Solicitation #: N00024-18-R-4448 NAVSEA POC Name/Title Phone
Date of Response: Jamillah Powell 202-781-2040 Randolph Cook 202-781-0093
E-Mail jamillah.powell@navy.mil randolph.cook@navy.mil
FBO Post # Work Item No. Document Number/Title Document
Type Question Government Response
1 150-11-006 Structural Repair Other
USS BULKELEY - Para 3.1.6 States to Accomplish preservation of repairs accomplished in
3.1.3.1. There is no 3.1.3.1. Please confirm the contractor is to preserve what was repaired in 3.1 -3.1.1.8
THE CONTRACTOR IS TO PRESERVE WHAT WAS REPAIRED IN
PARA 3.1-3.1.1.8
2 RESERVED RESERVED RESERVED RESERVED RESERVED
3 RESERVED RESERVED RESERVED RESERVED RESERVED
4 RESERVED RESERVED RESERVED RESERVED RESERVED
5 RESERVED RESERVED RESERVED RESERVED RESERVED
6 RESERVED RESERVED RESERVED RESERVED RESERVED
7 RESERVED RESERVED RESERVED RESERVED RESERVED
8 RESERVED RESERVED RESERVED RESERVED RESERVED
9 RESERVED RESERVED RESERVED RESERVED RESERVED
10 857-11-001 Temporary Off-ship Berthing to BOQ/BEQ Other
USS BULKELEY - This item already has a living barge for the crew to live while the ship is in the overhaul and has been in place for the out of port bidders. Please confirm, the Norfolk area does not price this item.
Confirmed. Norfolk, VA Bidders should not price this item.
11 857-11-002 Temporary Galley & Messing Facilities Other
USS BULKELEY - This item already has a living barge with Galley and Messing capability for food preparation for the crew while the ship is in the overhaul and has been in place for the out of port bidders. Please confirm, the Norfolk area does not price this item.
Confirmed. Norfolk, VA Bidders should not price this item.
12 992-11-006 Temporary Duty Section Berthing, Off Ship Other
USS BULKELEY - This item already has a living barge for the Duty Section to live while the ship is in the overhaul and has been in place for the out of port bidders. Please confirm, the Norfolk area does not price this item.
Confirmed. Norfolk, VA Bidders should not price this item.
13 992-11-012 Messing and Berthing Barge Tow (Long Distance ) Other
USS BULKELEY - This item in the past has been for the out of port bidders. Please confirm, Norfolk does not price this item
Confirmed. Norfolk, VA Bidders should not price this item.
14 992-11-015 Messing and Berthing , Temporary Services, Inspection and Repair for Steam Barge Other
USS BULKELEY - There is an item already provided for the steam living barge , item 992- 11-013. Please confirm this item 992-11-015 is for out of port bidders and Norfolk does not price it
Confirmed. Norfolk, VA Bidders should not price this item.
15 992-11-017 Messing and Berthing , Temporary Services, Inspection and Repair for Electric Barge Other
USS BULKELEY - There is an item already provided for the electric living barge , item 992- 11-018. Please confirm this item, 992-11-017 is for out of port bidders and Norfolk does not price it
Confirmed. Norfolk, VA Bidders should not price this item.
USS Gunston Hall 631-21-003
Mast; preserve Other USS GUNSTON HALL - Paragraph 3.3 - 3.4 - Please clarify for preservation and nonskid of the mast. The tables and lines do not appear to be the correct system. Please provide the FY of Standard Item 009-32 used when writing this work item.
Tables and Lines were developed from FY-19 Change 2
441-90-001 ShipAlt LSD44-79109K Other USS GUNSTON HALL - This item is listed on J-18, but not found in the work package.
Please advise.
Solicitation Amendment 0001 revised section J, Attachment J-15 and J-16 to add this item as outlined in Addendum 1.
512-11-001 Fan Motor Other USS GUNSTON HALL - This item is in the work package, but not found on J-18. Please advise.
Solicitation Amendment 0002 revised section J, Attachment J-18 to add this item.
524-80-001 ShipAlt LSD44-82261K Other USS GUNSTON HALL - This item is in the work package, but not found on J-18. Please advise.
Solicitation Amendment 0002 revised section J, Attachment J-18 to add this item.
562-11-003 Stbd. Rudder Assessment Other USS GUNSTON HALL - This item is listed on J-18, but not found in the work package.
Please advise.
Solicitation Amendment 0001 revised section J, Attachments J-15 and J-16 to add this item as outlined in Addendum 1.
562-11-004 Port Rudder Assessment Other USS GUNSTON HALL - This item is listed on J-18, but not found in the work package.
Please advise.
Solicitation Amendment 0001 revised section J, Attachment J-18 and added this item as outlined in Addendum 1.
120-11-010 Deck and Bulkhead Other USS GUNSTON HALL - Please confirm that paragraph 3.7 only applies to new and disturbed work, not the entire space.
No, paragraph 3.7 is not classified as new and disturbed work. In accordance with 009-32 Paragraph 3.6.1.3 new and disturbed surfaces are those surfaces less than 10 square feet. The area to be preserved is greater than 10 square feet based on the amount of work identified in space. In accordance with reference 2.1, utilize standard item 009-32 Table 3, Line 6, for the preservation of the interior surfaces in location 1.2 of the work item.
Paragraph 3.8 is the only paragraph in the work item that addresses new and disturbed.
23 Reserved Reserved Reserved Reserved Reserved
120-11-016 Bulkhead Other USS GUNSTON HALL - Please confirm that paragraph 3.4 only applies to new and disturbed work, not the entire space.
No, paragraph 3.4 is not classified as new and disturbed work. In accordance with 009-32 Paragraph 3.6.1.3 new and disturbed surfaces are those surfaces less than 10 square feet. The area to be preserved is greater than 10 square feet based on the amount of work identified in space. In accordance with reference 2.1, utilize standard item 009-32 Table 2, Line 28, for the preservation of surfaces in location 1.2.1; and Table 3, Line 6 for interior surfaces in location 1.2.2.
120-11-021 Structural Other USS GUNSTON HALL - Please confirm that paragraph 3.8 only applies to new and disturbed work, not the entire space.
No, paragraph 3.8 is not classified as new and disturbed work. In accordance with 009-32 Paragraph 3.6.1.3 new and disturbed surfaces are those surfaces less than 10 square feet. The area to be preserved is greater than 10 square feet based on the amount of work identified in space. In accordance with reference 2.1, utilize standard item 009-32 Table 3, Line 9 or 10 for the preservation of surfaces within machinery space.
120-11-023 Machinery Space Other USS GUNSTON HALL - Please confirm that paragraph 3.4 only applies to new and disturbed work, not the entire space.
No, paragraph 3.4 is not classified as new and disturbed work. In accordance with 009-32 Paragraph 3.6.1.3 new and disturbed surfaces are those surfaces less than 10 square feet. The area to be preserved is greater than 10 square feet based on the amount of work identified in space. In accordance with reference 2.1, utilize standard item 009-32 Table 3, Line 9 or 10, for the preservation of the surfaces in location 1.2.1.
120-11-023 Machinery Space Other USS GUNSTON HALL - Please confirm that paragraph 3.5 only applies to new and disturbed work, not the entire space.
No, paragraph 3.5 is not classified as new and disturbed work. In accordance with 009-32 Paragraph 3.6.1.3 new and disturbed surfaces are those surfaces less than 10 square feet. The area to be preserved is greater than 10 square feet based on the amount of work identified in space. In accordance with reference 2.1, utilize standard item 009-32 Table 4, Line 17, for the preservation of each location listed in 1.2.2 and 1.2.3.
120-11-024 Supply Storeroom Other USS GUNSTON HALL - Please confirm that paragraph 3.4 only applies to new and disturbed work, not the entire space.
No, paragraph 3.4 is not classified as new and disturbed work. In accordance with 009-32 Paragraph 3.6.1.3 new and disturbed surfaces are those surfaces less than 10 square feet. The area to be preserved is greater than 10 square feet based on the amount of work identified in space. In accordance with reference 2.1, utilize standard item 009-32 Table 3, Line 6, for surfaces within location 1.2 and Table 3, Lines 9 or 10 for surfaces within drain well.
120-11-027 Bulkhead Other USS GUNSTON HALL - Please confirm that paragraph 3.4 only applies to new and disturbed work, not the entire space.
CONCUR, paragraph 3.4 applies to new and disturbed work, not the entire space
30 RESERVED RESERVED RESERVED RESERVED RESERVED
31 USS Gunston Hall
572-11-001 Dumbwaiter Trunk; repair and preserve Other USS GUNSTON HALL - Paragraph 4.1 - Please provide ESR 17-4171. Provided via ARMDEC Safe on 9 Aug 2018
168-80-002 SA 77228D Drawing USS BULKELEY - The following did not come with Addendum 1 or Errata 1. please provide
Provided via ARMDEC Safe on 8 Aug 2018
167-8395322 Rev C, ShipAlt DDG-51-77228 Doors Watertight, All CRES
2.3 LAR 77228/DDG51CL/1149359, Deviation Request, Minor, Hot Forming of
2.4 LAR 77228/DDG51CL/1150336, Deviation Request, Minor, Hot Forming of
2.5 LAR 77228/DDG51CL/1151479, Deviation Request, Minor, Hot Forming of
2.6 LAR 77228/DDG51CL/1152953, Deviation Request, Minor, Hot Forming of
2.7 LAR 77228/DDG51CL/1160465, Applicability of 8100 Drawings
2.8 LAR 77228/DDG51CL/1170669, QAWTS/ATD Replacement from Steel to CRES
2.9 LAR 77228/DDG62CL/1121747, Correct Reference for Pipe Lever
2.10 LAR 77228/DDG72CL/1170350, Modify Drawing to Clarify WTTD
522-90-001 SA 80255 Drawing USS BULKELEY - 522-8766531 Rev A, ShipAlt DDG-51-80255 Repl Thermopneumatic
Piping Provided via ARMDEC Safe on 8 Aug 2018
2.3 436-8766530 Rev A, ShipAlt DDG-51-80255 Repl Thermopneumatic Ctrl
2.4 436-8766529 Rev A, ShipAlt DDG-51-80255 Magazine Sprinkling
2.5 MIL-STD-2042, Fiber Optic Cable Topology Installation Standard
33 2.8 4720-DDG84-FY19, Ship Alteration Material Summary (4720/3). Please Provide.
411-90-001 SA 89925K Drawing USS BULKELEY - 2.8 LAR 89925/DDG84/1173896, SID Review (7139) Cblway RO-Instl (E1) Provided via ARMDEC Safe on 8 Aug 2018
2.9 LAR 89925/DDG84/1173860, SID Review (7134) Fdn Misc Comp RO-Instl (E1)
2.10 LAR 89925/DDG84/1174059, SID Review (7156) CIC ECW Ppg RO-Instl (E1)
2.11 LAR 89925/DDG84/1174672, SID Review (7132) CSER1 Fdn RO / Instl. Please Provide.
411-90-002 SA 89804K Drawing USS BULKELEY - 2.12 LAR 89804/DDG84/1174027, SID Review (3547) Misc Comp Fdn RO-
Instl (E1) Provided via ARMDEC Safe on 8 Aug 2018
2.13 LAR 89804/DDG84/1174030, SID Review (3556) CSER2 & 3 Cblway Instl (E1)
2.14 LAR 89804/DDG84/1174057, SID Review (3580) CSER3 ECW Ppg RO-Instl (E1)
2.15 LAR 89804/DDG84/1174013, SID Review (3544) CSER3 Fdn RO-Instl (E1)
2.16 LAR 89804/DDG84/1174033, SID Review (3578) CSER2 ECW Ppg RO-Instl (E1)
2.17 LAR 89804/DDG84/1174045, SID Review (3541) CSER2 Fdn RO-Instl (E1)
2.18 LAR 89804/DDG84/1174170, SID Review (3575) CSER3 HVAC (E1)
2.19 LAR 89804/DDG84/1174171, SID Review (3576) Fan Rm HVAC (E1)
2.20 LAR 89804/DDG84/1174148, SID Review (3573) Ppg RO-Instl (E1)
2.21 RLAR 89804/DDG84/1174827, Update Test Notes for HVAC. Please Provide.
438-90-001 SA 71726K Drawing USS BULKELEY - RLAR 71726/DDG84/1174825, Update Test Notes for HVA. Please
Provide.
Provided via ARMDEC Safe on 8 Aug 2018
438-90-002 SA 71604K Drawing USS BULKELEY - 2.11LAR 71604/DDG84/1174846, SID Review (7454) Fdn AMR1 / 3Gen (E1)
Provided via ARMDEC Safe on 8 Aug 2018
2.12 LAR 71604/DDG84/1174809, SID Review (7461) Ppg Mech Instl (E1)
2.13 RLAR 71604/DDG84/1172807, Reserv 1: Incorporate Shipcheck Data Iso
2.14 RLAR 71604/DDG84/1172808, Reserv 1: Incorporate Shipcheck Data for
2.15 RLAR 71604/DDG84/1172809, Reserv 1: Incorporate Shipcheck Data for
2.16 RLAR 71604/DDG84/1172810, Reserv 1: Pending Vent Portion
2.17 RLAR 71604/DDG84/1174620, Update Test Notes for TAO (E1)
2.18 LAR 71604/DDG84/1173201, TAO Test Procedures Required for HY80 (E1)
2.19 RLAR 71604/DDG84/1173538, MCS Pot Water Auto Valve Numbering. Please Provide.
451-90-001 SA 85077K Drawing USS BULKELEY - 2.5 RLAR 85077/DDG84/1174115 Add Waveguide dry air. Please Provide
Provided via ARMDEC Safe on 8 Aug 2018
456-90-001 SA 89766K Drawing USS BULKELEY - 2.6 LAR 89766/DDG84/1172911, Design Discrepancy (E1) Provided via ARMDEC Safe on 8 Aug 2018
39 2.7 RLAR 89766/DDG84/1173286, Relocate MAMs Cabinet to CSER4. Please Provide.
472-90-001 SA 80156K Drawing USS BULKELEY - 2.9 RLAR 80156/DDG84/1174036. Provided via ARMDEC Safe on 8 Aug 2018 40 Please Provide.
512-90-002 SA 71655K Drawing USS BULKELEY - 2.6 RLAR 71655/DDG79/1172843 Fan Room. Please Provide. Provided via ARMDEC Safe on 8 Aug 2018
583-90-001 SA 83894K Drawing USS BULKELEY - 2.6 RLAR 83894/DDG84/1173996 Add Various Notes Provided via ARMDEC Safe on 8 Aug 2018
2.7 RLAR 83894/DDG84/1174798 SLAD WCL.
42 Please Provide.
588-90-001 SA 73212K Drawing USS BULKELEY - 3.5 RLAR 73212/DDG79/1173398 Add LN for light. Please Provide Provided via ARMDEC Safe on 8 Aug 2018
651-90-001 SA 71605K Drawing USS BULKELEY - 2.11 LAR 71605/DDG84/1172248, SID Review (9220) Potw/Drn Ppg (E1) Provided via ARMDEC Safe on 8 Aug 2018
2.12 LAR 71605/DDG84/1173199, TAO Test Procedures Required for HY80 (E1)
2.13 RLAR 71605/DDG84/1175450, Material Shortage for Deck Pad Material
2.14 RLAR 71605/DDG84/1172607, Revise Cutout for WR Hot Food Well (E1)
2.15 RLAR 71605/DDG84/1172658, Revise Test Notes to Suit (E1)
44 2.16 RLAR 71605/DDG84/1172660, Revise Test Notes to Suit. Please Provide.
45 997-11-001 Drydocking and Undocking Other USS GUNSTON HALL - Paragraph 3.13 calls for Fleeting, this practice has not been accomplished in recent years, recommend deleting this paragraph from the item.
CONCUR WITH BIDDER. MARMC MT provided Errata 3 to removed para 3.13 that calls for "fleeting".
46 USS Gunston Hall Attachment J-18 / Work Item Index Other USS GUNSTON HALL - Items 512-11-001 & 524-80-001 are on the work item index but are not included on the Attachment J-18.
Responses for this question provided above. See responses 18 and 19 above.
47 USS Gunston Hall Attachment J-18 / Work Item Index Other Items 441-90-001, 562-11-003 & 562-11-004 are listed on the J-18 but Contractor did not receive specs for them.
Response for this question provided above. See responses 17, 20 and 21 above.
48 123-11-002 Fuel Oil Service Tank Other
USS GUNSTON HALL - This item is listed on J-18, twice Please advise. Section J, Attachment J-18 has been revised by Amendment 0002 to delete one listing.
49 123-10-002 Fuel Oil Storage Tank Other
USS GUNSTON HALL - Please confirm that paragraph 3.13 only applies to new and disturbed work, not the entire tank.
Work specification 123-10-002 does not have para 3.13.
Please provide correct work item number or paragragraph number or cancel question.
50 130-11-003 Machinery Space Other
USS GUNSTON HALL - Please confirm that paragraph 3.6 only applies to new and disturbed work, not the space.
No, paragraph 3.6 is not classified as new and disturbed work. In accordance with 009-32 Paragraph 3.6.1.3 new and disturbed surfaces are those surfaces less than 10 square feet. The area to be preserved is greater than 10 square feet based on the amount of work identified in space. In accordance with reference 2.1, utilize standard item 009-32 Table 3.
51 672-11-001 Storeroom Other
USS GUNSTON HALL - Please confirm that paragraph 3.3 only applies to new and disturbed work, not the entire space.
No, paragraph 3.3 is not classified as new and disturbed work. In accordance with 009-32 Paragraph 3.6.1.3 new and disturbed surfaces are those surfaces less than 10 square feet. The area to be preserved is greater than 10 square feet based on the amount of work identified in space. In accordance with reference 2.1, utilize standard item 009-32 Table 3, Line 7, for the preservation of the interior surfaces in location 1.2 of the work item.
Paragraph 3.8 is the only paragraph in the work item that addresses new and disturbed.
415-90-001 Addendum 1 ShipAlt LSD44-82497K Other
USS GUNSTON HALL - Reference 2.26 which is the 4720 that ID's Kitted GFM has not been provided, please provide.
Reference 2.26 not applicable to work item 415-90-001.
ERRATA 3 submitted to delete reference 2.26 from 415- 90-001.
53 Attachment J-3 DDG51 Flex Milestones Other Contractor requests the dates be corrected on the attachment J-3 Admendment 0001 provided to correct information in Attachment J-3 cell J4.
54 Attachment J-10 DDG84 Flex Milestones Other Contractor requests the dates be corrected on the attachment J-10 No change necessary. Attachment J-10 is correct as provided.
55 Attachment J-17 LSD44 Flex Milestones Other Contractor requests the dates be corrected on the attachment J-17 Admendment 0001 provided to correct information in Attachment J-17 cell J4.
Solicitation Section B Is it acceptable for the offeor to submit ONLY the section B CLINs that apply to a proposal and leave out the rest?
Offerors should submit Section B pricing specfic to the availability that is being proposed. For all USS GUNSTON HALL proposals, offerors should submit pricing for CLINs 0001 through 0036, for all USS ARLEIGH BURKE proposals, offerors should submit pricing for CLINs 0101 through 0164;
for all USS BULKELEY proposals, offerors should submit pricing for CLINs 0201 through 0269.
Solicitation Section L Are bidders required to submit proposals for all execution scenarios?
In accordance with the solicitation, Section L, paragraph 5.0, Offerors are required to submit separate proposals for each and every availability under each and every execution scenario that can be completed with their available pier and docking facilities. Offerors who do not submit a separate proposal for each and every availability under each and every execution scenario that can be completed with their available pier and docking facilities will be considered unresponsive to the requirements of the solicitation and may not be considered for award.
Solicitation Section L Where is the offeror expected to identify why they are not bidding to a specific execution scenario?
In accordance with the solicitation, Section L, paragraph 5.0, Offerors should address this in the cover letter for each proposal.