- USS VICKSBURG (CG 69) and USS ANZIO (CG 68) Modernization Period (MODPRD) Availabilities SOLICITATION
- Solicitation number
- N00024-19-R-4446
About this file
N00024-19-R-4446 Amendment 003
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N00024-19-R-4446_conformed_through_0005.pdf | ||
| N00024-19-R-4446_Amendment_0005.pdf | ||
| N00024-19-R-4446_0004.pdf | ||
| S-3_BQ_PPI_ANZIO_CG68_QA_4.xlsm | XLSM spreadsheet | |
| S-3_BQ_PPI_VICKSBURG_CG69_QA_4.xlsm | XLSM spreadsheet | |
| S-3_BQ_PPI_ANZIO_CG68_QA_3.xlsm | XLSM spreadsheet | |
| N00024-19-R-4446_A0003_conformed.pdf | ||
| S-3_BQ_PPI_VICKSBURG_CG69_QA_3.xlsm | XLSM spreadsheet | |
| S-3_BQ_PPI_ANZIO_CG68_QA_2.xlsm | XLSM spreadsheet | |
| N00024-19-R-4446_0002.pdf | ||
| S-3_BQ_PPI_VICKSBURG_CG69_QA_2.xlsm | XLSM spreadsheet | |
| N00024-19-R-4446_conformed_through_0002.pdf | ||
| N00024-19-R-4446_0001.pdf | ||
| S-3_BQ_PPI_VICKSBURG_CG69_QA_1.xlsm | XLSM spreadsheet | |
| N00024-19-R-4446_conformed_though_0001.pdf | ||
| S-3_BQ_PPI_ANZIO_CG68_QA_1.xlsm | XLSM spreadsheet | |
| J-14_CG68_ANZIO_Pricing_Spreadsheet.xlsx | XLSX spreadsheet | |
| J-4_CG69_VICKSBURG_Pricing_Spreadsheet.xlsx | XLSX spreadsheet | |
| J-5_QASP_VIK_ANZ_MODPRDs.docx | DOCX document | |
| N00024-19-R-4446.pdf |
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N0002419FR93026
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
Amendment 0003 includes the items below :
Section B: Includes NOTE C in description for SLINs 0101AA - 0101AH
Section I: Updates 52.217-7 to include SLINs 0101 AA - 0101AH in description
Section J: Updates J-1 and J-11 to include Errata 3.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 7
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 15-Mar-2019
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N0002419R4446
X 9B. DATED (SEE ITEM 11)
18-Jan-2019
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
15-Mar-2019
CODE
NAVAL SEA SYSTEMS COMMAND (HQ)
1333 ISAAC HULL AVE SE
WASHINGTON NAVY YARD DC 20376-2030
N00024 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N0002419R4446
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION B - SUPPLIES OR SERVICES AND PRICES
SUBCLIN 0101AA
The CLIN extended description has changed from:
PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF THE USS ANZIO (CG 68)
DURING FY20 MODPRD (Modernization Period) (Non-prorated WIs – See attachment J-14 for list)The
Contractor shall prepare for and accomplish repair and modernization during the MODERNIZATION PERIOD
(MODPRD) onboard USS ANZIO (CG 68) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-11 and J-12.See Note B
To:
Contractor shall prepare for and accomplish repair and modernization during the MODERNIZATION PERIOD
(MODPRD) onboard USS ANZIO (CG 68) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-11 and J-12.See Notes B and C
SUBCLIN 0101AB
PPREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF THE USS ANZIO (CG 68)
Contractor shall prepare for and accomplish repair and modernization during the MODERNIZATION PERIOD
(MODPRD) onboard USS ANZIO (CG 68) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included
PPREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF THE USS ANZIO (CG 68)
Contractor shall prepare for and accomplish repair and modernization during the MODERNIZATION PERIOD
(MODPRD) onboard USS ANZIO (CG 68) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included
SUBCLIN 0101AC
Contractor shall prepare for and accomplish repair and modernization during the MODERNIZATION PERIOD
(MODPRD) onboard USS ANZIO (CG 68) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included
Contractor shall prepare for and accomplish repair and modernization during the MODERNIZATION PERIOD
(MODPRD) onboard USS ANZIO (CG 68) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included
SUBCLIN 0101AD
Contractor shall prepare for and accomplish repair and modernization during the MODERNIZATION PERIOD
(MODPRD) onboard USS ANZIO (CG 68) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included
Contractor shall prepare for and accomplish repair and modernization during the MODERNIZATION PERIOD (MODPRD) onboard USS ANZIO (CG 68) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included
SUBCLIN 0101AE
Contractor shall prepare for and accomplish repair and modernization during the MODERNIZATION PERIOD
(MODPRD) onboard USS ANZIO (CG 68) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included
Contractor shall prepare for and accomplish repair and modernization during the MODERNIZATION PERIOD
(MODPRD) onboard USS ANZIO (CG 68) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included
SUBCLIN 0101AF
Contractor shall prepare for and accomplish repair and modernization during the MODERNIZATION PERIOD
(MODPRD) onboard USS ANZIO (CG 68) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included
Contractor shall prepare for and accomplish repair and modernization during the MODERNIZATION PERIOD
(MODPRD) onboard USS ANZIO (CG 68) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included
SUBCLIN 0101AG
Contractor shall prepare for and accomplish repair and modernization during the MODERNIZATION PERIOD
(MODPRD) onboard USS ANZIO (CG 68) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included
Contractor shall prepare for and accomplish repair and modernization during the MODERNIZATION PERIOD
(MODPRD) onboard USS ANZIO (CG 68) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included
SUBCLIN 0101AH
Contractor shall prepare for and accomplish repair and modernization during the MODERNIZATION PERIOD
(MODPRD) onboard USS ANZIO (CG 68) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included
Contractor shall prepare for and accomplish repair and modernization during the MODERNIZATION PERIOD
(MODPRD) onboard USS ANZIO (CG 68) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included
SECTION I - CONTRACT CLAUSES
The following have been modified:
52.217-7 OPTION FOR INCREASED QUANTITY--SEPARATELY PRICED LINE ITEM (MAR 1989)
Applicable to CLINs 0002 – 0014: USS VICKSBURG (CG 69) FY19 MODPRD
The Government may require the delivery of the numbered line item, identified in the Schedule as an option item, in the quantity and at the price stated in the Schedule. The Contracting Officer may exercise the option by written notice to the Contractor within 20 days prior to the availability start date. Delivery of added items shall continue at the same rate that like items are called for under the contract, unless the parties otherwise agree.
Applicable to Growth Reservation CLINs 0015 - 0035: USS VICKSBURG (CG 69) FY19 MODPRD
The Government may require the delivery of the numbered line item, identified in the Schedule as an option item, in the quantity and at the price stated in the Schedule. The Contracting Officer may exercise the option by written notice to the Contractor NLT than September 15th, 2020. Delivery of added items shall continue at the same rate that like items are called for under the contract, unless the parties otherwise agree.
Applicable to CLINs 0101 AA - 0101AJ, 0102 – 0121: USS ANZIO (CG 68) FY20 MODPRD
The Government may require the delivery of the numbered line item, identified in the Schedule as an option item, in the quantity and at the price stated in the Schedule. The Contracting Officer may exercise the option by written notice to the Contractor within 90 days prior to the availability start date. Delivery of added items shall continue at the same rate that like items are called for under the contract, unless the parties otherwise agree.
Applicable to Growth Reservation CLINs 0122 - 0149: USS ANZIO (CG 68) FY20 MODPRD
The Government may require the delivery of the numbered line item, identified in the Schedule as an option item, in the quantity and at the price stated in the Schedule. The Contracting Officer may exercise the option by written notice to the Contractor NLT than September 15th, 2021. Delivery of added items shall continue at the same rate that like items are called for under the contract, unless the parties otherwise agree.
SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
The following have been modified:
Section J - List of Documents, Exhibits and Other Attachments
DOCUMENTS/EXHIBITS/ATTACHMENTS
The following document(s), exhibit(s), and other attachment(s) form a part of this solicitation:
No. Document
Attachment S-1 Manpower Utilization Data Sheet
Attachment S-2 Dry-Dock Utilization Data Sheet
Attachment S-3 Pre-Proposal Information (PPI) Form
Attachment S-4 Manpower Plan to Actual Data Sheet
Attachment S-5 Eligibility Criteria Data Sheet
Attachment S-6 Value Adjusted Total Evaluated Price Reduction Tables
The following document(s), exhibit(s), and other attachment(s) also form a part of this solicitation and will form a part of the contract resulting from this solicitation:
CG 69 FY19 MODPRD
Attachment J-1 Specification Package No. TPPC-CG69-MARMCN19-CN01 Rev 1 (Errata 1, Errata 2, Errata 3)
Attachment J-2 Work Item Plans, Drawings, and Other References Attachment J-3 Execution Milestones and Key Event Dates (Amendment 0001)
Attachment J-4 Pricing Workbook (Amendment 0001)
Attachment J-5 Quality Assurance Surveillance Plan
Attachment J-6 Subcontracting Plan (to be incorporated upon award)
Attachment J-7 Schedule Model Review
CG 68 FY20 MODPRD
Attachment J-11 Specification Package No. TPPC-CG68-MARMCN20-CN02 (Errata 1, Errata 2, Errata
3)
Attachment J-12 Work Item Plans, Drawings, and Other References
Attachment J-13 Execution Milestones and Key Event Dates (Amendment 0001)
Attachment J-14 Pricing Workbook (Amendment 0001)
Attachment J-15 Quality Assurance Surveillance Plan
Attachment J-16 Subcontracting Plan (to be incorporated upon award)
Attachment J-17 Schedule Model Review
Exhibit A Contract Data Requirements List (CDRL) (DD Form 1423) A001-A003; A005-A009; A011; A012; A014
(Does not include A004, A0010, or A0013)
Exhibit B Contract Data Requirements List (CDRL) (DD Form 1423) B001-B009
Exhibit C Contract Data Requirements List (CDRL) (DD Form 1423) C001-C002
(End of Summary of Changes)