J-3_USS_COWPENS_Milestones_Final_Rev1_FBO.xlsx

XLSX spreadsheet 107 KB Posted

Attached to
USS COWPENS (CG 63) and USS GETTYSBURG (CG 64) Modernization Period (MODPRD) Availabilities
Solicitation number
N00024-18-R-4439
Issued by

About this file

J-3 COWPENS (CG 63) Milestones Rev1

View the file

Other files

Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CG63 Milestone

Milestone / Key EventOfferor Proposed DateProposed 'A+' value
(Calculated Values)Schedule Constraint
Contract AwardOfferor is not to propose.

Offeror shall assume contract award on or about 16 March 2018 on initial proposals.

Offeror shall assume contract award on or about 6 April 2018 on Final Proposal Revisions.

Vessel AvailableOfferor shall assume "Vessel Available" milestone will occur no earlier than 12 April 2018.
Avail Start at KTR FacilityOfferor shall assume vessel will be available to commence transit to the contractor's facility no earlier than to "Vessel Available" milestone.

Offerors outside the vessels homeport shall propose an Availability start date no less than 60 days from contract award.

Offerors outside the vessels homeport shall propose an Availability start date accounting for vessel preparation and transit duration.

Offerors within the vessels homeport shall propose an Availability start date no less than 15 days from contract award.

Offerors within the vessels homeport shall propose an Availability start date no less than 15 days from "Vessel Available" milestone.

GFM Delivery Offeror is not to propose.

GFM will be delivered incrementally. Offeror should not assume GFM will be delivered prior to 3 March 2018.

10% Availability Complete 31-Dec-99 0 Offeror is not to propose.

Date shall be the mathematically solved 10% point between proposed "Avail Start at KTR Facility" and "KTR Contract Complete" Milestones.

DOCK0Offeror shall propose Dock Date IAW Specification 997-11-001
20% Dock Period Complete - Dock Related Open and Inspect CFRs Due31-Dec-990Offeror is not to propose.

Date shall be the mathematically solved 20% point between proposed Dock and Undock Milestones.

UNDOCK0Offeror shall propose Undock Date IAW Specification 997-11-001
20% Open and Inspect31-Dec-990Offeror is not to propose.

Date shall be the mathematically solved 20% point between proposed "Avail Start at KTR Facility" and "KTR Contract Complete" Milestones.

25% CONFERENCE 31-Dec-99 0 Offeror is not to propose.

Date shall be the mathematically solved 25% point between proposed "Avail Start at KTR Facility" and "KTR Contract Complete" Milestones.

60 HZ Restored0Offer proposed date must be at least 15 days prior to ISC Turnover 1 milestone
ISC TURNOVER #10Offeror proposed date shall be no less than 53 days before "CHT System Restored", "Sea Water Cooling System Restored" and "Firemain System Restored" milestones.

ISC TURNOVER #2 0 Offeror proposed date shall be no less than 46 days before "CHT System Restored", "Sea Water Cooling System Restored" and "Firemain System Restored" milestones.

ISC TURNOVER #3 0 Offeror proposed date shall be no less than 39 days before "CHT System Restored", "Sea Water Cooling System Restored" and "Firemain System Restored" milestones.

ISC TURNOVER #4 0 Offeror proposed date shall be no less than 50 days before "AC Plants Restored" milestone.

Overhauled Equipment installed 0 Offeror proposed date shall be no less than 259 days before "KTR Contract Complete" milestone.

COMBAT SYSTEMS MSR TURNOVER #1 0 Offeror proposed date shall be no less than 56 days before "Distributed Systems Restored" milestone.

CHT System Restored0"60 HZ Restored" milestone must be complete prior to the completion of this milestone.
Sea Water Cooling System Restored0"CHT System Restored" milestone must be complete prior to the completion of this milestone.
Firemain System Restored0"Sea Water Cooling System Restored" milestone must be complete prior to the completion of this milestone.
COMBAT SYSTEMS MSR TURNOVER #20Offeror proposed date shall be no less than 109 days before "ALO" milestone.

50% CONFERENCE 31-Dec-99 0 Offeror is not to propose.

Date shall be the mathematically solved 50% point between proposed "Avail Start at KTR Facility" and "KTR Contract Complete" Milestones.

COMBAT SYSTEMS MSR TURNOVER #3 0 Offeror proposed date shall be no less than 102 days before "ALO" milestone.

Potable Water system restored and sanitized0"Firemain System Restored" milestone must be complete prior to the completion of this milestone.
AC Plants Restored0"Potable Water system restored and sanitized" milestone must be complete prior to the completion of this milestone.
COMBAT SYSTEMS MSR TURNOVER #40Offeror proposed date shall be no less than 88 days before "ALO" milestone.

COMBAT SYSTEMS MSR TURNOVER #5 0 Offeror proposed date shall be no less than 74 days before "ALO" milestone.

Lube Oil System Restored0"AC Plants Restored" milestone must be complete prior to the completion of this milestone.
LP/HP Air Systems Restored0"Lube Oil System Restored" milestone must be complete prior to the completion of this milestone.
CHW System Restored0"LP/HP Air Systems Restored" milestone must be complete prior to the completion of this milestone.
Fuel Oil System Restored0"CHW System Restored" milestone must be complete prior to the completion of this milestone.
CPP System Restored0"Fuel Oil System Restored" milestone must be complete prior to the completion of this milestone.
Bleed Air System Restored0"CPP System Restored" milestone must be complete prior to the completion of this milestone.
COMBAT SYSTEMS MSR TURNOVER #60Offeror proposed date shall be no less than 60 days before "ALO" milestone.

Distributed Systems Restored - CS Support Equipment available (FM, CHW, ECW, 60HZ, HP air, LP air available to CS turn over spaces) 0 Offeror proposed date shall be no less than 193 days before "KTR Contract Complete" milestone.

"Bleed Air System Restored" milestone must be complete prior to the completion of this milestone.

400 HZ Restored0Must be completed Prior to Combat systems Turn Over three to complete testing to support ALO Milestone.
Engineering Plant Production Completion Date (PCD)0Offeror proposed date shall be no less than 54 days before "ALO" milestone.

Combat Systems AEGIS Light Off (ALO) 0 Offeror proposed date shall be no less than 133 days before "KTR Contract Complete" milestone.

"ALO" milestone must be complete prior to the completion of this milestone.

Fuel ship for Hot Plant Testing 0 Offeror proposed date shall be no less than 133 days before "KTR Contract Complete" milestone.

"ALO" milestone must be complete prior to the completion of this milestone.

75% CONFERENCE 31-Dec-99 0 Offeror is not to propose.

Date shall be the mathematically solved 75% point between proposed "Avail Start at KTR Facility" and "KTR Contract Complete" Milestones.

Habitability Work Complete
Commence Crew Move Aboard0Offeror proposed date shall be no less than 105 days before "KTR Contract Complete" milestone.

"Fuel ship for Hot Plant Testing" milestone must be complete prior to the completion of this milestone.

Commence Hot Plant Testing 0 Offeror proposed date shall be no less than 91 days before "KTR Contract Complete" milestone.

"Habitability Work Complete / Commence Crew Move Aboard" milestone must be complete prior to the completion of this milestone.

Complete Hot Plant Testing 0 Offeror proposed date shall be no less than 49 days before "KTR Contract Complete" milestone.

"Commence Hot Plant Testing" milestone must be complete prior to the completion of this milestone.

LOA Preps (Start) 0 Offeror proposed date shall be no less than 49 days before "KTR Contract Complete" milestone.

"Complete Hot Plant Testing" milestone must be complete prior to the completion of this milestone.

IBS testing (Complete) 0 Offeror proposed date shall be no less than 35 days before "KTR Contract Complete" milestone.

"LOA Preps (Start)" milestone must be complete prior to the completion of this milestone.

LOA 0 Offeror proposed date shall be no less than 21 days before "KTR Contract Complete" milestone.

"IBS testing (Complete)" milestone must be complete prior to the completion of this milestone.

Dock Trials 0 Offeror proposed date shall be no less than 14 days before "KTR Contract Complete" milestone.

"LOA" milestone must be complete prior to the completion of this milestone.

Fast Cruise 0 Offeror proposed date shall be no less than 13 days before "KTR Contract Complete" milestone.

"Dock Trials" milestone must be complete prior to the completion of this milestone.

Crew Rest Period 0 Offeror proposed date shall be no less than 12 days before "KTR Contract Complete" milestone.

"Dock Trials" milestone must be complete prior to the completion of this milestone.

HM&E SEA TRIALS (CSST 1) 0 Offeror proposed date shall be no less than 7 days before "KTR Contract Complete" milestone.

"Fast Cruise " milestone must be complete prior to the completion of this milestone.

Transit to NAVSTA 0 Offeror proposed date shall be no less than 0 days before "KTR Contract Complete" milestone.

"HM&E SEA TRIALS (CSST 1)" milestone must be complete prior to the completion of this milestone.

KTR Contract Complete 0 Offeror Shall propose date no later than 24 July 2019.

"Transit to NAVSTA" milestone must be complete prior to the completion of this milestone.

CS Turnover USS COWPENS CG 63 FY18 EDSRA Combat Systems (CS) Turnovers

Offeror proposed date shall be no less than X days before Completion milestone.MSR/AIT Completion milestone
COMPARTMENT NUMBERCOMPARTMENT NAME
COMBAT SYSTEMS TURNOVER #1 (MSR to AIT)
2-94-1-QFan Room56Distrubited Systems Restored
2-94-2-QFan Room56Distrubited Systems Restored
01-392-2-QFan Room56Distrubited Systems Restored
01-148-1-QFan Room56Distrubited Systems Restored
01-178-0-QFan Room56Distrubited Systems Restored
01-226-1-QFan Room56Distrubited Systems Restored
02-228-4-QFan Room56Distrubited Systems Restored
02-234-2-QFan Room56Distrubited Systems Restored
03-138-2-QFan Room56Distrubited Systems Restored
03-174-1-QFan Room56Distrubited Systems Restored
03-188-0-QFan Room56Distrubited Systems Restored
04-300-2-QFan Room56Distrubited Systems Restored
1-82-2-QFan Room56Distrubited Systems Restored
1-382-3-QFan Room56Distrubited Systems Restored
2-464-1-QFan Room56Distrubited Systems Restored
3-426-0-QVLS Fan Rm #356Distrubited Systems Restored
COMBAT SYSTEMS TURNOVER #2 (MSR to AIT)
01-236-0-CLoad Center 41109ALO
2-127-0-CIC & Gyro Rm #1 (FWD)109ALO
3-382-0-CIC & Gyro Rm #2 (AFT)109ALO
COMBAT SYSTEMS TURNOVER #3 (MSR to AIT)
2-236-0-QAegis Cooling Rm #1 (C&D Skid Rm)102ALO
102ALO
5-220-0-EAMR #1 (400 Hz & FWD SPY Skid)102ALO
3-382-2-QAFT SPY Skid (Cooling Rm #2)102ALO
3-393-4-Q400 Hz Converter Rm #2102ALO
03-220-2-QEW Equipment Cooling RM102ALO
1-159-0-QCSMC102ALO
01-138-0-CComputer Central102ALO
02-138-0-CCIC102ALO
04-140-1-CAegis Radar Rm #1102ALO
03-138-1-CAegis Radar Rm #2102ALO
01-220-0-CAegis Radar Rm #3102ALO
05-316-0-CAegis Radar Rm #4102ALO
04-316-0-CAegis Radar Rm #5102ALO
COMBAT SYSTEMS TURNOVER #4 (MSR to AIT)
02-200-0-CRadio Transmitter Rm88ALO
02-220-0-CRadio Central88ALO
03-162-2-CMK 99 XMTR Rm88ALO
04-188-0QForemast88ALO
05-149-0-CPilot House88ALO
04-164-1-CChart Rm88ALO
03-227-2-CPhalanx Local Control Rm88ALO
2-272-0-CCCS88ALO
3-127-0-QTomahawk Equip Rm (TER)88ALO
2-260-1-QSupply Dept Office88ALO
3-260-2-QSNAP Cage88ALO
03-199-0-CIFF Equipment Room88ALO
COMBAT SYSTEMS TURNOVER #5 (MSR to AIT)
03-260-0-QMain Mast74ALO
01-180-0-CShips Signal Exploitation Space74ALO
03-224-0-CElectronic Warfare Rm74ALO
05-166-1-CDirector Assembly Rm #1 (STBD)74ALO
05-166-2-CDirector Assembly Rm #2 (PORT)74ALO
06-308-2-QDirector Assembly Rm #374ALO
05-308-2-QDirector Supt Equip Rm74ALO
02-174-0-CSonar Control Rm74ALO
1-28-0-QUNASSIGNED74ALO
2-28-0-QSonar Rm #174ALO
3-28-0-QSonar Rm #274ALO
4-34-0-QSonar Rm #374ALO
2-220-0-QLAMPS/TACTAS RM74ALO
4-28-0-TAccess Trunk74ALO
4-58-0-QDome Equip Rm74ALO
6-28-0-TDome Access Trunk74ALO
3-435-0-MMK41 VLS Mag #2 (AFT)74ALO
3-94-0-MMK41 VLS Mag #1 (FWD)74ALO
01-58-0-MMT-51 Load Drum Rm #174ALO
02-292-0-CHelicopter Hanger74ALO
03-188-2-QElectronic Workshop #174ALO
03-234-0-QPhalanx Workshop74ALO
03-289-0-QElectronic Workshop #274ALO
1-390-1-MTorpedo Rm #1 (STBD)74ALO
1-390-4-MTorpedo Rm #2 (PORT)74ALO
1-464-2-QVLS Sec Station # 2 (AFT)74ALO
1-(464-506)-0-M5/54 Gun (MT 52)74ALO
1-58-0-MLoad Drum #1 (FWD)74ALO
1-92-1-QVLS Sec Station # 1 (FWD)74ALO
2-94-2-QVLS Fan Rm #274ALO
2-94-1-QVLS Fan Rm #174ALO
2-431-2-TVLS Launcher Access Trunk (AFT)74ALO
2-506-0-QTowed Array Rm74ALO
2-506-1-QNixie Rm74ALO
2-518-2-ABathythermograph Rm74ALO
COMBAT SYSTEMS TURNOVER #6 (MSR to AIT)
Fwd,Stbd,Port,AftAN/SPY Arrays60ALO
3-62-0-M5/54 Proj Mag #1 (FWD)60ALO
3-482-0-M5/54 Proj Mag #2 (AFT)60ALO
2-482-0-MMT-52 Load Drum Rm #260ALO
01-(435-464)Missile Deck (AFT)60ALO
01-(97-127)Missile Deck (FWD)60ALO
06-170-1FCS Dir #260ALO
06-170-2FCS Dir #160ALO
06-324-2FCS Dir #360ALO
07-312-2FCS Dir #460ALO
03-240-1AN/SLQ-32 (STBD)60ALO
03-240-2AN/SLQ-32 (PORT)60ALO
04-(190-220)-3Decoy Launchers No. 1 & 3 (STBD)60ALO
04-(206-276)Elect Warfare Ant./SRBOC Decoy Launcher Layout60ALO
04-236-3-MCIWS (MT 21)60ALO
04-236-4-MCIWS (MT 22)60ALO
05-(290-315)-4NULKA Decoy Launcher 660ALO
04-(290-310)-4Decoy Launchers No. 2 & 4 (PORT)60ALO
1-(506-529)-4W/Deck Harpoon Launcher (AFT)60ALO

COW PERL

WORK ITEM NO. USS COWPENS (CG-63)

TPPC-DDG79-MARMCN18-CN01

FY18 SRA Planning Event Readiness List (PERL) (Work Item Title) FOUO: Distribution authorized to DePartment of Defense and U.S. DePartment of Defense ContraCtors only (administrative use) (26 SeP 16) Other requests referred to CNRMC.

I = Open & Inspect Report P = Production Complete T = Testing Complete

C = Certification CompleteGOV ESTDRYDOCK SHIP TBDAVAIL 20% (O&I)FIREMAIN / SEAWATER RESTOREDUNDOCK SHIPDISTRIBUTIVE SYSTEMS RESTOREDPCDALO and CSSTREFUEL SHIP FOR HPTHAB TURNVOVERDOCK TRIALSFAST CRUISECREW RESTSEA TRIALSKTR CONTRACT COMPLETE
LEGEND
042-11-002Availability General Administrative requirements; provide and manage
042-12-001Work package Execution Review; accomplish
045-11-001Security Services; provide
077-11-001Hazardous Waste produced on Naval Vessels; control
110-11-001Structural Repairs, Auxiliary Machinery Rooms One and 2; accomplishIp/c
110-11-003Structural Repairs, crew Berthing (3-346-0-L); accomplishIpc
110-11-004Structural Repairs, Shaft Alley & Sewage plant No. 2; accomplishIp/c
110-11-005Structural Repairs, Main Engine Room Number One; accomplishIpc
110-11-006Shell plating, crew Berthing; replaceIpc
110-11-009Underwater Hull; inspect and repairIp/c
110-11-010Structural Repairs, Main Engine Room Number 2; accomplishIpc
110-11-011Structural Repairs, Sonar Dome and Equipment Rooms; accomplishIp/c
110-11-012Structural Repairs, SD and Boatswain Storerooms; accomplishIp/c
110-11-013Structural Repairs, 5/54 Magazine; accomplishIp/c
110-11-014Structural Repairs, pump Room No. 2; accomplishIp/c
110-11-017Structural Repairs, pump Room No. One; accomplishIp/c
110-11-018Structural Repairs, TWS Equipment Room; accomplishIp/c
110-11-022Structural Repairs, pump Room No. One; accomplishIp/c
110-21-002Access Trunk Bulkhead plating and Stiffeners; replaceIp/c
110-21-003Shell plating, Main Engine Room Number One; replaceIp/c
110-21-004Shell plating, Shaft Alley; replaceIp/c
110-90-001ShipAlt cG47-83390K, Reinforce Transverse Web Frame; accomplishIp/c
110-90-002ShipAlt cG47-83307K, Increase Fatigue Strength Frame 138, 01 Level; accomplishIp/c
110-90-003ShipAlt cG47-86333K Shell panel Stiffener Upgrade; accomplishI
123-11-001compensated Fuel Tank Group One; preserveIp/c
123-11-002compensated Fuel Tank Group 2; preserveIp/c
123-11-003compensated Fuel Tank Group 3; preserveIp/c
123-11-004compensated Fuel Tank Group 4; preserveIp/c
123-11-005compensated Fuel Tank Group 5; preserveIp/c
123-11-006compensated Fuel Tank Group 6; preserveIp/c
123-11-007Fuel Service Tank and Gravity Head Tank; preserveIp
123-11-008Fuel Oil Service and Gravity Head Tank Structural Repairs; accomplishIp
123-11-009compensated Fuel Tank Group One; repairIp/c
123-11-010compensated Fuel Tank Group 2; repairIp/c
123-11-011compensated Fuel Tank Group 3; repairIp/c
123-11-012compensated Fuel Tank Group 4; repairIp/c
123-11-013compensated Fuel Tank Group 5; repairIp/c
123-11-014compensated Fuel Tank Group 6; repairIp/c
123-11-021Tank Top and cross Flooding Duct; replaceIp/c
123-12-001Jp-5 Storage Tanks; preserveIp/c
123-12-002Jp-5 Storage Tanks; repairIp/c
123-13-001compensated Fuel Tank Top Group One; repairIp/c
123-13-002compensated Fuel Tank Top Group 2; repairIp/c
123-13-003compensated Fuel Tank Top Group 3; repairIp/c
123-13-004compensated Fuel Tank Top Group 4; repairIp/c
123-13-005compensated Fuel Tank Top Group 5; repairIp/c
123-13-006compensated Fuel Tank Top Group 6; repairIp/c
123-14-001potable Water Tanks; preserveIp/c
123-14-002potable Water Tank; repairIp/c
123-15-001Lube Oil Storage/Settling Tanks; preserveIp/c
123-15-002Lube Oil Storage/Settling Tanks; repairIp/c
123-15-004controllable Reversible pitch propeller (cRp) Hydraulic Oil Sump Tank (FWD); gas free and cleanIp/c
123-15-005controllable Reversible pitch propeller (cRp) Hydraulic Oil Sump Tank (AFT); gas free and cleanIp/c
123-17-001contaminated Oil Tanks; preserveIp/c
123-17-002contaminated Oil Tanks; repairIp/c
123-19-001collection, Holding and Transfer (cHT) Tanks; repair and preserveIp/c
123-19-002Waste Tank; repairIp/c
123-21-001Accessible Void; repairIp/c
123-22-001Accessible Void; preserveIp/c
123-22-002Escape Trunk Vertical Stiffener; repairIp/c
123-22-003chain Locker and chain Locker Sump; repairIp/c
123-22-004chain Locker and chain Locker Sump; preserveIp/c
123-31-001Tank and Void Open, pump, clean and Gas Free; accomplishIp/c
123-90-001ShipAlt cG47-83059K, Fuel Oil Tanks 6-94-1-F And 6-94-2-F cracks Structural Mod; accomplishIp/c
130-11-001Deferred Boat Deck Stiffener Installation; accomplishIp
130-11-002Deferred SRBOc Launcher Backup Structure Replacement; accomplishIp/c
130-11-003Structural Assembly Stiffener Alignment; accomplishIp/c
130-11-004Deferred cable collar Modification; accomplishp/c
130-11-005Deferred cable collar plate Replacement; accomplishp/c
130-11-006Deferred Waveguide collar Relocation; accomplishp/c
130-11-007Deferred ADNS Sway Brace Foundation Repair; accomplishp/c
130-11-008Main Mast pad Replacement; accomplishIp/c
130-11-009Deferred Radar Room Structure plate; installp/c
130-11-010Deferred Boat platform Modification; accomplishp/c
130-11-011Helicopter Spare Engine Stowage Holes cleaning; accomplishp
130-11-012Deferred port/Starboard Halyard pinrail; relocatep
130-90-001ShipAlt cG47-83265.03K, Hull Deck Alteration; accomplishp/c
150-11-00103 Level Deckhouse Exterior Bulkhead; repairIp/c
150-11-002Bulkhead plating Repair; accomplishIp/c
150-11-003Superstructure crack; repairIp/c
150-11-004Superstructure Weld Repair; accomplishIp/c
150-11-005Superstructure; repairIp/c
150-11-006Helo Hangar Structural Repair; accomplishIp/c
150-11-007Fan Room 01-148-1-Q Deferred Structural Repair; accomplishIp/c
150-11-009Superstructure cracks; repairIp/c
150-15-003classified Documents Disintegrator Room Restoration; accomplishp/c
150-90-001ShipAlt cG47-78449.03K, Deckhouse Insert plate Installation to Bulkhead; accomplishIp/c
153-11-001Radio central Bulkhead plate; RepairIp/c
163-11-002Sea chest; inspect and repairIp/c
165-11-001Sonar Dome Access Scuttles; repairIp/c
165-11-002Sonar Dome Rubber Window (SDRW); inspect and repairIp/c
165-11-003SONAR Dome Rubber Window (SDRW) Radiographic Evaluation; accomplishIp/c
165-11-004Sonar Dome pressurization System; OverhaulIp/c
165-11-005Sonar Dome Rubber Window (SDRW) Firemain piping Replacement; accomplishIp/c
167-11-002Scuttle, Steel, Flush, Quick-Acting; replacep/c
167-20-001Ballistic Door, Aluminum, Double; repairp/c
167-80-001ShipAlt cG47-78523.03D, Aluminum Ballistic Double Door Hinge and Dog Removal; accomplishp/c
168-11-002Scuttle & Hatch, Exterior, Flush, Quick-Acting; replacep/c
168-12-001Door, Hinge pad Assembly; installp/c
168-12-002Door, Aluminum, Exterior, Watertight, Individually Dogged; replacep/c
171-11-001Main Mast; inspect and repairIp/c
171-11-002Main Mast Deferred Interference Installation; accomplishp/c
180-11-001close In Weapon System (cIWS) Mount 21 and Mount 22 Foundation Flatness check; accomplishp/c
234-11-001Gas Turbine Module (GTM) Base Enclosure preservation; accomplishp/c
234-11-002Main propulsion Gas Turbine Module (GTM 1A) Engine; installp/c
234-11-003Main propulsion Gas Turbine Module (GTM 1B) Engine; installp/c
234-11-004Main propulsion Gas Turbine (GTM 2B) Engine; installp/c
234-11-005Main propulsion Gas Turbine Module (GTM 2A) Engine; installp/c
234-12-001Main propulsion Gas Turbine Module (GTM) Resilient Mount; replacep/c
241-11-001Main Reduction Gear (MRG), Multiple Disc Brake; replacep/c
241-11-003Main Reduction Gear (MRG) Flex Hose Replacement; accomplishp/c
241-11-004Main Reduction Gear No.1 and No 2 (MRG) Thrust Bearing Seal; replacep/c
243-11-001Starboard Outboard Shafting and Bearing; inspect and replaceIp/c
243-11-003Starboard Stern Tube Shaft Seal; overhaulIp/c
243-11-004port Stern Tube Shaft Seal; overhaulIp/c
243-11-005Starboard Stern Tube Flax packing and Gland Ring Removal; accomplishIp/c
243-11-006port Stern Tube Flax packing and Gland Ring Removal; accomplishIp/c
243-11-007port propulsion Shaft Bulkhead Seal Replacement; accomplishIp/c
243-11-008Starboard propulsion Shaft Bulkhead Seal Replacement; accomplishIp/c
243-11-009port and Starboard Shaft Seal Low pressure Inflation Flex Hose Replacement; accomplishIp/c
243-12-001port propulsion Outboard Shafting and Bearing; inspect & replaceIp/c
244-11-001port and Starboard propulsion Line Shaft Bearings: Inspect, Measure Repair, and Alignment check; accomplishIp/c
244-12-001Outboard propulsion Shafting, Starboard Bearing clearance Measurement; accomplishIp/c
244-12-002Outboard propulsion Shafting, port Bearing clearance Measurement; accomplishIp/c
245-11-001Starboard controllable Reversible pitch propeller (cRp) prairie Air and Valve Rod Assembly; inspect and repairIp/c
245-11-003Starboard controllable pitch propeller (cpp) System, Hub and propeller; inspect and repairIp/c
245-11-004controllable Reversible pitch (cRp) Motor Driven pumps; installIp/c
245-11-005port and STBD controllable Reversible pitch propeller (cRp) Oil Distribution (OD) Box; repairIp/c
245-11-006controllable Reversible pitch (cRp) Hydraulic System No One, Flexible Hose Replacement; accomplishIp/c
245-11-007controllable Reversible pitch (cRp) Hydraulic System No 2, Flexible Hose Replacement; accomplishIp/c
245-11-008controllable Reversible pitch (cRp) Attached pump install; accomplishIp/cc
245-11-009controllable Reversible pitch (cRp) propeller Hydraulic Oil System; flushIp/c
245-12-001port controllable Reversible pitch propeller (cRp) prairie Air and Valve Rod Assembly; inspect and repairIp/c
245-12-002port controllable pitch propeller (cpp) System, Hub and propeller; inspect and repairIp/c
251-11-001Gas Turbine Module (GTM) 2A and 2B Silencers; installp/c
251-11-003Gas Turbine Generator No. One, 2 & 3 Moisture Separator System Refurbishment; accomplishp/c
251-11-004Gas Turbine Module (GTM) 1A and 1B Silencers; installp/c
251-11-005Deferred 2A and 2B Intake Hatch covers Flanges and Fasteners; installp/c
251-21-001Ships Service Gas Turbine Module (GTM) 1A cooling Fan Replacement; accomplishp/c
251-31-001Gas Turbine Module (GTM) Air Intake Moisture Separator System Refurbishment; accomplishp/c
251-31-002Gas Turbine Generator No. 2 Air Intake Blow-in Door; repairp/c
251-31-003Gas Turbine Module cooling Silencer (GTM)(1A, 1B, 2A and 2B); replacep/c
251-32-001Blow-In Doors in FWD Intake 2A and 2B; repairp/c
251-32-002Ships Service Gas Turbine Module (GTM) 2A & 2B cooling Fan Replacement; accomplishp/c
256-11-001Seawater Low pressure Air compressor (LpAc) Strainers No. One and 2; replacep/c
256-11-002Seawater Duplex Strainer (Hellan) Refurbishment; accomplishp/c
261-11-001Fuel Oil Service System Service Tank Unloading Valve(s); repair and replacep/c
261-11-002Fuel Oil Service coalescer Filter Valves; replacep/cc*
261-11-003Fuel Oil Service System Valves; replacep/c
261-11-004Fuel Oil Service System Flexible Hose Replacement; accomplishp/c
261-11-005Fuel Oil Service Remote Operator Gear; preservep/c
261-22-001Fuel Oil Service pump/Motor Assemblies; installp/c
262-11-001Main Reduction Gear (MRG) LO Service Unloading Valve; replacep/c
262-11-002GTM LOScA Heat Excanger Numbers 1-A, 1-B, 2-A, and 2-B System Fluid replenishment; accomplishp/c
262-11-003Main Reduction Gear (MRG) Lube Oil cooler; clean and inspectp/c
262-11-004Lube Oil Service System Unloading Valve; replacep/c
262-11-005Lube Oil Service System Unloading Valve; overhaulp/c
262-11-006Main Reduction Gear (MRG) Lube Oil Flex Hose Replacement; accomplishp/c
262-11-007Lube Oil Service pump (LOSp) Suction and Discharge Flex Hose Replacement; accomplishp/c
262-11-008Main Reduction Gear, Units One and 2, Lubricating Oil System Replenishment; accomplish.p/c
262-11-009controllable Reversible pitch (cRp) No. 2 Lube Oil Duplex Strainer Repair; accomplishp/c
262-11-010Lube Oil Service pump (LOSp) & Attached Lube Oil pump (LOp) Flex Hose Replacement; accomplishp/c
262-31-001Main Attached Lube Oil pumps; repairp/c
262-41-001Lube Oil Service pumps, Motors, and purifiers; installp/c
302-11-001Auxiliary Machinery Room No. One Motor controller; repairp/c
302-11-002pump Room Number 2 Motor controller; repairp/c
302-11-003Auxiliary Machinery Room No. 2 Motor controller; repairp/c
302-11-004Engine Room No. 2 Motor controller; repairp/c
311-11-001Ships Service Gas Turbine Generator (SSGTG) cooling Fan Replacement; accomplishp/c
311-30-001Gas Turbine Generator and Reduction Gear(GTG) Lube Oil pumps, No. One, 2 and 3; installp/c
311-31-001Ships Service Gas Turbine Generator (SSGTG) No.1 Engine; installp/c
311-31-002Ships Service Gas Turbine Generator (SSGTG) No.2 Engine; install and restorep/c
311-31-003Ships Service Gas Turbine Generator (SSGTG) No. 3 Engine; install and restorep/c
311-31-004Gas Turbine Generator Air Inlet Flex Boots; installp/c
311-33-001Gas Turbine Generator Resilient Mount; installp/c
313-11-001Battery charger for Rigid-Hull Inflatable Boat (RHIB) No. One; installp/c
313-11-002Battery charger for Rigid-Hull Inflatable Boat (RHIB) No. 2; installp/c
313-11-003pallet Battery charger No. One and 2; replacep/c
314-11-001Electrical power Supply cables; replacep/c
314-11-0022STcB cooler control Board, replacep/c
320-11-001Replace cable and conduit Fitting Assembly; accomplishp/c
320-11-002power panel pp2-488-1 Spare circuit Breaker; replacep/c
320-11-004Replace power panel Type AQB-A101 circuit Breakers; accomplishp/c
320-11-005power panel 05-319-2 circuit Breaker; replacep/c
320-11-006Refurbish Multiple controllers; accomplishp/c
320-11-007Replace power Distribution Box; accomplishp/c
320-11-008controller, GTG cooling Fan; replacep/c
320-11-009pump Room Motor controllers; refurbishp/c
320-11-010Shaft Alley Motor controllers; refurbishp/c
320-11-011400Hz power Distribution System Load Test; accomplishp/c
320-11-013Electrical power Supply cables; replacep/c
320-80-001ShipAlt cG47 class AER 60169, Thermal Drying Oven; removep/c
321-11-001cable Deferred Reconnect; accomplishp/c
321-11-002Helicopter Electrical Servicing System (HESS)400Hz/28VDc Station Recertification; accomplishp/c
321-11-003Shore power Station; repairp/c
321-90-001ShipAlt cG47-88891K, Electronic Ground Fault Detectors Replacement; accomplishp/c
324-11-001Load center 42 (Lc 42) circuit Breaker and Dossert connections; replacep/c
324-11-002Automatic Bus Transfer (ABT); replacep/c
324-11-003Dossert connectors; replacep/c
324-11-004Switchboard (1SWBD, 2SWBD and 3SWBD) circuit Breaker Maintenance, clean and Repair; accomplishp/c
324-11-005Load centers 12 and 31 circuit Breakers and Dossert connections; replacep/c
331-11-001Searchlight and Key Telegraph, cables and Deck Sleeves Installation; accomplishp/c
331-11-003Helicopter Hangar Lighting System; repairp/c
343-11-001Gas Turbine Generator Seawater cooling pump and Motor Assembly; installp/c
343-11-002GTG cooling Fans, Fire Dampers, and Expansion Joints; procure and installp/c
343-11-003Ships Service Gas Turbine Generator (SSGTG) Lube Oil coolers; clean and inspectp/c
343-11-005Gas Turbine Generator (GTG) Blow-In Door Actuators No. One, 2, and 3; repairp/c
343-11-006Gas Turbine Generator (GTG) Air Intakes No. 2 preservation; accomplishp/c
343-11-007Gas Turbine Generator (GTG) and Gas Turbine Module (GTM) Intake/Uptake temporary access; repairp/c
343-12-001Gas Turbine Generator (GTG) Number 2 Terminal Box; replacep/c
343-13-001Gas Turbine Generator (GTG) Air Intake No. 3 preservation; accomplishp/c
407-11-001Electromagnetic Interference (EMI) Discrepancy; correctp/c
415-90-001ShipAlt cG47-86539.03K, common Data Link Management System Installation; accomplishp/c
422-11-001Aircraft Warning Lights; replacep/c
423-11-001AS-3240A/URN, TAcAN Antenna; replacep/c
423-90-001Shipalt cG47-71386K, Advanced Digital Antenna production (ADAp); accomplishp/c
424-11-001AN/UQN-4 Fathometer Transducer; replacep/c
424-90-001ShipAlt cG47-86222.03K, NGF Backfit phase I; accomplishp/c
426-22-001Underwater Log Rodmeter; procure and installp/c
428-90-001ShipAlt cG47-86418K, Navigation Sensor System Interface Removal; accomplishp/c
432-11-001Sound powered phone System Testing; accomplishp/c
432-11-002Sound powered phone Jackbox, Kickpipe, & cable; repairp/c
432-11-004Fan Room Digital phone; installp/c
432-11-006Sound powered phone Stuffing Tube; removep/c
432-11-007Sound powered phone Kickpipe X40J-2U; repairp/c
432-11-008Sound powered phone Jackbox X40J-2R; repairp/c
432-11-009Sound powered phone Jackbox X40J-2Q; repairp/c
432-11-011Sound powered phone Jackbox X40J-36; repairp/c
432-12-001Damaged Sound powered Jack Box conduit and cable; replacep/c
433-11-0015Mc Electrical cable; replacep/c
433-11-002Helicopter control Station Announcing System; repairp/c
433-90-001ShipAlt cG47-87106.03K, Interior Voice communications System (IVcS) and Digital Integrated Announcing System (DIAS) Upgrade; accomplishp/c
436-11-001Relocate Hydrogen Sulfide (H2S) Alarm System Detector and Replace cable; accomplishp/c
436-11-002Relocate Hydrogen Sulfide (H2S) Alarm System Detector; accomplishp/c
436-11-003Relocate Hydrogen Sulfide (H2S) Alarm System Detector and Replace cable; accomplishp/c
436-11-004Fan Room Electrical cable; installp/c
437-11-001Hp Air compressor No. 2 Motor controller; installp/c
437-21-001Oily Waste Drain Tank Level Indicator (TLI) System; repairp/c
437-80-001ShipAlt cG47-77239D propulsion Shafting Torsion Meter Modification; accomplishp/c
437-90-002ShipAlt cG47-83356K, Tank Level Indicator (TLI) Upgrade; accomplishp/c
437-90-003ShipAlt cG47-83372K, Time Domain Reflectometer (TDR) Tank Level Indicator (TLI) Installation; accomplishp/c
437-90-004ShipAlt cG47-87294K Radar Tank Level Indicator (TLI) Upgrade Tank Level Indicator System; accomplishp/c
438-90-001ShipAlt cG47-73856.03K, Integrated Ship controls Upgrade; accomplishp/c
439-11-001TV-DTS OE-556/U Radome and Antenna Reinstallation; accomplishp/c
439-11-002Helicopter Operations Surveillance System (HOSS); testp/c
441-11-001Whip Antenna Installation; accomplishp/c
441-11-002OA-9242(V)/SR Antenna Tilting Group; repairp/c
441-11-003Radio central 02-220-0-c Deferred Equipment Installation; accomplishp/c
441-11-004Ultra High Frequency (UHF) primary Radio System Assessment; accomplishp/c
441-11-006AS-4127 & AS-4400/URc-107 JTIDS Antennas; replacep/c
441-71-001Inmarsat B Saturn Radome; replacep/c
441-90-005ShipAlt cG47-84694K, AN/SRc-61A(V)11 DMR communication System Installation; accomplishp/c
441-90-006ShipAlt cG47-80897.03K, pEOc41 NMT AN/WSc-9(V)XX Multiband Terminal Alteration; accomplishp/c
441-90-007ShipAlt cG47-80696K, pEOc4I BFTN AN/USQ-195(V)1; accomplishp/c
441-90-008ShipAlt cG47-81322K, pEOc4I ADNS AN/USQ-144K(V)2; accomplishp/c
441-90-009ShipAlt cG47-85030K, ShipAlt Radio Systems; accomplishp/c
442-11-001AN/WQc-2A Sonar communications Transducer; replacep/c
442-11-002Hydrophone, Sonar DT-513A/BQA-8; replacep/c
443-90-001ShipAlt cG47-86316K, Replace Air Horn with Electric Horn; accomplishp/c
452-90-001Shipalt cG47-87310.03 AN/SpS-49(V)8 Air Search Radar Removal; accomplishp/c
452-90-002ShipALT cG47-83623K, cOTS SARTIS, AN/UpX-34(V) Upgrade; accomplishp/c
455-11-001cV-3372/UpX Antenna position programmer; refurbishp/c
456-01-001AS-3572/SpY-1B Antenna Array Resurfacing; accomplishp/c
456-11-002SpY Unit T-64 cooling Skid pump/Motor Assembly; repairp/c
456-90-001ShipAlt cG47-85077.03K AN/SpQ-9B pDD W/Tech Refresh on Surface Ships; accomplishp/c
456-90-002ShipAlt cG47-77614.03K, AcB12/TI12 OA computing plant Upgrade; accomplish
p/c
456-90-003ShipAlt cG47-78510.03K AWS: AcB12/TI12 cIc Display Upgrades; accomplishp/c
456-90-004ShipAlt cG47-87024.03K, AN/SQQ-89A(V)15 W/TI-14 HW FOR cG MOD; accomplishp/c
457-11-001cable Tags; replacep/c
462-90-001ShipAlt cG47-86644 K USW-DSS AN/UYQ-100(V)3 to AN/SQQ-89(V)15 Interface; accomplishp/c
463-80-001ShipAlt cG47-76231D, Sonar Stave cable connectorization Modifications; accomplishp/c
465-11-002Bathythermograph Launcher Ball Valve; replacep/c
468-90-001ShipAlt cG47-89226K, AN/SQQ-89A(V)15 W/TI-14 Modification; accomplishp/c
471-90-001ShipAlt cG47-71180K, Surface Electronic Warfare Improvement program (SEWIp) Installation; accomplishp/c
472-11-001Integrated Design Drawing for cG63 ShipAlt passive countermeasures; installp/c
472-11-002passive countermeasure System (pcMS) Material for Non-ShipAlt Work; installp/c
472-90-001ShipAlt cG47-80156.03K Mod to AN/SLQ-32(V)6 Hardware; accomplishp/c
475-11-001Degaussing System connection Box; replacep/c
475-11-002Degaussing System M-coil; inspect and repairp/c
481-90-001ShipAlt cG47-78818.03K, Mark 34 Mod 6 Gun Weapons System (GWS) MOD TI12 ABc12 Hardware Upgrade; accomplishp/c
482-11-002Replace Salvo Warning Sirens and cable; accomplishp/c
484-90-001ShipALT cG47-79256.03K, AN/USG-2B installation: accomplishp/c
492-61-001Stabilized Glide Slope Indicator (SGSI) Overhaul and Test; accomplishp/c
495-90-001ShipAlt cG47-84924K IcOp Infrastructure Installation; accomplishp/c
495-90-002ShipAlt cG47-88467.03K canes MOD 01 classified LAN Install; accomplishp/c
505-11-001Valve and Remote Operator Replacement; accomplishp/c
505-11-002Gas Turbine Generator (GTG) No. One Base Enclosure Flexible Hose Replacement; accomplishp/c
505-11-003Generator Turbine Module (GTM) 1A & 1B Base Enclosure Flex Hose Replacement; accomplishp/c
505-11-004Sonar Flex Hose Replacement; accomplishp/c
505-50-001Refrigeration Flexible Hose Assemblies; replacep/c
505-50-002Air conditioning plant No. One through 4 Flexible Hose Assemblies; replacep/c
505-50-003SpY-1 palletized Electronics cooling Water (EcW) Skid Flexible Hose Assembly; replacep/c
505-50-004Seawater pump No. 1 Flexible Hose Assembly; replacep/c
505-50-005potable Water Service pump Flexible Hose Assembly; replacep/c
505-50-006Lube Oil purifier No. 2 Flexible Hose Assembly and Resilient Mounts; replacep/c
505-50-007Flex Hose Replacement; accomplishp/c
505-50-0092B GTM Base Flex Hose Replacement; accomplishp/c
508-11-001Lagging and Insulation Inside Machinery Spaces; replacep/c
508-12-001Lagging and Insulation Outside Machinery Spaces; replacep/c
512-11-001Fan Room Equipment Installation; accomplishp/c
512-11-002Fan Room Overhaul; accomplishp/c
512-11-003Fan Room 01-392-2-Q Restoration; accomplishp/c
512-11-004VLS Fan Rooms No. One and 2 Overhaul; accomplishp/c
512-11-005Fan Room 1-82-2-Q Overhaul; accomplishp/c
512-11-007Fan Room 1-382-3-Q; refurbishp/c
512-11-008Ventilation Watertight closure; replacep/c
512-11-009Vaneaxial Fan Installation; accomplishp/c
512-11-010Fume collector; replacep/c
512-11-011Fan Room 3-426-0-Q Restoration; accomplishp/c
512-11-012Fan Room 02-234-2-Q Deferred Equipment Installation; accomplishp/c
512-11-013HVAc Deferral of cFR 1169 and Various Rcc's, accomplishp/c
512-11-014Fan Room Ventilation Equipment; installp/c
512-11-015Fan Room Deferred Equipment Installation; accomplishp/c
512-11-017Fan Room Equipment; replacep/c
512-11-018Exhaust Vent plenum Installation; accomplishp/c
512-11-020Gravity cooling coils; replacep/c
512-11-021Vaneaxial Fan Motors, ShipALT cG47-85077.01K Fan Room (03-174-1-Q); installp/c
512-11-022cooling coil and Ventilation Duct; replacementp/c
512-11-023Heating, Ventilation and Air conditioning Duct Assembly; replacep/c
512-11-026Fan Room HVAc Duct remove; accomplishp/c
512-11-027Fan coil Unit Deferral; installp/c
512-11-028Ventilation Weather Opening Ship protective covers; removep/c
512-11-029Galley Ventilation; cleanp/c
512-11-030Ventilation Duct cleaning; accomplishp/c
512-11-031Laundry Ventilation cleaning; accomplishp/c
512-80-001ShipAlt cG47 class AER 68013, Ventilation Duct cleaning Accesses; accomplishp/c
512-90-001ShipAlt cG47-83357K, Disposable Ventilation Filters; accomplishp/c
513-11-001Toxic Gas Vent Dampers; repairp/c
513-11-002Ventilation Smoke Dampers; replacep/c
514-11-001Overhauled Air conditioning Units; installp/c
514-11-002Fan coil Units (FcU's) and Fan coil Assembly (FcA); restorep/c
514-11-003Fan coil Units (FcU's) and Fan coil Assembly (FcA); restorep/c
514-11-004Fan coil Units (FcU's) and Fan coil Assemblies (FcA's); restorep/c
514-11-005Fan coil Units (FcU's) and Fan coil Assembly (FcA); overhaulp/c
514-11-006Fan coil Units (FcU's) and Fan coil Assemblies (FcA's); replacep/c
514-11-007Fan coil Units (FcU's) and Fan coil Assembly (FcA); replacep/c
514-11-008Fan coil Units (FcU's); installp/c
514-11-009Fan coil Units (FcU's); installp/c
514-11-010chill Water pump Flexible Hose Assembly; replacep/c
514-11-011Air conditioning plant; Lube Oil cooler repairp/c
514-11-012AFT Array chilled Water Auto Air Vent and Isolation Valve; replace
p/c
514-11-013chilled Water Expansion Tank Valves; replacep/c
514-11-014cooling coil chilled Water Solenoid Valves Deferral; installp/c
514-11-015chilled Water Supply Solenoid Valve; replacep/c
514-11-016Fwd & Stbd Array chilled Water Flex Hoses; Remove/Replacep/c
514-11-017chilled Water Valves; replacep/c
514-11-018Fan coil Unit 01-277-1; replacep/c
514-11-019Gravity cooling coils; replacep/c
514-11-021chilled Water piping powder MAG NO.1; repairp/c
514-11-022Gravity cooling coil; replacep/c
514-20-001Air conditioning plant Unit Shell condenser-Evaporators; inspect and repairp/c
514-20-002chilled Water Isolation Valves: replacep/c
514-21-001A/c plant chilled Water pumps and Motors; installp/c
516-11-001Reefer plant compressors and Motors No One & 2; install and testp/c
516-11-002Refrigeration plant condenser, Mechanical clean; accomplishp/c
516-11-004No. One and No. 2 Refrigeration plants; flushp/c
516-11-005chill STRM No.1, chill STRM No.2 and Freeze STRM Drain piping; replacep/c
517-90-001ShipAlt cG47-83219.03K, Electric conversion for Waste Heat Boilers; accomplishp/c
520-11-001Sea Valves, 2 1/2 Inch and Smaller; replaceIp/c
520-11-002Sea Valves, 3 Inch and Larger; replaceIp/c
521-11-001Firemain and Seawater piping Replacement; accomplishIp/c
521-11-002No. 2 Air conditioning plant Hellan Duplex Strainer; replacep/c
521-11-003Stern Tube Seawater cooling and Flushing piping; replaceIp/c
521-11-004Fire pumps No. One through 6, Recirculating & Vent case Y-Strainer Replacement; accomplishp/c
521-11-005Firemain Reducing Station 18; repairpc
521-11-006Seawater Service pump No. 3 Inline check Valve; replacepc
521-11-007Firemain Reducing Station Flushing Valves: Replacepc
521-11-008Firemain Fire Zone #1 System Flush & Butterfly Valves Replace; accomplishpc
521-11-009Firemain System Valve Repair; accomplishpc
521-11-010Fire Station, Hose Rack Stowage FOG Nozzle Vertical Restraint Brackets; Replacep/c
521-11-011Firemain System Gate Valve Replacement; accomplishpc
521-11-012Firemain System Butterfly Valves; replacepc
521-11-013Firemain Fire Zone #2 System Flush & Butterfly Valves Replace; accomplishpc
521-11-014Firemain Fire Zone #3 System Flush & Butterfly Valves Replace; accomplishpc
521-11-015close-in Weapon System (cIWS) Firemain Flexible Hose and Hanger Replacement; accomplishp/c
521-11-016Seawater System Flush & Butterfly Valve Replacement; accomplishpc
521-11-017Firemain System 8 Inch Valves; repairpc
521-11-018Hydraulic System Actuator control Valve Replacement; accomplishp/c
521-11-019Firemain Eductor piping; replacepc
521-11-020Sonar Firemain piping Flange; refurbishp/c
521-11-021Firemain System Valve; replacepc
521-11-022Firemain System Solenoid Operated pilot Valve (SOpV); installpc
521-21-001Fire pumps and Motors; installpc
521-21-002Firemain pump Flexible Hose; installpc
522-11-001Deluge System Y-Strainer Replacement; accomplishp/c
522-11-002Manual control Valves for Magazine Seawater Sprinkler and VLS Deluge Systems repair; accomplishp/c
522-11-003Magazine Sprinkler control Valve Replacement; accomplishp/c
522-11-004Magazine Sprinkler Hydraulic control Station Flex Hose; replacep/c
522-11-005MK41 VLS Magazine Accumulator Tank:Recertifyp/c
523-11-002Repair and Replace Solenoid Operated pilot Valve (SOpV); accomplishpc
523-11-003countermeasure Washdown (cMWD) Drain piping Replacement; accomplishpc
523-11-004countermeasure Washdown (cMWD) piping; installpc
523-11-006countermeasure Washdown (cMWD) Flush Deck And Deck Edge Nozzles; Replacepc
523-90-001ShipAlt cG47-87295K, Add Fresh Water cross connect to cMWD; accomplishpc
524-11-001AEGIS Sea Water cooling pumps and Motors No. One & 2; installp/c
524-11-002Sea Water Service pumps and Motors No One, 2 & 3; installp/c
524-11-003Stern Tube Strainers (port and Starboard); replacep/c
524-11-004Seawater Service Air conditioning (A/c) plant Strainer Refurbishment; accomplishp/c
524-11-005Aegis Seawater cooling Duplex Strainer Refurbishment; accomplishp/c
524-11-006Sea Water Valves; replaceIpc
524-11-007Wye Strainer, Needle Valve, and Gate Valve; replacepc
524-11-008Sea Water System Strainers; replacepc
524-11-009Sea Water Service pump No. One Discharge check Valve; replacepc
524-11-010cHW plant NO. 3 & 4 Ac cutout Butterfly Valve; repairp/c
524-11-011Gas Turbine Generator (GTG) Seawater cooling pump Flexible Hose Replacement; accomplishp/c
524-11-013AEGIS Seawater System chemical cleaning; accomplishp/c
524-11-014Seawater Service pump No. 2 Flexible Hoses; replacepc
524-12-001Bulkhead 174 Isolation Valve; replacep/c
524-90-001ShipAlt cG47-83262K, Seawater Heat Exchanger Layup Isolation Modification; accomplishp/c
526-11-001Weatherdeck Deck Drain Scupper; replacep/c
526-11-002cG47 class AER 68141, Overboard Discharge Modification; accomplishp/c
526-11-003Weather Deck Drain; inspect and cleanp/c
528-11-001Deck Drain Assembly; replacep/c
528-11-002cHT pumps Flexible Hose; replacep/c
528-11-003Sanitary and Sewage System Valves; replacep/c
528-11-004Sanitary and Sewage cHT piping Valves; replacep/c
528-11-005Galley Sink Drain cut Out Valve; replacep/c
528-11-006Sanitary and Sewage cHT piping Valves; replacep/c
528-11-007plumbing System Remote Operator Gear; repairp/c
528-11-008Sanitary and Sewage System plumbing Drain and piping; replace valvesp/c
528-11-009Sanitary and Sewage System plumbing Drain and piping; replace valvesp/c
528-11-010Eyewash plumbing Drain and piping; replacep/c