J-3_USS_COWPENS_Milestones_Final_Rev1_FBO.xlsx
XLSX spreadsheet 107 KB Posted
- Attached to
- USS COWPENS (CG 63) and USS GETTYSBURG (CG 64) Modernization Period (MODPRD) Availabilities
- Solicitation number
- N00024-18-R-4439
About this file
J-3 COWPENS (CG 63) Milestones Rev1
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CG63 Milestone
| Milestone / Key Event | Offeror Proposed Date | Proposed 'A+' value | ||
| (Calculated Values) | Schedule Constraint | |||
| Contract Award | Offeror is not to propose. |
Offeror shall assume contract award on or about 16 March 2018 on initial proposals.
Offeror shall assume contract award on or about 6 April 2018 on Final Proposal Revisions.
| Vessel Available | Offeror shall assume "Vessel Available" milestone will occur no earlier than 12 April 2018. |
| Avail Start at KTR Facility | Offeror shall assume vessel will be available to commence transit to the contractor's facility no earlier than to "Vessel Available" milestone. |
Offerors outside the vessels homeport shall propose an Availability start date no less than 60 days from contract award.
Offerors outside the vessels homeport shall propose an Availability start date accounting for vessel preparation and transit duration.
Offerors within the vessels homeport shall propose an Availability start date no less than 15 days from contract award.
Offerors within the vessels homeport shall propose an Availability start date no less than 15 days from "Vessel Available" milestone.
GFM Delivery Offeror is not to propose.
GFM will be delivered incrementally. Offeror should not assume GFM will be delivered prior to 3 March 2018.
10% Availability Complete 31-Dec-99 0 Offeror is not to propose.
Date shall be the mathematically solved 10% point between proposed "Avail Start at KTR Facility" and "KTR Contract Complete" Milestones.
| DOCK | 0 | Offeror shall propose Dock Date IAW Specification 997-11-001 | |
| 20% Dock Period Complete - Dock Related Open and Inspect CFRs Due | 31-Dec-99 | 0 | Offeror is not to propose. |
Date shall be the mathematically solved 20% point between proposed Dock and Undock Milestones.
| UNDOCK | 0 | Offeror shall propose Undock Date IAW Specification 997-11-001 | |
| 20% Open and Inspect | 31-Dec-99 | 0 | Offeror is not to propose. |
Date shall be the mathematically solved 20% point between proposed "Avail Start at KTR Facility" and "KTR Contract Complete" Milestones.
25% CONFERENCE 31-Dec-99 0 Offeror is not to propose.
Date shall be the mathematically solved 25% point between proposed "Avail Start at KTR Facility" and "KTR Contract Complete" Milestones.
| 60 HZ Restored | 0 | Offer proposed date must be at least 15 days prior to ISC Turnover 1 milestone |
| ISC TURNOVER #1 | 0 | Offeror proposed date shall be no less than 53 days before "CHT System Restored", "Sea Water Cooling System Restored" and "Firemain System Restored" milestones. |
ISC TURNOVER #2 0 Offeror proposed date shall be no less than 46 days before "CHT System Restored", "Sea Water Cooling System Restored" and "Firemain System Restored" milestones.
ISC TURNOVER #3 0 Offeror proposed date shall be no less than 39 days before "CHT System Restored", "Sea Water Cooling System Restored" and "Firemain System Restored" milestones.
ISC TURNOVER #4 0 Offeror proposed date shall be no less than 50 days before "AC Plants Restored" milestone.
Overhauled Equipment installed 0 Offeror proposed date shall be no less than 259 days before "KTR Contract Complete" milestone.
COMBAT SYSTEMS MSR TURNOVER #1 0 Offeror proposed date shall be no less than 56 days before "Distributed Systems Restored" milestone.
| CHT System Restored | 0 | "60 HZ Restored" milestone must be complete prior to the completion of this milestone. |
| Sea Water Cooling System Restored | 0 | "CHT System Restored" milestone must be complete prior to the completion of this milestone. |
| Firemain System Restored | 0 | "Sea Water Cooling System Restored" milestone must be complete prior to the completion of this milestone. |
| COMBAT SYSTEMS MSR TURNOVER #2 | 0 | Offeror proposed date shall be no less than 109 days before "ALO" milestone. |
50% CONFERENCE 31-Dec-99 0 Offeror is not to propose.
Date shall be the mathematically solved 50% point between proposed "Avail Start at KTR Facility" and "KTR Contract Complete" Milestones.
COMBAT SYSTEMS MSR TURNOVER #3 0 Offeror proposed date shall be no less than 102 days before "ALO" milestone.
| Potable Water system restored and sanitized | 0 | "Firemain System Restored" milestone must be complete prior to the completion of this milestone. |
| AC Plants Restored | 0 | "Potable Water system restored and sanitized" milestone must be complete prior to the completion of this milestone. |
| COMBAT SYSTEMS MSR TURNOVER #4 | 0 | Offeror proposed date shall be no less than 88 days before "ALO" milestone. |
COMBAT SYSTEMS MSR TURNOVER #5 0 Offeror proposed date shall be no less than 74 days before "ALO" milestone.
| Lube Oil System Restored | 0 | "AC Plants Restored" milestone must be complete prior to the completion of this milestone. |
| LP/HP Air Systems Restored | 0 | "Lube Oil System Restored" milestone must be complete prior to the completion of this milestone. |
| CHW System Restored | 0 | "LP/HP Air Systems Restored" milestone must be complete prior to the completion of this milestone. |
| Fuel Oil System Restored | 0 | "CHW System Restored" milestone must be complete prior to the completion of this milestone. |
| CPP System Restored | 0 | "Fuel Oil System Restored" milestone must be complete prior to the completion of this milestone. |
| Bleed Air System Restored | 0 | "CPP System Restored" milestone must be complete prior to the completion of this milestone. |
| COMBAT SYSTEMS MSR TURNOVER #6 | 0 | Offeror proposed date shall be no less than 60 days before "ALO" milestone. |
Distributed Systems Restored - CS Support Equipment available (FM, CHW, ECW, 60HZ, HP air, LP air available to CS turn over spaces) 0 Offeror proposed date shall be no less than 193 days before "KTR Contract Complete" milestone.
"Bleed Air System Restored" milestone must be complete prior to the completion of this milestone.
| 400 HZ Restored | 0 | Must be completed Prior to Combat systems Turn Over three to complete testing to support ALO Milestone. |
| Engineering Plant Production Completion Date (PCD) | 0 | Offeror proposed date shall be no less than 54 days before "ALO" milestone. |
Combat Systems AEGIS Light Off (ALO) 0 Offeror proposed date shall be no less than 133 days before "KTR Contract Complete" milestone.
"ALO" milestone must be complete prior to the completion of this milestone.
Fuel ship for Hot Plant Testing 0 Offeror proposed date shall be no less than 133 days before "KTR Contract Complete" milestone.
"ALO" milestone must be complete prior to the completion of this milestone.
75% CONFERENCE 31-Dec-99 0 Offeror is not to propose.
Date shall be the mathematically solved 75% point between proposed "Avail Start at KTR Facility" and "KTR Contract Complete" Milestones.
| Habitability Work Complete | |||
| Commence Crew Move Aboard | 0 | Offeror proposed date shall be no less than 105 days before "KTR Contract Complete" milestone. |
"Fuel ship for Hot Plant Testing" milestone must be complete prior to the completion of this milestone.
Commence Hot Plant Testing 0 Offeror proposed date shall be no less than 91 days before "KTR Contract Complete" milestone.
"Habitability Work Complete / Commence Crew Move Aboard" milestone must be complete prior to the completion of this milestone.
Complete Hot Plant Testing 0 Offeror proposed date shall be no less than 49 days before "KTR Contract Complete" milestone.
"Commence Hot Plant Testing" milestone must be complete prior to the completion of this milestone.
LOA Preps (Start) 0 Offeror proposed date shall be no less than 49 days before "KTR Contract Complete" milestone.
"Complete Hot Plant Testing" milestone must be complete prior to the completion of this milestone.
IBS testing (Complete) 0 Offeror proposed date shall be no less than 35 days before "KTR Contract Complete" milestone.
"LOA Preps (Start)" milestone must be complete prior to the completion of this milestone.
LOA 0 Offeror proposed date shall be no less than 21 days before "KTR Contract Complete" milestone.
"IBS testing (Complete)" milestone must be complete prior to the completion of this milestone.
Dock Trials 0 Offeror proposed date shall be no less than 14 days before "KTR Contract Complete" milestone.
"LOA" milestone must be complete prior to the completion of this milestone.
Fast Cruise 0 Offeror proposed date shall be no less than 13 days before "KTR Contract Complete" milestone.
"Dock Trials" milestone must be complete prior to the completion of this milestone.
Crew Rest Period 0 Offeror proposed date shall be no less than 12 days before "KTR Contract Complete" milestone.
"Dock Trials" milestone must be complete prior to the completion of this milestone.
HM&E SEA TRIALS (CSST 1) 0 Offeror proposed date shall be no less than 7 days before "KTR Contract Complete" milestone.
"Fast Cruise " milestone must be complete prior to the completion of this milestone.
Transit to NAVSTA 0 Offeror proposed date shall be no less than 0 days before "KTR Contract Complete" milestone.
"HM&E SEA TRIALS (CSST 1)" milestone must be complete prior to the completion of this milestone.
KTR Contract Complete 0 Offeror Shall propose date no later than 24 July 2019.
"Transit to NAVSTA" milestone must be complete prior to the completion of this milestone.
CS Turnover USS COWPENS CG 63 FY18 EDSRA Combat Systems (CS) Turnovers
| Offeror proposed date shall be no less than X days before Completion milestone. | MSR/AIT Completion milestone | ||
| COMPARTMENT NUMBER | COMPARTMENT NAME |
| COMBAT SYSTEMS TURNOVER #1 (MSR to AIT) | |||
| 2-94-1-Q | Fan Room | 56 | Distrubited Systems Restored |
| 2-94-2-Q | Fan Room | 56 | Distrubited Systems Restored |
| 01-392-2-Q | Fan Room | 56 | Distrubited Systems Restored |
| 01-148-1-Q | Fan Room | 56 | Distrubited Systems Restored |
| 01-178-0-Q | Fan Room | 56 | Distrubited Systems Restored |
| 01-226-1-Q | Fan Room | 56 | Distrubited Systems Restored |
| 02-228-4-Q | Fan Room | 56 | Distrubited Systems Restored |
| 02-234-2-Q | Fan Room | 56 | Distrubited Systems Restored |
| 03-138-2-Q | Fan Room | 56 | Distrubited Systems Restored |
| 03-174-1-Q | Fan Room | 56 | Distrubited Systems Restored |
| 03-188-0-Q | Fan Room | 56 | Distrubited Systems Restored |
| 04-300-2-Q | Fan Room | 56 | Distrubited Systems Restored |
| 1-82-2-Q | Fan Room | 56 | Distrubited Systems Restored |
| 1-382-3-Q | Fan Room | 56 | Distrubited Systems Restored |
| 2-464-1-Q | Fan Room | 56 | Distrubited Systems Restored |
| 3-426-0-Q | VLS Fan Rm #3 | 56 | Distrubited Systems Restored |
| COMBAT SYSTEMS TURNOVER #2 (MSR to AIT) | |||
| 01-236-0-C | Load Center 41 | 109 | ALO |
| 2-127-0-C | IC & Gyro Rm #1 (FWD) | 109 | ALO |
| 3-382-0-C | IC & Gyro Rm #2 (AFT) | 109 | ALO |
| COMBAT SYSTEMS TURNOVER #3 (MSR to AIT) | |||
| 2-236-0-Q | Aegis Cooling Rm #1 (C&D Skid Rm) | 102 | ALO |
| 102 | ALO | ||
| 5-220-0-E | AMR #1 (400 Hz & FWD SPY Skid) | 102 | ALO |
| 3-382-2-Q | AFT SPY Skid (Cooling Rm #2) | 102 | ALO |
| 3-393-4-Q | 400 Hz Converter Rm #2 | 102 | ALO |
| 03-220-2-Q | EW Equipment Cooling RM | 102 | ALO |
| 1-159-0-Q | CSMC | 102 | ALO |
| 01-138-0-C | Computer Central | 102 | ALO |
| 02-138-0-C | CIC | 102 | ALO |
| 04-140-1-C | Aegis Radar Rm #1 | 102 | ALO |
| 03-138-1-C | Aegis Radar Rm #2 | 102 | ALO |
| 01-220-0-C | Aegis Radar Rm #3 | 102 | ALO |
| 05-316-0-C | Aegis Radar Rm #4 | 102 | ALO |
| 04-316-0-C | Aegis Radar Rm #5 | 102 | ALO |
| COMBAT SYSTEMS TURNOVER #4 (MSR to AIT) | |||
| 02-200-0-C | Radio Transmitter Rm | 88 | ALO |
| 02-220-0-C | Radio Central | 88 | ALO |
| 03-162-2-C | MK 99 XMTR Rm | 88 | ALO |
| 04-188-0Q | Foremast | 88 | ALO |
| 05-149-0-C | Pilot House | 88 | ALO |
| 04-164-1-C | Chart Rm | 88 | ALO |
| 03-227-2-C | Phalanx Local Control Rm | 88 | ALO |
| 2-272-0-C | CCS | 88 | ALO |
| 3-127-0-Q | Tomahawk Equip Rm (TER) | 88 | ALO |
| 2-260-1-Q | Supply Dept Office | 88 | ALO |
| 3-260-2-Q | SNAP Cage | 88 | ALO |
| 03-199-0-C | IFF Equipment Room | 88 | ALO |
| COMBAT SYSTEMS TURNOVER #5 (MSR to AIT) | |||
| 03-260-0-Q | Main Mast | 74 | ALO |
| 01-180-0-C | Ships Signal Exploitation Space | 74 | ALO |
| 03-224-0-C | Electronic Warfare Rm | 74 | ALO |
| 05-166-1-C | Director Assembly Rm #1 (STBD) | 74 | ALO |
| 05-166-2-C | Director Assembly Rm #2 (PORT) | 74 | ALO |
| 06-308-2-Q | Director Assembly Rm #3 | 74 | ALO |
| 05-308-2-Q | Director Supt Equip Rm | 74 | ALO |
| 02-174-0-C | Sonar Control Rm | 74 | ALO |
| 1-28-0-Q | UNASSIGNED | 74 | ALO |
| 2-28-0-Q | Sonar Rm #1 | 74 | ALO |
| 3-28-0-Q | Sonar Rm #2 | 74 | ALO |
| 4-34-0-Q | Sonar Rm #3 | 74 | ALO |
| 2-220-0-Q | LAMPS/TACTAS RM | 74 | ALO |
| 4-28-0-T | Access Trunk | 74 | ALO |
| 4-58-0-Q | Dome Equip Rm | 74 | ALO |
| 6-28-0-T | Dome Access Trunk | 74 | ALO |
| 3-435-0-M | MK41 VLS Mag #2 (AFT) | 74 | ALO |
| 3-94-0-M | MK41 VLS Mag #1 (FWD) | 74 | ALO |
| 01-58-0-M | MT-51 Load Drum Rm #1 | 74 | ALO |
| 02-292-0-C | Helicopter Hanger | 74 | ALO |
| 03-188-2-Q | Electronic Workshop #1 | 74 | ALO |
| 03-234-0-Q | Phalanx Workshop | 74 | ALO |
| 03-289-0-Q | Electronic Workshop #2 | 74 | ALO |
| 1-390-1-M | Torpedo Rm #1 (STBD) | 74 | ALO |
| 1-390-4-M | Torpedo Rm #2 (PORT) | 74 | ALO |
| 1-464-2-Q | VLS Sec Station # 2 (AFT) | 74 | ALO |
| 1-(464-506)-0-M | 5/54 Gun (MT 52) | 74 | ALO |
| 1-58-0-M | Load Drum #1 (FWD) | 74 | ALO |
| 1-92-1-Q | VLS Sec Station # 1 (FWD) | 74 | ALO |
| 2-94-2-Q | VLS Fan Rm #2 | 74 | ALO |
| 2-94-1-Q | VLS Fan Rm #1 | 74 | ALO |
| 2-431-2-T | VLS Launcher Access Trunk (AFT) | 74 | ALO |
| 2-506-0-Q | Towed Array Rm | 74 | ALO |
| 2-506-1-Q | Nixie Rm | 74 | ALO |
| 2-518-2-A | Bathythermograph Rm | 74 | ALO |
| COMBAT SYSTEMS TURNOVER #6 (MSR to AIT) | |||
| Fwd,Stbd,Port,Aft | AN/SPY Arrays | 60 | ALO |
| 3-62-0-M | 5/54 Proj Mag #1 (FWD) | 60 | ALO |
| 3-482-0-M | 5/54 Proj Mag #2 (AFT) | 60 | ALO |
| 2-482-0-M | MT-52 Load Drum Rm #2 | 60 | ALO |
| 01-(435-464) | Missile Deck (AFT) | 60 | ALO |
| 01-(97-127) | Missile Deck (FWD) | 60 | ALO |
| 06-170-1 | FCS Dir #2 | 60 | ALO |
| 06-170-2 | FCS Dir #1 | 60 | ALO |
| 06-324-2 | FCS Dir #3 | 60 | ALO |
| 07-312-2 | FCS Dir #4 | 60 | ALO |
| 03-240-1 | AN/SLQ-32 (STBD) | 60 | ALO |
| 03-240-2 | AN/SLQ-32 (PORT) | 60 | ALO |
| 04-(190-220)-3 | Decoy Launchers No. 1 & 3 (STBD) | 60 | ALO |
| 04-(206-276) | Elect Warfare Ant./SRBOC Decoy Launcher Layout | 60 | ALO |
| 04-236-3-M | CIWS (MT 21) | 60 | ALO |
| 04-236-4-M | CIWS (MT 22) | 60 | ALO |
| 05-(290-315)-4 | NULKA Decoy Launcher 6 | 60 | ALO |
| 04-(290-310)-4 | Decoy Launchers No. 2 & 4 (PORT) | 60 | ALO |
| 1-(506-529)-4 | W/Deck Harpoon Launcher (AFT) | 60 | ALO |
COW PERL
WORK ITEM NO. USS COWPENS (CG-63)
TPPC-DDG79-MARMCN18-CN01
FY18 SRA Planning Event Readiness List (PERL) (Work Item Title) FOUO: Distribution authorized to DePartment of Defense and U.S. DePartment of Defense ContraCtors only (administrative use) (26 SeP 16) Other requests referred to CNRMC.
I = Open & Inspect Report P = Production Complete T = Testing Complete
| C = Certification Complete | GOV EST | DRYDOCK SHIP TBD | AVAIL 20% (O&I) | FIREMAIN / SEAWATER RESTORED | UNDOCK SHIP | DISTRIBUTIVE SYSTEMS RESTORED | PCD | ALO and CSST | REFUEL SHIP FOR HPT | HAB TURNVOVER | DOCK TRIALS | FAST CRUISE | CREW REST | SEA TRIALS | KTR CONTRACT COMPLETE | ||
| LEGEND | |||||||||||||||||
| 042-11-002 | Availability General Administrative requirements; provide and manage | ||||||||||||||||
| 042-12-001 | Work package Execution Review; accomplish | ||||||||||||||||
| 045-11-001 | Security Services; provide | ||||||||||||||||
| 077-11-001 | Hazardous Waste produced on Naval Vessels; control | ||||||||||||||||
| 110-11-001 | Structural Repairs, Auxiliary Machinery Rooms One and 2; accomplish | I | p/c | ||||||||||||||
| 110-11-003 | Structural Repairs, crew Berthing (3-346-0-L); accomplish | I | p | c | |||||||||||||
| 110-11-004 | Structural Repairs, Shaft Alley & Sewage plant No. 2; accomplish | I | p/c | ||||||||||||||
| 110-11-005 | Structural Repairs, Main Engine Room Number One; accomplish | I | p | c | |||||||||||||
| 110-11-006 | Shell plating, crew Berthing; replace | I | p | c | |||||||||||||
| 110-11-009 | Underwater Hull; inspect and repair | I | p/c | ||||||||||||||
| 110-11-010 | Structural Repairs, Main Engine Room Number 2; accomplish | I | p | c | |||||||||||||
| 110-11-011 | Structural Repairs, Sonar Dome and Equipment Rooms; accomplish | I | p/c | ||||||||||||||
| 110-11-012 | Structural Repairs, SD and Boatswain Storerooms; accomplish | I | p/c | ||||||||||||||
| 110-11-013 | Structural Repairs, 5/54 Magazine; accomplish | I | p/c | ||||||||||||||
| 110-11-014 | Structural Repairs, pump Room No. 2; accomplish | I | p/c | ||||||||||||||
| 110-11-017 | Structural Repairs, pump Room No. One; accomplish | I | p/c | ||||||||||||||
| 110-11-018 | Structural Repairs, TWS Equipment Room; accomplish | I | p/c | ||||||||||||||
| 110-11-022 | Structural Repairs, pump Room No. One; accomplish | I | p/c | ||||||||||||||
| 110-21-002 | Access Trunk Bulkhead plating and Stiffeners; replace | I | p/c | ||||||||||||||
| 110-21-003 | Shell plating, Main Engine Room Number One; replace | I | p/c | ||||||||||||||
| 110-21-004 | Shell plating, Shaft Alley; replace | I | p/c | ||||||||||||||
| 110-90-001 | ShipAlt cG47-83390K, Reinforce Transverse Web Frame; accomplish | I | p/c | ||||||||||||||
| 110-90-002 | ShipAlt cG47-83307K, Increase Fatigue Strength Frame 138, 01 Level; accomplish | I | p/c | ||||||||||||||
| 110-90-003 | ShipAlt cG47-86333K Shell panel Stiffener Upgrade; accomplish | I | |||||||||||||||
| 123-11-001 | compensated Fuel Tank Group One; preserve | I | p/c | ||||||||||||||
| 123-11-002 | compensated Fuel Tank Group 2; preserve | I | p/c | ||||||||||||||
| 123-11-003 | compensated Fuel Tank Group 3; preserve | I | p/c | ||||||||||||||
| 123-11-004 | compensated Fuel Tank Group 4; preserve | I | p/c | ||||||||||||||
| 123-11-005 | compensated Fuel Tank Group 5; preserve | I | p/c | ||||||||||||||
| 123-11-006 | compensated Fuel Tank Group 6; preserve | I | p/c | ||||||||||||||
| 123-11-007 | Fuel Service Tank and Gravity Head Tank; preserve | I | p | ||||||||||||||
| 123-11-008 | Fuel Oil Service and Gravity Head Tank Structural Repairs; accomplish | I | p | ||||||||||||||
| 123-11-009 | compensated Fuel Tank Group One; repair | I | p/c | ||||||||||||||
| 123-11-010 | compensated Fuel Tank Group 2; repair | I | p/c | ||||||||||||||
| 123-11-011 | compensated Fuel Tank Group 3; repair | I | p/c | ||||||||||||||
| 123-11-012 | compensated Fuel Tank Group 4; repair | I | p/c | ||||||||||||||
| 123-11-013 | compensated Fuel Tank Group 5; repair | I | p/c | ||||||||||||||
| 123-11-014 | compensated Fuel Tank Group 6; repair | I | p/c | ||||||||||||||
| 123-11-021 | Tank Top and cross Flooding Duct; replace | I | p/c | ||||||||||||||
| 123-12-001 | Jp-5 Storage Tanks; preserve | I | p/c | ||||||||||||||
| 123-12-002 | Jp-5 Storage Tanks; repair | I | p/c | ||||||||||||||
| 123-13-001 | compensated Fuel Tank Top Group One; repair | I | p/c | ||||||||||||||
| 123-13-002 | compensated Fuel Tank Top Group 2; repair | I | p/c | ||||||||||||||
| 123-13-003 | compensated Fuel Tank Top Group 3; repair | I | p/c | ||||||||||||||
| 123-13-004 | compensated Fuel Tank Top Group 4; repair | I | p/c | ||||||||||||||
| 123-13-005 | compensated Fuel Tank Top Group 5; repair | I | p/c | ||||||||||||||
| 123-13-006 | compensated Fuel Tank Top Group 6; repair | I | p/c | ||||||||||||||
| 123-14-001 | potable Water Tanks; preserve | I | p/c | ||||||||||||||
| 123-14-002 | potable Water Tank; repair | I | p/c | ||||||||||||||
| 123-15-001 | Lube Oil Storage/Settling Tanks; preserve | I | p/c | ||||||||||||||
| 123-15-002 | Lube Oil Storage/Settling Tanks; repair | I | p/c | ||||||||||||||
| 123-15-004 | controllable Reversible pitch propeller (cRp) Hydraulic Oil Sump Tank (FWD); gas free and clean | I | p/c | ||||||||||||||
| 123-15-005 | controllable Reversible pitch propeller (cRp) Hydraulic Oil Sump Tank (AFT); gas free and clean | I | p/c | ||||||||||||||
| 123-17-001 | contaminated Oil Tanks; preserve | I | p/c | ||||||||||||||
| 123-17-002 | contaminated Oil Tanks; repair | I | p/c | ||||||||||||||
| 123-19-001 | collection, Holding and Transfer (cHT) Tanks; repair and preserve | I | p/c | ||||||||||||||
| 123-19-002 | Waste Tank; repair | I | p/c | ||||||||||||||
| 123-21-001 | Accessible Void; repair | I | p/c | ||||||||||||||
| 123-22-001 | Accessible Void; preserve | I | p/c | ||||||||||||||
| 123-22-002 | Escape Trunk Vertical Stiffener; repair | I | p/c | ||||||||||||||
| 123-22-003 | chain Locker and chain Locker Sump; repair | I | p/c | ||||||||||||||
| 123-22-004 | chain Locker and chain Locker Sump; preserve | I | p/c | ||||||||||||||
| 123-31-001 | Tank and Void Open, pump, clean and Gas Free; accomplish | I | p/c | ||||||||||||||
| 123-90-001 | ShipAlt cG47-83059K, Fuel Oil Tanks 6-94-1-F And 6-94-2-F cracks Structural Mod; accomplish | I | p/c | ||||||||||||||
| 130-11-001 | Deferred Boat Deck Stiffener Installation; accomplish | I | p | ||||||||||||||
| 130-11-002 | Deferred SRBOc Launcher Backup Structure Replacement; accomplish | I | p/c | ||||||||||||||
| 130-11-003 | Structural Assembly Stiffener Alignment; accomplish | I | p/c | ||||||||||||||
| 130-11-004 | Deferred cable collar Modification; accomplish | p/c | |||||||||||||||
| 130-11-005 | Deferred cable collar plate Replacement; accomplish | p/c | |||||||||||||||
| 130-11-006 | Deferred Waveguide collar Relocation; accomplish | p/c | |||||||||||||||
| 130-11-007 | Deferred ADNS Sway Brace Foundation Repair; accomplish | p/c | |||||||||||||||
| 130-11-008 | Main Mast pad Replacement; accomplish | I | p/c | ||||||||||||||
| 130-11-009 | Deferred Radar Room Structure plate; install | p/c | |||||||||||||||
| 130-11-010 | Deferred Boat platform Modification; accomplish | p/c | |||||||||||||||
| 130-11-011 | Helicopter Spare Engine Stowage Holes cleaning; accomplish | p | |||||||||||||||
| 130-11-012 | Deferred port/Starboard Halyard pinrail; relocate | p | |||||||||||||||
| 130-90-001 | ShipAlt cG47-83265.03K, Hull Deck Alteration; accomplish | p/c | |||||||||||||||
| 150-11-001 | 03 Level Deckhouse Exterior Bulkhead; repair | I | p/c | ||||||||||||||
| 150-11-002 | Bulkhead plating Repair; accomplish | I | p/c | ||||||||||||||
| 150-11-003 | Superstructure crack; repair | I | p/c | ||||||||||||||
| 150-11-004 | Superstructure Weld Repair; accomplish | I | p/c | ||||||||||||||
| 150-11-005 | Superstructure; repair | I | p/c | ||||||||||||||
| 150-11-006 | Helo Hangar Structural Repair; accomplish | I | p/c | ||||||||||||||
| 150-11-007 | Fan Room 01-148-1-Q Deferred Structural Repair; accomplish | I | p/c | ||||||||||||||
| 150-11-009 | Superstructure cracks; repair | I | p/c | ||||||||||||||
| 150-15-003 | classified Documents Disintegrator Room Restoration; accomplish | p/c | |||||||||||||||
| 150-90-001 | ShipAlt cG47-78449.03K, Deckhouse Insert plate Installation to Bulkhead; accomplish | I | p/c | ||||||||||||||
| 153-11-001 | Radio central Bulkhead plate; Repair | I | p/c | ||||||||||||||
| 163-11-002 | Sea chest; inspect and repair | I | p/c | ||||||||||||||
| 165-11-001 | Sonar Dome Access Scuttles; repair | I | p/c | ||||||||||||||
| 165-11-002 | Sonar Dome Rubber Window (SDRW); inspect and repair | I | p/c | ||||||||||||||
| 165-11-003 | SONAR Dome Rubber Window (SDRW) Radiographic Evaluation; accomplish | I | p/c | ||||||||||||||
| 165-11-004 | Sonar Dome pressurization System; Overhaul | I | p/c | ||||||||||||||
| 165-11-005 | Sonar Dome Rubber Window (SDRW) Firemain piping Replacement; accomplish | I | p/c | ||||||||||||||
| 167-11-002 | Scuttle, Steel, Flush, Quick-Acting; replace | p/c | |||||||||||||||
| 167-20-001 | Ballistic Door, Aluminum, Double; repair | p/c | |||||||||||||||
| 167-80-001 | ShipAlt cG47-78523.03D, Aluminum Ballistic Double Door Hinge and Dog Removal; accomplish | p/c | |||||||||||||||
| 168-11-002 | Scuttle & Hatch, Exterior, Flush, Quick-Acting; replace | p/c | |||||||||||||||
| 168-12-001 | Door, Hinge pad Assembly; install | p/c | |||||||||||||||
| 168-12-002 | Door, Aluminum, Exterior, Watertight, Individually Dogged; replace | p/c | |||||||||||||||
| 171-11-001 | Main Mast; inspect and repair | I | p/c | ||||||||||||||
| 171-11-002 | Main Mast Deferred Interference Installation; accomplish | p/c | |||||||||||||||
| 180-11-001 | close In Weapon System (cIWS) Mount 21 and Mount 22 Foundation Flatness check; accomplish | p/c | |||||||||||||||
| 234-11-001 | Gas Turbine Module (GTM) Base Enclosure preservation; accomplish | p/c | |||||||||||||||
| 234-11-002 | Main propulsion Gas Turbine Module (GTM 1A) Engine; install | p/c | |||||||||||||||
| 234-11-003 | Main propulsion Gas Turbine Module (GTM 1B) Engine; install | p/c | |||||||||||||||
| 234-11-004 | Main propulsion Gas Turbine (GTM 2B) Engine; install | p/c | |||||||||||||||
| 234-11-005 | Main propulsion Gas Turbine Module (GTM 2A) Engine; install | p/c | |||||||||||||||
| 234-12-001 | Main propulsion Gas Turbine Module (GTM) Resilient Mount; replace | p/c | |||||||||||||||
| 241-11-001 | Main Reduction Gear (MRG), Multiple Disc Brake; replace | p/c | |||||||||||||||
| 241-11-003 | Main Reduction Gear (MRG) Flex Hose Replacement; accomplish | p/c | |||||||||||||||
| 241-11-004 | Main Reduction Gear No.1 and No 2 (MRG) Thrust Bearing Seal; replace | p/c | |||||||||||||||
| 243-11-001 | Starboard Outboard Shafting and Bearing; inspect and replace | I | p/c | ||||||||||||||
| 243-11-003 | Starboard Stern Tube Shaft Seal; overhaul | I | p/c | ||||||||||||||
| 243-11-004 | port Stern Tube Shaft Seal; overhaul | I | p/c | ||||||||||||||
| 243-11-005 | Starboard Stern Tube Flax packing and Gland Ring Removal; accomplish | I | p/c | ||||||||||||||
| 243-11-006 | port Stern Tube Flax packing and Gland Ring Removal; accomplish | I | p/c | ||||||||||||||
| 243-11-007 | port propulsion Shaft Bulkhead Seal Replacement; accomplish | I | p/c | ||||||||||||||
| 243-11-008 | Starboard propulsion Shaft Bulkhead Seal Replacement; accomplish | I | p/c | ||||||||||||||
| 243-11-009 | port and Starboard Shaft Seal Low pressure Inflation Flex Hose Replacement; accomplish | I | p/c | ||||||||||||||
| 243-12-001 | port propulsion Outboard Shafting and Bearing; inspect & replace | I | p/c | ||||||||||||||
| 244-11-001 | port and Starboard propulsion Line Shaft Bearings: Inspect, Measure Repair, and Alignment check; accomplish | I | p/c | ||||||||||||||
| 244-12-001 | Outboard propulsion Shafting, Starboard Bearing clearance Measurement; accomplish | I | p/c | ||||||||||||||
| 244-12-002 | Outboard propulsion Shafting, port Bearing clearance Measurement; accomplish | I | p/c | ||||||||||||||
| 245-11-001 | Starboard controllable Reversible pitch propeller (cRp) prairie Air and Valve Rod Assembly; inspect and repair | I | p/c | ||||||||||||||
| 245-11-003 | Starboard controllable pitch propeller (cpp) System, Hub and propeller; inspect and repair | I | p/c | ||||||||||||||
| 245-11-004 | controllable Reversible pitch (cRp) Motor Driven pumps; install | I | p/c | ||||||||||||||
| 245-11-005 | port and STBD controllable Reversible pitch propeller (cRp) Oil Distribution (OD) Box; repair | I | p/c | ||||||||||||||
| 245-11-006 | controllable Reversible pitch (cRp) Hydraulic System No One, Flexible Hose Replacement; accomplish | I | p/c | ||||||||||||||
| 245-11-007 | controllable Reversible pitch (cRp) Hydraulic System No 2, Flexible Hose Replacement; accomplish | I | p/c | ||||||||||||||
| 245-11-008 | controllable Reversible pitch (cRp) Attached pump install; accomplish | I | p/c | c | |||||||||||||
| 245-11-009 | controllable Reversible pitch (cRp) propeller Hydraulic Oil System; flush | I | p/c | ||||||||||||||
| 245-12-001 | port controllable Reversible pitch propeller (cRp) prairie Air and Valve Rod Assembly; inspect and repair | I | p/c | ||||||||||||||
| 245-12-002 | port controllable pitch propeller (cpp) System, Hub and propeller; inspect and repair | I | p/c | ||||||||||||||
| 251-11-001 | Gas Turbine Module (GTM) 2A and 2B Silencers; install | p/c | |||||||||||||||
| 251-11-003 | Gas Turbine Generator No. One, 2 & 3 Moisture Separator System Refurbishment; accomplish | p/c | |||||||||||||||
| 251-11-004 | Gas Turbine Module (GTM) 1A and 1B Silencers; install | p/c | |||||||||||||||
| 251-11-005 | Deferred 2A and 2B Intake Hatch covers Flanges and Fasteners; install | p/c | |||||||||||||||
| 251-21-001 | Ships Service Gas Turbine Module (GTM) 1A cooling Fan Replacement; accomplish | p/c | |||||||||||||||
| 251-31-001 | Gas Turbine Module (GTM) Air Intake Moisture Separator System Refurbishment; accomplish | p/c | |||||||||||||||
| 251-31-002 | Gas Turbine Generator No. 2 Air Intake Blow-in Door; repair | p/c | |||||||||||||||
| 251-31-003 | Gas Turbine Module cooling Silencer (GTM)(1A, 1B, 2A and 2B); replace | p/c | |||||||||||||||
| 251-32-001 | Blow-In Doors in FWD Intake 2A and 2B; repair | p/c | |||||||||||||||
| 251-32-002 | Ships Service Gas Turbine Module (GTM) 2A & 2B cooling Fan Replacement; accomplish | p/c | |||||||||||||||
| 256-11-001 | Seawater Low pressure Air compressor (LpAc) Strainers No. One and 2; replace | p/c | |||||||||||||||
| 256-11-002 | Seawater Duplex Strainer (Hellan) Refurbishment; accomplish | p/c | |||||||||||||||
| 261-11-001 | Fuel Oil Service System Service Tank Unloading Valve(s); repair and replace | p/c | |||||||||||||||
| 261-11-002 | Fuel Oil Service coalescer Filter Valves; replace | p/c | c* | ||||||||||||||
| 261-11-003 | Fuel Oil Service System Valves; replace | p/c | |||||||||||||||
| 261-11-004 | Fuel Oil Service System Flexible Hose Replacement; accomplish | p/c | |||||||||||||||
| 261-11-005 | Fuel Oil Service Remote Operator Gear; preserve | p/c | |||||||||||||||
| 261-22-001 | Fuel Oil Service pump/Motor Assemblies; install | p/c | |||||||||||||||
| 262-11-001 | Main Reduction Gear (MRG) LO Service Unloading Valve; replace | p/c | |||||||||||||||
| 262-11-002 | GTM LOScA Heat Excanger Numbers 1-A, 1-B, 2-A, and 2-B System Fluid replenishment; accomplish | p/c | |||||||||||||||
| 262-11-003 | Main Reduction Gear (MRG) Lube Oil cooler; clean and inspect | p/c | |||||||||||||||
| 262-11-004 | Lube Oil Service System Unloading Valve; replace | p/c | |||||||||||||||
| 262-11-005 | Lube Oil Service System Unloading Valve; overhaul | p/c | |||||||||||||||
| 262-11-006 | Main Reduction Gear (MRG) Lube Oil Flex Hose Replacement; accomplish | p/c | |||||||||||||||
| 262-11-007 | Lube Oil Service pump (LOSp) Suction and Discharge Flex Hose Replacement; accomplish | p/c | |||||||||||||||
| 262-11-008 | Main Reduction Gear, Units One and 2, Lubricating Oil System Replenishment; accomplish. | p/c | |||||||||||||||
| 262-11-009 | controllable Reversible pitch (cRp) No. 2 Lube Oil Duplex Strainer Repair; accomplish | p/c | |||||||||||||||
| 262-11-010 | Lube Oil Service pump (LOSp) & Attached Lube Oil pump (LOp) Flex Hose Replacement; accomplish | p/c | |||||||||||||||
| 262-31-001 | Main Attached Lube Oil pumps; repair | p/c | |||||||||||||||
| 262-41-001 | Lube Oil Service pumps, Motors, and purifiers; install | p/c | |||||||||||||||
| 302-11-001 | Auxiliary Machinery Room No. One Motor controller; repair | p/c | |||||||||||||||
| 302-11-002 | pump Room Number 2 Motor controller; repair | p/c | |||||||||||||||
| 302-11-003 | Auxiliary Machinery Room No. 2 Motor controller; repair | p/c | |||||||||||||||
| 302-11-004 | Engine Room No. 2 Motor controller; repair | p/c | |||||||||||||||
| 311-11-001 | Ships Service Gas Turbine Generator (SSGTG) cooling Fan Replacement; accomplish | p/c | |||||||||||||||
| 311-30-001 | Gas Turbine Generator and Reduction Gear(GTG) Lube Oil pumps, No. One, 2 and 3; install | p/c | |||||||||||||||
| 311-31-001 | Ships Service Gas Turbine Generator (SSGTG) No.1 Engine; install | p/c | |||||||||||||||
| 311-31-002 | Ships Service Gas Turbine Generator (SSGTG) No.2 Engine; install and restore | p/c | |||||||||||||||
| 311-31-003 | Ships Service Gas Turbine Generator (SSGTG) No. 3 Engine; install and restore | p/c | |||||||||||||||
| 311-31-004 | Gas Turbine Generator Air Inlet Flex Boots; install | p/c | |||||||||||||||
| 311-33-001 | Gas Turbine Generator Resilient Mount; install | p/c | |||||||||||||||
| 313-11-001 | Battery charger for Rigid-Hull Inflatable Boat (RHIB) No. One; install | p/c | |||||||||||||||
| 313-11-002 | Battery charger for Rigid-Hull Inflatable Boat (RHIB) No. 2; install | p/c | |||||||||||||||
| 313-11-003 | pallet Battery charger No. One and 2; replace | p/c | |||||||||||||||
| 314-11-001 | Electrical power Supply cables; replace | p/c | |||||||||||||||
| 314-11-002 | 2STcB cooler control Board, replace | p/c | |||||||||||||||
| 320-11-001 | Replace cable and conduit Fitting Assembly; accomplish | p/c | |||||||||||||||
| 320-11-002 | power panel pp2-488-1 Spare circuit Breaker; replace | p/c | |||||||||||||||
| 320-11-004 | Replace power panel Type AQB-A101 circuit Breakers; accomplish | p/c | |||||||||||||||
| 320-11-005 | power panel 05-319-2 circuit Breaker; replace | p/c | |||||||||||||||
| 320-11-006 | Refurbish Multiple controllers; accomplish | p/c | |||||||||||||||
| 320-11-007 | Replace power Distribution Box; accomplish | p/c | |||||||||||||||
| 320-11-008 | controller, GTG cooling Fan; replace | p/c | |||||||||||||||
| 320-11-009 | pump Room Motor controllers; refurbish | p/c | |||||||||||||||
| 320-11-010 | Shaft Alley Motor controllers; refurbish | p/c | |||||||||||||||
| 320-11-011 | 400Hz power Distribution System Load Test; accomplish | p/c | |||||||||||||||
| 320-11-013 | Electrical power Supply cables; replace | p/c | |||||||||||||||
| 320-80-001 | ShipAlt cG47 class AER 60169, Thermal Drying Oven; remove | p/c | |||||||||||||||
| 321-11-001 | cable Deferred Reconnect; accomplish | p/c | |||||||||||||||
| 321-11-002 | Helicopter Electrical Servicing System (HESS)400Hz/28VDc Station Recertification; accomplish | p/c | |||||||||||||||
| 321-11-003 | Shore power Station; repair | p/c | |||||||||||||||
| 321-90-001 | ShipAlt cG47-88891K, Electronic Ground Fault Detectors Replacement; accomplish | p/c | |||||||||||||||
| 324-11-001 | Load center 42 (Lc 42) circuit Breaker and Dossert connections; replace | p/c | |||||||||||||||
| 324-11-002 | Automatic Bus Transfer (ABT); replace | p/c | |||||||||||||||
| 324-11-003 | Dossert connectors; replace | p/c | |||||||||||||||
| 324-11-004 | Switchboard (1SWBD, 2SWBD and 3SWBD) circuit Breaker Maintenance, clean and Repair; accomplish | p/c | |||||||||||||||
| 324-11-005 | Load centers 12 and 31 circuit Breakers and Dossert connections; replace | p/c | |||||||||||||||
| 331-11-001 | Searchlight and Key Telegraph, cables and Deck Sleeves Installation; accomplish | p/c | |||||||||||||||
| 331-11-003 | Helicopter Hangar Lighting System; repair | p/c | |||||||||||||||
| 343-11-001 | Gas Turbine Generator Seawater cooling pump and Motor Assembly; install | p/c | |||||||||||||||
| 343-11-002 | GTG cooling Fans, Fire Dampers, and Expansion Joints; procure and install | p/c | |||||||||||||||
| 343-11-003 | Ships Service Gas Turbine Generator (SSGTG) Lube Oil coolers; clean and inspect | p/c | |||||||||||||||
| 343-11-005 | Gas Turbine Generator (GTG) Blow-In Door Actuators No. One, 2, and 3; repair | p/c | |||||||||||||||
| 343-11-006 | Gas Turbine Generator (GTG) Air Intakes No. 2 preservation; accomplish | p/c | |||||||||||||||
| 343-11-007 | Gas Turbine Generator (GTG) and Gas Turbine Module (GTM) Intake/Uptake temporary access; repair | p/c | |||||||||||||||
| 343-12-001 | Gas Turbine Generator (GTG) Number 2 Terminal Box; replace | p/c | |||||||||||||||
| 343-13-001 | Gas Turbine Generator (GTG) Air Intake No. 3 preservation; accomplish | p/c | |||||||||||||||
| 407-11-001 | Electromagnetic Interference (EMI) Discrepancy; correct | p/c | |||||||||||||||
| 415-90-001 | ShipAlt cG47-86539.03K, common Data Link Management System Installation; accomplish | p/c | |||||||||||||||
| 422-11-001 | Aircraft Warning Lights; replace | p/c | |||||||||||||||
| 423-11-001 | AS-3240A/URN, TAcAN Antenna; replace | p/c | |||||||||||||||
| 423-90-001 | Shipalt cG47-71386K, Advanced Digital Antenna production (ADAp); accomplish | p/c | |||||||||||||||
| 424-11-001 | AN/UQN-4 Fathometer Transducer; replace | p/c | |||||||||||||||
| 424-90-001 | ShipAlt cG47-86222.03K, NGF Backfit phase I; accomplish | p/c | |||||||||||||||
| 426-22-001 | Underwater Log Rodmeter; procure and install | p/c | |||||||||||||||
| 428-90-001 | ShipAlt cG47-86418K, Navigation Sensor System Interface Removal; accomplish | p/c | |||||||||||||||
| 432-11-001 | Sound powered phone System Testing; accomplish | p/c | |||||||||||||||
| 432-11-002 | Sound powered phone Jackbox, Kickpipe, & cable; repair | p/c | |||||||||||||||
| 432-11-004 | Fan Room Digital phone; install | p/c | |||||||||||||||
| 432-11-006 | Sound powered phone Stuffing Tube; remove | p/c | |||||||||||||||
| 432-11-007 | Sound powered phone Kickpipe X40J-2U; repair | p/c | |||||||||||||||
| 432-11-008 | Sound powered phone Jackbox X40J-2R; repair | p/c | |||||||||||||||
| 432-11-009 | Sound powered phone Jackbox X40J-2Q; repair | p/c | |||||||||||||||
| 432-11-011 | Sound powered phone Jackbox X40J-36; repair | p/c | |||||||||||||||
| 432-12-001 | Damaged Sound powered Jack Box conduit and cable; replace | p/c | |||||||||||||||
| 433-11-001 | 5Mc Electrical cable; replace | p/c | |||||||||||||||
| 433-11-002 | Helicopter control Station Announcing System; repair | p/c | |||||||||||||||
| 433-90-001 | ShipAlt cG47-87106.03K, Interior Voice communications System (IVcS) and Digital Integrated Announcing System (DIAS) Upgrade; accomplish | p/c | |||||||||||||||
| 436-11-001 | Relocate Hydrogen Sulfide (H2S) Alarm System Detector and Replace cable; accomplish | p/c | |||||||||||||||
| 436-11-002 | Relocate Hydrogen Sulfide (H2S) Alarm System Detector; accomplish | p/c | |||||||||||||||
| 436-11-003 | Relocate Hydrogen Sulfide (H2S) Alarm System Detector and Replace cable; accomplish | p/c | |||||||||||||||
| 436-11-004 | Fan Room Electrical cable; install | p/c | |||||||||||||||
| 437-11-001 | Hp Air compressor No. 2 Motor controller; install | p/c | |||||||||||||||
| 437-21-001 | Oily Waste Drain Tank Level Indicator (TLI) System; repair | p/c | |||||||||||||||
| 437-80-001 | ShipAlt cG47-77239D propulsion Shafting Torsion Meter Modification; accomplish | p/c | |||||||||||||||
| 437-90-002 | ShipAlt cG47-83356K, Tank Level Indicator (TLI) Upgrade; accomplish | p/c | |||||||||||||||
| 437-90-003 | ShipAlt cG47-83372K, Time Domain Reflectometer (TDR) Tank Level Indicator (TLI) Installation; accomplish | p/c | |||||||||||||||
| 437-90-004 | ShipAlt cG47-87294K Radar Tank Level Indicator (TLI) Upgrade Tank Level Indicator System; accomplish | p/c | |||||||||||||||
| 438-90-001 | ShipAlt cG47-73856.03K, Integrated Ship controls Upgrade; accomplish | p/c | |||||||||||||||
| 439-11-001 | TV-DTS OE-556/U Radome and Antenna Reinstallation; accomplish | p/c | |||||||||||||||
| 439-11-002 | Helicopter Operations Surveillance System (HOSS); test | p/c | |||||||||||||||
| 441-11-001 | Whip Antenna Installation; accomplish | p/c | |||||||||||||||
| 441-11-002 | OA-9242(V)/SR Antenna Tilting Group; repair | p/c | |||||||||||||||
| 441-11-003 | Radio central 02-220-0-c Deferred Equipment Installation; accomplish | p/c | |||||||||||||||
| 441-11-004 | Ultra High Frequency (UHF) primary Radio System Assessment; accomplish | p/c | |||||||||||||||
| 441-11-006 | AS-4127 & AS-4400/URc-107 JTIDS Antennas; replace | p/c | |||||||||||||||
| 441-71-001 | Inmarsat B Saturn Radome; replace | p/c | |||||||||||||||
| 441-90-005 | ShipAlt cG47-84694K, AN/SRc-61A(V)11 DMR communication System Installation; accomplish | p/c | |||||||||||||||
| 441-90-006 | ShipAlt cG47-80897.03K, pEOc41 NMT AN/WSc-9(V)XX Multiband Terminal Alteration; accomplish | p/c | |||||||||||||||
| 441-90-007 | ShipAlt cG47-80696K, pEOc4I BFTN AN/USQ-195(V)1; accomplish | p/c | |||||||||||||||
| 441-90-008 | ShipAlt cG47-81322K, pEOc4I ADNS AN/USQ-144K(V)2; accomplish | p/c | |||||||||||||||
| 441-90-009 | ShipAlt cG47-85030K, ShipAlt Radio Systems; accomplish | p/c | |||||||||||||||
| 442-11-001 | AN/WQc-2A Sonar communications Transducer; replace | p/c | |||||||||||||||
| 442-11-002 | Hydrophone, Sonar DT-513A/BQA-8; replace | p/c | |||||||||||||||
| 443-90-001 | ShipAlt cG47-86316K, Replace Air Horn with Electric Horn; accomplish | p/c | |||||||||||||||
| 452-90-001 | Shipalt cG47-87310.03 AN/SpS-49(V)8 Air Search Radar Removal; accomplish | p/c | |||||||||||||||
| 452-90-002 | ShipALT cG47-83623K, cOTS SARTIS, AN/UpX-34(V) Upgrade; accomplish | p/c | |||||||||||||||
| 455-11-001 | cV-3372/UpX Antenna position programmer; refurbish | p/c | |||||||||||||||
| 456-01-001 | AS-3572/SpY-1B Antenna Array Resurfacing; accomplish | p/c | |||||||||||||||
| 456-11-002 | SpY Unit T-64 cooling Skid pump/Motor Assembly; repair | p/c | |||||||||||||||
| 456-90-001 | ShipAlt cG47-85077.03K AN/SpQ-9B pDD W/Tech Refresh on Surface Ships; accomplish | p/c | |||||||||||||||
| 456-90-002 | ShipAlt cG47-77614.03K, AcB12/TI12 OA computing plant Upgrade; accomplish | ||||||||||||||||
| p/c | |||||||||||||||||
| 456-90-003 | ShipAlt cG47-78510.03K AWS: AcB12/TI12 cIc Display Upgrades; accomplish | p/c | |||||||||||||||
| 456-90-004 | ShipAlt cG47-87024.03K, AN/SQQ-89A(V)15 W/TI-14 HW FOR cG MOD; accomplish | p/c | |||||||||||||||
| 457-11-001 | cable Tags; replace | p/c | |||||||||||||||
| 462-90-001 | ShipAlt cG47-86644 K USW-DSS AN/UYQ-100(V)3 to AN/SQQ-89(V)15 Interface; accomplish | p/c | |||||||||||||||
| 463-80-001 | ShipAlt cG47-76231D, Sonar Stave cable connectorization Modifications; accomplish | p/c | |||||||||||||||
| 465-11-002 | Bathythermograph Launcher Ball Valve; replace | p/c | |||||||||||||||
| 468-90-001 | ShipAlt cG47-89226K, AN/SQQ-89A(V)15 W/TI-14 Modification; accomplish | p/c | |||||||||||||||
| 471-90-001 | ShipAlt cG47-71180K, Surface Electronic Warfare Improvement program (SEWIp) Installation; accomplish | p/c | |||||||||||||||
| 472-11-001 | Integrated Design Drawing for cG63 ShipAlt passive countermeasures; install | p/c | |||||||||||||||
| 472-11-002 | passive countermeasure System (pcMS) Material for Non-ShipAlt Work; install | p/c | |||||||||||||||
| 472-90-001 | ShipAlt cG47-80156.03K Mod to AN/SLQ-32(V)6 Hardware; accomplish | p/c | |||||||||||||||
| 475-11-001 | Degaussing System connection Box; replace | p/c | |||||||||||||||
| 475-11-002 | Degaussing System M-coil; inspect and repair | p/c | |||||||||||||||
| 481-90-001 | ShipAlt cG47-78818.03K, Mark 34 Mod 6 Gun Weapons System (GWS) MOD TI12 ABc12 Hardware Upgrade; accomplish | p/c | |||||||||||||||
| 482-11-002 | Replace Salvo Warning Sirens and cable; accomplish | p/c | |||||||||||||||
| 484-90-001 | ShipALT cG47-79256.03K, AN/USG-2B installation: accomplish | p/c | |||||||||||||||
| 492-61-001 | Stabilized Glide Slope Indicator (SGSI) Overhaul and Test; accomplish | p/c | |||||||||||||||
| 495-90-001 | ShipAlt cG47-84924K IcOp Infrastructure Installation; accomplish | p/c | |||||||||||||||
| 495-90-002 | ShipAlt cG47-88467.03K canes MOD 01 classified LAN Install; accomplish | p/c | |||||||||||||||
| 505-11-001 | Valve and Remote Operator Replacement; accomplish | p/c | |||||||||||||||
| 505-11-002 | Gas Turbine Generator (GTG) No. One Base Enclosure Flexible Hose Replacement; accomplish | p/c | |||||||||||||||
| 505-11-003 | Generator Turbine Module (GTM) 1A & 1B Base Enclosure Flex Hose Replacement; accomplish | p/c | |||||||||||||||
| 505-11-004 | Sonar Flex Hose Replacement; accomplish | p/c | |||||||||||||||
| 505-50-001 | Refrigeration Flexible Hose Assemblies; replace | p/c | |||||||||||||||
| 505-50-002 | Air conditioning plant No. One through 4 Flexible Hose Assemblies; replace | p/c | |||||||||||||||
| 505-50-003 | SpY-1 palletized Electronics cooling Water (EcW) Skid Flexible Hose Assembly; replace | p/c | |||||||||||||||
| 505-50-004 | Seawater pump No. 1 Flexible Hose Assembly; replace | p/c | |||||||||||||||
| 505-50-005 | potable Water Service pump Flexible Hose Assembly; replace | p/c | |||||||||||||||
| 505-50-006 | Lube Oil purifier No. 2 Flexible Hose Assembly and Resilient Mounts; replace | p/c | |||||||||||||||
| 505-50-007 | Flex Hose Replacement; accomplish | p/c | |||||||||||||||
| 505-50-009 | 2B GTM Base Flex Hose Replacement; accomplish | p/c | |||||||||||||||
| 508-11-001 | Lagging and Insulation Inside Machinery Spaces; replace | p/c | |||||||||||||||
| 508-12-001 | Lagging and Insulation Outside Machinery Spaces; replace | p/c | |||||||||||||||
| 512-11-001 | Fan Room Equipment Installation; accomplish | p/c | |||||||||||||||
| 512-11-002 | Fan Room Overhaul; accomplish | p/c | |||||||||||||||
| 512-11-003 | Fan Room 01-392-2-Q Restoration; accomplish | p/c | |||||||||||||||
| 512-11-004 | VLS Fan Rooms No. One and 2 Overhaul; accomplish | p/c | |||||||||||||||
| 512-11-005 | Fan Room 1-82-2-Q Overhaul; accomplish | p/c | |||||||||||||||
| 512-11-007 | Fan Room 1-382-3-Q; refurbish | p/c | |||||||||||||||
| 512-11-008 | Ventilation Watertight closure; replace | p/c | |||||||||||||||
| 512-11-009 | Vaneaxial Fan Installation; accomplish | p/c | |||||||||||||||
| 512-11-010 | Fume collector; replace | p/c | |||||||||||||||
| 512-11-011 | Fan Room 3-426-0-Q Restoration; accomplish | p/c | |||||||||||||||
| 512-11-012 | Fan Room 02-234-2-Q Deferred Equipment Installation; accomplish | p/c | |||||||||||||||
| 512-11-013 | HVAc Deferral of cFR 1169 and Various Rcc's, accomplish | p/c | |||||||||||||||
| 512-11-014 | Fan Room Ventilation Equipment; install | p/c | |||||||||||||||
| 512-11-015 | Fan Room Deferred Equipment Installation; accomplish | p/c | |||||||||||||||
| 512-11-017 | Fan Room Equipment; replace | p/c | |||||||||||||||
| 512-11-018 | Exhaust Vent plenum Installation; accomplish | p/c | |||||||||||||||
| 512-11-020 | Gravity cooling coils; replace | p/c | |||||||||||||||
| 512-11-021 | Vaneaxial Fan Motors, ShipALT cG47-85077.01K Fan Room (03-174-1-Q); install | p/c | |||||||||||||||
| 512-11-022 | cooling coil and Ventilation Duct; replacement | p/c | |||||||||||||||
| 512-11-023 | Heating, Ventilation and Air conditioning Duct Assembly; replace | p/c | |||||||||||||||
| 512-11-026 | Fan Room HVAc Duct remove; accomplish | p/c | |||||||||||||||
| 512-11-027 | Fan coil Unit Deferral; install | p/c | |||||||||||||||
| 512-11-028 | Ventilation Weather Opening Ship protective covers; remove | p/c | |||||||||||||||
| 512-11-029 | Galley Ventilation; clean | p/c | |||||||||||||||
| 512-11-030 | Ventilation Duct cleaning; accomplish | p/c | |||||||||||||||
| 512-11-031 | Laundry Ventilation cleaning; accomplish | p/c | |||||||||||||||
| 512-80-001 | ShipAlt cG47 class AER 68013, Ventilation Duct cleaning Accesses; accomplish | p/c | |||||||||||||||
| 512-90-001 | ShipAlt cG47-83357K, Disposable Ventilation Filters; accomplish | p/c | |||||||||||||||
| 513-11-001 | Toxic Gas Vent Dampers; repair | p/c | |||||||||||||||
| 513-11-002 | Ventilation Smoke Dampers; replace | p/c | |||||||||||||||
| 514-11-001 | Overhauled Air conditioning Units; install | p/c | |||||||||||||||
| 514-11-002 | Fan coil Units (FcU's) and Fan coil Assembly (FcA); restore | p/c | |||||||||||||||
| 514-11-003 | Fan coil Units (FcU's) and Fan coil Assembly (FcA); restore | p/c | |||||||||||||||
| 514-11-004 | Fan coil Units (FcU's) and Fan coil Assemblies (FcA's); restore | p/c | |||||||||||||||
| 514-11-005 | Fan coil Units (FcU's) and Fan coil Assembly (FcA); overhaul | p/c | |||||||||||||||
| 514-11-006 | Fan coil Units (FcU's) and Fan coil Assemblies (FcA's); replace | p/c | |||||||||||||||
| 514-11-007 | Fan coil Units (FcU's) and Fan coil Assembly (FcA); replace | p/c | |||||||||||||||
| 514-11-008 | Fan coil Units (FcU's); install | p/c | |||||||||||||||
| 514-11-009 | Fan coil Units (FcU's); install | p/c | |||||||||||||||
| 514-11-010 | chill Water pump Flexible Hose Assembly; replace | p/c | |||||||||||||||
| 514-11-011 | Air conditioning plant; Lube Oil cooler repair | p/c | |||||||||||||||
| 514-11-012 | AFT Array chilled Water Auto Air Vent and Isolation Valve; replace | ||||||||||||||||
| p/c | |||||||||||||||||
| 514-11-013 | chilled Water Expansion Tank Valves; replace | p/c | |||||||||||||||
| 514-11-014 | cooling coil chilled Water Solenoid Valves Deferral; install | p/c | |||||||||||||||
| 514-11-015 | chilled Water Supply Solenoid Valve; replace | p/c | |||||||||||||||
| 514-11-016 | Fwd & Stbd Array chilled Water Flex Hoses; Remove/Replace | p/c | |||||||||||||||
| 514-11-017 | chilled Water Valves; replace | p/c | |||||||||||||||
| 514-11-018 | Fan coil Unit 01-277-1; replace | p/c | |||||||||||||||
| 514-11-019 | Gravity cooling coils; replace | p/c | |||||||||||||||
| 514-11-021 | chilled Water piping powder MAG NO.1; repair | p/c | |||||||||||||||
| 514-11-022 | Gravity cooling coil; replace | p/c | |||||||||||||||
| 514-20-001 | Air conditioning plant Unit Shell condenser-Evaporators; inspect and repair | p/c | |||||||||||||||
| 514-20-002 | chilled Water Isolation Valves: replace | p/c | |||||||||||||||
| 514-21-001 | A/c plant chilled Water pumps and Motors; install | p/c | |||||||||||||||
| 516-11-001 | Reefer plant compressors and Motors No One & 2; install and test | p/c | |||||||||||||||
| 516-11-002 | Refrigeration plant condenser, Mechanical clean; accomplish | p/c | |||||||||||||||
| 516-11-004 | No. One and No. 2 Refrigeration plants; flush | p/c | |||||||||||||||
| 516-11-005 | chill STRM No.1, chill STRM No.2 and Freeze STRM Drain piping; replace | p/c | |||||||||||||||
| 517-90-001 | ShipAlt cG47-83219.03K, Electric conversion for Waste Heat Boilers; accomplish | p/c | |||||||||||||||
| 520-11-001 | Sea Valves, 2 1/2 Inch and Smaller; replace | I | p/c | ||||||||||||||
| 520-11-002 | Sea Valves, 3 Inch and Larger; replace | I | p/c | ||||||||||||||
| 521-11-001 | Firemain and Seawater piping Replacement; accomplish | I | p/c | ||||||||||||||
| 521-11-002 | No. 2 Air conditioning plant Hellan Duplex Strainer; replace | p/c | |||||||||||||||
| 521-11-003 | Stern Tube Seawater cooling and Flushing piping; replace | I | p/c | ||||||||||||||
| 521-11-004 | Fire pumps No. One through 6, Recirculating & Vent case Y-Strainer Replacement; accomplish | p/c | |||||||||||||||
| 521-11-005 | Firemain Reducing Station 18; repair | p | c | ||||||||||||||
| 521-11-006 | Seawater Service pump No. 3 Inline check Valve; replace | p | c | ||||||||||||||
| 521-11-007 | Firemain Reducing Station Flushing Valves: Replace | p | c | ||||||||||||||
| 521-11-008 | Firemain Fire Zone #1 System Flush & Butterfly Valves Replace; accomplish | p | c | ||||||||||||||
| 521-11-009 | Firemain System Valve Repair; accomplish | p | c | ||||||||||||||
| 521-11-010 | Fire Station, Hose Rack Stowage FOG Nozzle Vertical Restraint Brackets; Replace | p/c | |||||||||||||||
| 521-11-011 | Firemain System Gate Valve Replacement; accomplish | p | c | ||||||||||||||
| 521-11-012 | Firemain System Butterfly Valves; replace | p | c | ||||||||||||||
| 521-11-013 | Firemain Fire Zone #2 System Flush & Butterfly Valves Replace; accomplish | p | c | ||||||||||||||
| 521-11-014 | Firemain Fire Zone #3 System Flush & Butterfly Valves Replace; accomplish | p | c | ||||||||||||||
| 521-11-015 | close-in Weapon System (cIWS) Firemain Flexible Hose and Hanger Replacement; accomplish | p/c | |||||||||||||||
| 521-11-016 | Seawater System Flush & Butterfly Valve Replacement; accomplish | p | c | ||||||||||||||
| 521-11-017 | Firemain System 8 Inch Valves; repair | p | c | ||||||||||||||
| 521-11-018 | Hydraulic System Actuator control Valve Replacement; accomplish | p/c | |||||||||||||||
| 521-11-019 | Firemain Eductor piping; replace | p | c | ||||||||||||||
| 521-11-020 | Sonar Firemain piping Flange; refurbish | p/c | |||||||||||||||
| 521-11-021 | Firemain System Valve; replace | p | c | ||||||||||||||
| 521-11-022 | Firemain System Solenoid Operated pilot Valve (SOpV); install | p | c | ||||||||||||||
| 521-21-001 | Fire pumps and Motors; install | p | c | ||||||||||||||
| 521-21-002 | Firemain pump Flexible Hose; install | p | c | ||||||||||||||
| 522-11-001 | Deluge System Y-Strainer Replacement; accomplish | p/c | |||||||||||||||
| 522-11-002 | Manual control Valves for Magazine Seawater Sprinkler and VLS Deluge Systems repair; accomplish | p/c | |||||||||||||||
| 522-11-003 | Magazine Sprinkler control Valve Replacement; accomplish | p/c | |||||||||||||||
| 522-11-004 | Magazine Sprinkler Hydraulic control Station Flex Hose; replace | p/c | |||||||||||||||
| 522-11-005 | MK41 VLS Magazine Accumulator Tank:Recertify | p/c | |||||||||||||||
| 523-11-002 | Repair and Replace Solenoid Operated pilot Valve (SOpV); accomplish | p | c | ||||||||||||||
| 523-11-003 | countermeasure Washdown (cMWD) Drain piping Replacement; accomplish | p | c | ||||||||||||||
| 523-11-004 | countermeasure Washdown (cMWD) piping; install | p | c | ||||||||||||||
| 523-11-006 | countermeasure Washdown (cMWD) Flush Deck And Deck Edge Nozzles; Replace | p | c | ||||||||||||||
| 523-90-001 | ShipAlt cG47-87295K, Add Fresh Water cross connect to cMWD; accomplish | p | c | ||||||||||||||
| 524-11-001 | AEGIS Sea Water cooling pumps and Motors No. One & 2; install | p/c | |||||||||||||||
| 524-11-002 | Sea Water Service pumps and Motors No One, 2 & 3; install | p/c | |||||||||||||||
| 524-11-003 | Stern Tube Strainers (port and Starboard); replace | p/c | |||||||||||||||
| 524-11-004 | Seawater Service Air conditioning (A/c) plant Strainer Refurbishment; accomplish | p/c | |||||||||||||||
| 524-11-005 | Aegis Seawater cooling Duplex Strainer Refurbishment; accomplish | p/c | |||||||||||||||
| 524-11-006 | Sea Water Valves; replace | I | p | c | |||||||||||||
| 524-11-007 | Wye Strainer, Needle Valve, and Gate Valve; replace | p | c | ||||||||||||||
| 524-11-008 | Sea Water System Strainers; replace | p | c | ||||||||||||||
| 524-11-009 | Sea Water Service pump No. One Discharge check Valve; replace | p | c | ||||||||||||||
| 524-11-010 | cHW plant NO. 3 & 4 Ac cutout Butterfly Valve; repair | p/c | |||||||||||||||
| 524-11-011 | Gas Turbine Generator (GTG) Seawater cooling pump Flexible Hose Replacement; accomplish | p/c | |||||||||||||||
| 524-11-013 | AEGIS Seawater System chemical cleaning; accomplish | p/c | |||||||||||||||
| 524-11-014 | Seawater Service pump No. 2 Flexible Hoses; replace | p | c | ||||||||||||||
| 524-12-001 | Bulkhead 174 Isolation Valve; replace | p/c | |||||||||||||||
| 524-90-001 | ShipAlt cG47-83262K, Seawater Heat Exchanger Layup Isolation Modification; accomplish | p/c | |||||||||||||||
| 526-11-001 | Weatherdeck Deck Drain Scupper; replace | p/c | |||||||||||||||
| 526-11-002 | cG47 class AER 68141, Overboard Discharge Modification; accomplish | p/c | |||||||||||||||
| 526-11-003 | Weather Deck Drain; inspect and clean | p/c | |||||||||||||||
| 528-11-001 | Deck Drain Assembly; replace | p/c | |||||||||||||||
| 528-11-002 | cHT pumps Flexible Hose; replace | p/c | |||||||||||||||
| 528-11-003 | Sanitary and Sewage System Valves; replace | p/c | |||||||||||||||
| 528-11-004 | Sanitary and Sewage cHT piping Valves; replace | p/c | |||||||||||||||
| 528-11-005 | Galley Sink Drain cut Out Valve; replace | p/c | |||||||||||||||
| 528-11-006 | Sanitary and Sewage cHT piping Valves; replace | p/c | |||||||||||||||
| 528-11-007 | plumbing System Remote Operator Gear; repair | p/c | |||||||||||||||
| 528-11-008 | Sanitary and Sewage System plumbing Drain and piping; replace valves | p/c | |||||||||||||||
| 528-11-009 | Sanitary and Sewage System plumbing Drain and piping; replace valves | p/c | |||||||||||||||
| 528-11-010 | Eyewash plumbing Drain and piping; replace | p/c |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.