N00024-18-R-4439_-_BQ_-_1_DEC_2017.xlsx

XLSX spreadsheet 54 KB Posted

Attached to
USS COWPENS (CG 63) and USS GETTYSBURG (CG 64) Modernization Period (MODPRD) Availabilities
Solicitation number
N00024-18-R-4439
Issued by

About this file

Bidders' Questions - 1

View the file

Other files

Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Pre-Proposal Information (PPI)

DATE OF REQUEST: 30 OCT 2017SOLICITATION NO: N00024-18-R-4439
TITLE: USS COWPENS (CG 63) & USS GETTYSBURG (CG 64)NAVSEA POCs:

Billy Castleberry, billy.castleberry@navy.mil;

Craig S. Barton, craig.s.barton@navy.mil

POC PHONE: (202) 781-1248

ITEM NO: USS Cowpens Spec 997-11-001 and J-3 USS Cowpens Milestones CONTRACTOR QUESTION 4: J-3 USS Cowpens Milestone "DOCK" states; "Offeror shall propose Dock Date IAW Specification 997-11-001". Specification 997-11-001, Para. 3.6 indicates "DOCK" schedule milestone should be within the first 10 percent of the contractual period. QUESTION: Please provide more guidance regarding the DOCK schedule guidance provided in Specification 997-11-001, Para. 3.6 "within the first 10 percent of the contractual period"? If a contractor proposes a DOCK schedule date later than the first 10 percent of the contractual period, how will the Gov't evaluate the proposed milestone schedule? Assuming a contractor proposes to achieve the required contractual delivery date, can a contractor propose a "DOCK" milestone schedule date later than the first 10 percent of the contractual period? Please clarify as soon as possible? GOVERNMENT RESPONSE:

Addressed ERRATA 1 CG 63, ERRATA 3 CG 64. Docking does not have to occur within 10% of the availability.

TITLE: Drydocking and Undocking; accomplish
PARA. NO: 997-11-001, Para 3.6
PAGE NO: 997-11-001, Page 3 of 7

ITEM NO: J-7 Pricing Workbook, Various Work Items CONTRACTOR QUESTION 5: 1) Contractor notes that Work Items 042-11-002, 042-12-001, 045-11-001, 077-11-001, 110-11-001, 110-11-003, 110-11-004, 110-11-005, 110-11-006, 110-11-009, 110-11-010, 110-11-011, appear to be duplicated.

2) Contractor notes that upon receipt and review of the Specification package the following disparities with the J-7 document as written.

(a) Work Item 042-32-001, Marine Coatings Containing Heavy Metals Material; remove and dispose is not listed.

(b) Work Item 423-90-001, Shipalt CG47-71386K, Advanced Digital Antenna Production (ADAP); accomplish is listed however was not provided in the Specification package.

(c) Work Item 561-11-006, Steering Gear Hydraulic System; flush is listed however was not provided in the Specification package.

QUESTION: Can the Customer provide clarification regarding the disparities identified above and will a revised J-7 Pricing Spreadsheet be provided.

GOVERNMENT RESPONSE:

Revision of J7 provided.

TITLE: J-7 Pricing Workbook
PARA. NO:
PAGE NO:

ITEM NO: 980-90-017 CONTRACTOR QUESTION 7: Contractor notes that the Specification as written is missing quantities required for the following listed paragraphs 3.1, 3.2, 3.4, 3.5, 3.7.1, 3.7.2, 3.7.3, 3.7.4, 3.7.4.2, 3.7.8, 3.7.11, 3.7.12, 3.7.13.

QUESTION: Will the Customer provide clarification regarding the disparities identified above and issue a revised specification?

GOVERNMENT RESPONSE:

Addressed ERRATA 1 CG 63

TITLE: CG47 Combat Systems MOD PR Contract Support; provide
PARA. NO:
PAGE NO:

ITEM NO: 980-90-018 CONTRACTOR QUESTION 8: Contractor notes that the Specification as written is missing quantities required for the following listed paragraphs 3.1, 3.2, 3.4, 3.5.

QUESTION: Will the Customer provide clarification regarding the disparities identified above and issue a revised specification?

GOVERNMENT RESPONSE:

Work Item cancellation addressed ERRATA 2 CG 63

TITLE: ShipAlt CG47-91244K ATIP AIT Support; provide, OPTION ITEM.
PARA. NO:
PAGE NO:

ITEM NO: 980-90-019 CONTRACTOR QUESTION 9: Contractor notes that the Specification as written is missing quantities required for the following listed paragraphs 3.1.1, 3.1.3, 3.3.1, 3.3.2, 3.3.3, 3.3.4, 3.3.6, 3.3.7, 3.3.8, 3.3.10, 3.3.11, 3.7.

QUESTION: Will the Customer provide clarification regarding the disparities identified above and issue a revised specification?

GOVERNMENT RESPONSE:

Addressed ERRATA 2 CG 63

TITLE: CG47 Aegis Modernization Team (AMT) Project Development
PARA. NO:
PAGE NO:

ITEM NO: 441-90-006 CONTRACTOR QUESTION 11: Paragraph 3.3, states “Provide 20 mandays of labor and 10,00 dollars of material to accomplish additional work not previously identified in the Work Item, as directed by the SUPERVISOR”.

• Contractor cannot determine is this typo reflects $1,000 or $10,000 of material.

QUESTION: Can the Customer provide clarification as the disparities identified above regarding the requirements of paragraph 3.3, and will an Amendment be issued providing a revised specification be issued?

GOVERNMENT RESPONSE:

Work item will be corrected to read "10,000" via ERRATA 2 CG 63.

TITLE: ShipAlt CG47-80897.03K, PEOC41 NMT AN/WSC-9(V)XX Multiband Terminal Alteration; accomplish
PARA. NO:
PAGE NO:

ITEM NO: Attachment J-7 CONTRACTOR QUESTION 12:

The following items were received but are not listed on the J-7:

514-11-005, 533-11-003, 980-11-02, 980-11-027 GOVERNMENT RESPONSE:

Revision of J7 provided.

TITLE:
PARA. NO:
PAGE NO:

ITEM NO: Work Item Package CONTRACTOR QUESTION 13:

The following items are listed on the J-7 but were not included in the spec package:

244-11-002, 245-11-008, 261-12-002, 261-12-003, 321-11-001, 423-14-001, 423-90-001, 428-90-001, 436-11-010, 437-21-001, 456-01-006, 456-10-002, 472-11-003, 472-11-004, 482-11-001, 505-11-009, 514-11-003, 533-11-002, 562-11-001, 623-12-003, 645-11-001, 661-11-001, 751-11-003, 763-11-002, 772-20-001, 980-11-005, 992-11-003GOVERNMENT RESPONSE: These are no longer part of the official package. Revision of J7 provided.
TITLE:
PARA. NO:
PAGE NO:
ITEM NO: 168-12-004CONTRACTOR QUESTION 14:
Item is listed as 168-12-002 on Attachment J-7GOVERNMENT RESPONSE:

Item is 168-12-004 correction. Revision of J7 provided.

TITLE: Door and Scuttle Repair; accomplish
PARA. NO:
PAGE NO:
ITEM NO: 456-01-004CONTRACTOR QUESTION 15:
Item title on spec does not match item title on Attachment J-7GOVERNMENT RESPONSE:

Correction to title was made during final packaging. Revision of J7 provided.

TITLE: Radar Target Processor Protective Cover; replace
PARA. NO:
PAGE NO:
ITEM NO: 551-31-003CONTRACTOR QUESTION 16:
Item is listed as 551-31-002 on Attachment J-7GOVERNMENT RESPONSE:

Item is 551-31-003 correction. Revision of J7 provided.

TITLE: Self-Reactivating Dehydrator; repair
PARA. NO:
PAGE NO:
ITEM NO: 631-90-001CONTRACTOR QUESTION 17:
Item is listed as 631-80-001 on Attachment J-7GOVERNMENT RESPONSE:

Cancelled. Addressed ERRATA 1 CG 64.

TITLE: Complete ShipAlt CG47-83283K Corrosion Control Enhancement; accomplish
PARA. NO:
PAGE NO:
ITEM NO: 437-21-003CONTRACTOR QUESTION 18:
Item listed as 437-21-001 on Attachment J-7GOVERNMENT RESPONSE:

Item is 437-21-003 correction. Revision of J7 provided.

TITLE: Oily Waste Drain Tank Level Indicator (TLI) System; repair
PARA. NO:
PAGE NO:

ITEM NO: 521-90-001 - Gettysburg CONTRACTOR QUESTION 20: Para 3.1 states to accomplish requirements of 2.2 thru 2.6 using the material in 2.7 and 5.3. Ref 2.7 is the 4720 and this Alt is not listed in the document, and 5.3 list states KITTED MATERIAL: None. Please provide a list of GFM. GOVERNMENT RESPONSE:

4720/3 Reference listed is for work item title listed on work item. 4720's received after solicitation. Addressed ERRATA 1 CG 64.

TITLE: SA 86960K Upgrade to Titanium Fire Pumps
PARA. NO: 3.1
PAGE NO: 2

ITEM NO: 523-90-001 - Gettysburg CONTRACTOR QUESTION 21: Para 3.1 states to accomplish requirements of 2.2 thru 2.6 using the material in 2.7 and 5.3. Ref 2.7 is the 4720 and this Alt is not listed in the document, and 5.3 states Kitted material Ref. 2.7. Please provide a list of GFM. GOVERNMENT RESPONSE:

Addressed in Reference Disk dated 11/21/17

TITLE: SA 87259K Add FW Cross Connect to CMWD
PARA. NO: 3.1
PAGE NO: 2

ITEM NO: 524-90-001 - Gettysburg CONTRACTOR QUESTION 22: Para 3.1 states to accomplish requirements of 2.2 thru 2.7 using the material in 2.8 and 5.3. Ref 2.8 is the 4720 and this Alt is not listed in the document, and 5.3 states Kitted material Ref. 2.8. Please provide a list of GFM. GOVERNMENT RESPONSE:

Addressed in Reference Disk dated 11/21/17

TITLE: SA 87288K Replace SW Boundary Valves with TOTS
PARA. NO: 3.1
PAGE NO: 2

ITEM NO: 526-80-002 - Gettysburg CONTRACTOR QUESTION 23: Para 3.1 states to accomplish requirements of 2.2 and 2.3 using the material in 2.4 and 5.3. Ref 2.4 is the 4720 and this Alt is not listed in the document, and 5.3 states Kitted material Ref. 2.4. Please provide a list of GFM. GOVERNMENT RESPONSE:

Addressed in Reference Disk dated 11/21/17

TITLE: SA 77812D Deck Drain Mods
PARA. NO: 3.1
PAGE NO: 1

ITEM NO: 528-90-001 - Gettysburg CONTRACTOR QUESTION 24: Para 3.1 states to accomplish requirements of 2.2 through 2.5 using the material in 2.6 and 5.3. Ref 2.6 is the 4720 and this Alt is not listed in the document, and 5.3 states Kitted material Ref. 2.6. Please provide a list of GFM. GOVERNMENT RESPONSE:

Addressed in Reference Disk dated 11/21/17

TITLE: SA 87606.02K Fan Room Corrosion Mitigation
PARA. NO: 3.1
PAGE NO: 2

ITEM NO: 533-90-003 - Gettysburg CONTRACTOR QUESTION 25: Para 3.1 states to accomplish requirements of 2.2 through 2.6 and applicable SA portions of 2.7 & 2.8 using the material in 2.9 and 5.3. Ref 2.9 is the 4720 and this Alt is not listed in the document, and 5.3 states Kitted material Ref. 2.9. Please provide a list of GFM. GOVERNMENT RESPONSE:

Addressed in Reference Disk dated 11/21/17

TITLE: SA 84326.K Replace HATCO Booster
PARA. NO: 3.1
PAGE NO: 2

ITEM NO: 540-90-001 - Gettysburg CONTRACTOR QUESTION 26: Para 3.1 states to accomplish requirements of 2.2 through 2.4 using the material in 2.5 and 5.3. Ref 2.5 is the 4720 and this Alt is not listed in the document, and 5.3 states Kitted material Ref. 2.5. Please provide a list of GFM. GOVERNMENT RESPONSE:

Addressed in Reference Disk dated 11/21/17

TITLE: SA 80740K Fuel Oil and LO Heater Power Sys Mod
PARA. NO: 3.1
PAGE NO: 1

ITEM NO: 555-90-0003 - Gettysburg CONTRACTOR QUESTION 27: Para 3.1 states to accomplish requirements of 2.2 and 2.3 using the material in 2.4 and 5.3. Ref 2.4 is the 4720 and this Alt is not listed in the document, and 5.3 states Kitted material Ref. 2.4. Please provide a list of GFM. GOVERNMENT RESPONSE:

Addressed in Reference Disk dated 11/21/17

TITLE: SA 81435.K Installation of Remote Fire Toggle Switch
PARA. NO: 3.1
PAGE NO: 1

ITEM NO: 586-11-001 - Gettysburg CONTRACTOR QUESTION 28: The equipment listed in 1.3.1 thru 1.3.5 is listed as GFE. Please confirm the Government will provide this equipment for installation. GOVERNMENT RESPONSE:

Work Item cancelled ERRATA 1 CG 64.

TITLE: Glide Slope Indicator
PARA. NO: 2.2
PAGE NO: 1

ITEM NO: CONTRACTOR QUESTION 30: There are several work items in this package that have a LOE para to provide X amount of days, vice mandays. Please confirm where ever the para reads X amount of days, it should be priced as mandays. (8 hrs per day). One example is item 505-11-001 GOVERNMENT RESPONSE:

Addressed ERRATA 1 CG 64.

TITLE:
PARA. NO:
PAGE NO:

ITEM NO: USS Gettysburg Spec 997-11-001 and J-6 USS Gettysburg Milestones CONTRACTOR QUESTION 31: J-6 USS Gettysburg Milestone "DOCK" states; "Offeror shall propose Dock Date IAW Specification 997-11-001". Specification 997-11-001, Para. 3.7 indicates "DOCK" schedule milestone should be within the first 10 percent of the contractual period. QUESTION: Please provide guidance regarding the DOCK schedule guidance provided in Specification 997-11-001, Para. 3.7 "within the first 10 percent of the contractual period"? If a contractor proposes a DOCK schedule date later than the first 10 percent of the contractual period, how will the Gov't evaluate the proposed milestone schedule? Assuming a contractor proposes to achieve the required contractual delivery date, can a contractor propose a "DOCK" milestone schedule date later than the first 10 percent of the contractual period and an Undock milestone of their choice ? Please clarify. GOVERNMENT RESPONSE:

Addressed ERRATA 1 CG 63, ERRATA 3 CG 64. Docking does not have to occur within 10% of the availability.

TITLE: Drydocking and Undocking; accomplish
PARA. NO: NO: 997-11-001, Para 3.7
PAGE NO:

ITEM NO: 456-90-001 CONTRACTOR QUESTION 33:

Para 3.1 states "Accomplish the requirements of 2.2 through 2.17 and applicable portions of 2.18, including all general, local, special, test and rip-out notes, using 2.24 through 2.27 for guidance. Work is to be completed in accordance with the schedule provided in 2.28."

Para 3.1.1 states "Fabricate, fit and install from raw material provided by 2.29,2.30 and 5.3, for accomplishing the requirements of 2.2 through 2.16, 2.18 through 2.20, 2.25 through 2.27."

For estimating purposes please clarify the intent of para 3.1.1. Who is accomplishing ref 2.19 through 2.20 and 2.25 through 2.27 since there is no requirement to accomplish these paragraphs in 3.1?

Please advise GOVERNMENT RESPONSE:

Requirements of references are divided between MSR and AIT as stated in work item.

Ref 2.19 and 2.20 are stated in paragraph 3.1.1 and 3.8. MSR shall accomplish requirements as stated. ie. MSR shall fabricate, fit and install the raw material provided by references (2.29, 2.30 and 5.3) for the accomplishment of tasks described in 2.19 and 2.20.

Ref 2.25 through 2.27 are stated in paragraph 3.1 and 3.1.1. MSR shall fabricate, fit and install from raw material provided by references (2.29, 2.30 and 5.3) to accomplish 2.2 through 2.17 and applicable portions of 2.18 - use these references as guidance to accomplish requirements.

TITLE: ShipAlt CG47-85077.03K AN/SPQ-9B PDD W/Tech Refresh on Surface Ships; accomplish
PARA. NO: 3.1.1
PAGE NO: 3

ITEM NO: 456-90-002 CONTRACTOR QUESTION 34:

Para 3.1 states "Accomplish the requirements of 2.2 through 2.22 and applicable portions of SA 77614.03K in 2.23 through 2.25 including all general, local, special, test and rip-out notes, using 2.26 through 2.56 for guidance. Work is to be completed in accordance with the schedule provided in 2.61."

Para 3.1.1 states "Fabricate, fit and install from raw material provided by 2.59, 2.60 and 5.3, for accomplishing the requirements of 2.2 through 2.22 and 2.26 through 2.56."

For estimating purposes please clarify the intent of para 3.1.1. Who is accomplishing ref 2.26 through 2.56 since there is no requirement to accomplish these paragraphs in 3.1?

Please advise GOVERNMENT RESPONSE:

Requirements of references are divided between MSR and AIT as stated in work item.

Ref 2.26 through 2.56 are stated in 3.1: "using 2.26 through 2.56 for g;uidance". MSR shall accomplsh requirements as stated. ie. MSR shall fabricate, fit and install from raw material provided by 2.59, 2.60 and 5.3 for the accomplishment of tasks described in 2.26 through 2.56.

Accomplishment of Ref 2.26 through 2.41 are subsequently stated in paragraph 3.10 Ref 2.42 through 2.56 are references to be used as guidance.

TITLE: Title: ShipAlt CG47-77614.03K, ACB12/TI12 OA Computing Plant Upgrade; accomplish

PARA. NO: 3.1.1
PAGE NO: 4
Re
ITEM NO: 456-90-003CONTRACTOR QUESTION 35:

Para 3.2 states "Accomplish the requirements of 2.2 through 2.29 and applicable portions of SA 78510.03K in 2.43 and 2.44 including all general, local, special, test and rip-out notes, using 2.42 and 2.45 through 2.58 for guidance. Work is to be completed in accordance with the schedule provided in 2.59."

Para 3.2.1 states "Fabricate, fit and install from raw material provided by 2.60 and 2.61 and 5.3, for accomplishing the requirements of 2.2 through 2.23, 2.25, 2.26, 2.30 through 2.44."

For estimating purposed please clarify the intent of para 3.2.1. (who is accomplishing ref 2.30 through 2.42) since there is no requirement to accomplish these paragraphs in 3.2?

Please advise GOVERNMENT RESPONSE:

Requirements of references are divided between MSR and AIT as stated in work item.

TITLE: ShipAlt CG47-78510.03K AWS: ACB12/TI12 CIC Display Upgrades; accomplish
PARA. NO: 3.2.1
PAGE NO: 4

ITEM NO: 456-90-004 CONTRACTOR QUESTION 36:

Para 3.1 states "Accomplish the requirements of 2.2 through 2.27, and applicable portions of SA 87024.03K in 2.28 including all general, local, special, test and rip-out notes using 2.50 for guidance."

Para 3.1.1 state "Fabricate, fit and install from raw material provided by 2.51 and 5.3, for accomplishing the requirements of 2.2 through 2.33."

For estimating purposed please clarify the intent of para 3.1.1. (who is accomplishing ref 2.29 through 2.33) since there is no requirement to accomplish these paragraphs in 3.1?

Please advise GOVERNMENT RESPONSE:

Requirements of references are divided between MSR and AIT as stated in work item.

TITLE: ShipAlt CG47-87024.03K, AN/SQQ-89A(V)15 W/TI-14 HW FOR CG MOD; accomplish
PARA. NO: 3.1.1
PAGE NO: 3

ITEM NO: 651-90-002 CONTRACTOR QUESTION 39:

Paragraph 3.1 states "Accomplish the requirements of 009-90 of 2.1 to obtain the services of a technical OEM representative to align and verify all equipment."

Please provide sources for Technical OEM Representative services (009-90) to accomplish installation on this shipalt.

GOVERNMENT RESPONSE:

THE SOURCE 2000

502 Rotary Street Hampton, VA 23661 800-497-2144 http://thesource2000.net

TITLE: ShipAlt CG47-83409K, Advanced Food Service; accomplish
PARA. NO: 3.1
PAGE NO: 2

ITEM NO: 481-90-001 CONTRACTOR QUESTION 40:

Para 3.2 states "Accomplish the requirements of 2.2 through 2.29, and applicable portions of SA 78818.03K in 2.30 through 2.32 including all general, local, special, test and rip-out notes, using 2.33 for guidance. Work is to be completed in accordance with the schedule provided in 2.40."

Para 3.2.1 states "Fabricate, fit and install from raw material provided by 2.41 and 2.42 and 5.3, for accomplishing the requirements of 2.2 thru 2.32 and 2.34 thru 2.37."

For estimating purposes please clarify the intent of para 3.2.1. Who is accomplishing ref 2.34 through 2.37 since there is no requirement to accomplish these paragraphs in 3.2?

please advise

GOVERNMENT RESPONSE:

Requirements of references are divided between MSR and AIT as stated in work item.

TITLE: ShipAlt CG47-78818.03K, Mark 34 Mod 6 Gun Weapons System (GWS) MOD TI12 ABC12 Hardware Upgrade; accomplish

PARA. NO: 3.2.1
PAGE NO: 3

ITEM NO: 495-90-001 CONTRACTOR QUESTION 42:

Para 3.2 states "Accomplish the requirements of 2.2 through 2.4. Work is to be completed in accordance with the schedule provided in 2.8."

Para 3.2.1 states "Fabricate, fit and install from raw material provided by 2.9 and 5.3, for accomplishing the requirements of 2.2 thru 2.5 and 2.10."

For estimating purposes please clarify the intent of para 3.2.1. Who is accomplishing ref 2.5 and 2.10 since there is no requirement to accomplish these paragraphs in 3.2?

please advise GOVERNMENT RESPONSE:

Requirements of references are divided between MSR and AIT as stated in work item.

TITLE: ShipAlt CG47-84924K ICOP Infrastructure Installation; accomplish

PARA. NO: 3.2.1
PAGE NO: 2

ITEM NO: 484-90-001 CONTRACTOR QUESTION 43:

Para 3.2 states "Accomplish the requirements of 2.2 through 2.15 and applicable 79256.03K in 2.16 including all general, local, special, test and rip-out notes using 2.21 through 2.24 for guidance. Work is to be completed in accordance with the schedule provided in 2.25."

Para 3.2.1 states "Fabricate, fit and install from raw material provided by 2.26and 2.27 and 5.3, for accomplishing the requirements of 2.2 through 2.14 and 2.16 through 2.20."

For estimating purposes please clarify the intent of para 3.2.1. Who is accomplishing ref 2.17 through 2.20 since there is no requirement to accomplish these paragraphs in 3.2?

please advise GOVERNMENT RESPONSE:

Requirements of references are divided between MSR and AIT as stated in work item.

TITLE: ShipALT CG47-79256.03K, AN/USG-2B installation: accomplish

PARA. NO: 3.2.1
PAGE NO: 3

ITEM NO: 441-90-005 CONTRACTOR QUESTION 44:

Para 3.4 states "Fabricate and install label plates I.A.W. Ref 2.8."

also Note 4.1. states "AIT will accomplish all misc cableway modification requirememnts (stud-runs, T-Bar, etc.)."

Who's responsibility is it to install noted cable tags? GOVERNMENT RESPONSE:

Para 3.4 is the responsibility of the MSR for all cable labels within the scope of requirements listed in 3.1 or interferences touched by the MSR within this work item.

TITLE: SHIPALT CG47-8469K, AN/SRC 61A(V) 11 DMR COMUNICATION SYS INSTALL; ACCOMPLISH
PARA. NO: 3.4
PAGE NO: 2 of 3 and 3 of 3

ITEM NO: 721-31-001 CONTRACTOR QUESTION 50: Are 3/16" steel reinforced plates GFE? GOVERNMENT RESPONSE:

No, Not provided as GFE.

TITLE: MK41 VLS Launcher Top
PARA. NO: 3.6.1
PAGE NO: 3 of 8

ITEM NO: 721-31-001 CONTRACTOR QUESTION 51: Are metal pans GFE? GOVERNMENT RESPONSE:

No, Not provided as GFE.

TITLE: MK41 VLS Launcher Top
PARA. NO: 3.6.2
PAGE NO: 3 of 8

ITEM NO: 721-31-001 CONTRACTOR QUESTION 52: Are containment enclosures GFE? GOVERNMENT RESPONSE:

No, Not provided as GFE.

TITLE: MK41 VLS Launcher Top
PARA. NO: 3.7
PAGE NO: 3 of 8

ITEM NO: 721-31-001 CONTRACTOR QUESTION 53: Are 3/4" thick fire retardent plywood blanks GFE? GOVERNMENT RESPONSE:

No, Not provided as GFE.

TITLE: MK41 VLS Launcher Top
PARA. NO: 3.9.1
PAGE NO: 4 of 8

ITEM NO: 721-31-001 CONTRACTOR QUESTION 54: Are metal pans GFE? GOVERNMENT RESPONSE:

No, Not provided as GFE.

TITLE: MK41 VLS Launcher Top
PARA. NO: 3.9.1.2
PAGE NO: 4 of 8

ITEM NO: 980-90-018 CONTRACTOR QUESTION 68:

Please quantify the requirements paragraphs 3.1-3.2, 3.4-3.5 GOVERNMENT RESPONSE:

Work Item cancellation addressed ERRATA 2 CG 63

TITLE: Ship Alt 91244 k Support
PARA. NO: 3.1-3.2,3.4-3.5
PAGE NO: 1

ITEM NO: 980-90-019 CONTRACTOR QUESTION 69:

Please quantify the requirements in paragraphs 3.1-3.1.3,3.3.13.3.6,3.3.8, 3.3.10,3.3.11

GOVERNMENT RESPONSE:

Addressed ERRATA 2 CG 63

TITLE: Aegis Modernization
PARA. NO: 3.1-3.1.3,3.3.13.3.6,3.3.8, 3.3.10,3.3.11
PAGE NO: 1-2

ITEM NO: 980-90-017 CONTRACTOR QUESTION 70:

Please quantify the requirements in paragraphs 3.1-3.2, 3.4,3.5,3.7.1-3.7.4,3.7.8

GOVERNMENT RESPONSE:

Addressed ERRATA 1 CG 63

TITLE: Combat Systems Mod Support
PARA. NO: 3.1-3.2, 3.4,3.5,3.7.1-3.7.4,3.7.8
PAGE NO: 1-3

ITEM NO: 993-11-002 CONTRACTOR QUESTION 71: Paragraph 3.2 calls for 2 each qualified logistician to assist ships force. For estimating purposes how many hours of assistance will be required? GOVERNMENT RESPONSE:

Addressed ERRATA 1 CG 64. 8 hour days, 5 days a week for length of Avail.

TITLE: Ship's Force Warehouse
PARA. NO: 3.2
PAGE NO:

ITEM NO: 992-11-006 CONTRACTOR QUESTION 72: For estimating purposes, provide size of barge, YRBM or APL? Where will it be pick up at? Where will it be returned to? GOVERNMENT RESPONSE:

Estimate for an APL. Picked up and returned to NAVSTA.

TITLE: Messing and Berthing Barge Tow
PARA. NO:
PAGE NO:

ITEM NO: 150-90-002 - 008 CONTRACTOR QUESTION 74: The 150-90-002 - 008 ShipAlts list a large number of Rev A references to accomplish work IAW. The References provided on CD are Not Rev A. Please review and provide correct references. GOVERNMENT RESPONSE:

Addressed in Reference Disk dated 11/21/17

TITLE: ShipAlts
PARA. NO:
PAGE NO:

ITEM NO: 437-21-003 CONTRACTOR QUESTION 78: Please review this item, it refers to non existing paragraphs. GOVERNMENT RESPONSE:

Addressed ERRATA 2 CG 64

TITLE: Oily Waste Drain TLI System
PARA. NO:
PAGE NO:

ITEM NO: 612-11-001 CONTRACTOR QUESTION 79: Para 3.2 states to fab, fit and install new the following parts for section of missing lifeline identified in 1.3.1 at locations listed in 1.2.1. Quantities in body of item and the identification in Para 1.3.1 do not match. Please review and advise. GOVERNMENT RESPONSE:

Addressed ERRATA 2 CG 64

TITLE: Ladder, Liferail, and Guardline; replace
PARA. NO: 3.2
PAGE NO: 2 of 12

ITEM NO: 612-11-001 CONTRACTOR QUESTION 80: Para 3.2.2 states to fab, fit, and install new each guardrail listed in 1.3.3 and 1.3.4 in locations listed in 1.2.2 through 1.2.7. Para 1.3.3 has a quantity of (3) kevlar lifelines. Para 1.3.4 has a quantity of (32) nylon guardlines. Para 1.2.2 through 1.2.7 is all over the ship. What quantities are we to work to? If it is (3) kevlar lifelines, what specific locations are needed? GOVERNMENT RESPONSE:

Addressed ERRATA 2 CG 64 to remove unneeded work disrepancies

TITLE: Ladder, Liferail, and Guardline; replace
PARA. NO: 3.2.2
PAGE NO:

ITEM NO: 980-90-005 CONTRACTOR QUESTION 82: Para 3.1 States “Receive, Inventory, Bag, Tag, Store and turn over to installing activity, material listed in Attachment B, when directed by the SUPERVISOR. SUPERVISOR will provide notification 5 days prior to issuance”

QUESTION: Will attachment B to this specification be provided to identify the equipment to Receive, Inventory, Bag, Tag, Store and turn over to installing activity?

GOVERNMENT RESPONSE:

Attachment B should read "Ref 2.3". Addressed ERRATA 2 CG 63

TITLE: ShipAlt CG47-81251.03K, BFTT Aegis Hardware Build 4.2 Upgrade, Alteration Installation Team (AIT) Support Services; provide, OPTION ITEM
PARA. NO:
PAGE NO:

ITEM NO: 415-90-001 CONTRACTOR QUESTION 83: Paragraph 3.1, states “Accomplish the requirements of 2.2 through 2.6, and applicable portions of SA 86539.03.3K in 2.7 and 2.8 including all general, local, special, test and rip-out notes, using 2.9 through 2.12 for guidance”.

• Contractor notes that upon review of the reference disc’s provided that the following references were not included.

*Reference 2.5, drawing 441-8735455, ShipAlt CG47-86539.03K PEO C41 C2P Tech Refresh Mod to Wire Connection List *Reference 2.6, drawing 441-8735456, ShipAlt CG47-86539.03K PEO C41 C2P Tech Refresh Mod to Blk Wrg Diag w/ Pre-Fab *Reference 2.7, drawing 401-8416998 Rev A, CG47 Class Integrated Design Drawing for CG63 Combat Info Center MOD to ARR (EDSRA18) *Reference 2.8, drawing 401-8416999, CG47 Class Integrated Design Drawing for CG63 Computer Central MOD to ARR (EDSRA18)

QUESTION: Can the Customer provide the above missing references to all bidders?

GOVERNMENT RESPONSE:

Reference 2.5 441-8735455 is not required. This reference and it's requirements will be deleted via ERRATA 2 CG 63.

Reference 2.6 441-8735456 and reference 2.7 401-8416998 and reference 2.8 401-8416999 will be provided. Addressed ERRATA 2 CG 63

TITLE: ShipAlt CG47-86539.03K, Common Data Link Management System Installation; accomplish
PARA. NO:
PAGE NO:

ITEM NO: Multiple CONTRACTOR QUESTION 86:

Work items 123-11-006, 123-12-001, 123-21-002, 123-21-003, 631-13-005 reference item 123-10-001; however, item 123-10-001 is not included in the work specs. Please advise.

Work item 150-90-001 references item 123-10-003; however, item 123-10-003 is not included in the work specs. Please advise. GOVERNMENT RESPONSE:

Should be Work item 992-31-001 vice 123-10-001. Addressed ERRATA 2 CG 64.

TITLE:
PARA. NO:
PAGE NO:
ITEM NO: 437-21-003CONTRACTOR QUESTION 87: Paragraph 3.1.1 states to Remove existing, fit, and install new parts listed in 5.1.1
and 5.1.2. Paragraph 5.1.2 does not exist. What are these new parts listed in 5.1.2. Please clarify.GOVERNMENT RESPONSE:

Addressed ERRATA 2 CG 64.

TITLE: Oily Waste Drain Tank Level Indicator (TLI) System; repair
PARA. NO: 3.1.1
PAGE NO: 1

ITEM NO: 437-21-003 CONTRACTOR QUESTION 88: Paragraph 3.1.2 states to Remove existing, fit, and install new parts listed in 5.1.3 through 5.1.10. Paragraphs 5.1.3 through 5.1.10 do not exist. What are these new parts listed in the missing paragraphs 5.1.3 through 5.1.10. Please clarify. GOVERNMENT RESPONSE:

Addressed ERRATA 2 CG 64.

TITLE: Oily Waste Drain Tank Level Indicator (TLI) System; repair
PARA. NO: 3.1.2
PAGE NO: 1
ITEM NO: 150-11-001CONTRACTOR QUESTION 89: Paragraph 3.3.5 & 3.3.6 gives the size of Flat Bar to be renewed, but does not provide the footage to be renewed. Please review.GOVERNMENT RESPONSE: Addressed ERRATA 2 CG 64.
TITLE: Superstructure Repairs
PARA. NO:
PAGE NO:

ITEM NO: J-7 CONTRACTOR QUESTION 90: Items 168-12-004, 437-21-003, 514-11-005, 533-11-003, 551-31-003, 631-90-001, 980-11-002 & 980-11-027 are in the package, but not listed on the Pricing Sheet J-7. If these items belong, please add to J-7 GOVERNMENT RESPONSE:

Included in the CG 64 Package. Revision of J7 provided.

TITLE:
PARA. NO:
PAGE NO:

ITEM NO: J-7 CONTRACTOR QUESTION 91: The following items are listed on J-7, but there is no work item in the package: 244-11-002, 245-11-008, 261-12-002, 261-12-003, 321-11-001, 423-14-001, 423-90-001, 436-11-010, 437-21-001, 456-01-006, 456-10-002, 472-11-003, 472-11-004, 482-11-001, 505-11-009, 514-11-003, 533-11-002, 551-31-002, 562-11-001, 623-12-003, 631-80-001, 645-11-001, 661-11-001, 751-11-003, 763-11-002, 772-20-001, 980-11-005 & 992-11-003. Please review an advise. GOVERNMENT RESPONSE:

Revision of J7 provided.

TITLE:
PARA. NO:
PAGE NO:

ITEM NO: J-7 CONTRACTOR QUESTION 92: Item 244-11-002 is on J-7 two places with different titles. Please review and advise. GOVERNMENT RESPONSE:

Revision of J7 provided.

TITLE:
PARA. NO:
PAGE NO:

ITEM NO: 130-11-003 CONTRACTOR QUESTION 93: Paragraph 3.5 calls for Type 5 nonskid and paragraph 3.5.1 calls for Peel & Stick non-skid. Please clarify which is to be installed. GOVERNMENT RESPONSE:

Addressed ERRATA 2 CG 64.

TITLE: Trimettallic Aircraft Securing Fittings
PARA. NO:
PAGE NO:

ITEM NO: 411-90-001 CONTRACTOR QUESTION 94: In reference to paragraph 4.2, please confirm that the AIT will be securing all equipment to foundations to include bolting, shimming and torqueing if required. If not, please list the equipment that the contractor is to secure. GOVERNMENT RESPONSE:

4.2 States mounting of equipment to ALL foundations within the work item. References list all foundations and equipment to be installed.

TITLE: ShipAlt 78510.03K
PARA. NO: 4.2
PAGE NO:

ITEM NO: 463-90-001 CONTRACTOR QUESTION 95: There is no 4720/3 Material Summary Report listed as a reference in section 2 of the spec item. GOVERNMENT RESPONSE:

Addressed ERRATA 2 CG 64.

ShipAlt CG47-76231K Sonar Stave Cable Connectorization Modifications; accomplish
PARA. NO:
PAGE NO:1

ITEM NO: 463-90-001 CONTRACTOR QUESTION 96: Ref 2.2 (Dwg 463-8415475 Rev. C, sheet 6, Detail 47-A lists the stuffing tubes as existing for CG68-73. There is no material listed for changeout of the stuffing tubes for CG64. Based on experience the stuffing tubes installed on early CG's are a size 3 pressure proof tubes, where as the new trunk cables to be installed require a size 5 pressure proof tube. Are the stuffing tubes to be replaced as part of this ShipAlt? Who will provide these tubes? GOVERNMENT RESPONSE:

Note 7 states that ALL incidental material required to accomplish modifications as shown on drawing shall be provided by the installing activity. Note 13 states that transits and stuffing tubes shall be installed as required.

TITLE: ShipAlt CG47-76231K Sonar Stave Cable Connectorization Modifications; accomplish
PARA. NO: 2.2
PAGE NO:

ITEM NO: 463-90-001 CONTRACTOR QUESTION 97: Ref 2.2 (Dwg 463-8415475 Rev. C, List of Material (LOM) shows items 6-11 connectors but does not show the 4,620 each contact pin part# M39029/70-389 on the LOM, will the contact pins be supplied with the connectors or will contractor be required to supply them? GOVERNMENT RESPONSE:

Comes as part of the connector, Addressed ERRATA 2 CG 64 to add 4720 reference

TITLE: ShipAlt CG47-76231K Sonar Stave Cable Connectorization Modifications; accomplish
PARA. NO: 2.2
PAGE NO: