643-11-001 Technical documents" 03-14-19 14:54
NAVSEA Drawing640-8737732-ATechnical Document Not Included On CDUploaded in fusion "MODPRD 643-11-001 Technical documents" 03-14-19 14:54
NAVSEA Drawing640-8737733-ATechnical Document Not Included On CDUploaded in fusion "MODPRD 643-11-001 Technical documents" 03-14-19 14:54
NAVSEA Drawing640-8737735-ATechnical Document Not Included On CDUploaded in fusion "MODPRD 643-11-001 Technical documents" 03-14-19 14:54
NAVSEA Drawing644-8737737-ATechnical Document Not Included On CDUploaded in fusion "MODPRD 643-11-001 Technical documents" 03-14-19 14:54
NAVSEA Drawing644-873738-ATechnical Document Not Included On CDUploaded in fusion "MODPRD 643-11-001 Technical documents" 03-14-19 14:54
NAVSEA Drawing644-8737739-ATechnical Document Not Included On CDUploaded in fusion "MODPRD 643-11-001 Technical documents" 03-14-19 14:54
NAVSEA Drawing644-8737740-ATechnical Document Not Included On CDUploaded in fusion "MODPRD 643-11-001 Technical documents" 03-14-19 14:54
NAVSEA Drawing644-8737741-ATechnical Document Not Included On CDUploaded in fusion "MODPRD 643-11-001 Technical documents" 03-14-19 14:54
NAVSEA Drawing652-8738030-ATechnical Document Not Included On CDUploaded in fusion "MODPRD 643-11-001 Technical documents" 03-14-19 14:54
NAVSEA Drawing642-8738034-ATechnical Document Not Included On CDUploaded in fusion "MODPRD 643-11-001 Technical documents" 03-14-19 14:54
NAVSEA Drawing514-8738035-ATechnical Document Not Included On CDUploaded in fusion "MODPRD 643-11-001 Technical documents" 03-14-19 14:54
NAVSEA Drawing621-8738039-ATechnical Document Not Included On CDUploaded in fusion "MODPRD 643-11-001 Technical documents" 03-14-19 14:54
NAVSEA Drawing635-8738040-ATechnical Document Not Included On CDUploaded in fusion "MODPRD 643-11-001 Technical documents" 03-14-19 14:54
NAVSEA Drawing101-8738041-ATechnical Document Not Included On CDUploaded in fusion "MODPRD 643-11-001 Technical documents" 03-14-19 14:54
VFI Drawing772-22-00113231501-FTechnical Document Not Included On CD"TYPO" should be 1323501 Rev T Corrected in Errata 1
NAVSEA Drawing997-11-001801-6253821-BTechnical Document Not Included On CDStates on work item (CONDIFENTIAL) Port Enginerer/ships force does have
NAVSEA Drawing801-6253822-BTechnical Document Not Included On CDStates on work item (CONDIFENTIAL) Port Enginerer/ships force does have

&P of &N image1.jpeg image2.png