USS VICKSBURG (CG 69) and USS ANZIO (CG 68) Modernization Period (MODPRD) Availabilities SOLICITATION
Solicitation number
N00024-19-R-4446
Issued by

About this file

USS ANZIO CG 68 QA 4

View the file

Other files

File Type Posted
N00024-19-R-4446_conformed_through_0005.pdf PDF
N00024-19-R-4446_Amendment_0005.pdf PDF
N00024-19-R-4446_0004.pdf PDF
S-3_BQ_PPI_VICKSBURG_CG69_QA_4.xlsm XLSM spreadsheet
S-3_BQ_PPI_ANZIO_CG68_QA_3.xlsm XLSM spreadsheet
N00024-19-R-4446_A0003_conformed.pdf PDF
S-3_BQ_PPI_VICKSBURG_CG69_QA_3.xlsm XLSM spreadsheet
N00024-19-R-4446_A0003.pdf PDF
S-3_BQ_PPI_ANZIO_CG68_QA_2.xlsm XLSM spreadsheet
N00024-19-R-4446_0002.pdf PDF
S-3_BQ_PPI_VICKSBURG_CG69_QA_2.xlsm XLSM spreadsheet
N00024-19-R-4446_conformed_through_0002.pdf PDF
N00024-19-R-4446_0001.pdf PDF
S-3_BQ_PPI_VICKSBURG_CG69_QA_1.xlsm XLSM spreadsheet
N00024-19-R-4446_conformed_though_0001.pdf PDF
S-3_BQ_PPI_ANZIO_CG68_QA_1.xlsm XLSM spreadsheet
J-14_CG68_ANZIO_Pricing_Spreadsheet.xlsx XLSX spreadsheet
J-4_CG69_VICKSBURG_Pricing_Spreadsheet.xlsx XLSX spreadsheet
J-5_QASP_VIK_ANZ_MODPRDs.docx DOCX document
N00024-19-R-4446.pdf PDF
Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CG68 Q&A

Drawing
GFMSolicitation #:N00024-19-R-4446Phone
RLARTPPCTPPC-CG69-MARMCN20-CN02Justin Lessel, Contract Specialist, justin.d.lessel@navy.mil202-781-4064
Martha Bello, Contracting Officer, martha.bello@navy.mil202-781-3864
The following are answers to questions received from potential offerors. The answers provide clarification only and DO NOT constitute an amendment to the solicitation.To request references, drawings, RLARs, and Erratas being provided under this Solicitation Question & Answer Set,

please contact the NAVSEA POCs.

Work Item No.Document Number/TitleQuestionGovernment Response
437-90-004ShipAlt CG47-83372K, Time Domain Reflectometer (TDR) Tank Level Indicator (TLI) Installation; accomplishPlease not Reference 2.13 is obsolete, Test 437008-4 Rev D is its replacementPlease use the reference from USS Vicksburg added in errata 1.
SolicitationInter-port DifferentialPlease provide the detailed derivation of the Inter-port Differential value(s) included in the solicitation, including identification of the individual components comprising each IPD. Based upon the competitive nature of this RFP and to ensure that the Government’s price evaluation includes an accurate estimate of the Availability’s total estimated cost to the Gov’t, the bidder considers the detailed derivation of the Inter-port Differential value(s) to be critical information required to prepare a competitive proposal.The interport differential amounts included in the solicitation are based upon current NAVSEA guidance. In accordance with current NAVSEA guidance, Interport differentials include fuel costs, towing and pilot charges, escort ship charges, TYCOM or Squadron Commander travel (to include the port engineer/maintenance manager, type desk assistant, immediate superior in charge, intermediate maintenance activity, and SUPSHIP), and ships force travel/per diem for work and for training purposes.

NAVSEA held an industry day on 30 November 2016 and discussed interport differential costs. This forum gave NAVSEA an opportunity to receive feedback from the ship repair industry on matters relating to the calculation of the interport differential costs.

SolicitationLDsPlease provide the detailed derivation of the RFP’s “Liquidated Damages” amount. Liquidated damages are predetermined values in-place of actual damages. Therefore, bidder should have an understanding of how the Navy derived the liquidated damages amount.The LDs are the daily value of the lost use of the crew (so the sum of their daily wages) and the daily value of the lost ship (i.e. purchase price of the ship, inflated to today dollars, divided by the life cycle of ship). See attached calculations.
428-90-001ShipAlt 86418KThis same ShipAlt on Vicksburg and Gettysburg has an AIT accomplishing the Electrical portion of the Alt, Anzio has the contractor accomplishing 2.4 which is the Electrical work. Please review and advise.See Errata 2. IDD drawings are applicable portions.
631-21-001Superstructure PreservationPlease confirm this item is for decks and 242 sq ft of PCMS tile only? Table 2, line 42 as called out in paragraph 3.5 is for "Hanger Decks, Flight Decks, Vertical Replenishment Deck Areas", etc…"Work package planned using FY19 CHG1 NSIs, Table 2 Line 42 is EXTERIOR SURFACES ABOVE BOOTTOP, WITH EXCEPTION OF AREAS RECEIVING NONSKID.
634-21-004Non-Critical Nonskid; replaceLocation (3-483-0-M), this location is also part of work item 634-21-002, please adviseThere is no 3-483-0-M in these work items but there is a 3-482-0-M (GEN ARRG DWG 6253911) . Work Item 634-21-004 was cancelled via Errata 3.
150-90-001ShipAlt CG47-83506.05K, Superstructure Fatigue and Sensitization Modifications Aft; accomplishErrata 2, reference 2.55 has not been provided, please provide RLAR/00IDD/CG68/P238.Reference provided with Amendment 0004.
441-90-008ShipAlt CG47-80897.02K, PEOC41 Navy Multiband Terminal (NMT) AN/WSC-9(V)XX Q/KA; accomplishErrata 2, reference 2.39 has not been provided, please provide RLAR/80897.02/CG68/P209.Reference provided with Amendment 0004.
SolicitationAttachment S-4Please confirm that a completed Attachment S-4 (that satisfies the requirements of Factor 2 paragraphs 2 a, b, and c) fulfills the requirements of Current Progress/Manning Reports of Factor 2 Paragraph 2. If not, please provide additional detail on what is required.Yes, a completed Attachment S-4 meets the requirement for progress/manning reports.
641-11-001Officers Habitability and Berthing Enhancement Project (HOFF and BOFF); accomplishThe answer to Question 28 stated the below listed references would be provided with Amendment 0002. They have not yet been provided, can correct revision drawings please be provided?

para 2.4, drawing 8738099, revision A para 2.5, drawing 8737930, revision A para 2.6, drawing 8737931, revision A para 2.16, drawing 8737945, revision A para 2.21, drawing 8737946, revision A

para 2.22, drawing 8737947, revision AReference provided with Amendment 0004.
512-90-001ShipAlt CG68-83283.02K, Corrosion Control Enhancements; accomplishErrata 0002 of the item added the following references: 2.52 RLAR 83283.02/CG68/P216, S/A CG47-83283.02K, DWG Mods due to CG68 SSRA19 Cancellation and 2.53 RLAR 283.02/CG68/P170, CG68; USS Anzio; SSRA19; SA 83283.02; Corrosion Control Enhancements; Paint and Insulation Corrections. Can these references please be provided?Reference provided with Amendment 0004.
300-11-001 Errata 3Cableway and MCT RestoreErrata 3 added new requirements in paragraph 3.3 - 3.4, that are not possible to bid without more information. What is the location of work, how many MCT's are newly installed? Also paragraph 3.5 was added which provides Level of Effect. Please confirm the work in paragraph 3.3 - 3.4 will be covered by the LOE in 3.5.Yes, work in paragraph 3.3 - 3.4 will be covered by LOE in 3.5. Location will be based on what is found during open and inspect of locations in work item.

&P of &N

Sheet2

Sheet3 image1.jpeg image2.png

File details come from the government source that posted it.