Solicitation #: N00024-18-R-4448 NAVSEA POC Name/Title Phone
Date of Response: 10/9/2018 Jamillah Powell 202-781-2040 Randolph Cook 202-781-0093
E-Mail jamillah.powell@navy.mil randolph.cook@navy.mil
FBO Post # Work Item No. Document Number/Title Document Type Question Government Response
150 202-90-001 ShipAlt DDG51-87737K, Removal of Unused MCS Cables; accomplish
Drawing Please provide drawing 202-8749269 Rev A Reference provided by via email 9/7/2018
151 634-11-004
Peel and Stick Deck Nonskid Other USS ARLEIGH BURKE: Para 1.2.2 states 2-370-2-L is a passage, but our records indicate this loacation is an airlock. Please confirm the location should be 2-370- 3-L which is the passageway.
the government has validated that 2- 370-2-L is a passage.
155 529-90-001
ShipAlt DDG-51-87881K Main Drainage System Piping and Valve Modification (PARTIAL); accomplish
Other Arleigh Burke Question: Paragraph 3.1 states "Accomplish the requirements of
2.2 and 2.3, in the locations listed in 1.2, for the installation of valves listed in 5.1,..."
Please confirm, contractor is only to install the 4 valves in paragraph 5.1 and not all the valves listed in 2.2.
YES. This is a partial shipalt and only (QTY 4) valves identified in 5.1 will be replaced.
156 529-90-001
ShipAlt DDG-51-87881K Main Drainage System Piping and Valve Modification (PARTIAL); accomplish
Other Arleigh Burke: Ref-2.3 (8750518) list GFM for items CA101, CA102, CA103, and CA104, but there is no material listed in paragraph 5.1 for this reference. Please confirm this material is GFM
Confirmed, this material is GFM. Gov has verified there is material listed in para 5.1d
Milestones Other USS GUNSTON HALL - On the provided milestones, PCD is called out 45 days before LOA. Typically PCD is 14 days before LOA. Will PCD be changed to 14 days prior to LOA?
The JFMM provides guidance for a minimum of 14 days; however; the milestone provided is correct.
171 123-11-002
Fuel Oil Service Tank; repair and preserve
Other USS GUNSTON HALL - Paragraph 3.6 directs the Contractor to accomplish the requirements of 009-32 of 2.1 Table 4, Line 10 or 11, Note 65 for each tank listed in 1.2.1. Should it read 1.2 to cover all the tanks? Please confirm ALL tanks are to be blasted or just in way of repairs.
No, Note 65 only applies to tanks listed in 1.2.1. It does not apply to any other tanks listed in other paragraphs. All tanks are only "IN
WAY OF REPAIRS".
194 625-11-001
Pilot House Window; replace Other USS Bulkeley: Para 3.5 states to SP-11 Exterior Surfaces of the Windows. Para
3.6 states to SP-10 Exterior surfaces of the windows. Is the intention to SP-11 and then SP-10 the exterior surfaces or is the intention to only SP-11 the exterior surfaces, please clarify.
PARA 3.6 corrected on Errata 2 to provide clarification.
198 631-13-012
Hangar Number One; preserve Other USS Bulkeley: Please confirm that the intention in Para 3.1 is not to preserve Deck surfaces located in 1.2.1
Concur, the intention of paragraph
3.1 is not to preserve deck surfaces located in 1.2.1. The requirement to preserve the deck surfaces is in work item 634-21-001
199 631-13-013
Hangar Number 2; preserve Other USS Bulkeley: Please confirm that the intention in Para 3.1 is not to preserve Deck surfaces located in 1.2.1
See response to Question #198
200 631-12-001
Refrigeration Machinery Room Deck;
preserve
Other USS Bulkeley: Please confirm that the intention in Para 3.1 is to preserve only the deck surfaces in located in 1.2.1
Concur, preserve only the deck surfaces located in 1.2.1
203 123-17-001
Tank; repair and preserve Other USS BULKELEY - Tank listed in 1.2.1 to be preserved is also preseved in WI 123- 17-002 and WI 123-17-003, please update for the correct scope of work
WI cancelled on Errata 2
204 123-17-001
Tank; repair and preserve Other USS BULKELEY - Tank listed in 1.2.2 to be preserved is also preseved in WI 123- 17-003, please update for the correct scope of work
WI cancelled on Errata 2
205 123-17-002 Oily Waste Tank; repair and preserve Other USS BULKELEY - Tank listed in 1.2.4 to be preserved is also preserved in WI 123-
17-003, please update for the correct scope of work Para 1.2.4 deleted on Errata 2
206 631-11-002
Auxiliary Machinery Room Number 2;
preserve
Other USS BULKELEY - Bilge listed in in 1.2.1 to be preserved is also preserved in WI 631- 11-017, please update for the correct scope of work
Work item 631-11-002 was cancelled on Errata 3
207 583-90-001
SA 83894K SLAD Drawing USS Bulkeley - Ref 2.10 RLAR 83894/DDG84/1173239 is not included in the package. Please provide
Ref 2.10 RLAR 83894/DDG84/1173239 Provided via email 9/7/2018
208 256-61-003 Remote Valve Operator Assembly;
replace
Other USS BULKELEY - Due to the type of work required for this item, contractor recommends that 009-90 be removed from the item.
Concur, para 3.1 deleted on Errata 1
209 256-61-004 Remote Valve Operator Assembly;
replace
Other USS BULKELEY - Due to the type of work required for this item, contractor recommends that 009-90 be removed from the item.
Concur, para 3.1 deleted on Errata 1
210 256-61-005 Remote Valve Operator Assembly;
replace
Other USS BULKELEY - Due to the type of work required for this item, contractor recommends that 009-90 be removed from the item.
Concur, para 3.1 deleted on Errata 1
238 Various
ACB16/T116 Shipalts GFM USS Bulkeley - For all the ACB16 Shipalts, the foundation appear prefabricated.
Please confirm all foundation are prefabricated. In addition, please confirm all prefabbed foundations are primed and taped at the ends ready for installation.
All foundations that are listed as GFM foundations are prefabbed when listed as an assembly in the drawing. Prefabbed foundations are blasted, painted, and will be taped.
245 631-13-007
Collective Protection System (CPS) Zone 3 Fan Room; repair and preserve
Other USS Bulkeley - Please clarify if a second surface prep is needed as none is requested in paragraph 3.8.
Errata 2 provided to clarify the requirement.
246 631-13-009
Collective Protection System (CPS) Zone 4 Fan Room; repair and preserve
Other USS Bulkeley - Please clarify if a second surface prep is needed as none is requested in paragraph 3.8.
Errata 2 provided to clarify the requirement.
248 631-13-012 Hangar Number One; preserve Other USS Bulkeley - Please clarify that the intention in paragraph 3.1 is not to preserve deck surfaces located in 1.2.1.
See response to Question #198
249 631-13-013 Hangar Number 2; preserve Other USS Bulkeley - Please clarify that the intention in paragraph 3.1 is not to preserve deck surfaces located in 1.2.1.
See response to Question #198
250 631-12-001
Refrigeration Machinery Room Deck;
preserve
Other USS Bulkeley - Please clarify that the intention in paragraph 3.1 is to preserve only the deck surfaces in located in 1.2.1.
Concur, the intention in paragraph
3.1 is to preserve only the deck surfaces located in 1.2.1.
252 123-17-001 Tank; repair and preserve Other USS Bulkeley - Tank listed in 1.2.1 to be preserved is also preserved in 123-17-
002 and WI 123-17-003. Please update for the correct scope of work.
WI 123-17-001 cancelled on Errata 2
253 123-17-001
Tank; repair and preserve Other USS Bulkeley - Tank listed in 1.2.2 to be preserved is also preserved in WI 123-17- 003, please update for the correct scope of work.
WI 123-17-001 cancelled on Errata 2
254 123-17-002 Oily Waste Tank; repair and preserve Other USS Bulkeley - Tank listed in 1.2.4 to be preserved is also preserved in 123-17-
003. Please update for the correct scope of work.
Errata 2 issued to delete para 1.2.4
258 168-80-001
ShipAlt DDG51-64233D, Improved Fan Room Access Modification; accomplish
Other USS Bulkeley - Paragraph 3.2 directs the Contractor to fabricate and install new manhole covers. Reference 2.7 RLAR 64233/DDG87/1164799 provides direction to plug weld the existing manhole covers for reuse. Paragraph 5.1 lists the material as GFM. Please clarify if Contractor is to plug weld the existing for reuse or will the covers be replaced using GFM.
Ref 2.7 RLAR64233/DDG87/1164799 provided direction to plug weld manhold cover rings not the manhole covers. New manhole covers are provided as GFM in para 5.1.
273 123-11-006
Fuel Oil Service Tank Other USS GUNSTON HALL - Please review your answer to question 157. Per paragraph 3.1.1, 300 ft of welding, 3.1.3, 660 sq ft of plate and 3.1.4, 435 ft of tee bar to replace in each of 20 tanks sounds more like the overall totals, vice per tank requirements. Please confirm your anwer.
The Government's response to question #157 is modified.
Frontload is for the entire work item versus per tank requirements.
123-11-001 thru 123-14-001 Tank Preservation for various tanks Drawing
USS ARLEIGH BURKE: Errata 3 added Ref S9437-MMO-010 REV 3 to all these work items. Please provide this reference.
Reference provided via email 9/21/2018