VICKSBURG CG 69 Bidder's QA1
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N00024-19-R-4446_conformed_through_0005.pdf | ||
| N00024-19-R-4446_Amendment_0005.pdf | ||
| N00024-19-R-4446_0004.pdf | ||
| S-3_BQ_PPI_ANZIO_CG68_QA_4.xlsm | XLSM spreadsheet | |
| S-3_BQ_PPI_VICKSBURG_CG69_QA_4.xlsm | XLSM spreadsheet | |
| S-3_BQ_PPI_ANZIO_CG68_QA_3.xlsm | XLSM spreadsheet | |
| N00024-19-R-4446_A0003_conformed.pdf | ||
| S-3_BQ_PPI_VICKSBURG_CG69_QA_3.xlsm | XLSM spreadsheet | |
| N00024-19-R-4446_A0003.pdf | ||
| S-3_BQ_PPI_ANZIO_CG68_QA_2.xlsm | XLSM spreadsheet | |
| N00024-19-R-4446_0002.pdf | ||
| S-3_BQ_PPI_VICKSBURG_CG69_QA_2.xlsm | XLSM spreadsheet | |
| N00024-19-R-4446_conformed_through_0002.pdf | ||
| N00024-19-R-4446_0001.pdf | ||
| N00024-19-R-4446_conformed_though_0001.pdf | ||
| S-3_BQ_PPI_ANZIO_CG68_QA_1.xlsm | XLSM spreadsheet | |
| J-14_CG68_ANZIO_Pricing_Spreadsheet.xlsx | XLSX spreadsheet | |
| J-4_CG69_VICKSBURG_Pricing_Spreadsheet.xlsx | XLSX spreadsheet | |
| J-5_QASP_VIK_ANZ_MODPRDs.docx | DOCX document | |
| N00024-19-R-4446.pdf |
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CG69 Q&A
| USS VICKSBURG (CG 69) MODPRD Pre-Proposal Information (PPI) Questions | |||||
| Drawing | |||||
| GFM | Solicitation #: | N00024-19-R-4446 | Phone | ||
| RLAR | TPPC | TPPC-CG69-MARMCN19-CN01 | Justin Lessel, Contract Specialist, justin.d.lessel@navy.mil | 202-781-4064 | |
| Martha Bello, Contracting Officer, martha.bello@navy.mil | 202-781-3864 | ||||
| The following are answers to questions received from potential offerors. The answers provide clarification only and DO NOT constitute an amendment to the solicitation. | |||||
| To request references, drawings, RLARs, and Erratas being provided under this Solicitation Question & Answer Set, |
please contact the NAVSEA POCs.
| Q # | Work Item No. | Document Number/Title | Question | Government Response |
| 1 | J-3 | J-3 | Attachment “VICKSBURG MODPRD Milestones” includes a tab labeled CSR – Combat Systems (CS) Turnovers. The tab shows SOA as 9/9/2019; however, the milestones show SOA as 09/30/2019. Please review and advise. | Attachment J-3 has been revised in Amendment 0001 to reflect SOA 9/30/2019 in all locations, to include CRS tab. |
| 2 | RFP | RFP, pgs 146-148 | The solicitation, pages 146-148 show the end date for the VICKSBURG as 03/28/2021; however, the milestones show EOA as 04/02/2021. Please review and advise. | Amendment 0001 revised RFP pgs. 146-148 to reflect 04/02/2021 avail complete date. |
| 3 | J-14 | J-14 | The milestone attachment for both the ANZIO and VICKSBURG list a 10% COMPLETE milestone. What items or activities should be tied to this milestone? | Attachment J-3 has been revised in Amendment 0001 to remove 10% complete milestone. |
| 4 | 430-90-001 | ShipAlt CG47-87106.03K, Interior Voice Communication System (IVCS) and Digital Integrated Announcing System (DIAS) Upgrade (SPLITALT); accomplish | The subject item has no reference paragraphs in the body of the item. They are all shown as 2.- Please correct this to indicate proper references. | The Work Item has been revised and 2 RLARS (PER PMR) added via Errata 1. |
| 5 | 456-90-005 | ShipAlt CG47-78510.03K, AWS: ACB12/TI12 CIC Display Upgrades (SPLITALT); accomplish | Para 3.1.4 requires the contractor to prepare surfaces for bonding & grounding IAW 2.46. Ref 2.46 is MIL-STD -1310, for EMP mitigation. In para 4.1 the AIT will accomplish ALL electrical installations. It will be necessary to know what surface preparation is required by the contractor during installation IOT comply with this requirement. Please clarify the paint system and SSPC spec. | IAW SSPC specs, the paint system should be completed in the fabrication process of foundations |
| 6 | 456-90-005 | ShipAlt CG47-78510.03K, AWS: ACB12/TI12 CIC Display Upgrades (SPLITALT); accomplish | Para 3.1 requires the contractor to accomplish the requirements of reference 2.2 thru 2.42. Reference 2.28 are electrical in nature. Para 4.1 states that an AIT will accomplish ALL electrical work. Please confirm that references 2.28, 2.30, 2.31, 2.32, 2.2.33, 2.34, 2.35 & 3.42 will be accomplished by others. | The AIT will complete all electrical installations. The following references - 2.28, 2.30 through 2.35 and 3.42, (which are updates to kitted material), will be received and completed by AIT. |
| 7 | 430-90-001 | ShipAlt CG47-87106.03K, Interior Voice Communication System (IVCS) and Digital Integrated Announcing System (DIAS) Upgrade (SPLITALT); accomplish | This work item was not complete when published, please review and reissue. Example “Accomplish the requirement of 2. - through 2.-, using 2.-“ | The Work Item has been revised and 2 RLARS (PER PMR) added via Errata 1. |
| 16 | 992-11-004 | Ship Towing Service, Long Range; provide (OPTION ITEM) | This item is typically for the out of port bidders. Please confirm Norfolk does not price this item. | Attachment J-4 has been revised to stated, "TO BE PRICED BY OUT OF HOMEPORT BIDDERS ONLY" |
| 17 | 992-11-006 | Messing and Berthing Barge Tow Service; provide (OPTION ITEM) | This item is typically for the out of port bidders. Please confirm Norfolk does not price this item. | Attachment J-4 has been revised to stated, "TO BE PRICED BY OUT OF HOMEPORT BIDDERS ONLY" |
| 18 | 992-11-009 | Messing and Berthing Barge, Temporary Service, Inspection and Repair in Contractor Plant, Steam Barge; accomplish (OPTION ITEM) | This item is typically for the out of port bidders. Please confirm Norfolk does not price this item. | Attachment J-4 has been revised to stated, "TO BE PRICED BY OUT OF HOMEPORT BIDDERS ONLY" |
| 19 | 992-11-011 | Messing and Berthing Barge, Temporary Service, Inspection and Repair in Contractor Plant, Electric Barge; accomplish (OPTION ITEM) | This item is typically for the out of port bidders. Please confirm Norfolk does not price this item. | Attachment J-4 has been revised to stated, "TO BE PRICED BY OUT OF HOMEPORT BIDDERS ONLY" |
| 20 | 992-11-014 | Messing and Berthing Barge Tow Service (Long Distance); provide (OPTION ITEM) | This item is typically for the out of port bidders. Please confirm Norfolk does not price this item. | Attachment J-4 has been revised to stated, "TO BE PRICED BY OUT OF HOMEPORT BIDDERS ONLY" |
| 21 | 593-31-001 | Plastic Waste Processing Units; repair | Contractor requests the Government identify the OEM Technical Representative required to accomplish work item. | Reference 2.2, Table 7-1 list original equipment manufacturers. |
| 22 | 593-31-002 | Solid Waste Shredder; repair | Contractor requests the Government identify the OEM Technical Representative required to accomplish work item. | Reference 2.2, Table 7-1 list original equipment manufacturers. |
| 23 | 593-31-003 | Solid Waste Pulper; repair | Contractor requests the Government identify the OEM Technical Representative required to accomplish work item. | Reference 2.2, Table 7-1 list original equipment manufacturers. |
| 24 | 980-11-017 | CG47 OA 89300 MK 41 VLS CG AMOD HW UPG, OA 74435 MK 41 VLS CRN and ELV RMVL, and OA 79353 MK 41 VLS Uptake EXT Plemum ST2 Installation, Alteration Installation Team (AIT) Support Service; provide | Paragraph 3.14 states to accomplish preservation and paragraph 3.14.1 states to "submit one copy, in hard copy or approved transferrable media of a report to the SUPERVISOR listing each discrepancy." What discrepancies are to be listed and reported? | Paragraph 3.14.1 of this Work Item has been deleted in Amendment 0001 via Errata 1. |
| 25 | 120-11-009 | Structural Repair and Preservation (Towed Array Room); accomplish | What is the location of the replacement material in paragraph 3.3? Should it contain 1.2.3? | Amendment 0001 has revised this Work item via Errata 1 to read, "Remove existing and install new a total of 6 linear ft of defective 10 X 4 X 11.77 pound tee, at location listed in 1.2.3, using 2.2 for guidance." |
| 26 | 120-11-010 | Structural Repair and Preservation (SONAR Trunk / Eductor Room); accomplish | Is it the intent of paragraph 3.12 to preserve the entire space in 1.2 or just the repaired and disturbed. | The intent of the paragraph is to preserve the entire space. |
| 27 | 992-11-006 | Messing & Berthing Barge | Paragraph 3.1 list TBD as location of Barge to be Towed, for estimating purposes, please provide location of barge. | The barge is located in Norfolk, Va. |
| 28 | 991-12-001 | Temporary Scaffolding | There is no specific location of work listed in this item, please confirm this item is 100% Level of Effort. | This Work item is 100% LOE. |
| 29 | 234-11-002 | Gas Turbine Main (GTM) Engine 1A and 1B Intake; repair | In para 3.5.4 there is no identification or part number for the linear actuator to be replaced. Please indicate part number or Tech Manual piece number for new linear actuator. Also in para 3.6.7 reference 2.2 does not give enough information to order the securing pin lanyards and the location of the 2 ground strap studs. in para 3.8.3 It is not clearly shown in ref 2.13 the material type/grade for the padeye fabrication. Is this piece no 115 of section 31-C? Please clarify this material type/grade. | PARA 3.5.4 -The part no. is AD35540-2 (NSN 3040-01-518-2879) which is in Tech Manual S9251-BQ-MMA-010 Table 7-9, piece 21. PARA 3.6.7 - The lanyards are part of the Pin Assembly which is part no. AD38136-3 which is in Tech Manual S9251-BQ-MMA-010 Table 7-1, piece 26. PARA 3.8.3 - Reference 2.13 contains all information needed for padeye fabrication. Specifically Elevation 29-C clearly gives all dimensions and refers you to the material type which is Item No. 115 on the material list ( 20.4# plate, OSS, Mil-S-22698, Grade A Class U) |
| 30 | 980-90-034 | ShipAlt CG69/EDA19 | This work item list two references for the contractor to accomplish the requirement of. Reference 2.2 is an Arrangement drawing, the work is accomplished under the individual ShipAlts in the package. Reference 2.3 is the Weather Deck Covering drawing, which is called out to be accomplished in the individual ShipAlt work items. Please confirm that this item is for information only? If not, please provide more guidance as to the scope to be accomplished. | The references listed are outside the scope of the individual ShipAlts in the package and need to be accomplished in conjunction with them. |
| 31 | 168-12-001 | Watertight Doors | Paragraphs 3.3 & 3.4, state to install material listed in paragraphs 5.1.33 & 5.1.34. there is no paragraph 5.1.33 & 5.1.34, please review. | Amendment 0001 revised this Work item via Errata 1. |
| 32 | 583-11-001 | Boat Davit; repair | Paragraph 1.3 identifies the boat davits as Lake Shore however reference 2.2 - 2.5 list different manufactures and the material called out for renewal is from (4) different Tech Manuals. What is the correct manufacture and which is the correct Tech Manual? | The correct Tech. Manual is S9583-BX-MMO-010 and VestDavit is listed as the Manufacturer. |
| 33 | 581-11-001 | Anchor Windlass | Paragraph 1.3.1 shows Northrop Grumman as the OEM. Can the Government provide a POC for Tech Rep required per paragraph 3.1? Or will a qualified Hydraulic Company with experience with this system be accepted per 009-90? | A qualified Hydraulic Company is acceptable. |
| 34 | 581-11-001 | Anchor Windlass; repair | Paragraph 3.15 calls out to flush and renew oil in reduction gear, speed control and hydraulic system. Note gear cases and tanks are not normally flushed. Is the intent to perform a HOT OIL Flush on the hydraulic system or just renew fluids in system? | Reference 2.9 does not state to perform a hot oil flush. The references states to flush system by renewing system fluids. |
| 36 | 450-90-001 | ShipAlt CG47-78252K, Firefighting Access Fitting Installation Mod; accomplish | Reference 2.2 should be 555-8708788 Rev A however when you open the file it contains Drawing 651-8708786. Please issue the correct drawing 555-8708786 Rev A. | Drawing 555-8708788 Rev A has been provided. |
| 37 | 980-11-025 | AIT Support | Paragraph 3.26 of this item directs contractor to accomplish the requirements of 2.12 through 2.127. This is all Electrical work, which we believe is being preformed by an AIT. The same support item on Anzio 980-11-025 is written for the contractor to remove equipment listed on attachment 1 and to install equipment listed on attachment 2, contractor providing rigging and crane service, AIT accomplishing disconnects and installation, along with nomal support required for AIT's. Please review Vicksburg's 980-11-025 we believe is should be written similar to Anzio's item 980-11-025. | Amendment 0001 revised this Work item via Errata 1. |
| 38 | 991-12-001 | Temporary Scaffolding for Ship's Force Use; provide | In the past this item has always provided location, duration and if containment is needed. Please provide this information, without it paragraphs 3.1 through 3.2 cannot be priced. | Amendment 0001 revised this Work item via Errata 1. The duration is 60 days and Paragraph 3.3 was changed to 45 mandays and $20,000 in material. |
| 39 | 991-12-001 | Temporary Scaffolding for Ship's Force Use; provide | Is it the intent for paragraph 3.3 to cover the requirements of paragraphs 3.1 through 3.2? | Yes. See response to Question 38. |
| 40 | 120-11-009 | Structural Repair and Preservation (Towed Array Room); accomplish | What is the location of the replacement material (6 LF of T-Bar) in paragraph 3.3? Should the location be 1.3? | See response to Question #25 |
| 41 | 123-11-006 | Fuel Oil Storage Tank; preserve | In reference to paragraphs 3.6 & 3.6.1, please confirm the Government wants to color code pipes and hand wheels in the tanks listed in paragraph 1.2. Color coding pipe in a tank is not a normal practice. Please advise. | Amendment 0001 revised this Work Item via Errata 1. Paragraphs 3.6 and 3.6.1 have been deleted. |
| 42 | 123-10-001 |
(123-17-001
| 123-17-002) | Tanks and Voids Open, Pump, Clean and Gas Free; accomplish | The location 1.2.2 (3-434-1-W) of item 123-17-001 & 123-17-002 is not listed in item 123-10-001 (gas free of tanks). Please add 3-434-1-Q to item 123-10-001. | Amendment 0001 revised this Work Item via Errata 1. 3-434-1-W has been added to WI 123-10-001. | |||
| 43 | 123-21-001 | Accessible Void Repair and Preservation; accomplish | Contractor recommends removing paragraphs 3.7 and 3.7.1 from item 123-21-001. There are no hand wheels in the tanks and voids and there is no piping references provided to ID systems. | Amendment 0001 revised this Work Item via Errata 1. Paragraphs 3.7 and 3.7.1 have been deleted. | ||
| 44 | 123-90-001 | ShipAlt CG47-83059K, Fuel Oil Tanks 6-94-1-F and 6-94-2-F Cracks Structural Mod; accomplish | Reference 2.2 (8529702 Rev A) called out in paragraph 3.1 is not listed in the Ship Applicability Tables. Please clarify if Revision A applies to CG 69 because Revision A was released for CG 73. | Revision A applies to CG 69. | ||
| 45 | 150-90-001 | ShipAlt CG47-83265.03K Removal of Catwalk Fwd / Stbd 03 Level; accomplish | Please verify if paragraph 3.5 for 009-32 Table 2, Line 39 is in accordance with 2.1 (FY-19) or FY-20. FY-19 would be fluidized powder coating. FY-20 would be a blast and decking not in way of non-skid. | All work items in this package are written under FY-19 Change 1. The correct table and line are listed; it calls for a blast and coat system, not fluidized powder coating. | ||
| 46 | 165-11-001 | Sonar Dome Rubber Window (SDRW) Inspection; accomplish | Please clarify paragraph 3.13, Table 5, Line 31 for the Upper Scuttle. In both FY-19 and FY-20 009-32 Table 5, Line 31 is fluidized bed powder coating. Is it the intent to remove the scuttle for preservation? | All work items in this package are written under FY-19 Change 1. Amendment 0001 has revised this Work Item via Errata 1. Paragraph 3.13 has been modified to state Table 5 Line 3 for the scuttle. | ||
| 47 | 243-11-002 | Main Propulsion Shaft and Rudder Locking Device; remove | Would the Government consider changing paragraph 3.5.5 preservation from 009-32 Table 2, Line 61 from fluidized bed powder coating, to Table 5, line 31 or 32 for normal powder coating? Paragraph 3.6.3 and 3.7.2 call out Table 5, Line 31 for normal powder coating; it would be more productive to keep all the material together. |
Fluidized bed has to go to Canada to be accomplished and normal powder coating will be done locally. Automatic Coatings LTD has a minimum square footage they will tool up for and the process cannot accomplish the statement in 3.5.5 to preserve just the outside of the blow in doors.
| No change has been made. 009-32 is for new and disturbed in this work item . | ||||||
| 48 | 259-11-002 | Gas Turbine Main (GTM) Exhaust and Mixing Tubes, Port (FWD); repair | Please review and clarify the surface prep in 3.1.1 for aluminum access plates and covers. Table 3, Line 27, Column A is a SSCP-SP-11 for steel surfaces. Contractor recommends Table 3, Line 49, Column A if the intent is to remove the preservation. | Amendment 0001 revised this Work Item via Errata 1. Paragraph 3.1.1 has been changed to Table 3 Line 20 for steel and Table 3 Line 49 for aluminum. | ||
| 49 | 450-90-001 | ShipAlt CG47-78252K, Firefighting Access Fitting Installation Mod; accomplish | Reference 2.2, 8708788 provided on the CD opens as 8708786. Please provide 8708788. | See response to question #36. | ||
| 50 | 452-90-003 | ShipAlt CG47-87310.03K, Remove AN/SPS-49(V) Radar System; accomplish | Paragraph 3.1 reads "Accomplish the requirements of 2.2 through 2.1, applicable portions of 2.12 using material listed in 2.13 and 5.3.1 and using 2.14 for guidance." Should the 2.1, be 2.11? | Yes Amendment 0001 has revised this Work Item via Errata 1. Paragraph 2.1 has been changed to 2.11. | ||
| 51 | 456-90-003 | ShipAlt CG47-77614.03K ACB12/TI12 OA Computer Upgrade (SPLITALT); accomplish | Paragraph 3.11.1 calls out to accomplish 009-26 attachment C and D (PRC & Matting) for the accomplishment of 2.10. The decking reference is 2.20. Please correct the reference number and reissue work item. | |||
| Amendment 0001 has revised this reference via Errata 1 | ||||||
| 52 | 456-90-005 | ShipAlt CG47-78510.03K, AWS: ACB12/TI12 CIC Display Upgrades (SPLITALT); accomplish | Provide the location reference for 3.14.1, which states to accomplish the requirements of 009-26 including Attachment D (electrical matting). The location or reference is missing. | The locations are the interior spaces with electrical mating that have been disturbed in the process of accomplishing the work item. | ||
| 53 | 456-90-006 | ShipAlt CG47-87024.03K, AN/SQQ-89A(V)15 W/TI-14 HW For CG Mod | ||||
| (SPLITALT); accomplish | Reference 2.26 RLAR 87024.03/CG69/P259 removes the Peel & Stick from 2.16 (Deck covering). Paragraph 3.10.1 is 009-26 attachment G (Peel & Stick) of 2.16. Please remove 3.10.1 from the work item. | The RLAR directs the Offeror to not install peel & stick in the Towed Array Room only. The other requirements of 009-026 need to be met. | ||||
| 54 | N/A | General Arrangement | Please provide General Arrangement drawing for the USS Vicksburg. | The Government provides dwgs on request for specific work items. | ||
| 55 | 123-17-001 | Oily Waste Tank; repair | Paragraph 3.6.1 lists an incorrect and / or incomplete GEMS Model No (45480). Please revise the item to include the complete part number for the penetration cable. | The model no. is complete(45480) and the NSN for that GEMS Model No. Cable is 6150-01-408-7850 | ||
| 56 | 980-11-015 | ShipAlt CG47-71386K, 78435K, 79922K, 80264K, 80696K, |
80897.03K, 80934K, 81322K, 81386.03K, 81798K, 82853K, 83712K, 83883K, 84619K, 84694K, 84924K, 85030K, 86418K, 86539.03K and 88467.03K, C4I, Alteration Installation Team (AIT) Support Service Please provide reference 2.25, drawing 304-8709045. Amendment 0001 has removed drawing 304 8709045 via Errata 1. It is not required for AIT Service Support work item 980-11-015.
| 57 | 517-90-001 | ShipAlt CG47-83219.02K, 83219.03 All Electric Modernization; accomplish | The inspection report for preservation soundness is 3.30.1. Paragraph 3.31 provides direction to use the report submitted in 3.29.1. Please change 3.31 to read report submitted in 3.30.1. | Amendment 0001 has revised this Work Item via Errata 1 |
| 58 | 631-12-001 | Gas Turbine Generator Number 3 Intake; preserve | Paragraph 3.1 is to use sheet 190 of 2.2 for guidance but in fact 1.2.1 (1-443-1-Q) is sheet 198. Please correct. | Amendment 0001 has revised this Work Item via Errata 1 |
| 59 | 633-21-001 | Impressed Current Cathodic Protection (ICCP) System; Repair | Is the intent of paragraph 3.8 to install the capastic shield? Should 3.8 be written, Accomplish the requirements of 009-32 of 2.1 for each capastic shield, using 2.6 for guidance, including Table One, Line 8 or 9? | Amendment 0001 has revised this Work Item via Errata 1. Paragraph 3.8 has bene corrected to Line 8 under. |
| 60 | 634-21-002 | Non-Skid Preservation (Interior); replace | References 2.2 and 2.3 have the same drawing number for the deck covering. Please provide the correct paint schedule number for paragraph 2.2 | Amendment 0001 has added Reference 631-5921949 Rev U, Paint Schedule via Errata 1. |
| 61 | 541-11-001 | Fuel Oil Fill System Repair; accomplish | Is the material identified in paragraph 1.3.14.1 and 1.3.14.2 to be provided as GFM as stated in paragraph 3.18? The material is not listed as GFM in paragraph 5. | Material is CFM. Amendment 0001 has revised this Work Item via Errata 1. Paragraph 3.18 has been modified to delete reference to paragraph 5. |
| 62 | 472-90-001 | LAR/80156/CG69/1750 | Need a copy of LAR/80156/CG69/1750 | Amendment 0001 has provided this via Errata 1 |
| 63 | 980-11-008 | ShipAlt CG47-88635.03K CIWS Block 1B Overhaul and ShipAlt |
CG47-88645K CIWS LCS/RCS Shock Isolator Upgrade Installation, Alteration
| Installation Team (AIT) Support Service; | Paragraph 3.7 reads "Provide one each conex box from 04/15/2019 through 09/27/2019,within close proximity to the ship." Is it the intent of this item to provide a conex box for 166 days prior to the ship's arrival? | Amendment 0001 has revised this Work Item via Errata 1 | ||
| 64 | 980--11-008 | ShipAlt CG47-88635.03K CIWS Block 1B Overhaul and ShipAlt |
CG47-88645K CIWS LCS/RCS Shock Isolator Upgrade Installation, Alteration
| Installation Team (AIT) Support Service; | Paragraph 3.8.1 reads "Office space shall be equipped with NMCI connection 04/15/2019 thru 09/27/2019. Is it the intent of this item to provide office space for 166 days prior to the ship's arrival? | Amendment 0001 has revised this Work Item via Errata 1 | ||||
| 65 | 980-11-002 | AN/SPY-1B Radar Array Resurface Support | Paragraphs 3.3 through 3.3.6 and 3.4 through 3.4.3.1 call out to stage the same locations. In past availabilities, the verbiage in paragraphs 3.4 through 3.4.3.1 is correct. Please delete paragraphs 3.3 through 3.3.6 on this item. | Amendment 0001 has revised this Work Item via Errata 1. Paragraphs 3.3 through 3.3.6 have been deleted. | ||
| 66 | 042-11-002 | Physical Security at Private Contractor's Facility; | Please provide reference 2.3 251702ZJUN15, Safety/Security/CG LSD Modernization Program EXORD be provided? | Due to its classification, this reference can be viewed at MARMC Security, NOB. Please contact Dave Shutter at 757-400-0357 | ||
| 67 | 187-11-001 | Harpoon Launcher Support; preserve | 3.1 Who is the Tec Rep for this item and what will the Tec Rep be accomplishing? | Amendment 0001 has revised this Work Item via Errata 1. 009-90 has been deleted. |
&P of &N