N00024-19-R-4446 conformed

View the file

Other files

File Type Posted
N00024-19-R-4446_conformed_through_0005.pdf PDF
N00024-19-R-4446_Amendment_0005.pdf PDF
N00024-19-R-4446_0004.pdf PDF
S-3_BQ_PPI_ANZIO_CG68_QA_4.xlsm XLSM spreadsheet
S-3_BQ_PPI_VICKSBURG_CG69_QA_4.xlsm XLSM spreadsheet
S-3_BQ_PPI_ANZIO_CG68_QA_3.xlsm XLSM spreadsheet
N00024-19-R-4446_A0003_conformed.pdf PDF
S-3_BQ_PPI_VICKSBURG_CG69_QA_3.xlsm XLSM spreadsheet
N00024-19-R-4446_A0003.pdf PDF
S-3_BQ_PPI_ANZIO_CG68_QA_2.xlsm XLSM spreadsheet
N00024-19-R-4446_0002.pdf PDF
S-3_BQ_PPI_VICKSBURG_CG69_QA_2.xlsm XLSM spreadsheet
N00024-19-R-4446_conformed_through_0002.pdf PDF
N00024-19-R-4446_0001.pdf PDF
S-3_BQ_PPI_VICKSBURG_CG69_QA_1.xlsm XLSM spreadsheet
S-3_BQ_PPI_ANZIO_CG68_QA_1.xlsm XLSM spreadsheet
J-14_CG68_ANZIO_Pricing_Spreadsheet.xlsx XLSX spreadsheet
J-4_CG69_VICKSBURG_Pricing_Spreadsheet.xlsx XLSX spreadsheet
J-5_QASP_VIK_ANZ_MODPRDs.docx DOCX document
N00024-19-R-4446.pdf PDF
Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CODE

(Hour)

PAGE(S)

until 03:00 PM local time 01 Apr 2019

X

A X B X C X D

EX

X

G F 183 - 188

189 - 201 X H 202 - 207 martha.bello@navy.mil

RATING PAGE OF PAGES

7. ISSUED BY

(Date)

IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.

Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)

Prescribed by GSA FAR (48 CFR) 53.214(c)

DO-A3 1 207

(If other than Item 7)

15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO

AND

ADDRESS

SIGN OFFER (Type or print)

OF

OFFEROR

AMENDMENT NO. DATE

15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS

IS DIFFERENT FROM ABOVE - ENTER

SUCH ADDRESS IN SCHEDULE.

18. OFFER DATE

1. THIS CONTRACT IS A RATED ORDER

UNDER DPAS (15 CFR 700)

2. CONTRACT NO.

N00024 8. ADDRESS OFFER TO

See Item 7

9. Sealed offers in original and 4 copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in

CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and

Section L conditions contained in this solicitation.

10. FOR INFORMATION

CALL:

A. NAME (NO COLLECT CALLS)

MARTHA BELLO 202-781-3864

11. TABLE OF CONTENTS

SOLICITATION/ CONTRACT FORM

SUPPLIES OR SERVICES AND PRICES/ COSTS

2 - 116

X I CONTRACT CLAUSES

DESCRIPTION/ SPECS./ WORK STATEMENT X

PACKAGING AND MARKING

117 - 140 141 - 142

J LIST OF ATTACHMENTS

INSPECTION AND ACCEPTANCE

DELIVERIES OR PERFORMANCE

143 - 146 147 - 154

X K

REPRESENTATIONS, CERTIFICATIONS AND

OTHER STATEMENTS OF OFFERORS

CONTRACT ADMINISTRATION DATA 155 - 159 X

SPECIAL CONTRACT REQUIREMENTS

OFFER (Must be fully completed by offeror) 160 - 166 X M

L INSTRS., CONDS., AND NOTICES TO OFFERORS

EVALUATION FACTORS FOR AWARD

NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.

is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.

13. DISCOUNT FOR PROMPT PAYMENT

(See Section I, Clause No. 52.232-8)

14. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments

AMENDMENT NO. DATE

to the SOLICITATION for offerors and related documents numbered and dated):

FACILITY

12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period

SOLICITATION, OFFER AND AWARD

X

(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)

PART I - THE SCHEDULE

26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE

EMAIL:TEL: (Signature of Contracting Officer)

CODE CODE

B. TELEPHONE (Include area code) C. E-MAIL ADDRESS

AWARD (To be completed by Government)

19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION

22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:

10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)

23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE

PART IV - REPRESENTATIONS AND INSTRUCTIONS

PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

167 - 181

PART II - CONTRACT CLAUSES

NAVAL SEA SYSTEMS COMMAND (HQ)

1333 ISAAC HULL AVE SE

WASHINGTON NAVY YARD DC 20376-2030

FAX:

TEL:

FAX:

TEL:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

SOLICITATION

6. REQUISITION/PURCHASE NO.

N0002419FR93026

5. DATE ISSUED

18 Jan 2019

4. TYPE OF SOLICITATION

SEALED BID (IFB)

NEGOTIATED (RFP)

[ X ]

3. SOLICITATION NO.

N0002419R4446

Section B - Supplies or Services and Prices

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

CLIN

Number

Base Items

FFP

PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF

THE USS VICKSBURG (CG 69) DURING FY19 MODPRD (Modernization Period) (Non-prorated WIs – See attachment J-4 for list)

The Contractor shall prepare for and accomplish repair and modernization during the MODERNIZATION PERIOD (MODPRD) onboard USS VICKSBURG (CG

69) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Note B

PURCHASE REQUEST NUMBER: N0002419FR93026

NET AMT

0001AA

1 Lot

FFP

PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF

69) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Note B

FOB: Destination

PSC CD: J998

0001AB

FFP

PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF

69) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Note B

0001AC

FFP

PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF

69) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Note B

OPTION Base Items

FFP

PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF

69) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes B and C

FFP

PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF

69) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes B and C

FFP

PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF

69) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes B and C

FFP

PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF

69) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes B and C

FFP

PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF

69) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes B and C

FFP

PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF

69) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes B and C

FFP

PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF

69) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes B and C

FFP

PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF

69) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes B and C

FFP

PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF

69) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes B and C

FFP

PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF

69) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes B and C

FFP

PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF

69) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes B and C

FFP

PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF

69) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes B and C

FFP

PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF

69) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes B and C

OPTION Growth for CLIN 0001AA

FFP

PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF

69) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes A, B, C, D, E, F, and G

FFP

PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF

69) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes A, B, C, D, E, F, and G

FFP

PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF

69) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes A, B, C, D, E, F, and G

OPTION Growth for CLIN 0001AB

FFP

PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF

69) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes A, B, C, D, E, F, and G

OPTION Growth for CLIN 0001AB

FFP

PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF

69) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes A, B, C, D, E, F, and G

OPTION Growth for CLIN 0001AC

FFP

PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF

69) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes A, B, C, D, E, F, and G

FFP

PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF

69) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes A, B, C, D, E, F, and G

FFP

PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF

69) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes A, B, C, D, E, F, and G

OPTION Growth for CLIN 0002

FFP

PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF

69) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes A, B, C, D, E, F, and G

OPTION Growth for CLIN 0003

FFP

PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF

69) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes A, B, C, D, E, F, and G

OPTION Growth for CLIN 0004

FFP

PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF

69) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes A, B, C, D, E, F, and G

OPTION Growth for CLIN 0005

FFP

PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF

69) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes A, B, C, D, E, F, and G

OPTION Growth for CLIN 0006

FFP

PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF

69) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes A, B, C, D, E, F, and G

OPTION Growth for CLIN 0007

FFP

PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF

69) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes A, B, C, D, E, F, and G

OPTION Growth for CLIN 0008

FFP

PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF

69) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes A, B, C, D, E, F, and G

OPTION Growth for CLIN 0009

FFP

PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF

69) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes A, B, C, D, E, F, and G

OPTION Growth for CLIN 0010

FFP

PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF

69) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes A, B, C, D, E, F, and G

OPTION Growth for CLIN 0011

FFP

PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF

69) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes A, B, C, D, E, F, and G

OPTION Growth for CLIN 0012

FFP

PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF

69) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes A, B, C, D, E, F, and G

OPTION Growth for CLIN 0013

FFP

PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF

69) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes A, B, C, D, E, F, and G

OPTION Growth for CLIN 0014

FFP

PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF

69) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes A, B, C, D, E, F, and G

30 Days

OPTION Daily Extensions

FFP

Additional Days in Dock requiring Availability Extension

PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF

69) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes A, B, C, D, E, F, and G

5 Days

FFP

Additional Days in Dock NOT requiring Availability Extension

PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF

69) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes A, B, C, D, E, F, and G

85 Days

FFP

Additional Days Pier Side requiring Availability Extension

PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF

69) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes A, B, C, D, E, F, and G

PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF

THE USS ANZIO (CG 68) DURING FY20 MODPRD (Modernization Period) (Non-prorated WIs – See attachment J-14 for list) the MODERNIZATION PERIOD (MODPRD) onboard USS ANZIO (CG 68) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-11 and J-12.

See Note B

0101AA

FFP

PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF

specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-11 and J-12.

See Note B

0101AB

FFP

PPREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF

specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-11 and J-12.

See Note B

0101AC

FFP

PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF

specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-11 and J-12.

See Note B

0101AD

FFP

PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF

specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-11 and J-12.

See Note B

0101AE

FFP

PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF

specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-11 and J-12.

See Note B

0101AF

FFP

PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF

specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-11 and J-12.

See Note B

0101AG

FFP

PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF

specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-11 and J-12.

See Note B

0101AH

FFP

PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF

specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-11 and J-12.

See Note B

0101AJ

FFP

PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF

specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-11 and J-12.

See Notes A, B, C, D, E, F, and G

FFP

PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF

specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-11 and J-12.

See Notes B and C

FFP

PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF

specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-11 and J-12.

See Notes B and C

FFP

PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF

specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-11 and J-12.

See Notes B and C

FFP

PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF

specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-11 and J-12.

See Notes B and C

FFP

PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF

specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-11 and J-12.

See Notes B and C

FFP

PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF

specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-11 and J-12.

See Notes B and C

FFP

PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF

specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-11 and J-12.

See Notes B and C

FFP

PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF

specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-11 and J-12.

See Notes B and C

FFP

PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF

specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-11 and J-12.

See Notes B and C

FFP

PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF

specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-11 and J-12.

See Notes B and C

FFP

PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF

specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-11 and J-12.

See Notes B and C

FFP

PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF

specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-11 and J-12.

See Notes B and C

FFP

PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF

specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-11 and J-12.

See Notes B and C

FFP

PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF

specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-11 and J-12.

See Notes B and C

FFP

PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF

specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-11 and J-12.

See Notes B and C

FFP

PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF

specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-11 and J-12.

See Notes B and C

FFP

PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF

specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-11 and J-12.

See Notes B and C

FFP

PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF

specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-11 and J-12.

See Notes B and C

FFP

PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF

specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-11 and J-12.

See Notes B and C

FFP

PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF

specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-11 and J-12.

See Notes B and C

OPTION Growth for CLIN 0101AA

FFP

PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF

specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-11 and J-12.

See Notes A, B, C, D, E, F, and G

FFP

PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF

specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-11 and J-12.

See Notes A, B, C, D, E, F, and G

FFP

PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF

specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-11 and J-12.

See Notes A, B, C, D, E, F, and G

OPTION Growth for CLIN 0101AB

FFP

PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF

specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-11 and J-12.

See Notes A, B, C, D, E, F, and G

OPTION Growth for CLIN 0101AB

FFP

PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF

specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-11 and J-12.

See Notes A, B, C, D, E, F, and G

OPTION Growth for CLIN 0101AC

FFP

PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF

specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-11 and J-12.

See Notes A, B, C, D, E, F, and G

FFP

PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF

specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-11 and J-12.

See Notes A, B, C, D, E, F, and G

FFP

PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF

specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-11 and J-12.

See Notes A, B, C, D, E, F, and G

OPTION Growth for CLIN 0102

FFP

PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF

specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-11 and J-12.

See Notes A, B, C, D, E, F, and G

OPTION Growth for CLIN 0103

FFP

PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF

specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-11 and J-12.

See Notes A, B, C, D, E, F, and G

OPTION Growth for CLIN 0104

FFP

PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF

specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-11 and J-12.

See Notes A, B, C, D, E, F, and G

OPTION Growth for CLIN 0105

FFP

PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF

specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-11 and J-12.

See Notes A, B, C, D, E, F, and G

OPTION Growth for CLIN 0106

FFP

PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF

specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-11 and J-12.

See Notes A, B, C, D, E, F, and G

OPTION Growth for CLIN 0107

FFP

PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF

specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-11 and J-12.

See Notes A, B, C, D, E, F, and G

OPTION Growth for CLIN 0108

FFP

PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF

specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-11 and J-12.

See Notes A, B, C, D, E, F, and G

OPTION Growth for CLIN 0109

FFP

PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF

specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-11 and J-12.

See Notes A, B, C, D, E, F, and G

OPTION Growth for CLIN 0110

FFP

PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF

specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-11 and J-12.

See Notes A, B, C, D, E, F, and G

OPTION Growth for CLIN 0111

FFP

PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF

specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-11 and J-12.

See Notes A, B, C, D, E, F, and G

OPTION Growth for CLIN 0112

FFP

PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF

specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-11 and J-12.

See Notes A, B, C, D, E, F, and G

OPTION Growth for CLIN 0113

FFP

PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF

specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-11 and J-12.

See Notes A, B, C, D, E, F, and G

OPTION Growth for CLIN 0114

FFP

PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF

specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-11 and J-12.

See Notes B, C, D, E, F, and G

OPTION Growth for CLIN 0115

FFP

PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF

specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-11 and J-12.

See Notes A, B, C, D, E, F, and G

OPTION Growth for CLIN 0116

FFP

PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF

specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-11 and J-12.

See Notes A, B, C, D, E, F, and G

OPTION Growth for CLIN 0117

FFP

PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF

specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-11 and J-12.

See Notes A, B, C, D, E, F, and G

OPTION Growth for CLIN 0118

FFP

PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF

specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-11 and J-12.

See Notes A, B, C, D, E, F, and G

OPTION Growth for CLIN 0119

FFP

PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF

specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-11 and J-12.

See Notes A, B, C, D, E, F, and G

OPTION Growth for CLIN 0120

FFP

PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF

specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-11 and J-12.

See Notes A, B, C, D, E, F, and G

OPTION Growth for CLIN 0121

FFP

PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF

specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-11 and J-12.

See Notes A, B, C, D, E, F, and G

30 Days

OPTION Daily Extension

FFP

Additional Days in Dock requiring Availability Extension

PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF

specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-11 and J-12.

See Notes A, B, C, D, E, F, and G

5 Days

FFP

Additional Days in Dock NOT requiring Availability Extension

PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF

specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-11 and J-12.

See Notes A, B, C, D, E, F, and G

85 Days

FFP

Additional Days Pier Side requiring Availability Extension

PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF

specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-11 and J-12.

See Notes A, B, C, D, E, F, and G

OPTION Growth for CLIN 0101AD

FFP

PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF

specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-11 and J-12.

See Notes A, B, C, D, E, F, and G

OPTION Growth for CLIN 0101AE

FFP

PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF

specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-11 and J-12.

See Notes A, B, C, D, E, F, and G

OPTION Growth for CLIN 0101AF

FFP

PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF

specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-11 and J-12.

See Notes A, B, C, D, E, F, and G

OPTION Growth for CLIN 0101AG

FFP

PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF

specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-11 and J-12.

See Notes A, B, C, D, E, F, and G

OPTION Growth for CLIN 0101AH

FFP

PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF

specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-11 and J-12.

See Notes A, B, C, D, E, F, and G

OPTION Growth for CLIN 0101AJ

FFP

PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF

specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-11 and J-12.

See Notes A, B, C, D, E, F, and G

DATA

CONTRACT DATA REQUIREMENTS LIST (CDRLs) FOR ALL CLINs, INCLUDING OPTION CLINS, IF EXERCISED.

The data to be furnished hereunder shall be prepared and submitted in accordance with the Contract Data Requirements List, DD Form 1423, Exhibits A, B and C attached hereto. The CDRLs form a part of the schedule of this solicitation.

Not Separately Priced (NSP).

DATA

CONTRACT DATA REQUIREMENTS LIST (CDRLs) FOR ALL CLINs, INCLUDING OPTION CLINS, IF EXERCISED.

The data to be furnished hereunder shall be prepared and submitted in accordance with the Contract Data Requirements List, DD Form 1423, Exhibits A, B and C attached hereto. The CDRLs form a part of the schedule of this solicitation.

Not Separately Priced (NSP).

LEVEL OF EFFORT TO COMPLETION

NOTE A: LEVEL OF EFFORT TO COMPLETION –SHIP REPAIR

1. The Contractor agrees to provide the level of effort to completion in the performance of growth

CLINs.

272,376 hours and $5,997,568 materials for the USS VICKSBURG (CG69) FY19 MODPRD 334,573 hours and $3,640,211 materials for the USS ANZIO (CG68) FY20 MODPRD

2. The total level of effort to completion for the performance of the above CLINs shall be man-hours of direct labor and the associated material required to support that labor and effort. The mix of labor and material may be adjusted, but may not exceed the dollar value of each CLIN listed above.

3. Effort performed in fulfilling the level of effort to completion obligations specified above shall only include effort performed in direct support of this contract and shall not include time and effort expended on such things as (local travel to and from an employee' s usual work location), uncompensated effort while on travel status, truncated lunch periods, work (actual or inferred) at an employee' s residence or other non-work locations.

4. LOE to Completion labor hours and material are within the general scope of the work stated in the contract and may not be used to: (1) direct a change as defined in, "FAR 52.243-1 CHANGES FIXED -PRICE clause of this contract or (2) change any of the terms or conditions of the contract.

5. If, in the opinion of the Contractor, any effort directed in the Growth Management Request Form calls for effort outside the scope of the contract, the Contractor shall notify the Contracting Officer in writing within two (2) working days after the receipt of any such direction. The Contractor shall not proceed with the work affected by the Growth Management Request Form unless and until the Contractor is notified by the Contracting Officer that the directed work is within the scope of this contract. Thereafter, any remaining disagreement on the scope issue shall be a dispute under the Disputes clause; however, nothing in this clause shall excuse the Contractor from proceeding with the subject growth work as directed by the Contracting Officer.

LABOR & MATERIAL BURDEN RATES

NOTE B: FIXED SHIP REPAIR LABOR AND MATERIAL BURDEN RATES FOR GROWTH AND NEW

WORK

SCHEDULE OF PRICES / RATES: SHIP REPAIR LABOR RATE (FULLY BURDENED)

1. The Contractor’s fully burdened ship repair labor rate will be used for negotiating growth and new work to be performed under this contract. The contractor agrees that the number of hours included in its price proposal for contract modifications shall include only direct production hours. For these purposes, direct production hours are for skilled labor at the journeyman level expended in direct production including but not limited to the following functions:

Abrasive cleaning/blasting Fire Watch Welding Burning Brazing

Carpentry Machinists (inside and outside) Electrical Work Electronic Work Engineering Design Support Lagging Ship-fitting Boiler-making Painting Sheet-metal Work Pipefitting Rigging General Labor Staging/Scaffolding Diesel Mechanics

2. The fully burdened ship repair labor rate proposed by the contractor listed in paragraph 7 below shall include all costs associated with support functions (whether charged directly or indirectly by the offeror’s accounting systems) provided in support of the direct production functions listed in paragraph 1 above.

Support functions shall be considered to be included in the offeror’s fully burdened ship repair labor rate for direct production hours. Labor hours for the below support functions shall not be separately proposed in any circumstance, including in support of subcontractors. Support functions include, and are not limited to, th

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.