FBO_Response_09.pdf

PDF 435 KB Posted

Attached to
DDG51 FY19 DSRA, DDG84 FY19 DMP, and LSD44 DSRA
Solicitation number
N00024-18-R-4448
Issued by

About this file

Response 09 to questions.

View the file

Other files

File Type Posted
N00024-18-R-4448-0015.pdf PDF
N00024-18-R-4448-0015_Conformed.pdf PDF
FBO_Response_10.pdf PDF
N00024-18-R-4448_Amendment_0014_conformed.pdf PDF
N00024-18-R-4448_Amendment_0014.pdf PDF
N00024-18-R-4448_Amendment_0013_conformed.pdf PDF
N00024-18-R-4448_Amendment_0013.pdf PDF
FBO_Response_08.pdf PDF
FBO_Response_07.pdf PDF
FBO_Response_06.pdf PDF
N00024-18-R-4448_Amendment_0012.pdf PDF
N00024-18-R-4448_Amendment_0012_conformed.pdf PDF
FBO_Response_05.pdf PDF
FBO_Response_04.pdf PDF
N00024-18-R-4448_Amendment_011.pdf PDF
N00024-18-R-4448_Amendment_011_Conformed.pdf PDF
N00024-18-R-4448_Amendment_0010.pdf PDF
N00024-18-R-4448_conformed_through_Amendment_0010.pdf PDF
FBO_Response_03.pdf PDF
N00024-18-R-4448_Amendment_0009.pdf PDF
N00024-18-R-4448_conformed_through_0009.pdf PDF
N00024-18-R-4448_Bidders_Questions_Response_02.pdf PDF
N0002418R4448_conformed_through_0008.pdf PDF
N0002418R4448_Amendment_0008.pdf PDF
N00024-18-R-4448_Bidders_Questions_Response_01.pdf PDF
N0002418R4448_conformed_through_0007.pdf PDF
N0002418R4448_Amendment_0007.pdf PDF
N0002418R4448_conformed_through_0006.pdf PDF
N0002418R4448_Amendment_0006.pdf PDF
N0002418R4448_conformed_through_0005.pdf PDF
N0002418R4448_Amendment_0005.pdf PDF
N0002418R4448_conformed_through_0004.pdf PDF
N0002418R4448_Amendment_0004.pdf PDF
N0002418R4448_conformed_through_0003.pdf PDF
N0002418R4448_Amendment_0003.pdf PDF
N0002418R4448_Conformed_through_0002.pdf PDF
N0002418R4448_Amendment_0002.pdf PDF
N00024-18-R-4448_conformed_through_0001.pdf PDF
N00024-18-R-4448_Amendment_0001.pdf PDF
S-3_PPI_for_N00024-18-R-4448.xlsm XLSM spreadsheet
N00024-18-R-4448.pdf PDF
Show all 41

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation #: N00024-18-R-4448 NAVSEA POC Name/Title Phone

Date of Response:12/11/2018 Jamillah Powell 202-781-2040 Randolph Cook 202-781-0093

E-Mail jamillah.powell@navy.mil randolph.cook@navy.mil

FBO Post # Work Item No.

Document Number/Title Document

Type Question Government Response

992-11-014 & 992- 11-015

Messing and Berthing Barge Temporary Service in Contractor Plant

Other USS Arleigh Burke - Are items 992-11-014 & 992-11-015 intended for home port bidders only?

The government's previous response to question 58 is retracted. Both specs are OPTON ITEMS as the government intends to exercise the option for either Steam or Electric barges. Bidders should price both work items.

992-11-007, 992-11- 010 & 992-11-017

Other USS Arleigh Burke - Are items 992-11-007, 992-11-010 & 992-11-017 intended for out of home port bidders?

The government's previous response to question 59 is retracted. Both specs are OPTON ITEMS as the government intends to exercise the option for either Steam or Electric barges. Bidders should price both work items.

265 J-10 Attachment

Milestones Other USS BULKELEY: In the J-10 Attachment, The execution tab has CS T/O 1 to AIT Begin Jun 28 2019, but the CS Turnovers Tab list CS TO 1 date as June 14 2019 and Sept 6, 2019.

Please provide the correct date.

Updated J-10 has been provided via Amendment 13.

266 J-10 Attachment

Other USS BULKELEY In the J-10 Attachment, The execution tab has HM&E T/O 1 to AIT (Oil Lab) date as May 6, 2019, but the HM&E Turnover tab list MSR HM&E T/O 1 as May 01, 2019. Please provide the correct date

Updated J-10 has been provided via Amendment 13.

992-11-006 & 992-11-009

Messing and Berthing Barge Electric Temporary Service in Contractor Plant;

provide (OPTION ITEM).

Other USS GUNSTON HALL - 2ea Messing and Berthing Barge Electric items are in the package.

Please advise.

The government's previous response to question 271 is retracted. Both specs are OPTON ITEMS as the government intends to exercise the option for either Steam or Electric barges. Bidders should price both work items.

992-11-007 & 992-11-010

Messing and Berthing Barge Steam Temporary Service in Contractor Plant;

provide (OPTION ITEM)

Other USS GUNSTON HALL - 2ea Messing and Berthing Barge Steam items are in the package.

Please advise.

The government's previous response to question 272 is retracted. Both specs are OPTON ITEMS as the government intends to exercise the option for either Steam or Electric barges. Bidders should price both work items.

274 J-10 Attachment Other USS BULKELEY In the J-10 Attachment, The HM&E tab T/O 7 has AHSS Vent Mod SA

71604 dwg 500-8659958 complete. That drawing is not referenced in 438-90-002 Updated J-10 has been provided via Amendment 13 to remove the drawing.

275 J-10 Attachment

Other USS BULKELEY Ref PM 2018-0008 TPPC DDG 84 USS Bulkeley DMP Milestones is listed in several S/A's. This document contains Milestone dates that are not aligned with the J-10 Milestones dates. Please confirm, the Milestones J-10 Attachment takes precedence over the Ref PM 2018-0008 listed in the specs.

Updated J-10 has been provided via Amendment 13 to revise milestone dates.

992-11-006 992-11-009

Messing and Berthing Barge Electric Temporary Service in Contractor Plant;

provide

Other

USS GUNSTON HALL This package has 2ea Messing and Berthing Barge Electric Temp Service items.

Please confirm that one of these items is for out of port bidders and Norfolk is to only price one item (See Bulkeley Gov response to similar question #15).

No. Bidders are to price both work items.

992-11-007 992-11-010

Messing and Berthing Barge, Temporary Service, Inspection and Repair in Contractor Plant, Electric Barge; accomplish

Other

USS GUNSTON HALL This package has 2ea Messing and Berthing Barge Steam Temp Service items.

Please confirm that one of these items is for out of port bidders and Norfolk is to only price one item (See Bulkeley Gov response to similar question #14).

No. Bidders are to price both work items.

992-11-008

Messing and Berthing Barge Tow Service (Long Distance); provide

Other USS GUNSTON HALL This item in the past has been for the out of port bidders. Please confirm, Norfolk does not price this item (See Bulkeley Gov response to similar question #13).

No. Bidders are to price both work items.

123-10-001

Tank and Void Open, Pump, Clean and Gas Free; accomplish

Other USS GUNSTON HALL Based on the Governments response to question# 295, is the amount of 3,500 Gallons the combined total for all tanks or is it 3,500 Gallons for each tank?

The amount of 3,500 gallons is for each tank.

123-10-001

Tank and Void Open, Pump, Clean and Gas Free; accomplish

Other USS GUNSTON HALL Based on the Governments response to question# 295, will tanks be at low suction at start of avail?

Yes. The government intends for tanks to be on low suction.

Contractor will be informed of any tank not capable of achieving low suction.

252-11-001 Main Propulsion Control System; align, adjust and calibrate

Other

USS GUNSTON HALL Based on Government's response to question# 281, the spec references (REF. 2.2) equipment that is required to complete onboard tests that the OEM will not provide.

Contractor requests Government to provide technical information so contractor can obtain specific equipment for (Q# 281 #2.) DOCTOR EPU (used to take diesel engine combustion signatures), and (Q# 281 #7.) Extender Card (normally onboard Ships Force equipment to assist troubleshooting?).

The government retracts the response to question #281.

MARMC code 261 will provide the required testing equipment.

The contractor is not required to procure test equipment.

Please accomplish the work spec as written.

Various Various Specs With No Changes By Errata Other

USS GUNSTON HALL Errata specs were provided on Amendment 13, but the following Errata 5 specs contained no changes.

311-23-006, 311-24-006, 321-11-002, 643-80-001, 980-11-001, 980-90-003, 992-11-003, 992-11-006, 992-11-008, & 992-31-001.

Please advise.

Contractor is correct. NO changes were made to spec items listed. Items were inadvertently added to ERRATA list . Proceed with work items as specified.

311-22-011 (E7) Number 2 Ship's Service Diesel Generator (SSDG) Piston and Liner Assembly; replace

Other USS GUNSTON HALL Is the intent of paragraph Para. 3.10 for contractor to lift the engine block so to identify damaged areas and submit CFR for weld repairs to be completed?

As stated in para 3.2, the contractor is to provide a project completion plan (PCP) that describes how to perform the actions listed in 3.10. The contractor is to lift the engine block so to allow the OEM to perform inspection of the engine block.

Also, the contractor is to report requirements resulting from the OEM inspection of the engine block as stated in para 3.1.1.

311-24-007 (E5) Number 4 Ship's Service Diesel Generator (SSDG) Vertical Drive Assembly; repair

Other

USS GUNSTON HALL (PAGE 6 OF 15) Kit, Blower Inspection (p/n; 16 501 590) IS LISTED.

Contractor requests the Government to confirm part number for a "Blower Inspection Kit"? OR, does the Government want a "Blower Assembly" priced?

The part number for the Blower inspection kit is 16 612 294.

The part number for the Blower Assembly is 16 501 590. The contractor shall provide both part numbers listed in para 3.3

311-24-007 (E5)

Number 4 Ship's Service Diesel Generator (SSDG) Vertical Drive Assembly; repair

Other USS GUNSTON HALL Contractor requests Government to clarify why several pieces of "CRITICAL MATERIAL" on pages 12-14 are no longer GFM?

These items no longer meet the criteria for GFM. Contractor is requested to procure these material items.

233-11-003(E5), 233-11-008(E5), 233-12-005(E5), 233-13-007(E5), 233-14-003(E5)

VARIOUS WORK ITEMS Other USS GUNSTON HALL Contractor requests Government to clarify why several pieces of material (some identified as CRITICAL) are no longer provided as GFM.

These items no longer meet the criteria for GFM. Contractor is requested to procure these materials.

233-11-003(E5), 233-11-008(E5), 233-12-005(E5), 233-13-007(E5), 233-14-003(E5)

VARIOUS WORK ITEMS Other USS GUNSTON HALL Is the Government’s intent for the Contractor to procure material lined out, or has the Government determined that the material is no longer required for repair?

Contractor is requested to procure this material as it is listed in para 3 or the work item.

311-22-011 (E7) Number 2 Ship's Service Diesel Generator (SSDG) Piston and Liner Assembly; replace

Other

USS GUNSTON HALLParagraph 3.12 states "Assemble the equipment disassembled in 3.4".

Paragraph 3.4 is to remove and Dispose of system fluids.

Contractor requests the Government to revise paragraph 3.12.

Paragraph 3.12 states: Assemble the equipment disassembled in 3.4 using 2.2 and 2.7 for guidance. The correct paragraph is

3.8 instead of 3.4. Errata 8 has been issued to correct.

252-11-001 Main Propulsion Control System; align, adjust and calibrate

Other USS GUNSTON HALL Ref. 2.2 (table 1-2) requires equipment Doctor EPU for testing. What is trying to be achieved by taking the Diesel Engine Combustion Signatures?

Concur that Ref. 2.2 (table 1-2) requires equipment Doctor EPU for testing. MARMC C261 will provide the test equipment and perform the testing. Contractor is required to provide support services as listed in paragraph 2.2

252-11-001 Main Propulsion Control System; align, adjust and calibrate

Other

USS GUNSTON HALL Ref. 2.2 (table 1-2) requires equipment for testing. Is Eddy Current Dynamometer (or Accelerator) installed shipboard equipment?

If yes, contractor would like to utilize the shipboard serial/analog port to determine test results.

No. MARMC C261 will provide test equipment and perform testing. The contractor is not required to utilize the shipboard serial/analog port to determine test results.

342-12-001 342-13-001 342-14-001

Ship's Service Diesel Generator (SSDG) Lube Oil Cooler; repair

Other

USS GUNSTON HALL IAW 3.4.3.1 contractor is to purchase and install 1ea OEM Glue GC11 and 1ea OEM GC8 using 2.2 as guidance. Upon review of 2.2 and a lack of piece number or part number, contractor cannot identify pieces and will not be able to determine price & availability of these pieces. Please advise.

Section 7 of Ref 2.2 descibes the two types of glue required for field repairs. Reference 2.2 [S9311-BT-MMC-010] states how to contact the OEM to determine the part numbers and determine price & availability of the parts.

311-21-004(E6), 311-22-010(E6), 311-24-007(E5)

VARIOUS WORK ITEMS Other USS GUNSTON HALL Contractor requests Government to clarify why several pieces of material (some identified as CRITICAL) are no longer provided as GFM.

These items no longer meet the criteria for GFM. Contractor will procure these materials.

311-21-004(E6), 311-22-010(E6), 311-24-007(E5)

VARIOUS WORK ITEMS Other USS GUNSTON HALL Is the Government’s intent for the Contractor to procure material lined out, or has the Government determined that the material is no longer required for repair?

It is the Government’s intent for the Contractor to procure this material as it is listed in para 3 for the work item.