Text version
Solicitation #: N00024-18-R-4448 NAVSEA POC Name/Title Phone
Date of Response: 9/7/2018 Jamillah Powell 202-781-2040 Randolph Cook 202-781-0093
E-Mail jamillah.powell@navy.mil randolph.cook@navy.mil
FBO Post # Work Item No.
Document Number/Title Document
Type Question Government Response
2 256-61-003
Remote Valve Operator
Other
USS BULKELEY- Para 3.1 states 009-90 for a tech rep. The para also states it’s a rigid rod remote operator. There isn't any need for a tech rep for the rigid rod type operators.
Contractor recommends deleting this requirement or provide a name and number of a tech rep to be utilized.
TECH REP REQUIREMENT DELETED FROM PARA 3.1 IN
ERATTA 1
3 256-61-004
Remote Valve Operator
Other
USS BULKELEY - Para 3.1 states 009-90 for a tech rep. The para also states it’s a rigid rod remote operator. There isn't any need for a tech rep for the rigid rod type operators.
Contractor recommends deleting this requirement or provide a name and number of a tech rep to be utilized.
TECH REP REQUIREMENT DELETED FROM PARA 3.1 IN
ERRATA 1
4 256-61-005
Remote Valve Operator
Other
USS BULKELEY - Para 3.1 states 009-90 for a tech rep. The para also states it’s a rigid rod remote operator. There isn't any need for a tech rep for the rigid rod type operators.
Contractor recommends deleting this requirement or provide a name and number of a tech rep to be utilized.
TECH REP REQUIREMENT DELETED FROM PARA 3.1 IN
ERRATA 1
5 411-90-001
SA 89925K AWS ACB16/TI16 CIC Display
Other
USS BULKELEY - Para 3.1 states AIT will accomplish all electrical work, then para 3.2 states to accomplish ref. 2.2 through 2.9. Ref. 2.7 & 2.8 are electrical drawings. Please confirm AIT will accomplish 2.7 & 2.8 entirely.
REF 2.7 IS TO BE ACCOMPLISHED BY THE CONTRACTOR. REF
2.8 AND 2.9 WILL BE ACCOMPLISHD BY THE AIT. REF 2.8 AND
2.9 DELETED ON ERATTA 1
6 456-90-002
SA 89769K ACB16/TI16 KAS WDRC USS BULKELEY - Para 3.1 states AIT will accomplish all electrical work, then para 3.2 states to accomplish ref. 2.2 through 2.12 Ref. 2.4 is electrical drawing. Please confirm AIT will accomplish 2.4 entirely.
REF 2.4 DELETED ON ERATTA 1. AIT TO ACCOMPLISH 2.4
7 541-80-001
SA 80246D F-76 Small Boat Refueling
Other
USS BULKELEY - Para 3.9 states to accomplish 009-107 for the cleaning and flushing of the sonar dome pressurization system. This doesn't make any sense. This item has nothing to do with the sonar pressurization system. Further para 3.9.1 states to accomplish 009-09 of the new and disturbed surfaces. Again, this doesn't make any sense. Recommend these paras be deleted
PARA 3.9 DELETED ON ERATTA 1
8 RESERVED RESERVED RESERVED RESERVED RESERVED
9 RESERVED RESERVED RESERVED RESERVED RESERVED
23 120-11-014
Structural Bulkhead Other USS GUNSTON HALL - Please confirm that paragraph 3.6 only applies to new and disturbed work, not the entire space.
009-32 Paragraph 3.6.1.3 Included under touch-up operations are new and disturbed surfaces of less than 10 square feet. Work area exceeds 10 square feet. Errata 4 to change the location from exterior to read "surfaces listed in 1.2.2" and "preservation of the interior surfaces listed in 1.2.1."
30 RESERVED RESERVED RESERVED RESERVED RESERVED
56 472-90-001
SA 80156K AN/SLQ-32 SEWIP Block 2 Other USS ARLEIGH BURKE - Para 3.1.9 states to procure the material from Attachment A. The Attachment A shows 3 columns of sources and its conflicting what is identified as GFM in the 4720 and the drawings. The Contractor uses the 4720 as the GFM provided material. Please provide an attachment listing what the Government wants the contractor to provide
Errata #1 submitted on 8/13/18 to provide updated Attachment A.
57 RESERVED RESERVED RESERVED RESERVED RESERVED
992-11-014 & 992- 11-015
Messing and Berthing Barge Temporary Service in Contractor Plant
Other USS Arleigh Burke - Are items 992-11-014 & 992-11-015 intended for home port bidders only?
Yes.
992-11-007, 992-11- 010 & 992-11-017
Other USS Arleigh Burke - Are items 992-11-007, 992-11-010 & 992-11-017 intended for out of home port bidders?
Yes.
60 482-90-001 Drawing USS Arleigh Burke - Please provide drawing number 482-876654 Rev. A. Drawing provided via ARMDEC Safe
61 168-12-002
Structural Door; repair Other USS Arleigh Burke - Paragraph 3.2, 3.2.1 specifies the fluidized bed method of powder coating (Table 2, Line 26) for the door. This requires that the door be shipped to the sole source provided in Canada. Can the work item be revised to invoke a standard type of powder coating that can be accomplished locally?
Yes, Errata 2 provided
62 251-31-002
Intake Engine Room Number One (Dirty Side), Structural
Other USS Arleigh Burke - Paragraph 3.13 - Please clarify the intent of the subject paragraph.
The item calls out for a blast of each repair area but a paint paragraph has not been included in the item. Should paragraph 3.13 be to paint the exterior of the surface repairs because 3.12 is for the interior?
Yes, Errata 2 provided
63 251-31-002
Intake Engine Room Number One (Dirty Side), Structural
Other USS Arleigh Burke - Paragraph 3.12, 3.13.1 - There is no paragraph to preserve surfaces NOT repaired, only to blast each intake. Paragraphs 3.12 & 3.13.1 are only addressing the repaired surfaces.
Errata 2 provided to modify 3.12 and to delete 3.13.1
251-31-003 / 251- 32-004
Other USS Arleigh Burke - Please clarify the intent of paragraph 3.13. The item calls out for a blast of each repair area but a paint paragraph has not been included. Should this be for painting the exterior of surface repairs since 3.11 is for the interior? Errata 2 provided to correct 3.11 and 3.12 and delete 3.12.1.
Paragraph 3.13 is correct as written.
65 631-11-007
Collective Protection System (CPS) Zone 4 Fan Room; repair and preserve
Other USS Arleigh Burke - Paragraph 3.2, 3.12 - Will the Government clarify "009-32 of 2.1 including Table x, Line x for preservation of each repair located in 1.x?" The statement of preservation for each repair area dictates to paint the repairs. This statement would only be clear if a SP-6 was not called out for this item. This leaves the area not getting preserved as the work item states to preserve only repaired areas. Please clarify if the intent is to preserve the entire area (space, tank, fan room).
Errata 2 provided
66 631-12-001
AFFF Hose Reel; replace Other USS Arleigh Burke - Paragraph 3.3 - Please clarify the locations of the retained hose reels, located in 1.2.2 - 1.2.4 and 2.2.2 for reuse. Paragraph 2.2.2 not included.
Errata 2 provided
67 631-21-001
Mast Preservation; accomplish Other USS Arleigh Burke - Contractor requests a reference drawing of the mast. Errata 2 provided. Reference provided via ARMDEC Safe.
68 631-21-003
Weather Deck; preserve Other USS Arleigh Burke - Paragraph 3.6 - There is not a location for 3.6 provided in the spec item. Should 009-78 be called out and PCMS provided or will this paragraph be removed in a future Errata?
Errata 2 provided
69 RESERVED RESERVED RESERVED RESERVED RESERVED
70 RESERVED RESERVED RESERVED RESERVED RESERVED
71 RESERVED RESERVED RESERVED RESERVED RESERVED
72 RESERVED RESERVED RESERVED RESERVED RESERVED
73 482-90-001
SA 81961K Other USS Arleigh Burke - Para 3.2 states to accomplish 2.4 to support the AIT by direction of the AIT. Please provide the detail of the AIT support needs. In addition, we did not receive Ref. 2.4 8766564 A. Please provide.
Paragraph 3.2 states "AIT support requirements are listed below:" Then the sub paragraphs immediately following 3.2 states the AITs responsibility for accomplishing the requirements of 2.4 (listed in para's 3.2.1, 3.2.2, 3.2.3, 3.2.4).
Then the KTR requirements of Ref 2.4 to support the AIT are listed in para's 3.2.5 thru 3.2.9. Copy of Ref. 2.4 provided via ARMDEC Safe 20 Aug 2018.
74 Standard Item 009-79
Government Owned Material (GOM) Status for Multi-Ship Multi-Option availabilities
Other USS Arleigh Burke - This standard item 009-79 is listed as a cat 1, but isn't marked out.
This doesn't apply to a FFP contract. Its identified in the standard item for a MSMO contract. Please mark through the 009-79 in the index
Concur 009-79 is for MSMO only. Errata 2 provided
75 633-11-003
Steering Gear Room, Zinc Anode; Replace Other USS Arleigh Burke - Para 3.3 states to install each new zinc anode found missing or damaged. Please confirm the contractor is to price 1 anode.
It is the responsibility of the KTR to determine per the drawings, para 3.1, and shipcheck how many zinc anodes are to be replaced.
76 RESERVED RESERVED RESERVED RESERVED RESERVED
77 RESERVED RESERVED RESERVED RESERVED RESERVED
78 130-11-006
Fan Room Other USS Arleigh Burke - Para 3.5 states to accomplish 009-32 table 3 Lines 6 & 21, which is a power tool clean. Please confirm, the contractor is to only preserve that which was repaired 3.2 - 3.2.4.
Errata 2 provided. WI 130-11-006 para 3.5 modified to read:
accomplish 009-32 table 3 Line 21 for preservation of each repair and entire deck located in 1.2
Title was also modified for clarity and now reads: Fan Room Deck, FR 42: Repair & Preserve.
79 150-11-012
Bridge Wing Other USS Arleigh Burke - Para 3.5 states to accomplish 009-32 table 2 line 1. Please confirm this is only for the new material installed in 3.2
Errata 2 provided. WI 150-11-012 para 3.5 modified to read:
Table 2 Lines 1-4 for each repair and entire location listed in 1.2.
80 150-11-013
Antenna Radome Foundation Other USS Arleigh Burke - Para 3.9 states to accomplish 009-32 for the new plate installed in 3.3.
Please change spec to read new plate installed in 3.2. Also, for para 3.10, please confirm, we are only preserving the areas repaired and not the entire space.
Errata 2 provided. WI 150-11-013 para 3.9 modified to read:
009-32 of 2.1 including Table 2, Lines 1 thru 4 for each repair located in 1.2.
Para 3.10 modified to read: Table 3, Line 1 for each repair interior surfaces located in 1.2.3 .
81 251-31-002
Intake Engine Room Number One (Dirty Side), Structural Repair; accomplish
Other USS Arleigh Burke - Is it the government’s intention to coat the surfaces prepared in para 3.3? Para 3.3 directs to SP-6 entire space, and the only preservation para preserve repaired surfaces or new and disturbed.
Errata 2 provided to clarify Government's intent.
82 631-11-010
Collective Protection System (CPS) Zone One Fan Room; repair and preserve
Other USS Arleigh Burke - Para 3.2 states to commercial blast the fan room. However, there is nothing in the item directing the contractor to preserve what was blasted. Para 3.4 only refers to the areas receiving lagging. Please correct this or confirm we are not painting the blasted areas.
Errata 2 provided. WI 631-11-010 Para 3.8 has been modified to read: accomplish 009-32 of 2.1 including Table 3, lines 14 thru 17 for preservation of entire interior surfaces of location listed in 1.2.
Para 3.4 is correct as written no lagging associated with this paragraph.
83 123-19-002
VCHT and Plumbing Waste Drain Tank Other USS Arleigh Burke - Para 3.2 has a requirement for a 009-90 for a tech rep. These tanks contain simple level switches not a TLI System. There is no need for a tech rep or 009-90.
Recommend para 3.2 be deleted.
Concur with recommendation to delete para 3.2.
Errata 2 provided.
84 123-11-006
Compensated Fuel Tank, Group 6; repair and preserve
Other USS Arleigh Burke - Para 3.8 invokes Table 4, Line 9 of 009-32, which is for reserve feedwater tanks and freshwater drain collecting tanks. Did the government instead intend to use Table 4, Line 10?
Errata 2 provided. The Government intended to use Table 4 Lines 10 or 11.
85 123-10-001
Tanks and Voids, open, pump and gas free
Other USS Arleigh Burke - This item describes the removal of petroleum products and compensating sea water, but doesn't provide an amount to be removed. The contractor has no way of knowing how much fluid is to be pumped and disposed. For estimating purpose, please provide an amount that all contractors can bid on.
Para 3.1.1 states that the Fluid tank capacity shall be considered to be at full volume.
Errata 2 provided for clarification.
86 RESERVED RESERVED RESERVED RESERVED RESERVED
87 472-90-001 SA 80156K Errata 1 makes all material CFM vice GFM on 2.2 - 2.9. The contractor cannot purchase
PCMS tile in 3.14. Please confirm the Government will provide the tile Yes, Government will provide the tile.
88 RESERVED RESERVED RESERVED RESERVED RESERVED
980-90-015 Errata
ShipAlt 76829K, 76869K, 76974K, 80274K, 82635K, 85964, 87103K, 89766K, 89769, 89804K, 89925K, 90643K, Alteration Installation Team (AIT) Support Service;
provide
Other USS Bulkeley - Work item 980-90-015 Errata 1 was issued on 8/7/18; however, there do not appear to be any changes marked on the work item even though the item is marked as Errata 1. Please advise. ERRATA1 issued on Aug 7 updated space names and space numbers in the attachments. Errata 1 version 2 issue by Amendment 4 included changes marked on the work item.
90 RESERVED RESERVED RESERVED RESERVED RESERVED
91 RESERVED RESERVED RESERVED RESERVED RESERVED
92 980-11-003 Ship's Force Office Space; provide Other USS Bulkeley - Paragraph 3.1, provide a Commercial Trailer to serve as ship's offices. Can existing offices be used?
YES
93 980-90-013
S/A 86881K Sea ram Upgrade Aft, AIT Support Service; provide
Other USS Bulkeley - Will lifting fixtures for the Gun Mount and Electronic Cabinet be provided? Lifting rig for mount will be provided. No lifting rig is required for electronics enclosure.
94 RESERVED RESERVED RESERVED RESERVED RESERVED
95 RESERVED RESERVED RESERVED RESERVED RESERVED
96 RESERVED RESERVED RESERVED RESERVED RESERVED
97 992-11-005 Ship Towing Service; provide (Option Item) Other USS Bulkeley - Is this item intended for bidders outside of the home port harbor? Yes, this item is intended for bidders outside of the home port harbor
98 992-11-006
Temporary Duty Section Berthing Off-Ship;
provide (Option Item)
Other USS Bulkeley - Is this item intended for bidders outside of the home port harbor? Yes, this item is intended for bidders outside of the home port harbor
99 RESERVED RESERVED RESERVED RESERVED RESERVED
100 992-11-015
Mess and Berthing Barge, Temporary service, inspection and Repair in Contractor Plant, steam Barge; accomplish (Option Item)
Other USS Bulkeley - Is this item intended for bidders outside of the home port harbor? Yes, this item is intended for bidders outside of the home port harbor
101 992-11-017
Mess and Berthing Barge, Temporary service, inspection and Repair in Contractor Plant, Electric Barge; accomplish (Option Item)
Other USS Bulkeley - Is this item intended for bidders outside of the home port harbor? Yes, this item is intended for bidders outside of the home port harbor
102 RESERVED RESERVED RESERVED RESERVED RESERVED
103 RESERVED RESERVED RESERVED RESERVED RESERVED
104 857-11-001 Temporary Off-Ship Berthing Equivalent to BOQ/BEQ; provide
Other USS Bulkeley - Is this item intended for bidders outside of the home port harbor? Yes, this item is intended for bidders outside of the home port harbor
105 857-11-002 Temporary Galley and Messing Facility;
Provide (Option Item)
Other USS Bulkeley - Is this item intended for bidders outside of the home port harbor? Yes, this item is intended for bidders outside of the home port harbor
106 168-80-002
SA 77228D Install CRES Individual Dogged Doors
Drawing USS Bulkeley - The following references were not received:
LAR77558/DDG71CL/1147179, RLAR 77228/DDG75CL/1146506, RLAR
77228/DDG91CL/1162643
RLAR 77228/DDG75CL/1146506, RLAR
77228/DDG91CL/1162643 provided to bidders via ARMDEC Safe on 8/20/2018.
243-11-001 & 243-12-001
Propulsion Shafting Stbd & Port Other USS Bulkeley - This item has identified the stern tube seal in para 1.3.1 and Para
3.1 directs the contractor to provide a tech rep to inspect, disassemble, repair, test and adjust the equipment in 1.3.1. Normally the stern tube seal item is a stand alone item detailing the required repairs with check points included for torqueing and pressure drops. Para 5.1.5 shows a new GFM shaft seal assembly.
Please provide information and direction to the contractor that details the required repairs, or confirm that the tech rep is to inspect and report required repairs only, with a change order for repairs to follow. Alternatively, are we to install a new seal assembly and if so, please provide the details for a new seal assembly
PARA 3.1 directs the contractor to provide a Tech Rep IAW 009-90 for the repairs. Para 3.2 directs the contractor to provide a PCP IAW 009-09 out lining the required repair procedure including installation of the new seal.
108 110-21-005
Crew Living Space No 1 Other USS ARLEIGH BURKE - Para 3.8 states to accomplish 009-32 for location in 1.2 and identified in 1.3.3 and 1.3.4. Please confirm the contractor is only preserving the repaired areas identified in para 1.3
Correct, the contractor is only responsible for preserving the repaired areas identified in para 1.3
109 482-90-001 SA 81961K and 85114K Drawing USS ARLEIGH BURKE - Ref 2.4 8766564 was not provided in this package. Please provide Drawing provided in Errata 2.
110 313-80-001 RESERVED RESERVED RESERVED RESERVED
111 321-11-004
Stuffing Tube; install Other USS ARLEIGH BURKE - Paragraph 1.3.1 lists (ONE ea) Stuffing Tube with Associated EMP Conduit, (4 foot by 4 inch diameter). Please confirm this sizing, equipment and cable type. Sizing, equipment, and cable type are listed in
Applicable References.
112 RESERVED RESERVED RESERVED RESERVED RESERVED
113 RESERVED RESERVED RESERVED RESERVED RESERVED
114 992-11-013
Temporary Services; provide Other USS ARLEIGH BURKE - Is the intent of paragraph 3.18.1 to install temporary HVAC in all living spaces for the duration of the availability?
Errata 2 changed original paragraph 3.18.1 to now
3.19.1. Errata 3 is provided to delete 3.19 and 3.19.1.
115 482-90-001
ShipAlt DDG-51-81961K and DDG-51-85114K, Tactical Tomahawk Weapons Control System (TTWCS) V5.4.0.2 and TMPC 5.0.1 Upgrade;
accomplish
Drawing USS ARLEIGH BURKE - Please provide reference 2.4, drawing 482-8766564 Rev. A.
Drawing provided in Errata 2.
116 492-61-001 Stabilized Glide Scope Indicator (SGSI) Service Platform; repair
Drawing USS ARLEIGH BURKE - Paragraph 2.5, drawing 6597928_P page one reads "material list starts on sh 19." There is not a sheet containing pages 19-20 with the material list. Please Drawing Provided in Errata 3.
117 RESERVED RESERVED RESERVED RESERVED RESERVED
118 RESERVED RESERVED RESERVED RESERVED RESERVED
123-11-001 thru 123-11-004
Compensated Fuel Tank Groups 1 through 4
Drawing USS Arleigh Burke: Reference 2.2 is for Gems TLI equipment. These tanks contain Ohmart Vega TLI's. Please provide applicable reference to this work item
Errata 3 Provided with appropriate reference
120 RESERVED RESERVED RESERVED RESERVED RESERVED
121 123-11-006
Compensated Fuel Tank Group 6 Drawing USS Arleigh Burke: Reference 2.2 is for Gems TLI equipment. These tanks contain Ohmart Vega TLI's. Please provide applicable reference to this work item Errata 3 Provided with appropriate reference
122 RESERVED RESERVED RESERVED RESERVED RESERVED
123 RESERVED RESERVED RESERVED RESERVED RESERVED
123-11-007 through 123-11-
Compensated Fuel Tank Groups 1 through 6
Drawing USS Arleigh Burke: Reference 2.2 is for Gems TLI equipment. These tanks contain Ohmart Vega TLI's. Please provide applicable reference to this work item Errata 3 Provided with appropriate reference
125 RESERVED RESERVED RESERVED RESERVED RESERVED
126 RESERVED RESERVED RESERVED RESERVED RESERVED
127 123-14-001
Potable Water Tanks Drawing USS Arleigh Burke: Reference 2.2 is for Gems TLI equipment. These tanks contain Ohmart Vega TLI's. Please provide applicable reference to this work item Errata 3 Provided with appropriate reference
128 259-10-001
Number One Gas Turbine Mixing Room, Uptake and Boundary Layer Infra-Red Suppression System (BLISS) Cap; repair
Other USS Arleigh Burke: Does the government intend to preserve the areas prepared in 3.2? 3.2 performs an SP-6 over the entire space, and the remaining preservations para, 3.9 - 3.11 only preserve in way of repairs. Yes, Errata 3 Provided
129 259-10-002
Number Two Gas Turbine Mixing Room, Uptake and Boundary Layer Infra-Red Suppression System (BLISS) Cap; repair
Other USS Arleigh Burke: Does the government intend to preserve the areas prepared in 3.2? 3.2 performs an SP-6 over the entire space, and the remaining preservations para, 3.9 - 3.11 only preserve in way of repairs. Yes, Errata 3 Provided
130 251-32-001
Aft Gas Turbine Intakes; rep and pres Other USS Arleigh Burke: Does the government intend to preserve the areas prepared in 3.3? 3.3 performs an SP-6 over the entire space, and the remaining preservations para, 3.13, 3.14 only preserve in way of repairs. Yes, Errata 3 Provided
131 411-90-001
SA 89925K
Drawing USS Bulkeley: The Second Errata 1 we received, Ref. 2.12 was added, LAR 1173791.
Please provide this ref. Provided via ARMDEC Safe on 23 Aug 2018
132 411-90-002
SA 89804K
Drawing USS Bulkeley: The Second Errata 1 we received, Ref. 2.22 was added, LAR 1173791.
Please provide this ref. Provided via ARMDEC Safe on 23 Aug 2018
133 721-90-001
SA 85964K
Drawing USS Bulkeley: The Second Errata 1 we received, Ref 2.3 was added, RLAR 1172429. Please provide this ref. Provided via ARMDEC Safe on 23 Aug 2018
134 163-11-001
Waster Sleeve; replace Other USS GUNSTON HALL - Item 163-11-001, paragraph 3.3 states to fabricate the waster sleeves but the item has the waster sleeves to be provided as GFM. Paragraph 3.3.1 states to accomplish 009-12 for the new waster sleeves. Please confirm this is accurate. Errata 4 was issued to remove LLTM IN PARA 5. KTR required to procure material to fabricate and install ALL WASTER SLEEVES listed 1.3.1 through 1.3.15 IN WORK ITEM 163-11-001. Para 3.3.1 invoking 009-12 is correct. 009-12 is invoked in this work item.
135 123-19-004 Collection, Holding and Transfer (CHT) Tank;
repair and preserve
Other USS GUNSTON HALL - Paragraph 3.15 is missing from the spec item. Please review and advise. Errata 4 was issued to correct missing para 3.15
136 120-11-020
Structural Repair; accomplish Other USS GUNSTON HALL - 009-12 is required to complete the requirements of this item but is not included in the spec.
ERRATA 4 was issued to add requirements of 009-12 in para 3.7.
137 123-16-001 Ballast Tank; repair and preserve Drawing USS GUNSTON HALL - Work item identifies 111-6100180 Rev H but Contractor was provided Rev E. ERRATA 4 was issued to change Rev H to Rev E.
138 123-16-002
Ballast Tank; repair Drawing USS GUNSTON HALL - Please provide reference 2.12, drawing 803-921865 Rev T. Reference 2.12, drawing 803-921865 Rev T provided via ARMDEC Safe on 23 Aug 2018.
139 311-21-012
Number One Ship's Service Diesel Generator (SSDG) Center Section Overhaul; accomplish
Drawing USS GUNSTON HALL - Please provide reference 2.2, NSWCCD-SSEC-931-MDEPP, LSD 41/49 (CV) Diesel Engine Preservation Procedure
Reference 2.12, NSWCCD-SSEC-931-MDEPP, LSD 41/49 (CV) Diesel Engine Preservation Procedure provided via ARMDEC Safe on 23 Aug 2018
140 551-21-002
Ship's Service (SS) Air Receiver; certify Drawing USS GUNSTON HALL - Work item identifies 551-6102097 Rev BV but Contractor was provided Rev B.
Errata 4 was issued to correct drawing reference from REV BV to REV B.
141 582-11-004
Inhaul Roller Chock; replace Drawing USS GUNSTON HALL - Please provide reference 2.3, drawing 801-6110369 Rev F. Reference 2.3 drawing 803-6110369 rev F provided via ARMDEC safe on 23 Aug 2018.
142 123-16-003 Ballast Tank; repair and preserve
Other USS GUNSTON HALL - Paragraph 1.2.6 - Ballast Tank (5-137-1-W) is not listed in the Tank and Void item 123-10-001.
Errata 3 was issued to add Ballast Tank 5-137-1-W to Work item 123-10-001.
143 RESERVED RESERVED RESERVED RESERVED RESERVED
144 583-11-001
Boat Handling & Stwg
Other
USS ARLEIGH BURKE: Para 3.7 states to accomplish 009-32 for the equipment listed in 1.3 IAW sheets 112, 113, & 114. Those sheets do not exist on this drawing. Please provide the correct sheets Yes, Errata 4 Provided.
145 RESERVED RESERVED RESERVED RESERVED RESERVED
146 RESERVED RESERVED RESERVED RESERVED RESERVED
File details come from the government source that posted it.