S-3_USS_CHO_PPI_QA3_FINAL.xlsm
XLSM spreadsheet 502 KB Posted
- Attached to
- USS CHOSIN (CG 65) and USS CAPE ST. GEORGE (CG 71) Modernization Period (MODPRD) Availabilities
- Solicitation number
- N00024-19-R-4447
About this file
USS CHOSIN (CG 65) Bidder's questions and answers
View the file
Other files
Show all 32
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QA3
| USS CHOSIN (CG 65) Bidder's Questions and Answers | ||||
| Drawing | ||||
| GFM | Solicitation #: | N00024-19-R-4447 | Phone | |
| RLAR | TPPC | TPPC-CG65-SWRMC19-CN01 | Justin Lessel, Contract Specialist, justin.d.lessel@navy.mil | 202-781-4064 |
| Martha Bello, Contracting Officer, martha.bello@navy.mil | 202-781-3864 | |||
| The following are answers to questions received from potential offerors. The answers provide clarification only and DO NOT constitute an amendment to the solicitation. | ||||
| To request references, drawings, RLARs, and Erratas being provided under this Solicitation Question & Answer Set, |
please contact Justin Lessel, justin.d.lessel@navy.mil, and Martha Bello, martha.bello@navy.mil.
| Work Item No. | Document Number/Title | Question | Government Response |
| 992-11-006 | Messing and Berthing Barge Tow Service | Para. 3.1 sates to Pick-up and deliver the barge listed in 1.3 from TBD to the Contractor's plant 14 Days prior to Availability Start Date, using 2.2 for guidance. Return the barge to TBD when directed by the SUPERVISOR. |
| For bidding purposes, please list the name, size, length and draft of the berthing barge to be towed, please list the location for pick-up and delivery. | Current description of barge is unknown. Typical messing and berthing barge is 150 ft long, 50 ft wide, 60 feet tall. | |||
| 992-11-016 | Fuel Assistance and Towboat Service for Fuel Barge; | Para. 3.2 states to Furnish pilot, towing bridle and towboat service and tow 2 (EA) fuel barges totaling 500,000 gallons of fuel from Authorized Fuel Depot, to the contractor's plant, adjacent to the ship. Upon completion of fueling and when directed by the SUPERVISOR, return the fuel barges to their original location. |
| For bidding purposes, please list the name, size, length and draft of the fuel barges to be towed, please list the location for pick-up and delivery of Authorized Fuel Depot. | Current description of barge is unknown. Typical fuel barge is 30 ft long, 25 ft wide and 6 ft tall. | |||
| 992-11-006 | Messing and Berthing Barge Tow Service | Para. 3.1 sates to Pick-up and deliver the barge listed in 1.3 from TBD to the Contractor's plant 14 Days prior to Availability Start Date, using 2.2 for guidance. Return the barge to TBD when directed by the SUPERVISOR. |
| For bidding purposes, please list the name, size, length and draft of the berthing barge to be towed, please list the location for pick-up and delivery. | Current description of barge is unknown. Typical messing and berthing barge is 150 ft long, 50 ft wide, 60 feet tall. | |||
| 992-11-016 | Fuel Assistance and Towboat Service for Fuel Barge; | Para. 3.2 states to Furnish pilot, towing bridle and towboat service and tow 2 (EA) fuel barges totaling 500,000 gallons of fuel from Authorized Fuel Depot, to the contractor's plant, adjacent to the ship. Upon completion of fueling and when directed by the SUPERVISOR, return the fuel barges to their original location. |
| For bidding purposes, please list the name, size, length and draft of the fuel barges to be towed, please list the location for pick-up and delivery of Authorized Fuel Depot. | Current description of barge is unknown. Typical fuel barge is 30 ft long, 25 ft wide and 6 ft tall. | |||
| 992-11-006 | Messing and Berthing Barge Tow Service, Temporary Service, Equipment and Systems Test, Inspection and Repair in Contractor Plant; accomplish (OPTION ITEM) | 3.1 Pick-up and deliver the barge listed in 1.3 from TBD to the |
Contractor's plant 14 Days prior to Availability Start Date, using 2.2 for guidance. Return the barge to TBD when directed by the SUPERVISOR.
Will the Government provide the size of the barge that will be provided to support ships force?
Can the Government remove the TBD and provide a pick up and return locations of the barge?
| Is this work item for Out of Home Port bidders only? | Current description of barge is unknown. Typical messing and berthing barge is 150 ft long, 50 ft wide, 60 feet tall. This work item is for out of home port bidders only, Location is San Diego Naval station. Attachment J-4 has been updated via Amendment 0004. | |||
| 533-11-001 | Electric Water Heater; repair | Contractor has contacted the OEM for this items and was informed that they do not provide onsite OEM representatives. The OEM do not have any recommendations on who to use to accomplish the 009-90 requirements for paragraph 3.2. |
| Please advise on how to accomplish the 009-90. | Work Item has been updated in Errata 2 via Amendment 0005. | |||
| 533-11-002 | Electric Water Heater; repair | Contractor has contacted the OEM for this items and was informed that they do not provide onsite OEM representatives. The OEM do not have any recommendations on who to use to accomplish the 009-90 requirements for paragraph 3.2. |
| Please advise on how to accomplish the 009-90. | Work Item has been updated in Errata 2 via Amendment 0005. | |||
| 533-11-002 | Electric Water Heater; repair | para 3.2 for 009-90 who is the Technical Representative to provide on-site technical assistance for the water heater . |
| Please advise | Work Item has been updated in Errata 2 via Amendment 0005. | |||
| 533-11-001 | Electric Water Heater; repair | para 3.2 for 009-90 who is the Technical Representative to provide on-site technical assistance for the water heater . |
| Please advise | Work Item has been updated in Errata 2 via Amendment 0005. | ||
| 252-90-001 | Paragraph 3.2 states; "Accomplish the requirements of 2.2 through 2.3 and using material provided in 5.3.1, including all general, local, special, test, installation and ripout notes." |
| QUESTION; "Reference 2.3 refers to a 2nd tier drawing (Ref 4) for the accomplishment of removal & installation, please review & advise. | The 2nd tier drawing (Ref 4) noted in Reference 2.3 will be accomplished by an AIT for removal & installation of electrical portion of this shipalt. | |||
| N/A | RFP N0002419R4447 | The ability for bidders to meet the current proposal due date of 5/16/2019 remains at risk due to significant pressure of other waterfront bid activities that have been eroding the available planning time for the USS Chosin's and USS Cape St. George's large work item packages in this solicitation. |
The downstream impacts of planning USS Lake Champlain (CG-57) DSRA that was planned yet subsequently cancelled on 4/2/2019, and the USS Decatur (DDG-73) / USS Stethem (DDG-63) EDSRA RFP with three pricing scenarios (now due 5/14/2019 to overcome challenges [was 4/22/2019]), has resulted in erosion of available days to focus on this RFP. This erosion of the planning timeline is hindering our ability to effectively/accurately estimate labor and obtain subcontractor and material vendor quotes. Subcontractors and vendors continue to notify us of delays, and in many cases, No Bidding key elements of work due to constraints.
We expect that the planning tempo will remain high on the MODPRD's where adjudicating forthcoming Amendments, Q&A's, Errata, Addendums, that are necessary but further apply risk to the scheduled due date.
| Question: To afford all contractors ample time to recover critically needed timeline and prepare/submit accurate proposals, and to allow for adequate time for subcontractor/vendor solicitations/evaluations/selections, request that the proposal due date be extended from 16 May 2019 at 3:00 pm, local time, Washington DC to 6 June 2019 at 3:00 pm, local time, Washington DC. A 21-day proposal due date extension, or roughly ~17 additional planning days. | The proposal due date has been extended to 06 June 2019. | |||
| 634-21-003 | Deck Covering Non-Skid; replace | Paragraph 3.2 states, "Accomplish the requirements of 009-32 of 2.1, for approved surface preparation, including table 2, line 13, Columns A, B, and E for steel surfaces for each location listed in 1.2". |
*Contractor notes that these NSI 009-32, table 2, line 13, Columns A, B, and E are for steel Fight & Hanger Decks and not the locations listed 1.2.
*Contractor notes that that the preservation for locations 1.2.1 and 1.2.2 are covered by Work Items 634-21-001 and location 1.2.3 is covered by Work Item 634-21-004.
Paragraph 3.6 states, "Accomplish a visual inspection, concurrently with the SUPERVISOR, Aeronautical Shipboard Installation Representative (ASIR), and a Level 1 Shipboard Corrosion Assessor, of the equipment listed in 1.3.7, 1.3.8, and the equipment removed and disassembled in 3.3 and 3.5 for buckling/deformation, pitting, thinning, cracks, fractures, cracked welds, scale, holes, deflections/distortions, general condition, wear, defects and deterioration using 2.2 through 2.17 for accept or reject criteria".
*Contractor notes that 1.3.7 and 1.3.8 are not listed in the specification as written.
*Contractor notes the scope of work and references 2.4 through 2.19 identified in this specification as written duplicates most of the requirements of the paragraphs and references identified in Work Item 588-21-003, Recovery Assist Securing and Traversing (RAST) Track Plate, Side Plate and Trough; preserve.
*Contractor believes this specification was intended for preservation of the 02 Level Flight & Hangar Decks that are Aluminum excluding the requirements covered in Work Item 588-21-003.
Will the Customer provide clarification as to the disparities with the location and the scope of work identified in the specification as written?
| This WI has been updated via Errata 1. See Amendment 0004 for revisions. | |||
| 542-21-002 | JP-5 Service Pump and Motor Assembly; install | Paragraph 3.3.4 states, "Accomplish the requirements of 009-15 of 2.1 for each rotating assembly". |
* Contractor notes that there is no NSI 00-17, Rotating Electrical Equipment; repair or NSI 009-33, Rotating Electrical Equipment; rewind identified to be accomplished to the Motor Unit and unless these Cat II NAVSEA Standard Items requirements are invoked the requirement to accomplish NSI 009-15, Rotating Machinery; balance is not applicable.
| Can the Customer provide clarification as to the above listed disparities identified in the specification as written? | Repair being accomplished by outside activity. Work Item has been updated in Errata 2 via Amendment 0005. | |||
| 992-11-004 | Ship Towing Service, Long Range; provide(OPTION ITEM) | WI 992-11-004, Ship Towing Service, Long Range; provide (OPTION ITEM) - Requires the contractor outside of San Diego to tow the vessel from its homeport to the location of the contractor and back to the vessels homeport once the MODPRD has been accomplished. |
Contractor has competed numerous availabilities of vessels homeported in San Diego and this is the first time a NAVSEA tow has been incorporated on a vessel that is self propelled into the specification.
Page 150 of the solicitation section b) The IPD applicable to the USS CHOSIN CG 65 must be included in all offers and is calculated using foreseeable costs for fuel, towing and pilot charges, and travel to the contractor’s facility by applicable Government personnel. The following chart provides the values to be included in all offerors’ price proposals to determine the offeror’s total evaluated price.
Question #1 - As this item is designated as an option item, is it the intent for the Government to use one of MSC's towing/salvage tugs to accomplish the tow and if they cannot accommodate the schedule have the contractor provide commercial towing services?
Contractor believes that by having the IPD stated within the solicitation as well as pricing the option item for the tow evaluated together essentially doubles the IPD for this vessel and gives San Diego contractors an unfair advantage prior to bidding any other work within the specification.
Question #2 - If the vessel has a propulsion system, why is it necessary to accomplish towing the vessel rather then have the vessel come under its own power?
Question #3 - Why does the vessel need to be towed both ways?
Towing Service Long Range is for contractors outside of San Diego area. Attachment J-4 has been updated in Amendment 0004 to note certain WIs that are to be priced by out of homeport bidders only.
Answer #1 - The MSC is required to provide long range towing services for towing outside of the San Diego area.
Answer #2 - The vessel does not currently have engines installed, thus the requirement of long range towing service to areas outside San Diego area.
Answer #3 - This requirement may be necessary.
992-11-006 Messing and Berthing Barge Tow Service Para. 3.1 sates to Pick-up and deliver the barge listed in 1.3 from TBD to the Contractor's plant 14 Days prior to Availability Start Date, using 2.2 for guidance. Return the barge to TBD when directed by the SUPERVISOR.
| For bidding purposes, please list the name, size, length and draft of the berthing barge to be towed, please list the location for pick-up and delivery. | Current description of barge is unknown. Typical messing and berthing barge is 150 ft long, 50 ft wide, 60 feet tall. | |||
| 992-11-016 | Fuel Assistance and Towboat Service for Fuel Barge; | Para. 3.2 states to Furnish pilot, towing bridle and towboat service and tow 2 (EA) fuel barges totaling 500,000 gallons of fuel from Authorized Fuel Depot, to the contractor's plant, adjacent to the ship. Upon completion of fueling and when directed by the SUPERVISOR, return the fuel barges to their original location. |
| For bidding purposes, please list the name, size, length and draft of the fuel barges to be towed, please list the location for pick-up and delivery of Authorized Fuel Depot. | Current description of barge is unknown. Typical fuel barge is 30 ft long, 25 ft wide and 6 ft tall. | |||
| NA | USS CHOSIN specification index | The specification index for the USS CHOSIN states FY-18 STANDARD ITEMS APPLICABLE TO THIS JOB ORDER WITHOUT FURTHER REFERENCE for both Category I & II. |
| Is this correct or should they be FY19? | CAT I STD ITEMS FY19 through CH2 and CAT II STD ITEMS FY19 through CH2 apply. WI Index was updated in Errata 1 via Amendment 0004. | |||
| 665-90-002 | ShipAlt CG47-83343K, Replace Bandsaw with Hacksaw; accomplish | Ref 2.6 identifies items 100-102 of reference 2.3 as PreFab. |
| Are these items just pre-cut or are they already assembled as a complete ready to go foundation? | Item 100 -102 will be furnished as a complete assembly. | |||
| N/A | SF 33 Block 9 | The USS Cape St George and USS Chosin MODPRD's have combined a total over 800 work items inclusive of over 200 ShipAlts to be priced by May 16th. Contractor has received numerous notifications by not only subcontractors but also mandated tech reps that they will not be able to meet and support the current proposal date of May 16th. |
Contractor requested a ship check on 4/9/19 and to date has not had a response from the Government.
Please consider the following:
1) Please make either the USS Cape St. George or the USS Chosin available for a ship check. The ship check is necessary to validate the scope and complexity as well identifying potential interferences for each associated work item.
2) Please extend the proposal due date of May 16th to June 16th. Please extend the bidder questions time frame to May 16th.
These extensions will be necessary for contractor to request and receive subcontractor quotes, review entire specification and references, submit questions, allow time to answer questions and contractor time to incorporate answers into our proposal.
Both requests above will need approval for contractor to continue preparing a proposal for this solicitation. 1) Ship check has been provided.
2) Proposal due date has been extended to 06 June 2019.
634-90-001 ShipAlt CG47-83539K, Compartment Deck Covering Replacement; accomplish Please provide the following missing references:
2.5 RLAR 83539/CG65/P272, Replace Compt Deck Coverings
| 2.6 RLAR 83539/CG65/P331, Replace Compt Deck Coverings | Ref 2.5 and 2.6 will be distributed via Amendment A0005. | |||
| N/A | SF 33 Block 9 | Contractor will need additional time to conduct the ship check, disseminate the information ascertained during the ship check to subcontractors as well as mandated tech reps. |
Due to the late access approval to conduct the ship check onboard the USS Chosin, please consider the following:
1) Please make the USS Chosin available for a ship check. The ship check is necessary to validate the scope and complexity as well identifying potential interferences for each associated work item.
2) Please extend the proposal due date of May 16th to June 28th. Please extend the bidder questions time frame to May 28th.
These extensions will be necessary for contractor to request and receive subcontractor quotes, review entire specification and references, submit questions, allow time to answer questions and contractor time to incorporate answers into our proposal.
Both requests above will need approval for contractor to continue preparing a proposal for this solicitation. 1) Ship check has been provided.
2) Proposal due date has been extended to 06 June 2019.
472-90-001 ShipAlt CG47-80156.03K, Mod to AN/SLQ-32(V)6 Hardware; accomplish Paragraph 3.6 states, "Accomplish the requirements of 009-123 of 2.1 and Test Note T-2 of 2.13 for fiber optic equipment and material installed or modified in accordance with 2.38".
*Contractor notes that reference 2.38 does not exist in this specification as written.
| Can the Customer provide the missing intended reference identified in paragraph 3.6 as 2.38? | Work Item has been updated in Errata 2 via Amendment 0005. | |||
| 533-11-001 | Electric Water Heater; repair | OEM and has informed contractor that they do not provide onsite OEM representatives. |
They do not have any recommendations on who to use.
| Please advise or remove the 009-90 requirement. | Work Item has been updated in Errata 2 via Amendment 0005. | |||
| 533-11-002 | Electric Water Heater; repair | OEM and has informed contractor that they do not provide onsite OEM representatives. |
They do not have any recommendations on who to use.
| Please advise or remove the 009-90 requirement. | Work Item has been updated in Errata 2 via Amendment 0005. | ||||
| RFP Attachment J-4 | RFP Attachment J-4 | Amendment 003 provide a revision to CAPE ST. GEORGE Attachment J-14 annotating work items that are to be priced by out of home-port Offerors only. These are work items 992-11-004 and 992-11-006. Will the Government provide the same update to Attachment J-4 for CHOSIN, or should Offerors assume the direction should also be applicable to CHOSIN work items 992-11-004 and 992-11-006? | See Amendment 0004 for J-4 revisions. | ||
| 521-90-001 | ShipAlt CG47-86960K Upgrade to Titanium Fire Pumps; accomplish | Paragraph 3.1 states, "Accomplish the requirements of 2.2 through 2.12 to upgrade each titanium fire pump, located in 1.2, including all general, local, special, test and rip-out notes and material listed in 2.13". |
*Contractor notes that reference 2.3 is identified as drawing 521-8710132 REV A, however the reference package only provided drawing 521-8710132-.
| Please provide the missing revision to reference 2.3. | Updated reference 2.3 drawing 521-8710132 REV A distributed via Amendment 0005. | |||
| 110-20-001 | Freeboard Thin Hull Inspection; accomplish | Paragraph 3.2 states, "Accomplish (250 EA) UT readings in each area where the visual inspection report of 3.1.1 identifies any pitting, erosion or potential structural degradation as determined by the assessor using 2.3 through 2.37 for guidance". |
*Contractor notes that there are total of 23 areas listed in 1.2 and as the specification paragraph 3.2 is written would be 5,750 UT's = (23 location X 250 UT's)
| Please provide clarification the as to the quantity of UT readings required to accomplish paragraph 3.2? | 250 total UT. Work Item has been updated in Errata 2 via Amendment 0005. | |||
| 456-90-003 | ShipAlt CG47-77614.03K, ACB12/TI12 OA Computer Plant Upgrade; accomplish | Paragraph 3.2 states, "Accomplish the requirements of 2.4 through 2.22 and applicable portions of 2.23 through 2.35, including all general, local, special, test and rip-out notes, using 2.36 through 2.41 as guidance and materials provided in 5.3". |
*Contractor notes that reference 2.16 is identified as drawing 532-8709494 Rev A, however the reference package only provided drawing 532-8709494-.
| Please provide the missing revision to reference 2.16. | Updated ref 2.16 drawing 532-8709494 REV A distributed via Amendment 0005. | |||
| 529-11-002 | Secondary Drainage System Repair and Restore; accomplish | Paragraph 3.3 states, "Remove existing and install new No.2 oily waste transfer pump strainer (F29) located in 1.2.4, using 2.6 for guidance". |
*Contractor notes that reference 2.6 drawing 529-5921317 Rev V, Remote Gear Operator for Main and Secondary, does not list the No.2 oily waste transfer pump strainer and (F29) is identified as a 3/4" Sleeve, DK Piecing, for Flex SFT W/360 Deg Indicator, STOW Co Part No 9349-503.
| Please provide clarification of the disparity between material identified in paragraph 3.3 of the specification as written and that listed in reference 2.6 as (F29)? | Ref 2.3 and 2.11 should be used. Work Item has been updated in Errata 2 via Amendment 0005. | ||||
| RFP Section J | RFP Section J | Attachment A to this Question No. 0068 provides a listing of 25 technical drawings where as of 5/1/19, 16 have not been provided and where the incorrect reference for 9 were provided. This includes 4720 reports that have not been provided. These discrepancies are preventing accurate estimates from being developed. Please provide as soon as possible. | References have been provided via Amendment 0005. | ||
| N/A | RFP N0002419R4447; Section F Deliveries or Performance | RFP Section F depicts the following “Delivery Dates”; |
USS CHOSIN CLINs 0001 through 0054: 17-JUN-2021 USS CAPE ST GEORGE CLINs 0101 through 0140: 20-May-2022
RFP Section J, Attachments J-3 and J-13 (Execution Milestones and Key Event Days) depict the following dates;
USS CHOSIN:
KTR Contract Complete: Wednesday, March 1, 2021 Availability Complete: Wednesday, June 16, 2021
Bidder acknowledges that Section F “Delivery Dates” match the Attachment J-3 “Availability Complete” dates.
QUESTION:
| Please explain Contractor’s performance/contractual obligations after the Attachment J-3 “KTR Contract Complete” dates? In other words, what are the contractor’s performance/contractual obligations during the period between the above Attachment J-3 “KTR Contract Complete” dates and “Availability Complete” dates; understanding that RFP Section F establishes the “Delivery Dates” as the same as the Attachment J-3 “Availability Complete” dates? | Attachment J-3 and J-13, as well as, Section F Delivery Dates have been revised via Amendment 0005 to correspond with each other. | |||
| N/A | RFP-N00024-19-R-4447 Section- C Page-85 | Contractor acknowledges that Section C Paragraph 2.1 (Page-85) of the conformed Amendment 0004 states in paragraph 2.1 "The required place of performance for the MODPRDs shall be the contractors facility." |
The contractor has reviewed previously awarded contracts, both Coastwide and SDMAC, and notes that availabilities accomplished in the Port of San Diego start pierside at NAVSTA 32nd Street for the first 14 Calendar days. This allows the customer and ship's force time to prepare the ship to enter contractors facility. Activities listed are not all inclusive: Ship's Force movement to Berthing Barge and Ship's Force off-load of stores, material, and portable equipment. This also allows the contractor an opportunity to set-up temporary services; installation of staging, drain, disposal, and dewatering of specific water systems; installation of the AN/SPY-1D Antenna Protective Covers and installation of deck protection prior to arrival in the contractors facility.
| Question: Can bidder's assume that if the contract is awarded to a bidder for accomplishment in the Port of San Diego, than the first 14 Calendar days will be accomplished pierside at NAVSTA 32nd Street prior to movement of the ship and berthing barge to the contractors facility? | No, once the contract is awarded we have allowed the KTR time to set up certain services required for ship movement such as temp firemain, temp lighting…etc. | |||
| 165-11-001 | Sonar Dome Rubber Window (SDRW); inspect and repair | 3.5.1 STATES "Accomplish base metal weld buildup of 2000 square feet of |
plating defects"
Is this a typo and the intent is for 2000 square inches?
| Please advise. | Work Item has been updated in Errata 2 via Amendment 0005 to read 2000 square inches. | |||
| 165-11-001 | Sonar Dome Rubber Window (SDRW); inspect and repair | 3.6 STATES "Remove existing and install new, a total of 50 square feet of |
defective plate, at location listed in 1.2.1 using report provided in 5.1 and..." 5.1 is GFM
| Please provide correct paragraph. | Work Item has been updated in Errata 2 via Amendment 0005. | |||
| 505-11-002 (E1) | Flexible Hose Assembly; replace | Errata 1 provided attachment A, however attachment A does not provide the lengths, diameter sizes, types or quantities required to provide pricing, |
| please provide the lengths, diameter sizes, types and quantities for all hoses. | Work Item has been updated in Errata 2 via Amendment 0005. | |||
| 505-11-002 (E1) | Flexible Hose Assembly; replace | Paragraph 3.1 states, "Remove and dispose of system fluids from each flexible hose assembly listed in Attachment A". |
*Contractor notes that Attachment A of the specification as written only provides the PCN Identifiecation for (17) each PCN's that Bidders have not been provided as references.
Paragraph 3.2 states, "Remove existing, fabricate and install each new flexible hose assembly listed in 1.3 and located in 1.2 and 1.4, using 2.2 through 2.12 for guidance. Template from existing shipboard conditions".
*Contractor notes that 1.3.1 states, "See Attachment A" and Customer has not provided a list flexible hose assemblies that accurately identifies the Quanity / Type along with associated references in 2.3 through 2.11 for each hose assembly.
Please provide the required list of flexible hose assemblies to all Bidders.
| Please provide a list of flexible hose assemblies that provide quantity and type and associated reference 2. required for each | Addendum to attachment A has been distributed in Errata 2 via Amendment 0005. | |||
| 150-90-009 | ShipAlt CG47-86309K, Bulwark Removal Aft 38 Feet; accomplish | Paragraph 3.1 Accomplish the requirements of 2.2 through 2.9 and 2.11 and 2.12 and applicable portions of 2.10, including all general, local, special, test and rip-out notes, using material provided in 5.3. |
*Contractor note that the following reference was note provided by the Customer.
-Reference 2.12, 86309CG65P303, RLAR Bulwark Removal Aft 38ft .
| Please provide the above listed missing reference. | Updated ref 2.12, 86309CG65P303, RLAR distributed via Amendment 0005. | |||
| 261-22-001 | Fuel Oil Service Booster Pump and Motor; install | Paragraph 3.2 states, "Accomplish the requirements of 009-92 of 2.1 for each equipment listed in 1.3 and located in 1.2, using material listed in 5.1.3 and 2.2 for guidance". |
*Contractor notes that there is no material of paragraph identified in or as 5.1.3 listed in the specification as written.
| Please provided clarification as to the disparity regarding paragraph 3.2 and 5.1.3? | Work Item has been updated in Errata 2 via Amendment 0005 to read paragraph 5.1. | |||
| 521-90-001 | ShipAlt CG47-86960K Upgrade to Titanium Fire Pumps; accomplish | Paragraph 3.1 states, "Accomplish the requirements of 2.2 through 2.12 to upgrade each titanium fire pump, located in 1.2, including all general, local, special, test and rip-out notes and material listed in 2.13". |
*Contractor notes that references 2.7 through 2.12 are structural as built drawings with no list of material quantities and that the specification intent may have been to utilize them for guidance only.
Please provided clarification as to the disparity regarding paragraph 3.1 to accomplish references 2.7 through 2.12 structural as built drawings or to utilize them for guidance only?
| References 2.7 through 2.12 are to be used for Guidance Only. All information needed are noted in references 2.2 through 2.6. | |||
| 264-31-001 | Lube Oil Purifier Assembly No. One; repair (OPTION ITEM) | Paragraph 3.4 states, "Disconnect electrically and mechanically and remove each lube oil purifier and motor listed in 1.3, located in 1.2 including each suction and discharge flexible hose assembly, using 2.2 and 2.3 for guidance". |
*Contractor notes that that paragraphs 3.6 through 3.8.2 describes requirements that are similar to an OEM Class "B" Overhaul, however omits the requirements to crate and secure the purifier assembly removed and provide prepaid shipping to from the Original Equipment Manufacturer (OEM) repair facility.
| Is it the Customers intent to have OEM Class "B" Overhaul accomplished on No. One Lube Oil Purifier Assembly? | Yes, the overhaul will be accomplished by a contracted OEM | |||
| 264-31-002 | Lube Oil Purifier Assembly No. 2; repair (OPTION ITEM) | Paragraph 3.4 states, "Disconnect electrically and mechanically and remove each lube oil purifier and motor listed in 1.3 and located in 1.2 including each suction and discharge flexible hose assembly, using 2.2 and 2.3 for guidance". |
*Contractor notes that paragraphs 3.6 through 3.8.2 describes requirements that are similar to an OEM Class "B" Overhaul, however omits the requirements to crate and secure the purifier assembly removed and provide prepaid shipping to from the Original Equipment Manufacturer (OEM) repair facility.
| Is it the Customers intent to have OEM Class "B" Overhaul accomplished on No. 2 Lube Oil Purifier Assembly? | Yes, the overhaul will be accomplished by a contracted OEM | |||
| 234-11-001 | GTM ENGINE 1A / 1B MODULES ENCLOSURE; REPAIR | PARA 3.1. STATES " ACCOMPLISH A 36 MONTH H & J INSPECTION OF EACH GTM SHOCK MOUNT LISTED IN 1.3. AND LOCATED IN 1.2. IN ACCORDANCE WITH ENCLOSURE (ONE) OF 2.2. THIS REF HAS NOT BEEN BE PROVIDED TO CONTRACTOR IN ORDER TO PRICE ACCORDINGLY. |
| Please provide. | SWRMC will accomplish the H & J. Para 3.1 has been removed. Work Item has been updated in Errata 2 via Amendment 0005. | |||
| 234-13-001 | GTM ENGINE 2A / 2B MODULES ENCLOSURE; REPAIR | PARA 3.1. STATES " ACCOMPLISH A 36 MONTH H & J INSPECTION OF EACH GTM SHOCK MOUNT LISTED IN 1.3. AND LOCATED IN 1.2. IN ACCORDANCE WITH ENCLOSURE (ONE) OF 2.2. THIS REF HAS NOT BEEN BE PROVIDED TO CONTRACTOR IN ORDER TO PRICE ACCORDINGLY. |
| Please provide. | SWRMC will accomplish the H & J. Para 3.1 has been removed. Work Item has been updated in Errata 2 via Amendment 0005. | |||
| N/A | SF 33 Block 9 | Contractor has received numerous notifications by mandated tech reps that they will not be able to meet and support the current proposal date of May 30th. The mandated tech reps have replied that if we can not grant them an extension, they will provide us a NO-Bid prior to May 30th. |
The following mandated tech reps (009-90's) have responded to our RFQ's requesting additional time to prepare and submit quotes for this MODPRD:
BF Goodrich, Champion industries of Salem, Collins Machine Works, Eaton Aerospace, Eddy Pump Corp., Hydradyne Hydraulics , Triump/Teleflex, Village Marine Incorporated, Alfa Laval, Oil Gear, Vestdavit, American Metal Bearing, Reliance Electric, Siemans Demag Delaval Turbomachinery, Warren Controls, Aerco International Inc.and Bermingham Controls.
Please consider the following:
1) Please remove the 009-90 requirements for the mandated tech reps that are non responsive so that the contractor can be compliant with the solicitation requirements.
2) Please extend the proposal due date of May 30th to June 16th.
This extension will be necessary for contractor to receive mandated tech reps quotes and incorporate their pricing into our proposal.
| Proposal due date has been extended to 06 June 2019. | ||
| All | As of 05/10/19, there is still a significant amount of missing GFI. |
Due to this missing information contractor request the bid be extend from receipt of all GFI by 2 weeks to allow time to process new information as well as missing information (that will also need to be processed by contractor, subcontractors and material vendors).
Please advise as soon as possible.
Thank you. Proposal due date has been extended to 06 June 2019.
&P of &N
Attachment A
| DISCREPANCIES | PM Notes | |||
| DOCUMENT TYPE | WORK ITEM | DOCUMENT NUMBER | DISCREPANCY DESCRIPTION | |
| NAVSEA Drawing | 110-90-002 | 320-2710391-A | Technical Document Not included on CD. | typo correct IDD DWG is 320-8710391-A Previously provided errata will be submitted. |
| NAVSEA Drawing | 120-11-007 | 101-5919513-AA | Incorrect SBWS Number Assigned | typo SBWS should read 110, drawing number is correct. |
| NAVSEA Drawing | 251-31-003 | 551-5921393-V | Technical Document Not included on CD. | should read Rev U, on CD. |
| Technical Manual | 259-11-002 | S9234-AD-MMO-060 Rev2 | Revision "15" was received. | should read Rev 15, corrected in errata 2 via Amendment 0005. |
| NAVSEA Drawing | 259-11-002 | 259-6013975-E | Technical Document Not included on CD. | should read Rev C, on CD. |
| NAVSEA Drawing | 262-11-001 | 262-6253673-A | Revision "B" was received. | should read Rev B, corrected in errata 2 via Amendment 0005. |
| NAVSEA Drawing | 262-12-001 | 262-6253673-A | Revision "B" was received. | should read Rev B, corrected in errata 2 via Amendment 0005. |
| NAVSEA Drawing | 321-90-001 | 331-8710201 | Incorrect SBWS Number Assigned | SWBS should be 301, drawing number is correct. |
| NAVSEA Drawing | 301-8710203 | Incorrect SBWS Number Assigned | SWBS should be 331, drawing number is correct. | |
| NAVSEA Drawing | 324-11-001 | 32411-3-700-A | Revision "C" was received. | should read Rev C, corrected in errata 2 via Amendment 0005. |
| NAVSEA Drawing | 441-90-007 | 320-8709425-A | Technical Document Not included on CD. | Rev A has been canceled Rev- applies. |
| Technical Manual | 463-80-001 | SE313-T1-MMA-010 Rev1 | Technical Document Not included on CD. | |
| NAVSEA Drawing | 472-90-001 | 512-8709697-A | Technical Document Not included on CD. | provided via Amendment 0005. |
| NAVSEA Drawing | 514-8709698-A | Technical Document Not included on CD. | provided via Amendment 0005 | |
| NAVSEA Drawing | 495-90-001 | 184-8710059-A | Technical Document Not included on CD. | provided via Amendment 0005 |
| Test Procedure | 512-90-003 | 611-H00514 | Possible Typhographical Error | |
| NAVSEA Drawing | 514-11-002 | 512-5921188-M | Revision "P" was received. | should read Rev P, corrected in errata 2 via Amendment 0005. |
| NAVSEA Drawing | 528-90-001 | 634-8710281-A | Technical Document Not included on CD. | provided via Amendment 0005. |
| 4720 GFM | 980-90-006 | 4720-CG65-FY20 Rev31 | Technical Document Not included on CD. | provided via Amendment 0005. |
| 4720 GFM | 4720-CG65-FY20 Rev35 | Technical Document Not included on CD. | provided via Amendment 0005. | |
| 4720 GFM | 4720-CG65-FY20 Rev38 | Technical Document Not included on CD. | provided via Amendment 0005. | |
| 4720 GFM | 4720-CG65-FY20 Rev39 | Technical Document Not included on CD. | provided via Amendment 0005. | |
| 4720 GFM | 4720-CG65-FY20 Rev37 | Technical Document Not included on CD. | provided via Amendment 0005. | |
| 4720 GFM | 4720-CG65-FY20 Rev41 | Technical Document Not included on CD. | provided via Amendment 0005. | |
| 4720 GFM | 980-90-009 | 4720-CG65-FY20 Rev39 | Technical Document Not included on CD. | provided via Amendment 0005. |