S-3_BQ_PPI_ANZIO_CG68_QA_2.xlsm
XLSM spreadsheet 488 KB Posted
- Attached to
- USS VICKSBURG (CG 69) and USS ANZIO (CG 68) Modernization Period (MODPRD) Availabilities SOLICITATION
- Solicitation number
- N00024-19-R-4446
About this file
ANZIO Answers to bidder's questions
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N00024-19-R-4446_conformed_through_0005.pdf | ||
| N00024-19-R-4446_Amendment_0005.pdf | ||
| N00024-19-R-4446_0004.pdf | ||
| S-3_BQ_PPI_ANZIO_CG68_QA_4.xlsm | XLSM spreadsheet | |
| S-3_BQ_PPI_VICKSBURG_CG69_QA_4.xlsm | XLSM spreadsheet | |
| S-3_BQ_PPI_ANZIO_CG68_QA_3.xlsm | XLSM spreadsheet | |
| N00024-19-R-4446_A0003_conformed.pdf | ||
| S-3_BQ_PPI_VICKSBURG_CG69_QA_3.xlsm | XLSM spreadsheet | |
| N00024-19-R-4446_A0003.pdf | ||
| N00024-19-R-4446_0002.pdf | ||
| S-3_BQ_PPI_VICKSBURG_CG69_QA_2.xlsm | XLSM spreadsheet | |
| N00024-19-R-4446_conformed_through_0002.pdf | ||
| N00024-19-R-4446_0001.pdf | ||
| S-3_BQ_PPI_VICKSBURG_CG69_QA_1.xlsm | XLSM spreadsheet | |
| N00024-19-R-4446_conformed_though_0001.pdf | ||
| S-3_BQ_PPI_ANZIO_CG68_QA_1.xlsm | XLSM spreadsheet | |
| J-14_CG68_ANZIO_Pricing_Spreadsheet.xlsx | XLSX spreadsheet | |
| J-4_CG69_VICKSBURG_Pricing_Spreadsheet.xlsx | XLSX spreadsheet | |
| J-5_QASP_VIK_ANZ_MODPRDs.docx | DOCX document | |
| N00024-19-R-4446.pdf |
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CG68 Q&A
| USS ANZIO (CG 68) MODPRD Pre-Proposal Information (PPI) Questions | |||||
| Drawing | |||||
| GFM | Solicitation #: | N00024-19-R-4446 | Phone | ||
| RLAR | TPPC | TPPC-CG69-MARMCN20-CN02 | Justin Lessel, Contract Specialist, justin.d.lessel@navy.mil | 202-781-4064 | |
| Martha Bello, Contracting Officer, martha.bello@navy.mil | 202-781-3864 | ||||
| The following are answers to questions received from potential offerors. The answers provide clarification only and DO NOT constitute an amendment to the solicitation. | |||||
| To request references, drawings, RLARs, and Erratas being provided under this Solicitation Question & Answer Set, |
please contact the NAVSEA POCs.
| Q # | Work Item No. | Document Number/Title | Question | Government Response |
| 27 | 074-11-001 | Structural UIT | Item 074-11-001 is listed on J-14 and mentioned in many of the work items in paragraph 4. The item is not listed in the specifications index also we do not have the item. We do have 074-11-002. Does 074-11-001 exists? | Attachment J-14 has been revised via Amendment 0002 to remove Work Item 074-11-001. |
| 28 | Missing or incorrect Rev's | The below listed references have not been provided to date, the ones with Revision A have Rev - provided, but the items call for Rev A, please provide correct drawings. |
641-11-001, para 2.4, drawing 8738099, revision A 641-11-001, para 2.5, drawing 8737930, revision A 641-11-001, para 2.6, drawing 8737931, revision A 641-11-001, para 2.16, drawing 8737945, revision A 641-11-001, para 2.21, drawing 8737946, revision A 641-11-001, para 2.22, drawing 8737947, revision A 150-90-008, para 2.25, drawing 78449.02CG68P207 456-90-008, para 2.3, drawing 153-8735928 Rev A, revision A 456-90-008, para 2.5, drawing 184-8735930 Rev A, revision A 524-80-001, para 2.10, drawing 77814CG68P205
| Amendment 0002 provided these references. | |||||
| 29 | 992-11-017 | Temporary General Announcing System, Circuit 1MC; install | Will the General Announcing System 1MC be fully operational on arrival to Contractors plant? | No, it will not be operational. | |
| 30 | 641-11-001 | Officers Habitability and Berthing Enhancement Project (HOFF and BOFF); accomplish | Please provide Rev. A of drawing 8738099; currently have Rev. -. | Amendment 0002 provided this drawing. | |
| 31 | 641-11-001 | Officers Habitability and Berthing Enhancement Project (HOFF and BOFF); accomplish | Please provide Rev. A of drawing 8737930; currently have Rev. -. | Amendment 0002 provided this drawing. | |
| 32 | 641-11-001 | Officers Habitability and Berthing Enhancement Project (HOFF and BOFF); accomplish | Please provide Rev. A of drawing 8737931; currently have Rev. -. | Amendment 0002 provided this drawing. | |
| 33 | 641-11-001 | Officers Habitability and Berthing Enhancement Project (HOFF and BOFF); accomplish | Please provide Rev. A of drawing 8737945; currently have Rev. -. | Amendment 0002 provided this drawing. | |
| 34 | 641-11-001 | Officers Habitability and Berthing Enhancement Project (HOFF and BOFF); accomplish | Please provide Rev. A of drawing 8737946; currently have Rev. -. | Amendment 0002 provided this drawing. | |
| 35 | 641-11-001 | Officers Habitability and Berthing Enhancement Project (HOFF and BOFF); accomplish | Please provide Rev. A of drawing 8737947; currently have Rev. -. | Amendment 0002 provided this drawing. | |
| 36 | 645-90-001 | ShipAlt CG47-85640.03K, Crew Physical Fitness Center; accomplish | Please provide reference RLAR 85640.03/CG68/P181. | Amendment 0002 provided this reference. | |
| 37 | 150-90-001 | ShipAlt CG47-83506.05K, Superstructure Fatigue and Sensitization Modifications Aft; accomplish | Please provide reference RLAR 83506.05/CG68/P223. | Amendment 0002 provided this reference. | |
| 38 | 150-90-002 | ShipAlt CG47-83506.06K, Superstructure Fatigue and Sensitization Modifications Aft; accomplish | Please provide reference RLAR 83506.05CG68P224. | Amendment 0002 provided this reference. | |
| 48 | 331-11-006 | General Electrical Repair | Material listed in paragraph 1.3.11 and located in 1.2.10 is only ID as FCS cable. Please provide size and length. | Amendment 0002 revised this work item to state 100 FEET FOR EACH (200 FEET TOTAL) TYPE 2SXAOW-3 via Errata 2. | |
| 49 | 624-12-001 | Metal Joiner Door; repair | In para 3.2 it states to repair doors using materials in 5.1. Para 3.3 states to install new metal joiner door and hatch listed in 1.3.1 thru 1.3.20. There is no para 1.3.20 and there are no hatches listed in 1.3. Please clarify which door and/or hatch are to be repaired with material in 5.1 and which door and/or hatch are to be replaced with new. | Amendment 0002 revised this work item Paragraph 3.3 to "door listed in 1.3.1 and 1.3.2" via Errata 2. | |
| 50 | 665-90-002 | ShipAlt CG47-83343K, Replace Band Saw with Hacksaw; accomplish | Paragraph 3.1 states new hacksaw provided in reference 2.7 which is the 4720 bill of material. This BOM lists only ripout materials. Will the hacksaw be provided GFM? | Yes, the hacksaw will be provided as GFM. The 4720 will be updated to add material as GFM. | |
| 51 | 074-11-002 | Structural Ultrasonic Impact Treatment (UIT) and G67 Sampling; accomplish | Contractor has discovered aluminum welding work items listed in paragraph 3.1 all reference 074-11-001 in paragraphs 4.1; however, 074-11-001 was not provided in the spec package but 074-11-002 was. Please advise if this is a typo or if 074-11-001 needs to be provided to the Contractor. | Work Item 074-11-001 is not in work package. Work Item 074-11-002 is the correct work item. | |
| 52 | 110-90-001 | ShipAlt CG47-83307K, Increase Fatigue Strength Frame 138, 01 Level; accomplish | Paragraph 1.4.1.2 identifies space number 3-94-01-M. DC Plates has this space as 3-94-0-M as does the CS turnover dates. Please advise on the correct space number. | See Amendment 0001, this location changed in Errata 1. | |
| 53 | 120-11-006 | Structural Repair and Preservation (MID); accomplish | Paragraph 3.2 states to perform 009-114 Mold Remediation for 100 SF. No location is given in this work item to perform this task. Please provide location. | See Amendment 0001, location was listed in 1.2.1 for a total of 100 Square feet via Errata 1. | |
| 54 | 123-10-001 | Tanks/Voids Open, Pump, Clean and Gas Free | Ktr found duplicate tanks in this item: Para 1.2.55 & 1.2.70(6-344-2-W), Para 1.2.92 & 1.2.29 (5-E-0-V) , Para 1.2.42 & 1.2.95 (6-34-0-V). | See Amendment 0001. Duplicates were removed via Errata 1. | |
| 55 | 150-90-002 | ShipAlt CG47-83506.06K, Superstructure Fatigue and Sensitization Modifications Aft; accomplish | Please provide reference RLAR 83506.05CG68P224. | Amendment 0002 provided this reference. | |
| 56 | 150-90-003 | ShipAlt CG47-83506.07K Superstructure Fatigue and Sensitization Modification Aft; accomplish | Please provide reference RLAR 83506.07CG68P225. | Amendment 0002 provided this reference. | |
| 57 | 150-90-005 | ShipAlt CG47-83506.01K Superstructure Fatigue and Sensitization Modifications (Aft); accomplish | Please provide reference RLAR 83506.01CG68P221. | Amendment 0002 provided this reference. | |
| 58 | 150-90-006 | ShipAlt CG47-83506.03K, Superstructure Fatigue and Sensitization Modifications (Aft); accomplish | Please provide reference RLAR 83506.03CG68P196. | Amendment 0002 provided this reference. | |
| 59 | 150-90-006 | ShipAlt CG47-83506.03K, Superstructure Fatigue and Sensitization Modifications (Aft); accomplish | Please provide reference RLAR 83506.03CG68P222. | Amendment 0002 provided this reference. | |
| 60 | multiple | J-14 | a. 074-11-001 and 074-11-002 listed but Contractor only received 074-11-002 |
b. 524-11-001 listed but Contractor did not receive
| c. 562-11-001 & 562-11-002 listed by Contractor did not receive | See Amendment 0001. Attachment J-14 was revised to remove this Work Item. | |||||
| 61 | 524-11-001 | J-14 | This is listed on J-14 for pricing but no item in the work package. | See Amendment 0001. Attachment J-14 was revised to remove this Work Item. | ||
| 62 | 562-11-001 | J-14 | This is listed on J-14 for pricing but no item in the work package. | Attachment J-14 has been revised in Amendment 0002 to remove this Work Item. |