N00024-19-R-4446_conformed_through_0005.pdf
PDF 1 MB Posted
- Attached to
- USS VICKSBURG (CG 69) and USS ANZIO (CG 68) Modernization Period (MODPRD) Availabilities SOLICITATION
- Solicitation number
- N00024-19-R-4446
About this file
N00024-19-R-4446 Conformed RFP
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N00024-19-R-4446_Amendment_0005.pdf | ||
| N00024-19-R-4446_0004.pdf | ||
| S-3_BQ_PPI_ANZIO_CG68_QA_4.xlsm | XLSM spreadsheet | |
| S-3_BQ_PPI_VICKSBURG_CG69_QA_4.xlsm | XLSM spreadsheet | |
| S-3_BQ_PPI_ANZIO_CG68_QA_3.xlsm | XLSM spreadsheet | |
| N00024-19-R-4446_A0003_conformed.pdf | ||
| S-3_BQ_PPI_VICKSBURG_CG69_QA_3.xlsm | XLSM spreadsheet | |
| N00024-19-R-4446_A0003.pdf | ||
| S-3_BQ_PPI_ANZIO_CG68_QA_2.xlsm | XLSM spreadsheet | |
| N00024-19-R-4446_0002.pdf | ||
| S-3_BQ_PPI_VICKSBURG_CG69_QA_2.xlsm | XLSM spreadsheet | |
| N00024-19-R-4446_conformed_through_0002.pdf | ||
| N00024-19-R-4446_0001.pdf | ||
| S-3_BQ_PPI_VICKSBURG_CG69_QA_1.xlsm | XLSM spreadsheet | |
| N00024-19-R-4446_conformed_though_0001.pdf | ||
| S-3_BQ_PPI_ANZIO_CG68_QA_1.xlsm | XLSM spreadsheet | |
| J-14_CG68_ANZIO_Pricing_Spreadsheet.xlsx | XLSX spreadsheet | |
| J-4_CG69_VICKSBURG_Pricing_Spreadsheet.xlsx | XLSX spreadsheet | |
| J-5_QASP_VIK_ANZ_MODPRDs.docx | DOCX document | |
| N00024-19-R-4446.pdf |
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CODE
(Hour)
PAGE(S)
until 03:00 PM local time 01 Apr 2019
X
A X B X C X D
EX
X
G F 183 - 188
189 - 201 X H 202 - 207 martha.bello@navy.mil
RATING PAGE OF PAGES
7. ISSUED BY
(Date)
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)
Prescribed by GSA FAR (48 CFR) 53.214(c)
DO-A3 1 207
(If other than Item 7)
15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO
AND
ADDRESS
SIGN OFFER (Type or print)
OF
OFFEROR
AMENDMENT NO. DATE
15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS
IS DIFFERENT FROM ABOVE - ENTER
SUCH ADDRESS IN SCHEDULE.
18. OFFER DATE
1. THIS CONTRACT IS A RATED ORDER
UNDER DPAS (15 CFR 700)
2. CONTRACT NO.
N00024 8. ADDRESS OFFER TO
See Item 7
9. Sealed offers in original and 4 copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in
CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and
Section L conditions contained in this solicitation.
10. FOR INFORMATION
CALL:
A. NAME (NO COLLECT CALLS)
MARTHA BELLO 202-781-3864
11. TABLE OF CONTENTS
SOLICITATION/ CONTRACT FORM
SUPPLIES OR SERVICES AND PRICES/ COSTS
2 - 116
X I CONTRACT CLAUSES
DESCRIPTION/ SPECS./ WORK STATEMENT X
PACKAGING AND MARKING
117 - 140 141 - 142
J LIST OF ATTACHMENTS
INSPECTION AND ACCEPTANCE
DELIVERIES OR PERFORMANCE
143 - 146 147 - 154
X K
REPRESENTATIONS, CERTIFICATIONS AND
OTHER STATEMENTS OF OFFERORS
CONTRACT ADMINISTRATION DATA 155 - 159 X
SPECIAL CONTRACT REQUIREMENTS
OFFER (Must be fully completed by offeror) 160 - 166 X M
L INSTRS., CONDS., AND NOTICES TO OFFERORS
EVALUATION FACTORS FOR AWARD
NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. DISCOUNT FOR PROMPT PAYMENT
(See Section I, Clause No. 52.232-8)
14. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments
AMENDMENT NO. DATE
to the SOLICITATION for offerors and related documents numbered and dated):
FACILITY
12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period
SOLICITATION, OFFER AND AWARD
X
(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)
PART I - THE SCHEDULE
26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE
EMAIL:TEL: (Signature of Contracting Officer)
CODE CODE
B. TELEPHONE (Include area code) C. E-MAIL ADDRESS
AWARD (To be completed by Government)
19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION
22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:
10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)
23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE
PART IV - REPRESENTATIONS AND INSTRUCTIONS
PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
167 - 181
PART II - CONTRACT CLAUSES
NAVAL SEA SYSTEMS COMMAND (HQ)
1333 ISAAC HULL AVE SE
WASHINGTON NAVY YARD DC 20376-2030
FAX:
TEL:
FAX:
TEL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SOLICITATION
6. REQUISITION/PURCHASE NO.
N0002419FR93026
5. DATE ISSUED
18 Jan 2019
4. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
[ X ]
3. SOLICITATION NO.
N0002419R4446
Section B - Supplies or Services and Prices
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
CLIN
Number
Base Items
FFP
PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF
THE USS VICKSBURG (CG 69) DURING FY19 MODPRD (Modernization Period) (Non-prorated WIs – See attachment J-4 for list)
The Contractor shall prepare for and accomplish repair and modernization during the MODERNIZATION PERIOD (MODPRD) onboard USS VICKSBURG (CG
69) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.
See Note B
PURCHASE REQUEST NUMBER: N0002419FR93026
NET AMT
0001AA
1 Lot
FFP
PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF
69) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.
See Note B
FOB: Destination
PSC CD: J998
0001AB
FFP
PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF
69) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.
See Note B
0001AC
FFP
PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF
69) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.
See Note B
OPTION Base Items
FFP
PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF
69) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.
See Notes B and C
FFP
PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF
69) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.
See Notes B and C
FFP
PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF
69) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.
See Notes B and C
FFP
PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF
69) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.
See Notes B and C
FFP
PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF
69) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.
See Notes B and C
FFP
PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF
69) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.
See Notes B and C
FFP
PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF
69) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.
See Notes B and C
FFP
PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF
69) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.
See Notes B and C
FFP
PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF
69) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.
See Notes B and C
FFP
PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF
69) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.
See Notes B and C
FFP
PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF
69) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.
See Notes B and C
FFP
PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF
69) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.
See Notes B and C
FFP
PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF
69) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.
See Notes B and C
OPTION Growth for CLIN 0001AA
FFP
PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF
69) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.
See Notes A, B, C, D, E, F, and G
FFP
PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF
69) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.
See Notes A, B, C, D, E, F, and G
FFP
PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF
69) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.
See Notes A, B, C, D, E, F, and G
OPTION Growth for CLIN 0001AB
FFP
PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF
69) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.
See Notes A, B, C, D, E, F, and G
OPTION Growth for CLIN 0001AB
FFP
PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF
69) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.
See Notes A, B, C, D, E, F, and G
OPTION Growth for CLIN 0001AC
FFP
PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF
69) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.
See Notes A, B, C, D, E, F, and G
FFP
PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF
69) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.
See Notes A, B, C, D, E, F, and G
FFP
PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF
69) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.
See Notes A, B, C, D, E, F, and G
OPTION Growth for CLIN 0002
FFP
PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF
69) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.
See Notes A, B, C, D, E, F, and G
OPTION Growth for CLIN 0003
FFP
PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF
69) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.
See Notes A, B, C, D, E, F, and G
OPTION Growth for CLIN 0004
FFP
PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF
69) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.
See Notes A, B, C, D, E, F, and G
OPTION Growth for CLIN 0005
FFP
PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF
69) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.
See Notes A, B, C, D, E, F, and G
OPTION Growth for CLIN 0006
FFP
PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF
69) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.
See Notes A, B, C, D, E, F, and G
OPTION Growth for CLIN 0007
FFP
PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF
69) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.
See Notes A, B, C, D, E, F, and G
OPTION Growth for CLIN 0008
FFP
PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF
69) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.
See Notes A, B, C, D, E, F, and G
OPTION Growth for CLIN 0009
FFP
PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF
69) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.
See Notes A, B, C, D, E, F, and G
OPTION Growth for CLIN 0010
FFP
PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF
69) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.
See Notes A, B, C, D, E, F, and G
OPTION Growth for CLIN 0011
FFP
PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF
69) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.
See Notes A, B, C, D, E, F, and G
OPTION Growth for CLIN 0012
FFP
PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF
69) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.
See Notes A, B, C, D, E, F, and G
OPTION Growth for CLIN 0013
FFP
PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF
69) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.
See Notes A, B, C, D, E, F, and G
OPTION Growth for CLIN 0014
FFP
PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF
69) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.
See Notes A, B, C, D, E, F, and G
30 Days
OPTION Daily Extensions
FFP
Additional Days in Dock requiring Availability Extension
PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF
69) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.
See Notes A, B, C, D, E, F, and G
5 Days
FFP
Additional Days in Dock NOT requiring Availability Extension
PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF
69) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.
See Notes A, B, C, D, E, F, and G
85 Days
FFP
Additional Days Pier Side requiring Availability Extension
PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF
69) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.
See Notes A, B, C, D, E, F, and G
PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF
THE USS ANZIO (CG 68) DURING FY20 MODPRD (Modernization Period) (Non-prorated WIs – See attachment J-14 for list) the MODERNIZATION PERIOD (MODPRD) onboard USS ANZIO (CG 68) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-11 and J-12.
See Note B
0101AA
FFP
PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF
specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-11 and J-12.
See Notes B and C
0101AB
FFP
PPREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF
specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-11 and J-12.
See Notes B and C
0101AC
FFP
PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF
specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-11 and J-12.
See Notes B and C
0101AD
FFP
PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF
specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-11 and J-12.
See Notes B and C
0101AE
FFP
PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF
specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-11 and J-12.
See Notes B and C
0101AF
FFP
PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF
specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-11 and J-12.
See Notes B and C
0101AG
FFP
PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF
specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-11 and J-12.
See Notes B and C
0101AH
FFP
PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF
specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-11 and J-12.
See Notes B and C
0101AJ
FFP
PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF
specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-11 and J-12.
See Notes A, B, C, D, E, F, and G
FFP
PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF
specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-11 and J-12.
See Notes B and C
FFP
PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF
specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-11 and J-12.
See Notes B and C
FFP
PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF
specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-11 and J-12.
See Notes B and C
FFP
PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF
specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-11 and J-12.
See Notes B and C
FFP
PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF
specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-11 and J-12.
See Notes B and C
FFP
PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF
specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-11 and J-12.
See Notes B and C
FFP
PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF
specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-11 and J-12.
See Notes B and C
FFP
PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF
specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-11 and J-12.
See Notes B and C
FFP
PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF
specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-11 and J-12.
See Notes B and C
FFP
PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF
specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-11 and J-12.
See Notes B and C
FFP
PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF
specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-11 and J-12.
See Notes B and C
FFP
PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF
specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-11 and J-12.
See Notes B and C
FFP
PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF
specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-11 and J-12.
See Notes B and C
FFP
PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF
specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-11 and J-12.
See Notes B and C
FFP
PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF
specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-11 and J-12.
See Notes B and C
FFP
PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF
specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-11 and J-12.
See Notes B and C
FFP
PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF
specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-11 and J-12.
See Notes B and C
FFP
PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF
specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-11 and J-12.
See Notes B and C
FFP
PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF
specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-11 and J-12.
See Notes B and C
FFP
PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF
specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-11 and J-12.
See Notes B and C
OPTION Growth for CLIN 0101AA
FFP
PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF
specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-11 and J-12.
See Notes A, B, C, D, E, F, and G
FFP
PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF
specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-11 and J-12.
See Notes A, B, C, D, E, F, and G
FFP
PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF
specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-11 and J-12.
See Notes A, B, C, D, E, F, and G
OPTION Growth for CLIN 0101AB
FFP
PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF
specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-11 and J-12.
See Notes A, B, C, D, E, F, and G
OPTION Growth for CLIN 0101AB
FFP
PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF
specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-11 and J-12.
See Notes A, B, C, D, E, F, and G
OPTION Growth for CLIN 0101AC
FFP
PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF
specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-11 and J-12.
See Notes A, B, C, D, E, F, and G
FFP
PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF
specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-11 and J-12.
See Notes A, B, C, D, E, F, and G
FFP
PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF
specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-11 and J-12.
See Notes A, B, C, D, E, F, and G
OPTION Growth for CLIN 0102
FFP
PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF
specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-11 and J-12.
See Notes A, B, C, D, E, F, and G
OPTION Growth for CLIN 0103
FFP
PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF
specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-11 and J-12.
See Notes A, B, C, D, E, F, and G
OPTION Growth for CLIN 0104
FFP
PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF
specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-11 and J-12.
See Notes A, B, C, D, E, F, and G
OPTION Growth for CLIN 0105
FFP
PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF
specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-11 and J-12.
See Notes A, B, C, D, E, F, and G
OPTION Growth for CLIN 0106
FFP
PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF
specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-11 and J-12.
See Notes A, B, C, D, E, F, and G
OPTION Growth for CLIN 0107
FFP
PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF
specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-11 and J-12.
See Notes A, B, C, D, E, F, and G
OPTION Growth for CLIN 0108
FFP
PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF
specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-11 and J-12.
See Notes A, B, C, D, E, F, and G
OPTION Growth for CLIN 0109
FFP
PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF
specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-11 and J-12.
See Notes A, B, C, D, E, F, and G
OPTION Growth for CLIN 0110
FFP
PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF
specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-11 and J-12.
See Notes A, B, C, D, E, F, and G
OPTION Growth for CLIN 0111
FFP
PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF
specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-11 and J-12.
See Notes A, B, C, D, E, F, and G
OPTION Growth for CLIN 0112
FFP
PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF
specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-11 and J-12.
See Notes A, B, C, D, E, F, and G
OPTION Growth for CLIN 0113
FFP
PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF
specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-11 and J-12.
See Notes A, B, C, D, E, F, and G
OPTION Growth for CLIN 0114
FFP
PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF
specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-11 and J-12.
See Notes B, C, D, E, F, and G
OPTION Growth for CLIN 0115
FFP
PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF
specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-11 and J-12.
See Notes A, B, C, D, E, F, and G
OPTION Growth for CLIN 0116
FFP
PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF
specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-11 and J-12.
See Notes A, B, C, D, E, F, and G
OPTION Growth for CLIN 0117
FFP
PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF
specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-11 and J-12.
See Notes A, B, C, D, E, F, and G
OPTION Growth for CLIN 0118
FFP
PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF
specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-11 and J-12.
See Notes A, B, C, D, E, F, and G
OPTION Growth for CLIN 0119
FFP
PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF
specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-11 and J-12.
See Notes A, B, C, D, E, F, and G
OPTION Growth for CLIN 0120
FFP
PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF
specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-11 and J-12.
See Notes A, B, C, D, E, F, and G
OPTION Growth for CLIN 0121
FFP
PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF
specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-11 and J-12.
See Notes A, B, C, D, E, F, and G
30 Days
OPTION Daily Extension
FFP
Additional Days in Dock requiring Availability Extension
PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF
specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-11 and J-12.
See Notes A, B, C, D, E, F, and G
5 Days
FFP
Additional Days in Dock NOT requiring Availability Extension
PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF
specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-11 and J-12.
See Notes A, B, C, D, E, F, and G
85 Days
FFP
Additional Days Pier Side requiring Availability Extension
PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF
specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-11 and J-12.
See Notes A, B, C, D, E, F, and G
OPTION Growth for CLIN 0101AD
FFP
PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF
specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-11 and J-12.
See Notes A, B, C, D, E, F, and G
OPTION Growth for CLIN 0101AE
FFP
PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF
specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-11 and J-12.
See Notes A, B, C, D, E, F, and G
OPTION Growth for CLIN 0101AF
FFP
PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF
specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-11 and J-12.
See Notes A, B, C, D, E, F, and G
OPTION Growth for CLIN 0101AG
FFP
PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF
specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-11 and J-12.
See Notes A, B, C, D, E, F, and G
OPTION Growth for CLIN 0101AH
FFP
PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF
specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-11 and J-12.
See Notes A, B, C, D, E, F, and G
OPTION Growth for CLIN 0101AJ
FFP
PREPARE FOR AND ACCOMPLISH REPAIR AND MODERNIZATION OF
specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-11 and J-12.
See Notes A, B, C, D, E, F, and G
DATA
CONTRACT DATA REQUIREMENTS LIST (CDRLs) FOR ALL CLINs, INCLUDING OPTION CLINS, IF EXERCISED.
The data to be furnished hereunder shall be prepared and submitted in accordance with the Contract Data Requirements List, DD Form 1423, Exhibits A, B and C attached hereto. The CDRLs form a part of the schedule of this solicitation.
Not Separately Priced (NSP).
OPTION DATA
CONTRACT DATA REQUIREMENTS LIST (CDRLs) FOR ALL CLINs, INCLUDING OPTION CLINS, IF EXERCISED.
The data to be furnished hereunder shall be prepared and submitted in accordance with the Contract Data Requirements List, DD Form 1423, Exhibits A, B and C attached hereto. The CDRLs form a part of the schedule of this solicitation.
Not Separately Priced (NSP).
LEVEL OF EFFORT TO COMPLETION
NOTE A: LEVEL OF EFFORT TO COMPLETION –SHIP REPAIR
1. The Contractor agrees to provide the level of effort to completion in the performance of growth
CLINs.
272,376 hours and $5,997,568 materials for the USS VICKSBURG (CG69) FY19 MODPRD 334,573 hours and $3,640,211 materials for the USS ANZIO (CG68) FY20 MODPRD
2. The total level of effort to completion for the performance of the above CLINs shall be man-hours of direct labor and the associated material required to support that labor and effort. The mix of labor and material may be adjusted, but may not exceed the dollar value of each CLIN listed above.
3. Effort performed in fulfilling the level of effort to completion obligations specified above shall only include effort performed in direct support of this contract and shall not include time and effort expended on such things as (local travel to and from an employee' s usual work location), uncompensated effort while on travel status, truncated lunch periods, work (actual or inferred) at an employee' s residence or other non-work locations.
4. LOE to Completion labor hours and material are within the general scope of the work stated in the contract and may not be used to: (1) direct a change as defined in, "FAR 52.243-1 CHANGES FIXED -PRICE clause of this contract or (2) change any of the terms or conditions of the contract.
5. If, in the opinion of the Contractor, any effort directed in the Growth Management Request Form calls for effort outside the scope of the contract, the Contractor shall notify the Contracting Officer in writing within two (2) working days after the receipt of any such direction. The Contractor shall not proceed with the work affected by the Growth Management Request Form unless and until the Contractor is notified by the Contracting Officer that the directed work is within the scope of this contract. Thereafter, any remaining disagreement on the scope issue shall be a dispute under the Disputes clause; however, nothing in this clause shall excuse the Contractor from proceeding with the subject growth work as directed by the Contracting Officer.
LABOR & MATERIAL BURDEN RATES
NOTE B: FIXED SHIP REPAIR LABOR AND MATERIAL BURDEN RATES FOR GROWTH AND NEW
WORK
SCHEDULE OF PRICES / RATES: SHIP REPAIR LABOR RATE (FULLY BURDENED)
1. The Contractor’s fully burdened ship repair labor rate will be used for negotiating growth and new work to be performed under this contract. The contractor agrees that the number of hours included in its price proposal for contract modifications shall include only direct production hours. For these purposes, direct production hours are for skilled labor at the journeyman level expended in direct production including but not limited to the following functions:
Abrasive cleaning/blasting Fire Watch Welding Burning Brazing
Carpentry Machinists (inside and outside) Electrical Work Electronic Work Engineering Design Support Lagging Ship-fitting Boiler-making Painting Sheet-metal Work Pipefitting Rigging General Labor Staging/Scaffolding Diesel Mechanics
2. The fully burdened ship repair labor rate proposed by the contractor listed in paragraph 7 below shall include all costs associated with support functions (whether charged directly or indirectly by the offeror’s accounting systems) provided in support of the direct production functions listed in paragraph 1 above.
Support functions shall be considered to be included in the offeror’s fully burdened ship repair labor rate for direct production hours. Labor hours for the below support functions shall not be separately proposed in any
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.