S-3_BQ_PPI_VICKSBURG_CG69_QA_2.xlsm

XLSM spreadsheet 495 KB Posted

Attached to
USS VICKSBURG (CG 69) and USS ANZIO (CG 68) Modernization Period (MODPRD) Availabilities SOLICITATION
Solicitation number
N00024-19-R-4446
Issued by

About this file

VICKSBURG Answers to bidder's questions

View the file

Other files

File Type Posted
N00024-19-R-4446_conformed_through_0005.pdf PDF
N00024-19-R-4446_Amendment_0005.pdf PDF
N00024-19-R-4446_0004.pdf PDF
S-3_BQ_PPI_ANZIO_CG68_QA_4.xlsm XLSM spreadsheet
S-3_BQ_PPI_VICKSBURG_CG69_QA_4.xlsm XLSM spreadsheet
S-3_BQ_PPI_ANZIO_CG68_QA_3.xlsm XLSM spreadsheet
N00024-19-R-4446_A0003_conformed.pdf PDF
S-3_BQ_PPI_VICKSBURG_CG69_QA_3.xlsm XLSM spreadsheet
N00024-19-R-4446_A0003.pdf PDF
S-3_BQ_PPI_ANZIO_CG68_QA_2.xlsm XLSM spreadsheet
N00024-19-R-4446_0002.pdf PDF
N00024-19-R-4446_conformed_through_0002.pdf PDF
N00024-19-R-4446_0001.pdf PDF
S-3_BQ_PPI_VICKSBURG_CG69_QA_1.xlsm XLSM spreadsheet
N00024-19-R-4446_conformed_though_0001.pdf PDF
S-3_BQ_PPI_ANZIO_CG68_QA_1.xlsm XLSM spreadsheet
J-14_CG68_ANZIO_Pricing_Spreadsheet.xlsx XLSX spreadsheet
J-4_CG69_VICKSBURG_Pricing_Spreadsheet.xlsx XLSX spreadsheet
J-5_QASP_VIK_ANZ_MODPRDs.docx DOCX document
N00024-19-R-4446.pdf PDF
Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CG69 Q&A

USS VICKSBURG (CG 69) MODPRD Pre-Proposal Information (PPI) Questions
Drawing
GFMSolicitation #:N00024-19-R-4446Phone
RLARTPPCTPPC-CG69-MARMCN19-CN01Justin Lessel, Contract Specialist, justin.d.lessel@navy.mil202-781-4064
Martha Bello, Contracting Officer, martha.bello@navy.mil202-781-3864
The following are answers to questions received from potential offerors. The answers provide clarification only and DO NOT constitute an amendment to the solicitation.
To request references, drawings, RLARs, and Erratas being provided under this Solicitation Question & Answer Set,

please contact the NAVSEA POCs.

Q #Work Item No.Document Number/TitleQuestionGovernment Response
62980-11-015AIT SupportParagraph 3.24 of this item directs contractor to accomplish the requirements of 2.21 through 2.75. This is all Electrical work, which we believe is being preformed by an AIT. The same support item on Anzio 980-11-015 is written for the contractor to remove equipment listed on attachment 1 and to install equipment listed on attachment 2, contractor providing rigging and crane service, AIT accomplishing disconnects and installation, along with nomal support required for AIT's. Please review Vicksburg's 980-11-015 we believe it should be written similar to Anzio's item 980-11-015.Amendment 0002 revised this Work item via Errata 2.
63438-90-002ShipAlt CG47-73856.03K, Integrated Ship Controls(SPLITALT); accomplishIn para 3.1 the contractor is required to accomplish the requirements of 2.2 thru 2.21. The RLARs that are invoked as references in 2.13 thru 2.17, 2.19, 2.20, 2.21 are not related to the references 2.2 thru 2.12 that the contractor is required to accomplish. There is no note in para 4 that indicates an AIT performing electrical work on this item. It is requested that these references be removed from para 3.1. Please confirm that the AIT will accomplish these RLARs as well as the drawings that they are referring to. The contractor does not have these drawings and therefore cannot accomplish these requirements.Amendment 0002 revised this Work item via Errata 2.
64Attachment J-3Vicksburg MilestonesCRS tab shows SOA date of 9/9/19, however the start date is 9/30/19. Please clarify.See response to Question 1.
65042-11-002Physical SecurityParagraph 3.1.1 has the contractor providing security for 545 days. Please confirm security will only be required during the vessels performance period at contractors facility.Security will only be required during the vessels performance period at contractors facility.
66245-11-001Controllable Reversible Pitch No 1 Hydraulic SystemPara 3.2 states to disconnect equipment listed in 1.3. Para 1.3.2 identifies a system and not equipment. Further, para 3.8 & 3.10 states to test and reinstall equipment in 1.3.2. Nothing is identified in 1.3.2. Please review this spec and specify work required.Amendment 0002 revised this Work item via Errata 2. Identification has been changed to "Controllable Pitch Propeller."
67245-11-002Controllable Reversible Pitch No 2 Hydraulic SystemPara 3.2 , 3.3, 3.7 states to disconnect and connect and assemble equipment listed in 1.3. Para 1.3.3 identifies a system and not equipment. Further, para 3.14 & 3.16 states to test and reassemble & install equipment in 1.3.3 Nothing is identified in 1.3.3. Please review this spec and specify work required.Amendment 0002 revised this Work item via Errata 2. Identification has been changed to "Controllable Pitch Propeller."
68331-11-001Gas Turbine Generator No 1 Intake & ExhaustPara 3.1 requires 009-90 for a joint inspection and Government oversight with the OEM technical designated representative. Please confirm the Government will provide this representative. If this is not the case, and the contractor is to provide the rep, please provide a POCAmendment 0002 revised this Work item to remove 009-90 via Errata 2. Government will provide Representative.
69331-11-001Gas Turbine Generator No 1 Intake & ExhaustPara 3.13 states to accomplish 009-11 for installation of new insulation, lagging and removable pads for those missing and unserviceable. For estimating purposes, please provide how much insulation, lagging and removable pads are to be priced.Amendment 0002 revised this Work item via Errata 2.
70331-11-001Gas Turbine Generator No 1 Intake & ExhaustPara 3.6.2.2 states to remove existing and install new flange fasteners as directed by the supervisor. For estimating purposes, provide a number of fasteners the contractor is to price.Amendment 0002 revised this Work item via Errata 2.
71331-11-001Gas Turbine Generator No 1 Intake & ExhaustPara 3.17 list 120 gallons of lube oil to remove and install. It references 2.6 which is a drawing for insulation and lagging. This appears to be a mistake and we recommend the Lube Oil listed in 3.17 be deleted. Further, the reference numbers listed in for all the material in 3.17 doesn't make any sense. Its unclear what exactly the contractor is to renew. Please review para 3.17 and provide exactly what the contractor is to replace.Amendment 0002 revised this Work item via Errata 2. . Paragraph 3.17 table changed to 2.7. Table 1-3 of 2.7 identifies oil - "Oil ..... MIL-L-23699"
72331-11-002Gas Turbine Generator No 2 Intake & ExhaustPara 3.1 requires 009-90 for a joint inspection and Government oversight with the OEM technical designated representative. Please confirm the Government will provide this representative. If this is not the case, and the contractor is to provide the rep, please provide a POCAmendment 0002 revised this Work item to remove 009-90 via Errata 2. Government will provide Representative
73331-11-002Gas Turbine Generator No 2 Intake & ExhaustPara 3.13 states to accomplish 009-11 for installation of new insulation, lagging and removable pads for those missing and unserviceable. For estimating purposes, please provide how much insulation, lagging and removable pads are to be priced.Amendment 0002 revised this Work item via Errata 2.
74331-11-002Gas Turbine Generator No 2 Intake & ExhaustPara 3.6.2.2 states to remove existing and install new flange fasteners as directed by the supervisor. For estimating purposes, provide a number of fasteners the contractor is to price.Amendment 0002 revised this Work item via Errata 2.
75331-11-002Gas Turbine Generator No 2 Intake & ExhaustPara 3.15 list 120 gallons of lube oil to remove and install. It references 2.6 which is a drawing for insulation and lagging. This appears to be a mistake and we recommend the Lube Oil listed in 3.15 be deleted. Further, the reference numbers listed in for all the material in 3.15 doesn't make any sense. Its unclear what exactly the contractor is to renew. Please review para 3.15 and provide exactly what the contractor is to replace.Amendment 0002 revised this Work item via Errata 2.
76331-11-003Gas Turbine Generator No. 3 Eng RestPara 3.1 requires 009-90 for a joint inspection and Government oversight with the OEM technical designated representative. Please confirm the Government will provide this representative. If this is not the case, and the contractor is to provide the rep, please provide a POCAmendment 0002 revised this Work item to remove 009-90 via Errata 2. Government will provide Representative
77331-11-003Gas Turbine Generator No. 3 Eng RestPara 3.10 list 80 gallons of lube oil to remove and install. This appears to be a mistake and we recommend the Lube Oil listed in 3.10 be deleted. Further, the reference numbers listed in for all the material in 3.10 doesn't make any sense. Its unclear what exactly the contractor is to renew. Please review para 3.10 and provide exactly what the contractor is to replace.Reference 2.6 listed in table for 3.10 is correct. Amendment 0002 revised this Work item via Errata 2. Table 1-3 of 2.6 identifies oil - "Oil ..... MIL-L-23699"
78541-11-001Fuel Oil Fill SystemParagraph 3.18, "states to remove existing and install new the equipment listed in 1.3.14" it also states "See 5.1.6 and 5.1.7" there is no 5.1.6 and 5.1.7. Please confirm the material listed in 1.3.14 is GFM?Paragraph 3.18 modified to remove (See 5.1.6 and 5.1.7) via ERRATA 1. See Amendment 0001.
79514-11-002Fan Coil Assembly (FCA), Fan Coil Unit(FCU) Main Deck and Below; repairItem 514-11-002, paragraph 3.1 states" electrically and mechanically reconnect equipment listed in paragraph 1.3.22 at location listed in paragraph 1.2". Paragraph 1.3.22 has listed 193 fan coil unites to be installed, but paragraph 1.2 only has 94 locations listed. Please advise contractor how many fan coil units to be reconnected.Amendment 0002 revised this Work item via Errata 2. . Paragraph 1.3.22 fan coil units reduced to a qty of 60 (ea). Reference Paragraph 2.17 added (Table 2-5 of S9CG0-CC-SIB-080/CG69 Vol.3 Rev.2), to identify locations of fan coil units.
80514-11-002Fan Coil Assembly (FCA), Fan Coil Unit(FCU) Main Deck and Below; repairItem 514-11-002, paragraph 3.1.4 & 3.1.5 state 50 indicating lights and 50 fuses to be replaced. If you go to paragraph 3.2 which also states replace 50 indicating lights and 50 fuses. Is it the governments intent to replace 100 each indicating lights and 100 fuses? Please clarify.Amendment 0002 revised this Work item via Errata 2. 50 fuses and 50 indicating lights deleted from paragraph 3.2.
81Missing or incorrect Rev'sThe below listed references have not been provided to date, the ones with Revision A in yellow are the ones that have Rev - provided, but the items call for Rev A, please provide correct drawings.

641-11-001, para 2.11, drawing 634-8737649, revision A 641-11-001, para 2.13, drawing 637-8737651, revision A 641-11-001, para 2.16, drawing 512-8737640, revision A 641-11-001, para 2.17, drawing 528-8737641, revision A 641-11-001, para 2.18, drawing 528-8737642, revision A 641-11-001, para 2.19, drawing 533.8737643, revision A 642-11-001, para 2.25, drawing 634-8737617 456-90-006, para 2.33, RLAR 87024.03/CG69/P412 456-90-009, para 2.22, RLAR 85077.03/CG69/P368

Amendment 0002 revised Work Item 641-11-001 via Errata 2; provided Rev A for Work Item 642-11-001; provided RLARs for Work Items 456-90-006 and 456-90-009.
82524-11-001Sea Water Service System Repair; accomplishPlease confirm that paragraph 3.15 is dealing with a total 52' of piping, not 104'Amendment 0002 revised this Work item via Errata 2. The work item states 52 feet.
83321-11-001Shore Power Station and Cabling; repairParagraph 3.3.1 directs Contractor to reinstall motor controllers; however, there are no motor controllers involved in this work item. Please advise.Amendment 0002 revised this Work item to delete Paragraph 3.3.1 via Errata 2.
84331-11-005Lighting and Electrical; repairParagraph 3.2.1 is to submit a report listing results of the requirements of 3.3 instead of 3.2. Please review and revise.Amendment 0002 revised this Work item via Errata 2.
85331-11-006General Electric Repairs; accomplishParagraph 1.3.18 shows the location of equipment is in 1.2.7; however, there is not a paragraph 1.2.7 in this item. Please review and revise.Amendment 0002 revised this Work item via Errata 2.
86430-90-001ShipAlt CG47-87106.03K, Interior Voice Communication System

(IVCS) and Digital Integrated Announcing System (DIAS) Upgrade

(SPLITALT); accomplishAll paragraphs are reference paragraphs 2.-. Please review and revise.See Amendment 0001, Errata 1 for this revised work item.
87074-11-001Structural Ultrasonic Impact Treatment (UIT) and G67
SamplingParagraph 3.1 directs the Contractor to "accomplish the requirements of 009-09 of 2.1 for accomplishing
welding and ultrasonic impact treatment for the following ship alterations, then list 23 items. There are 23 additional items not listed but have this note in the item, "Work item in conjunction with work item 074-11-001 for welding requirement of PCP, UIT and G67 sampling." Will items 110-90-004, 438-90-002, 441-90-001, 441-90-002, 441-90-003, 441-90-004, 441-90-006, 443-90-001, 456-90-005, 456-90-009, 466-90-002, 482-90-001, 517-90-001, 571-90-002, 593-90-001, 641-11-001, 642-11-001, 643-11-001, 643-11-002, 645-90-001, 671-90-001, 980-11-015 and 980-11-025 be added to paragraph 3.1 of item 074-11-001?Amendment 0002 revised this Work item via Errata 2.
88980-11-025ShipAlt CG47-74392.03K, 77614.03K, 78510.03K, 78818.03K,

78972.03K, 79256.03K, 82635.03K, 83623K, 85077.03K, 87024.03K, 87106.03K, 87438.03K, and 89226K, Combat Systems, Alteration Installation Team (AIT)

Support Service; providePlease provide reference 2.118, drawing 304-8708755, Ship Alt CG47-87106.03K IVCS UPGRADE MOD TO
CABLEWAYS AND CABLE ROUTING LIST.Amendment 0002 revised this Work item via Errata 2. Drawing 304-8708755 has been deleted from work item.
89430-90-001ShipAlt CG47-87106.03K, Interior Voice Communication System (IVCS) and DigitalAll of the paragraphs that contain a reference number only contain a dash after the 2. Please provide the correct reference numbers.See Amendment 0001, Errata 1 for this revised work item.
90721-31-0037211/015, Maintenance Requirement Card R-4, R-10, A-1, 144M-1, 72M-1, A-8R, 24M-1R, PM-1, SU-1, SU-2, SU-3 and OT-01Please provide reference 7211/015, Maintenance Requirement Card R-4, R-10, A-1, 144M-1, 72M-1, A-8R, 24M-1R, PM-1, SU-1, SU-2, SU-3 and OT-01.Reference 7211/015 has been provided in Amendment 0002.
91641-11-001634-8737649Please provide Rev. A per the spec. item; currently have Rev. -Amendment 0002 revised this Work item via Errata 2.
92641-11-001637-8737651Please provide Rev. A per the spec. item; currently have Rev. -Amendment 0002 revised this Work item via Errata 2.
93641-11-001512-8737640Please provide Rev. A per the spec. item; currently have Rev. -Amendment 0002 revised this Work item via Errata 2.
94641-11-001528-8737641Please provide Rev. A per the spec. item; currently have Rev. -Amendment 0002 revised this Work item via Errata 2.
95641-11-001528-8737642Please provide Rev. A per the spec. item; currently have Rev. -Amendment 0002 revised this Work item via Errata 2.
96641-11-001533.8737643Please provide Rev. A per the spec. item; currently have Rev. -Amendment 0002 revised this Work item via Errata 2.
97641-11-001OHABCG69P410Please provide drawing OHABCG69P410.Drawing OHABCG69P410 provided in Amendment 0002.
98641-11-001OHABCG69P454Please provide drawing OHABCG69P454.Drawing OHABCG69P454 provided in Amendment 0002.
99324-80-001CG477 Class AER 76101D Replace Dossert Lug Connectors; accomplishItem only provides Reference 2.2 - Guidance Inspection and Tech Procedure. All other references are Mil Stds. Paragraph 3.1 requires accomplishment of the inspection procedure Ref 2.2, and paragraph 3.1.1 requires to submit a report of the inspection results. Since there is no information in the work item to form a basis for an estimate, is the intention of this work item to accomplish the inspection procedure and submit a detailed report? Is it the intent to grow the item to accomplish the replacement of Dossert Lug connections found and identified after the accomplishment of Ref 2.2?The intention is to accomplish the inspection, and the report submitted by the contractor will determine further action.
100586-11-002Horizontal Reference System; repairContractor requests new equipment listed in paragraphs 1.3.1.1 & 1.3.1.2 be provided as GFM due to the high cost and long lead time.Paragraphs 1.3.1.1 & 1.3.1.2 to be provided as CFM. Amendment 0002 revised this Work item via Errata 2.
101980-11-015Messing and Berthing Barge Electric Temporary Service in Contractor Plant; provide (OPTION ITEM).Please provide drawing number 331-8709048.Drawing 331-8709048 provided in Amendment 0002.
102481-90-003ShipAlt CG47-78818.03K, Mark 34 Mod 6 Gun Weapons System (GWS) MOD TI12 ABC12 Hardware Upgrade(SPLITALT); accomplishPlease provide drawing number 183-8735792.Drawing 183-8735792 provided in Amendment 0002.
103481-90-003ShipAlt CG47-78818.03K, Mark 34 Mod 6 Gun Weapons System (GWS) MOD TI12 ABC12 Hardware Upgrade(SPLITALT); accomplishPlease provide drawing number 183-8735801.Drawing 183-8735801 provided in Amendment 0002.
104481-90-003ShipAlt CG47-78818.03K, Mark 34 Mod 6 Gun Weapons System (GWS) MOD TI12 ABC12 Hardware Upgrade(SPLITALT); accomplishPlease provide drawing number 183-8735802.Drawing 183-8735802 provided in Amendment 0002.
114561-11-001Steering Gear System; repairParagraph 3.2 - 3.2.5 and 3.9 - 3.9.3 states to flush the steering gear system using muslin bags at 180 degrees. Note normal flushing temperature required to meet a 4000 reynolds number is 130 - 160 degrees if correct GPM pump is used. Will a PCP be accepted using 3 micron Filter elements vise muslin bags at a temperature that meets a 4000 reynolds number?Amendment 0002 revised this Work item via Errata 2.
115524-22-001Fuel Oil Transfer SystemParagraph 3.7 calls for "10 days of labor". Please confirm that the expectation is for 10 mandays of labor.Amendment 0002 revised this Work item via Errata 2.
116150-90-008ShipAlt CG47-83503.07K, Superstructure Fatigue and Sensitization Modifications (FWD); accomplishReference 2.3 provided is Rev -, Rev A is call in the specification. Please provide correct drawing.Amendment 0002 revised this Work item via Errata 2. Rev A is not available, therefore Reference 2.3 has been changed to Rev - .
117991-12-001Temporary ScaffoldingConfirm that staging requirements of the item will be covered under Level of Effort in paragraph 3.3. If not, provide details on amount of staging, location and duration.See Amendment 0001, Errata 1 for this revised work item.

&P of &N