ANZIO CG 68 Bidder's QA1

View the file

Other files

File Type Posted
N00024-19-R-4446_conformed_through_0005.pdf PDF
N00024-19-R-4446_Amendment_0005.pdf PDF
N00024-19-R-4446_0004.pdf PDF
S-3_BQ_PPI_ANZIO_CG68_QA_4.xlsm XLSM spreadsheet
S-3_BQ_PPI_VICKSBURG_CG69_QA_4.xlsm XLSM spreadsheet
S-3_BQ_PPI_ANZIO_CG68_QA_3.xlsm XLSM spreadsheet
N00024-19-R-4446_A0003_conformed.pdf PDF
S-3_BQ_PPI_VICKSBURG_CG69_QA_3.xlsm XLSM spreadsheet
N00024-19-R-4446_A0003.pdf PDF
S-3_BQ_PPI_ANZIO_CG68_QA_2.xlsm XLSM spreadsheet
N00024-19-R-4446_0002.pdf PDF
S-3_BQ_PPI_VICKSBURG_CG69_QA_2.xlsm XLSM spreadsheet
N00024-19-R-4446_conformed_through_0002.pdf PDF
N00024-19-R-4446_0001.pdf PDF
S-3_BQ_PPI_VICKSBURG_CG69_QA_1.xlsm XLSM spreadsheet
N00024-19-R-4446_conformed_though_0001.pdf PDF
J-14_CG68_ANZIO_Pricing_Spreadsheet.xlsx XLSX spreadsheet
J-4_CG69_VICKSBURG_Pricing_Spreadsheet.xlsx XLSX spreadsheet
J-5_QASP_VIK_ANZ_MODPRDs.docx DOCX document
N00024-19-R-4446.pdf PDF
Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CG68 Q&A

USS ANZIO (CG 68) MODPRD Pre-Proposal Information (PPI) Questions
Drawing
GFMSolicitation #:N00024-19-R-4446Phone
RLARTPPCTPPC-CG69-MARMCN20-CN02Justin Lessel, Contract Specialist, justin.d.lessel@navy.mil202-781-4064
Martha Bello, Contracting Officer, martha.bello@navy.mil202-781-3864
The following are answers to questions received from potential offerors. The answers provide clarification only and DO NOT constitute an amendment to the solicitation.
To request references, drawings, RLARs, and Erratas being provided under this Solicitation Question & Answer Set,

please contact the NAVSEA POCs.

Q #Work Item No.Document Number/TitleQuestionGovernment Response
1J-13J-13Attachment “J-13 CG68 ANZIO MODPRD Milestones” includes a tab labeled CSR – Combat Systems (CS) Turnovers. The tab shows SOA as 6/8/2020; however, the milestones show SOA as 09/08/2020. Please review and adviseAttachment J-13 revised in Amendment 0001 to correct Start of Availability on CRS tab.
2multipleJ-14a. 074-11-001 and 074-11-002 listed but Contractor only received 074-11-002

b. 524-11-001 listed but Contractor did not receive

c. 562-11-001 & 562-11-002 listed by Contractor did not receive Attachment J-14 has been updated in Amendment 0001 to remove Work Item 074-11-001, 524-11-001, 562-11-001 & 562-11-002.

3 multiple J-14 The following item are marked as OPTION on the J-14 Pricing Spreadsheet but they are not all labeled as OPTION in the item title on the work specification. Please review and revised as necessary the J-14 and / or work specification.

424-90-001: ShipAlt CG47-86222K, NGF Backfit Phase One; accomplish 493-90-001: ShipAlt CG47-88467.02K, PEOC41 CANES Mod 01; accomplish 493-90-003: ShipAlt CG47-86752.02K, BFTT AEGIS Hardware Build 4.2; accomplish 495-90-001: ShipAlt CG47-84924K, ICOP Infrastructure Installation; accomplish 495-90-002: ShipAlt CG47-89715K SSEE INC F SFF; accomplish 580-90-002: ShipAlt CG47-92593K CG ERM Hardware Installation; accomplish 980-11-009: ShipAlt CG47-77543K, IPDS-LR System, Alteration Installation Team (AIT) Support Service; provide

980-11-020: ShipAlt CG47-77543K, IPDS-LR System, Alteration Installation Team (AIT) Support Service; provideAmendment 0001 revised these Work Items via Errata 1 to add "Option Item" to title.
4J-14J-14The milestone attachment for both the ANZIO and VICKSBURG list a 10% COMPLETE milestone. What items or activities should be tied to this milestone?Attachment J-13 revised in Amendment 0001 to remove 10% complete milestone.
5123-11-0034.22Work spec, pg 2, para 4.2Should paragraph 4.2 read “Work item should be worked in conjunction with 123-11-002?” As written this work items states to work in conjunction with itself.Amendment 0001 revised this Work Item via Errata 1 to change 4.1 to 123-11-002.
6work item indexpara 3.7The index provided with this package shows 009-32 to use the original FY-19 dated 03/07/2017. In 009-32 FY19 table 3, line 25 is a passageway, interior deck system. Is this the correct system for the cross flooding duct? In 009-32 FY19 CH-1 & CH-2 Table 3, Line 25 is interior steel surfaces. Please provide a Table and Line similar to Table 3, Line 10 (or a tank system).Amendment 0001 revised this Work Item via Errata 1 to change paragraph 3.7 to Table 3 Line 10.
7123-11-006Work spec, pg 2, para 3.4Paragraph 3.4 to color code piping inside storage tank and overflow tanks is not a normal process for tank preservation. Please consider removing paragraph 3.4 and 3.4.1 or provide references for piping in each group of tanks.Amendment 0001 revised this Work Item via Errata 1 to remove paragraph 3.4 and 3.4.1.
8123-10-001Work spec, pg 2, para 1.2.29, 1.2.92, 1.2.49 and 1.2.952-E-0-V is listed twice in paragraphs 1.2.29 and 1.2.92. 6-34.0.V is listed twice in paragraphs 1.2.49 and 1.2.95. The Contractor requests the duplicate paragraphs be removed and work specification re-issued.Amendment 0001 revised this Work Item via Errata 1 to remove paragraph 1.2.92 and 1.2.95 from work item
9150-90-008ShipAlt CG47-78449.02K, Aft Intake Trunk Structural Modification; accomplishThe work item for CG47-83506.05K is 150-90-001; paragraph 4.1 states the coordination CG47-83506.05K is 588-21-001. Work item 588-21-001 is a discrepancy repair item. Is paragraph 4.1 incorrect?Amendment 0001 revised this Work Item via Errata 1 to change 4.1 150-90-001
10165-11-001Sonar Dome Rubber Window (SDRW) Inspection; accomplishParagraph 3.11 states 009-32 Table 5, Line 3, 4, and 5 to preserve the coaming assembly and Line 31 for the upper surfaces of the scuttle. Standard Item 009-32 (FY-19(CH-2), Table 5, Line 31 is a powder coat system. Does the Government intend to powder coat the scuttle upper surfaces or did this work item get written using 009-32, FY-20 for Table 5, Line 31, which is power tooling of interior spaces?Use FY19 CH 1
11171-11-001Mast (Forward and Aft) Repair and Preservation; accomplishPlease clarify the platform to be power tooled and inspected in accordance with paragraphs 3.1 & 3.2 for the location in 1.2.1. Paragraph 1.2.1 states 134 feet above the 03 level. Should it read 134 feet above the baseline? The platform at the 134’-0 ABL is forward of frame 260 and the platform at the 107’-0 ABL is aft of frame 260 fitting the location between frames 260-276.Amendment 0001 revised this Work Item via Errata 1 to change paragraph 1.2.1 to read Mainmast (03-260-0-Y), Between Frames 260-276, Platform, 134 Feet Above the baseline.
12456-90-005ShipAlt CG47-78510.03K, AWS: ACB12/TI12 CIC Display Upgrades (SPLITALT); accomplishThe Table 2 and Line 39 (009-32 FY-19-CH-2) called out in paragraph 3.13 is for fluidized bed powder coating. Please provide a coating system for exterior surfaces similar to Table 2, Line 17.Amendment 0001 revised this Work Item via Errata 1 to change paragraph 3.13 to 009-32 Table 2 Line 17.
13517-90-001ShipAlt CG47-83219.02K, CG47-83219.03K All Electric Modernization; accomplishPlease review paragraph 3.31 for the spaces to be inspected. Should the paragraphs read 1.2.108 through 1.2.128? There is not a space 1.2.129.Amendment 0001 revised this Work Item via Errata 1 to change 3.31 to 1.2.108 through 1.2.128.
14517-90-001ShipAlt CG47-83219.02K, CG47-83219.03K All Electric Modernization; accomplishParagraph 3.31.1 directs Contractor to submit report listing results of requirements of paragraph 3.28 to the SUPERVISOR. The paragraph should read 3.31 vice 3.28.Amendment 0001 revised this Work Item via Errata 1 to change 3.31.1 to 3.31.
15517-90-001ShipAlt CG47-83219.02K, CG47-83219.03K All Electric Modernization; accomplishParagraph 3.32 directs Contractor to accomplish preservation using report submitted in 3.29 using 2.130 through 2.132 for guidance. The paragraph should read 3.31 vice 3.29.Amendment 0001 revised this Work Item via Errata 1 to change paragraph 3.32 to read, "Submit one legible copy, in hard copy or approved transferable media, of a report listing results of requirements of 3.29 to the SUPERVISOR."
16980-11-017CG47-OA 89300 MK 41 VLS CG AMOD HW UPG, OA 74435 MK 41 VLS CRN and ELV RMVL, OA 79353 MK 41 VLS Uptake EXT Plenum ST2 Installation, Alteration Installation Team (AIT) Support Service; provideParagraph 3.14 states to accomplish preservation and paragraph 3.14.1 states to “submit one copy, in hard copy or approved transferable media of a report to the SUPERVISOR listing each discrepancy.” What discrepancies are to be listed and reported?Amendment 0001 revised this Work Item via Errata 1 to delete paragraph 3.1.4.1 from work item.
17980-11-008ShipAlt CG47-00687K CIWS Block 1B Upgrade, ShipAlt CG47-88645K CIWS LCS/RCS Shock Isolator Upgrade Installation, Alteration Installation Team (AIT) Support Service; provideParagraph 3.12 states to “provide a lockable, weatherproof, connex storage unit with a minimum of 200 square feet of floor space, with an 8-foot minimum ceiling, for use by the AIT, for a duration of TBD, as directed by SUPERVISOR. For Estimating purposes, Contractor requests the duration be identified.Amendment 0001 revised this Work Item via Errata 1 to change paragraph 3.12 for duration of availability as designated by the SUPERVISOR.
18980-11-019ShipAlt CG47-81961K 00 Tactical Tomahawk Weapons Control System (TTWCS) V 5.4.0.2 and CG47-85114K 00 Tomahawk Command and Control System (TC2S) 5.0.1V7, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)Paragraph 3.3 states to “provide one each CONEX box with a minimum of 80 square feet of floor space, in close proximity to the ship.” For Estimating purposes, Contractor requests the duration be identified.Amendment 0001 revised this Work Item via Errata 1 to change paragraph 3.12 for duration of availability as designated by the SUPERVISOR.
19583-11-001Boat Davit Repairspara 1.3.1 states Lake Shore Inc as MFG however parts are for a Scan Pacific/Vestdavit. Reference 2.2, 2.3, 2.4 & 2.5 are for different davits. Which MFG and Tech Manual are correct?Amendment 0001 revised this Work Item via Errata 1. The Tech Manual is S9583-BX-MMO-010 and the MFR is Vestdavit.
20524-12-001Hydraulic Actuator; replacepara 3.2 states to accomplish requirements of 009-12. what is to be welded? Is the new actuator a drop fit or will installation require modification to piping etc.?Amendment 0001 removed this Work Item via Errata 1.
21245-12-001CRP Attached Hyd Oil Pump Drive Gear assy; repairpara 1.3.1 list (one) CRP Pump MFR IMO. However para 3.5 calls out to accomplish 009-17 which is for electric rotating equipment/motor. What is being repaired the hydraulic pump or the electric motor?Amendment 0001 removed this Work Item via Errata 1.
22245-11-001CRP No.2 Hyd System; repairpara 1.3.1 list (one) CRP Pump MFR IMO. However para 3.5 calls out to accomplish 009-17 which is for electric rotating equipment/motor. What is being repaired the hydraulic pump or the electric motor?Amendment 0001 removed this Work Item via Errata 1.
23581-11-001Anchor Windlass System; repairpara 3.6.1 calls out to accomplish flushing and renewing of oil in reduction gear case/speed control oil tank and hyd system. Note reduction gear casing and sumps are not generally flushed. Is the intent to renew oil in units? Or is the intent to perform a Hot Oil flush on the hydraulic system? if Hot Oil Flush is required will a PCP be required IAW 009-09?Amendment 0001 revised this Work Item via Errata 1 to add PCP 009-09 to work item
24561-11-001Steering Gear Hydraulic System; repairCan the Customer provide PC# and Fig# for material identified in paragraph 3.2?

Paragraph 3.5.3.1 & 3.11 calls out to use muslin bags for flushing the hydraulic system. Will the Customer allow the use of 3 micron filter assemblies vise muslin bags which is the current standard?

Also paragraph 3.5.3 states to flush at 180 degrees however if the correct GPM pump is used to reach a 4000 reynolds number then the temperature requirement could range from 130 - 160 degrees. Would a lower temp be allowed as long as the 4000 reynolds number is obtained? •The tech manual calls out the materials in question throughout instruction, but not anywhere in table format. Those columns are in paragraph 3.2 to conform to NAVSEA Standard Phraseology but have “N/A” in those fields due to format of the references.

• Yes, 3 micron filter assembly is acceptable.

• Yes, the lower temp range is acceptable.

Amendment 0001 revised this Work Item via Errata 1.

25562-11-001J-14This is listed on J-14 for pricing but no item in the work package.Attachment J-14 has been updated in Amendment 0001 to remove this Work Item
26562-11-002J-14This is listed on J-14 for pricing but no item in the work package.Attachment J-14 has been updated in Amendment 0001 to remove this Work Item