COW_GET_Bidders'_Questions_20171219.pdf

PDF 225 KB Posted

Attached to
USS COWPENS (CG 63) and USS GETTYSBURG (CG 64) Modernization Period (MODPRD) Availabilities
Solicitation number
N00024-18-R-4439
Issued by

About this file

Government Responses to Bidders' Questions as of 19 December 2017.

View the file

Other files

Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DATE OF REQUEST: Monday, October 30, 2017

HULLS/TITLE: USS COWPENS (CG 63) & USS GETTYSBURG (CG 64)

SOLICITATION NO: N00024-18-R-4439

NAVSEA POCs: Billy Castleberry NAVSEA POC E-MAIL: billy.castleberry@navy.mil

NAVSEA POC #: (202) 781-1248

# HULL Contract Area Question Response

ITEM NO: USS Cowpens Spec 997-11-001 and J-3 USS Cowpens Milestones TITLE: Drydocking and Undocking; accomplish

PARA. NO: 997-11-001,

Para 3.6

PAGE NO: 997-11-001,

CONTRACTOR QUESTION 4: J-3 USS Cowpens Milestone "DOCK" states;

"Offeror shall propose Dock Date IAW Specification 997-11-001".

Specification 997-11-001, Para. 3.6 indicates "DOCK" schedule milestone should be within the first 10 percent of the contractual period. QUESTION:

Please provide more guidance regarding the DOCK schedule guidance provided in Specification 997-11-001, Para. 3.6 "within the first 10 percent of the contractual period"? If a contractor proposes a DOCK schedule date later than the first 10 percent of the contractual period, how will the Gov't evaluate the proposed milestone schedule? Assuming a contractor proposes to achieve the required contractual delivery date, can a contractor propose a "DOCK" milestone schedule date later than the first 10 percent of the contractual period?

Please clarify as soon as possible?

GOVERNMENT RESPONSE:

Addressed ERRATA 1 CG 63, ERRATA 3 CG 64.

Docking does not have to occur within 10% of the availability.

ITEM NO: J-7 Pricing Workbook, Various Work Items TITLE: J-7 Pricing Workbook

PARA. NO:

PAGE NO:

CONTRACTOR QUESTION 5: 1) Contractor notes that Work Items 042-11- 002, 042-12-001, 045-11-001, 077-11-001, 110-11-001, 110-11-003, 110-11- 004, 110-11-005, 110-11-006, 110-11-009, 110-11-010, 110-11-011, appear to be duplicated.

2) Contractor notes that upon receipt and review of the Specification package the following disparities with the J-7 document as written.

(a) Work Item 042-32-001, Marine Coatings Containing Heavy Metals Material; remove and dispose is not listed.

(b) Work Item 423-90-001, Shipalt CG47-71386K, Advanced Digital Antenna Production (ADAP); accomplish is listed however was not provided in the Specification package.

(c) Work Item 561-11-006, Steering Gear Hydraulic System; flush is listed however was not provided in the Specification package.

QUESTION: Can the Customer provide clarification regarding the disparities identified above and will a revised J-7 Pricing Spreadsheet be provided.

GOVERNMENT RESPONSE:

Revision of J7 provided.

ITEM NO: 980-90-017

TITLE: CG47 Combat Systems MOD PR Contract Support; provide

PARA. NO:

PAGE NO:

CONTRACTOR QUESTION 7: Contractor notes that the Specification as written is missing quantities required for the following listed paragraphs 3.1, 3.2, 3.4, 3.5, 3.7.1, 3.7.2, 3.7.3, 3.7.4, 3.7.4.2, 3.7.8, 3.7.11, 3.7.12, 3.7.13.

QUESTION: Will the Customer provide clarification regarding the disparities identified above and issue a revised specification?

GOVERNMENT RESPONSE:

Addressed ERRATA 1 CG 63

ITEM NO: 980-90-018

TITLE: ShipAlt CG47- 91244K ATIP AIT Support;

provide, OPTION ITEM.

PARA. NO:

PAGE NO:

CONTRACTOR QUESTION 8: Contractor notes that the Specification as written is missing quantities required for the following listed paragraphs 3.1, 3.2, 3.4, 3.5.

QUESTION: Will the Customer provide clarification regarding the disparities identified above and issue a revised specification?

GOVERNMENT RESPONSE:

Work Item cancellation addressed ERRATA 2 CG 63

ITEM NO: 980-90-019

TITLE: CG47 Aegis Modernization Team (AMT) Project Development

PARA. NO:

PAGE NO:

CONTRACTOR QUESTION 9: Contractor notes that the Specification as written is missing quantities required for the following listed paragraphs 3.1.1, 3.1.3, 3.3.1, 3.3.2, 3.3.3, 3.3.4, 3.3.6, 3.3.7, 3.3.8, 3.3.10, 3.3.11, 3.7.

QUESTION: Will the Customer provide clarification regarding the disparities identified above and issue a revised specification?

GOVERNMENT RESPONSE:

Addressed ERRATA 2 CG 63

Pre-Proposal Information (PPI)

# HULL Contract Area Question Response

ITEM NO: 314-11-001

TITLE: Electrical Power Supply Cables; replace

PARA. NO:

PAGE NO:

CONTRACTOR QUESTION 10: Paragraph 3.1, states “Disconnect electrically and mechanically, remove existing and install new electrical power supply cables identified in 1.3 and located in 1.2, in accordance with 2.2, using 2.3 through 2.7 for guidance”.

• Contractor notes the paragraph as written does not state to accomplish reference 2.2, drawing 320-8646188, ShipAlt CG47-83505.02K Superstructure Fatigue & Sensitization 60HZ PWR SYS MOD.

Paragraph 3.1.3, states “Accomplish the requirements of 009-12 of 2.1, including Table 2, Column C, lines one through 7 and Nondestructive testing in accordance with line 10. Accomplish aluminum welding in accordance with 2.8”.

• Contractor notes that paragraph 3.1 does not state to accomplish reference 2.2 thus this paragraph is not required.

Paragraph 3.1.3.1, states “Accomplish the Process Control Procedure (PCP) requirements 009 09 of 2.1 for aluminum welding in accordance with 2.8”.

• Contractor notes that paragraph 3.1 does not state to accomplish reference 2.2 thus this paragraph is not required.

QUESTION: Can the Customer provide clarification as the disparities identified above regarding the requirements of paragraphs 3.1.1 and 3.1.3.1, and will an Amendment be issued providing a revised specification be issued?

GOVERNMENT RESPONSE:

No Welding required. LAR 83505.02/CG63/0108 invoked in ERRATA 3. Correction provided in CG63 Errata 3.

ITEM NO: 441-90-006

TITLE: ShipAlt CG47-

80897.03K, PEOC41 NMT

AN/WSC-9(V)XX

Multiband Terminal Alteration; accomplish

PARA. NO:

PAGE NO:

CONTRACTOR QUESTION 11: Paragraph 3.3, states “Provide 20 man-days of labor and 10,00 dollars of material to accomplish additional work not previously identified in the Work Item, as directed by the SUPERVISOR”.

• Contractor cannot determine is this typo reflects $1,000 or $10,000 of material.

QUESTION: Can the Customer provide clarification as the disparities identified above regarding the requirements of paragraph 3.3, and will an Amendment be issued providing a revised specification be issued?

GOVERNMENT RESPONSE:

Work item will be corrected to read "10,000" via ERRATA

2 CG 63.

ITEM NO: Attachment J-7

TITLE:

PARA. NO:

PAGE NO:

CONTRACTOR QUESTION 12:

The following items were received but are not listed on the J-7:

514-11-005, 533-11-003, 980-11-02, 980-11-027

GOVERNMENT RESPONSE:

Revision of J7 provided.

ITEM NO: Work Item Package

TITLE:

PARA. NO:

PAGE NO:

CONTRACTOR QUESTION 13:

The following items are listed on the J-7 but were not included in the spec package:

244-11-002, 245-11-008, 261-12-002, 261-12-003, 321-11-001, 423-14-001, 423-90-001, 428-90-001, 436-11-010, 437-21-001, 456-01-006, 456-10-002, 472-11-003, 472-11-004, 482-11-001, 505-11-009, 514-11-003, 533-11-002, 562-11-001, 623-12-003, 645-11-001, 661-11-001, 751-11-003, 763-11-002, 772-20-001, 980-11-005, 992-11-003

GOVERNMENT RESPONSE:

These are no longer part of the official package. Revision of J7 provided.

ITEM NO: 168-12-004

TITLE: Door and Scuttle Repair; accomplish

PARA. NO:

PAGE NO:

CONTRACTOR QUESTION 14:

Item is listed as 168-12-002 on Attachment J-7

GOVERNMENT RESPONSE:

Item is 168-12-004 correction. Revision of J7 provided.

ITEM NO: 456-01-004

TITLE: Radar Target Processor Protective Cover;

replace

PARA. NO:

PAGE NO:

CONTRACTOR QUESTION 15:

Item title on spec does not match item title on Attachment J-7

GOVERNMENT RESPONSE:

Correction to title was made during final packaging.

Revision of J7 provided.

ITEM NO: 551-31-003

TITLE: Self-Reactivating Dehydrator; repair

PARA. NO:

PAGE NO:

CONTRACTOR QUESTION 16:

Item is listed as 551-31-002 on Attachment J-7

GOVERNMENT RESPONSE:

Item is 551-31-003 correction. Revision of J7 provided.

ITEM NO: 631-90-001

TITLE: Complete ShipAlt CG47-83283K Corrosion Control Enhancement;

accomplish

PARA. NO:

PAGE NO:

CONTRACTOR QUESTION 17:

Item is listed as 631-80-001 on Attachment J-7

GOVERNMENT RESPONSE:

Cancelled. Addressed ERRATA 1 CG 64.

ITEM NO: 437-21-003

TITLE: Oily Waste Drain Tank Level Indicator (TLI) System; repair

PARA. NO:

PAGE NO:

CONTRACTOR QUESTION 18:

Item listed as 437-21-001 on Attachment J-7

GOVERNMENT RESPONSE:

Item is 437-21-003 correction. Revision of J7 provided.

ITEM NO: 521-90-001 -

Gettysburg

TITLE: SA 86960K

Upgrade to Titanium Fire Pumps

PARA. NO: 3.1

PAGE NO: 2

CONTRACTOR QUESTION 20: Para 3.1 states to accomplish requirements of 2.2 thru 2.6 using the material in 2.7 and 5.3. Ref 2.7 is the 4720 and this Alt is not listed in the document, and 5.3 list states KITTED MATERIAL:

None. Please provide a list of GFM.

GOVERNMENT RESPONSE:

4720/3 Reference listed is for work item title listed on work item. 4720's received after solicitation. Addressed ERRATA

1 CG 64.

ITEM NO: 523-90-001 -

Gettysburg TITLE: SA 87259K Add FW Cross Connect to

CMWD

PARA. NO: 3.1

PAGE NO: 2

CONTRACTOR QUESTION 21: Para 3.1 states to accomplish requirements of 2.2 thru 2.6 using the material in 2.7 and 5.3. Ref 2.7 is the 4720 and this Alt is not listed in the document, and 5.3 states Kitted material Ref. 2.7.

Please provide a list of GFM.

GOVERNMENT RESPONSE:

Addressed in Reference Disk dated 11/21/17

ITEM NO: 524-90-001 -

Gettysburg

TITLE: SA 87288K

Replace SW Boundary Valves with TOTS

PARA. NO: 3.1

PAGE NO: 2

CONTRACTOR QUESTION 22: Para 3.1 states to accomplish requirements of 2.2 thru 2.7 using the material in 2.8 and 5.3. Ref 2.8 is the 4720 and this Alt is not listed in the document, and 5.3 states Kitted material Ref. 2.8.

Please provide a list of GFM.

GOVERNMENT RESPONSE:

Addressed in Reference Disk dated 11/21/17

ITEM NO: 526-80-002 -

Gettysburg TITLE: SA 77812D Deck Drain Mods

PARA. NO: 3.1

PAGE NO: 1

CONTRACTOR QUESTION 23: Para 3.1 states to accomplish requirements of 2.2 and 2.3 using the material in 2.4 and 5.3. Ref 2.4 is the 4720 and this Alt is not listed in the document, and 5.3 states Kitted material Ref. 2.4.

Please provide a list of GFM.

GOVERNMENT RESPONSE:

Addressed in Reference Disk dated 11/21/17

ITEM NO: 528-90-001 -

Gettysburg TITLE: SA 87606.02K Fan Room Corrosion Mitigation

PARA. NO: 3.1

PAGE NO: 2

CONTRACTOR QUESTION 24: Para 3.1 states to accomplish requirements of 2.2 through 2.5 using the material in 2.6 and 5.3. Ref 2.6 is the 4720 and this Alt is not listed in the document, and 5.3 states Kitted material Ref. 2.6.

Please provide a list of GFM.

GOVERNMENT RESPONSE:

Addressed in Reference Disk dated 11/21/17

ITEM NO: 533-90-003 -

Gettysburg

TITLE: SA 84326.K

Replace HATCO Booster

PARA. NO: 3.1

PAGE NO: 2

CONTRACTOR QUESTION 25: Para 3.1 states to accomplish requirements of 2.2 through 2.6 and applicable SA portions of 2.7 & 2.8 using the material in 2.9 and 5.3. Ref 2.9 is the 4720 and this Alt is not listed in the document, and 5.3 states Kitted material Ref. 2.9. Please provide a list of GFM.

GOVERNMENT RESPONSE:

Addressed in Reference Disk dated 11/21/17

ITEM NO: 540-90-001 -

Gettysburg TITLE: SA 80740K Fuel Oil and LO Heater Power Sys Mod

PARA. NO: 3.1

PAGE NO: 1

CONTRACTOR QUESTION 26: Para 3.1 states to accomplish requirements of 2.2 through 2.4 using the material in 2.5 and 5.3. Ref 2.5 is the 4720 and this Alt is not listed in the document, and 5.3 states Kitted material Ref. 2.5.

Please provide a list of GFM.

GOVERNMENT RESPONSE:

Addressed in Reference Disk dated 11/21/17

ITEM NO: 555-90-0003 -

Gettysburg

TITLE: SA 81435.K

Installation of Remote Fire Toggle Switch

PARA. NO: 3.1

PAGE NO: 1

CONTRACTOR QUESTION 27: Para 3.1 states to accomplish requirements of 2.2 and 2.3 using the material in 2.4 and 5.3. Ref 2.4 is the 4720 and this Alt is not listed in the document, and 5.3 states Kitted material Ref. 2.4.

Please provide a list of GFM.

GOVERNMENT RESPONSE:

Addressed in Reference Disk dated 11/21/17

ITEM NO: 586-11-001 -

Gettysburg TITLE: Glide Slope Indicator

PARA. NO: 2.2

PAGE NO: 1

CONTRACTOR QUESTION 28: The equipment listed in 1.3.1 thru 1.3.5 is listed as GFE. Please confirm the Government will provide this equipment for installation.

GOVERNMENT RESPONSE:

Work Item cancelled ERRATA 1 CG 64.

ITEM NO: 588-21-002

Gettysburg TITLE: Bridge Crane Hoist

PARA. NO: 2.2 - 2.6

PAGE NO: 1

CONTRACTOR QUESTION 29: Para 3.2 states to install and align the hoist assembly, and 3.2.2 involves welding. Does this hoist require assembly? If so, please provide what needs to be assembled. Further, all the references 2.2 -

2.6 were not provided . Please provide these drawings.

GOVERNMENT RESPONSE:

Addressed in Reference Disk dated 11/21/17. Hoist is fully assembled, does not required assembly.

ITEM NO:

TITLE:

PARA. NO:

PAGE NO:

CONTRACTOR QUESTION 30: There are several work items in this package that have a LOE para to provide X amount of days, vice man-days. Please confirm where ever the para reads X amount of days, it should be priced as man-days. (8 hrs. per day). One example is item 505-11-001

GOVERNMENT RESPONSE:

Addressed ERRATA 1 CG 64.

ITEM NO: USS Gettysburg Spec 997-11-001 and J-6 USS Gettysburg Milestones TITLE: Drydocking and Undocking; accomplish

PARA. NO: NO: 997-

11-001, Para 3.7

PAGE NO:

CONTRACTOR QUESTION 31: J-6 USS Gettysburg Milestone "DOCK" states; "Offeror shall propose Dock Date IAW Specification 997-11-001".

Specification 997-11-001, Para. 3.7 indicates "DOCK" schedule milestone should be within the first 10 percent of the contractual period. QUESTION:

Please provide guidance regarding the DOCK schedule guidance provided in Specification 997-11-001, Para. 3.7 "within the first 10 percent of the contractual period"? If a contractor proposes a DOCK schedule date later than the first 10 percent of the contractual period, how will the Gov't evaluate the proposed milestone schedule? Assuming a contractor proposes to achieve the required contractual delivery date, can a contractor propose a "DOCK" milestone schedule date later than the first 10 percent of the contractual period and an Undock milestone of their choice ? Please clarify.

GOVERNMENT RESPONSE:

Addressed ERRATA 1 CG 63, ERRATA 3 CG 64.

Docking does not have to occur within 10% of the availability.

ITEM NO: 456-90-001

TITLE: ShipAlt CG47-

85077.03K AN/SPQ-9B

PDD W/Tech Refresh on Surface Ships; accomplish

PARA. NO: 3.1.1

PAGE NO: 3

CONTRACTOR QUESTION 33:

Para 3.1 states "Accomplish the requirements of 2.2 through 2.17 and applicable portions of 2.18, including all general, local, special, test and rip-out notes, using 2.24 through 2.27 for guidance. Work is to be completed in accordance with the schedule provided in 2.28."

Para 3.1.1 states "Fabricate, fit and install from raw material provided by 2.29,2.30 and 5.3, for accomplishing the requirements of 2.2 through 2.16, 2.18 through 2.20, 2.25 through 2.27."

For estimating purposes please clarify the intent of para 3.1.1. Who is accomplishing ref 2.19 through 2.20 and 2.25 through 2.27 since there is no requirement to accomplish these paragraphs in 3.1?

Please advise

GOVERNMENT RESPONSE:

Requirements of references are divided between MSR and AIT as stated in work item.

Ref 2.19 and 2.20 are stated in paragraph 3.1.1 and 3.8.

MSR shall accomplish requirements as stated. i.e.. MSR shall fabricate, fit and install the raw material provided by references (2.29, 2.30 and 5.3) for the accomplishment of tasks described in 2.19 and 2.20.

Ref 2.25 through 2.27 are stated in paragraph 3.1 and 3.1.1.

MSR shall fabricate, fit and install from raw material provided by references (2.29, 2.30 and 5.3) to accomplish

2.2 through 2.17 and applicable portions of 2.18 - use these references as guidance to accomplish requirements.

ITEM NO: 456-90-002

TITLE: Title: ShipAlt

CG47-77614.03K,

ACB12/TI12 OA

Computing Plant Upgrade;

accomplish

PARA. NO: 3.1.1

PAGE NO: 4

CONTRACTOR QUESTION 34:

Para 3.1 states "Accomplish the requirements of 2.2 through 2.22 and applicable portions of SA 77614.03K in 2.23 through 2.25 including all general, local, special, test and rip-out notes, using 2.26 through 2.56 for guidance. Work is to be completed in accordance with the schedule provided in 2.61."

Para 3.1.1 states "Fabricate, fit and install from raw material provided by 2.59,

2.60 and 5.3, for accomplishing the requirements of 2.2 through 2.22 and 2.26 through 2.56."

For estimating purposes please clarify the intent of para 3.1.1. Who is accomplishing ref 2.26 through 2.56 since there is no requirement to accomplish these paragraphs in 3.1?

Please advise

GOVERNMENT RESPONSE:

Requirements of references are divided between MSR and AIT as stated in work item.

Ref 2.26 through 2.56 are stated in 3.1: "using 2.26 through

2.56 for guidance". MSR shall accomplish requirements as stated. i.e.. MSR shall fabricate, fit and install from raw material provided by 2.59, 2.60 and 5.3 for the accomplishment of tasks described in 2.26 through 2.56.

Accomplishment of Ref 2.26 through 2.41 are subsequently stated in paragraph 3.10 Ref 2.42 through 2.56 are references to be used as guidance.

ITEM NO: 456-90-003

TITLE: ShipAlt CG47-

78510.03K AWS:

ACB12/TI12 CIC Display Upgrades; accomplish

PARA. NO: 3.2.1

PAGE NO: 4

CONTRACTOR QUESTION 35:

Para 3.2 states "Accomplish the requirements of 2.2 through 2.29 and applicable portions of SA 78510.03K in 2.43 and 2.44 including all general, local, special, test and rip-out notes, using 2.42 and 2.45 through 2.58 for guidance. Work is to be completed in accordance with the schedule provided in 2.59."

Para 3.2.1 states "Fabricate, fit and install from raw material provided by 2.60 and 2.61 and 5.3, for accomplishing the requirements of 2.2 through 2.23, 2.25, 2.26, 2.30 through 2.44."

For estimating purposed please clarify the intent of para 3.2.1. (who is accomplishing ref 2.30 through 2.42) since there is no requirement to accomplish these paragraphs in 3.2?

Please advise

GOVERNMENT RESPONSE:

Requirements of references are divided between MSR and AIT as stated in work item.

ITEM NO: 456-90-004

TITLE: ShipAlt CG47-

87024.03K, AN/SQQ-

89A(V)15 W/TI-14 HW

FOR CG MOD; accomplish

PARA. NO: 3.1.1

PAGE NO: 3

CONTRACTOR QUESTION 36:

Para 3.1 states "Accomplish the requirements of 2.2 through 2.27, and applicable portions of SA 87024.03K in 2.28 including all general, local, special, test and rip-out notes using 2.50 for guidance."

Para 3.1.1 state "Fabricate, fit and install from raw material provided by 2.51 and 5.3, for accomplishing the requirements of 2.2 through 2.33."

For estimating purposed please clarify the intent of para 3.1.1. (who is accomplishing ref 2.29 through 2.33) since there is no requirement to accomplish these paragraphs in 3.1?

Please advise

GOVERNMENT RESPONSE:

Requirements of references are divided between MSR and AIT as stated in work item.

37 CG 63

ITEM NO: 310-11-012

TITLE: Deferred Port/Starboard Halyard Pinrail; relocate

PARA. NO: 3.2

PAGE NO: 1

CONTRACTOR QUESTION 37:

Paragraph 3.2 states; "Accomplish the requirements of 009-32 of 2.1, including Table 2, Line 26, Columns A through E."

According to Standard Items FY18 CH-1 Table 2, Line 26 is for Steel Surfaces and is not applicable for the 04 Level Deck which is made out of aluminum.

Please review and advise.

GOVERNMENT RESPONSE:

Concur with contractor. Correct table/line for aluminum issued in Errata 4, CG 63.

38 CG 63

ITEM NO: 150-15-003

TITLE: Classified Documents Disintegrator Room Restoration;

accomplish

PARA. NO: 3.5

PAGE NO: 1

CONTRACTOR QUESTION 38:

Paragraph 3.5 states; "Accomplish the requirements of 009-32 of 2.1, using

2.4 as guidance, at the location listed in 2.1"

There is no location of work listed in paragraph 2.1. Contractor believes this to be a typo and paragraph 1.2.1 is the intended location of work.

Please concur or advise.

GOVERNMENT RESPONSE:

Concur with contractor. Typo - should've been 1.2 vice 2.1.

Correction in Errata 4, CG 63.

ITEM NO: 651-90-002

TITLE: ShipAlt CG47- 83409K, Advanced Food Service; accomplish

PARA. NO: 3.1

PAGE NO: 2

CONTRACTOR QUESTION 39:

Paragraph 3.1 states "Accomplish the requirements of 009-90 of 2.1 to obtain the services of a technical OEM representative to align and verify all equipment."

Please provide sources for Technical OEM Representative services (009-90) to accomplish installation on this ShipAlt.

GOVERNMENT RESPONSE:

THE SOURCE 2000

502 Rotary Street Hampton, VA 23661 800-497-2144 http://thesource2000.net

ITEM NO: 481-90-001

TITLE: ShipAlt CG47- 78818.03K, Mark 34 Mod 6 Gun Weapons System

(GWS) MOD TI12 ABC12

Hardware Upgrade;

accomplish

PARA. NO: 3.2.1

PAGE NO: 3

CONTRACTOR QUESTION 40:

Para 3.2 states "Accomplish the requirements of 2.2 through 2.29, and applicable portions of SA 78818.03K in 2.30 through 2.32 including all general, local, special, test and rip-out notes, using 2.33 for guidance. Work is to be completed in accordance with the schedule provided in 2.40."

Para 3.2.1 states "Fabricate, fit and install from raw material provided by 2.41 and 2.42 and 5.3, for accomplishing the requirements of 2.2 thru 2.32 and 2.34 thru 2.37."

For estimating purposes please clarify the intent of para 3.2.1. Who is accomplishing ref 2.34 through 2.37 since there is no requirement to accomplish these paragraphs in 3.2?

please advise

GOVERNMENT RESPONSE:

Requirements of references are divided between MSR and AIT as stated in work item.

ITEM NO: 495-90-002

ShipAlt CG47-88467.03K Canes MOD 01 Classified LAN Install; accomplish para 3.2.1

PAGE NO: 3

CONTRACTOR QUESTION 41:

Para 3.2 states "Accomplish the requirements of 2.2 through 2.16 and applicable portions of SA 88467.03K in 2.17 through 2.19 including all general, local, special, test and rip-out notes, using 2.23 and 2.24 for guidance.

Work is to be completed in accordance with the schedule provided in 2.27."

Para 3.2.1 states "Fabricate, fit and install from raw material provided by 2.25,

2.26 and 2.17 through 2.19 and 5.3, for accomplishing the requirements of 2.2 through 2.16 and 2.20 through 2.22."

For estimating purposes please clarify the intent of para 3.2.1. Who is accomplishing ref 2.20 through 2.22 since there is no requirement to accomplish these paragraphs in 3.2?

please advise

GOVERNMENT RESPONSE:

Requirements of references are divided between MSR and AIT as stated in work item.

ITEM NO: 495-90-001

TITLE: ShipAlt CG47-

84924K ICOP

Infrastructure Installation;

accomplish

PARA. NO: 3.2.1

PAGE NO: 2

CONTRACTOR QUESTION 42:

Para 3.2 states "Accomplish the requirements of 2.2 through 2.4. Work is to be completed in accordance with the schedule provided in 2.8."

Para 3.2.1 states "Fabricate, fit and install from raw material provided by 2.9 and 5.3, for accomplishing the requirements of 2.2 thru 2.5 and 2.10."

For estimating purposes please clarify the intent of para 3.2.1. Who is accomplishing ref 2.5 and 2.10 since there is no requirement to accomplish these paragraphs in 3.2?

please advise

GOVERNMENT RESPONSE:

Requirements of references are divided between MSR and AIT as stated in work item.

ITEM NO: 484-90-001

TITLE: ShipAlt CG47-

79256.03K, AN/USG-2B

installation: accomplish

PARA. NO: 3.2.1

PAGE NO: 3

CONTRACTOR QUESTION 43:

Para 3.2 states "Accomplish the requirements of 2.2 through 2.15 and applicable 79256.03K in 2.16 including all general, local, special, test and rip-out notes using 2.21 through 2.24 for guidance. Work is to be completed in accordance with the schedule provided in 2.25."

Para 3.2.1 states "Fabricate, fit and install from raw material provided by 2.26and 2.27 and 5.3, for accomplishing the requirements of 2.2 through 2.14 and 2.16 through 2.20."

For estimating purposes please clarify the intent of para 3.2.1. Who is accomplishing ref 2.17 through 2.20 since there is no requirement to accomplish these paragraphs in 3.2?

please advise

GOVERNMENT RESPONSE:

Requirements of references are divided between MSR and AIT as stated in work item.

ITEM NO: 441-90-005

TITLE: SHIPALT CG47-

8469K, AN/SRC 61A(V)

11 DMR

COMUNICATION SYS

INSTALL; ACCOMPLISH

PARA. NO: 3.4

PAGE NO: 2 of 3 and 3 of

CONTRACTOR QUESTION 44:

Para 3.4 states "Fabricate and install label plates I.A.W. Ref 2.8."

also Note 4.1. states "AIT will accomplish all misc. cableway modification requirements (stud-runs, T-Bar, etc.)."

Who's responsibility is it to install noted cable tags?

GOVERNMENT RESPONSE:

Para 3.4 is the responsibility of the MSR for all cable labels within the scope of requirements listed in 3.1 or interferences touched by the MSR within this work item.

ITEM NO: 593-21-001

OILY WASTE WTR

TRANSFER PUMP

ASSEMBLIES; INSTALL

PARA. NO: 3.5

PAGE NO: 2 of 3

CONTRACTOR QUESTION 45:

Para 3.5 states "Accomplish 009-22 of 2.1. for the cable(s) terminating in the equipment listed in 1.3."

FY-18 (CH-1) STD Items 009-22 shows CANCELLED as of 11/18/16.

Please advise and or issue Errata.

GOVERNMENT RESPONSE:

Correction provided in CG63 Errata 2. Agree with contractor 009-22 is cancelled. Delete Para 3.5 from work specification 593-21-001.

ITEM NO: 593-21-002

TITLE: OILY WASTE

WTR DRAIN PUMPS;

INSTALL

PARA. NO: 3.3

PAGE NO: 3 of 5

CONTRACTOR QUESTION 46:

Para 3.3 states "Accomplish 009-22 of 2.1. for the cable(s) terminating in the equipment listed in 1.3. USING 2.7. and 2.8. for guidance."

FY-18 (CH-1) STD Items 009-22 shows CANCELLED as of 11/18/16.

Please advise and or issue Errata.

GOVERNMENT RESPONSE:

Correction provided in CG63 Errata 2. Agree with contractor 009-22 is cancelled. Delete Para 3.3 from work specification 593-21-002.

ITEM NO: 593-11-010

TITLE: PULPER

CONTROL PANEL;

REPLACE

PARA. NO: 3.3.

PAGE NO: 1 OF 2

CONTRACTOR QUESTION 47:

Para 3.3 states "Accomplish 009-22 of 2.1. for the Pulper controller electrical cables I.A.W. 2.2. and 2.3."

FY-18 (CH-1) STD Items 009-22 shows CANCELLED as of 11/18/16.

Please advise and or issue Errata.

GOVERNMENT RESPONSE:

Correction provided in CG63 Errata 2. Agree with contractor 009-22 is cancelled. Delete Para 3.3 from work specification 593-11-010.

ITEM NO: 593-11-011

TITLE: CHT TNKS, HIGH

LIQUID LEVEL ALARM

SWITCHES; REPAIR

PARA. NO: 3.4.

PAGE NO: 2 OF 3

CONTRACTOR QUESTION 48:

Para 3.4 states "Accomplish 009-22 of 2.1. for the cable(s) terminating in the equipment listed in 1.3.1. and 1.3.2."

FY-18 (CH-1) STD Items 009-22 shows CANCELLED as of 11/18/16.

Please advise and or issue Errata.

GOVERNMENT RESPONSE:

Correction provided in CG63 Errata 2. Agree with contractor 009-22 is cancelled. Delete Para 3.4 from work specification 593-11-011.

ITEM NO: 721-31-001

TITLE: MK41 VLS

Launcher Top

PARA. NO: 3.6.1

PAGE NO: 3 of 8

CONTRACTOR QUESTION 50: Are 3/16" steel reinforced plates GFE?

GOVERNMENT RESPONSE:

No, Not provided as GFE.

ITEM NO: 721-31-001

TITLE: MK41 VLS

Launcher Top

PARA. NO: 3.6.2

PAGE NO: 3 of 8

CONTRACTOR QUESTION 51: Are metal pans GFE?

GOVERNMENT RESPONSE:

No, Not provided as GFE.

ITEM NO: 721-31-001

TITLE: MK41 VLS

Launcher Top

PARA. NO: 3.7

PAGE NO: 3 of 8

CONTRACTOR QUESTION 52: Are containment enclosures GFE?

GOVERNMENT RESPONSE:

No, Not provided as GFE.

ITEM NO: 721-31-001

TITLE: MK41 VLS

Launcher Top

PARA. NO: 3.9.1

PAGE NO: 4 of 8

CONTRACTOR QUESTION 53: Are 3/4" thick fire retardant plywood blanks

GFE?

GOVERNMENT RESPONSE:

No, Not provided as GFE.

ITEM NO: 721-31-001

TITLE: MK41 VLS

Launcher Top

PARA. NO: 3.9.1.2

PAGE NO: 4 of 8

CONTRACTOR QUESTION 54: Are metal pans GFE?

GOVERNMENT RESPONSE:

No, Not provided as GFE.

ITEM NO: 243-11-007,

243-11-008 TITLE: Bulkhead Seal Replacement

PARA. NO: 3.1

PAGE NO: 1

CONTRACTOR QUESTION 59:

Paragraph 3.1 please provide contact information for the field service technical representative.

GOVERNMENT RESPONSE:

009-90 does not require the government to establish the OEM for the Bidder. It is the Bidders responsibility to submit the OEM in report specified in 009-90 PARA 3.1.5 and request approval to use OEM Rep.

ITEM NO: 514-11-004

TITLE: FCU AND FCA

OVERHAUL

PARA. NO: 1

PAGE NO: 1

CONTRACTOR QUESTION 60:

Equipments ID on 1.3.2, 1.3.10 , 1.3.11 , 1.3.13 , 1.3.14 and 1.3.15 were not found on the drawings listed on the spec as per these equipments.

Please provide the correct drawings or advise.

GOVERNMENT RESPONSE:

Correction provided in CG63 Errata 3. Agree with contractor equipment ID will be address on corrected references.

ITEM NO: 514-11-005

TITLE: FCU AND FCA

OVERHAUL

PARA. NO: 1

PAGE NO: 1

CONTRACTOR QUESTION 61:

ID no.1.3.2 and 1.3.5 has the same equipment description.

Please verify and advise.

GOVERNMENT RESPONSE:

Correction provided in CG63 Errata 2. 1.3.2 and 1.3.5 are duplicates. There should one FCA for each of the spaces identified in 1.2. Delete Para 1.3.5 because this is a duplicate of 1.3.2.

ITEM NO: 854-11-001

TITLE: Towing Service Provide

PARA. NO: 3.1-3.8.1

PAGE NO: 1

CONTRACTOR QUESTION 62:

Please confirm that this item does not apply if the ship does not to leave its home port of San Diego.

GOVERNMENT RESPONSE: Confirmed. This is an out of port item.

ITEM NO: 980-11-004

TITLE: Industrial Hygienist Provide

PARA. NO: 3.1-3.1.2

PAGE NO: 1

CONTRACTOR QUESTION 63:

1. What is the intent of this item?

2. Please provide specific work scope for this individual.

3. Is it the Government’s intent to have a full time hygienist assigned to this work item? If so please modify specification to reflect this.

Please clarify.

GOVERNMENT RESPONSE:

INDUSTRIAL HYGENIST SERVICES REQUIRED FOR

THE DURATION OF THE EDSRA 18 AVAILABILITY

REQUIRED BY STANDARD ITEMS. THIS WORK WILL

BE DIRECTED BY SEA 21 FOR EXECUTION.

ITEM NO: 992-11-001

TITLE: Temporary Service Provide

PARA. NO: 3.3.17.2-

3.17.5

PAGE NO: 7

CONTRACTOR QUESTION 64:

Please identify the space locations of the five spaces that need temporary AC for bidding purposes.

GOVERNMENT RESPONSE:

Additional 5 spaces are not identified at this time. Will be known once ship is close to testing of Aegis and Combat systems.

ITEM NO: 992-11-004

TITLE: Fuel Assistance and Towboat Service

PARA. NO: 3..2-3.3

PAGE NO: 1

CONTRACTOR QUESTION 65:

The fuel depot in San Diego does not allow contractor supplied barges to enter or tow their barges.

Please advise.

GOVERNMENT RESPONSE:

Additional 5 spaces are not identified at this time. Will be known once ship is close to testing of Aegis and Combat systems.

ITEM NO: 992-11-006

TITLE: Crew Transportation Service

PARA. NO: 3.1-3.1.3

PAGE NO: 1

CONTRACTOR QUESTION 66:

1. The crew size requirement to be transported for this specification appear to be excessive compared to other recent crew transport specifications. Please review and advise.

2. Recommend transporting the crew between 0500 to 0700 and 1500 to 1700 hours to optimize number of trips.

Please review and advise.

GOVERNMENT RESPONSE:

360 is a valid crew size.

ITEM NO: 234-11-004 and 234-11-005 TITLE: MPGT Engine Install

PARA. NO: 3.2-3.3

PAGE NO: 1

CONTRACTOR QUESTION 67:

Paragraph 3.2-3.2.1 please provide contact information for the field service technical representative.

Paragraph 3.3 please confirm that the technicians in this paragraph will be government provided, if not please supply contact information for these technicians.

GOVERNMENT RESPONSE:

NAVSEA Technical Representative shall be provided by the Regional Maintenance Center. Port Engineer/ Project Manager to provide more information once known where ships availability will be completed.

ITEM NO: 980-90-018

TITLE: Ship Alt 91244 k Support

PARA. NO: 3.1-3.2,3.4-

3.5

PAGE NO: 1

CONTRACTOR QUESTION 68:

Please quantify the requirements paragraphs 3.1-3.2, 3.4-3.5

GOVERNMENT RESPONSE:

Work Item cancellation addressed ERRATA 2 CG 63

ITEM NO: 980-90-019

TITLE: Aegis Modernization

PARA. NO: 3.1-

3.1.3,3.3.13.3.6,3.3.8, 3.3.10,3.3.11

PAGE NO: 1-2

CONTRACTOR QUESTION 69:

Please quantify the requirements in paragraphs 3.1-3.1.3,3.3.13.3.6,3.3.8, 3.3.10,3.3.11

GOVERNMENT RESPONSE:

Addressed ERRATA 2 CG 63

ITEM NO: 980-90-017

TITLE: Combat Systems Mod Support

PARA. NO: 3.1-3.2,

3.4,3.5,3.7.1-3.7.4,3.7.8

PAGE NO: 1-3

CONTRACTOR QUESTION 70:

Please quantify the requirements in paragraphs 3.1-3.2, 3.4,3.5,3.7.1- 3.7.4,3.7.8

GOVERNMENT RESPONSE:

Addressed ERRATA 1 CG 63

ITEM NO: 993-11-002

TITLE: Ship's Force Warehouse

PARA. NO: 3.2

PAGE NO:

CONTRACTOR QUESTION 71: Paragraph 3.2 calls for 2 each qualified logistician to assist ships force. For estimating purposes how many hours of assistance will be required?

GOVERNMENT RESPONSE:

Addressed ERRATA 1 CG 64. 8 hour days, 5 days a week for length of Avail.

ITEM NO: 992-11-006

TITLE: Messing and Berthing Barge Tow

PARA. NO:

PAGE NO:

CONTRACTOR QUESTION 72: For estimating purposes, provide size of barge, YRBM or APL? Where will it be pick up at? Where will it be returned to?

GOVERNMENT RESPONSE:

Estimate for an APL. Picked up and returned to NAVSTA.

73 CG 64

ITEM NO: 991-12-001

TITLE: Temporary Scaffolding

PARA. NO:

PAGE NO:

CONTRACTOR QUESTION 73: How many days does the Staging need to be in place in each space? Is there a scheduled, start and completion date for each space?

GOVERNMENT RESPONSE: Addressed ERRATA 4 CG

64. Added 60 days.

ITEM NO: 150-90-002 -

TITLE: ShipAlts

PARA. NO:

PAGE NO:

CONTRACTOR QUESTION 74: The 150-90-002 - 008 ShipAlts list a large number of Rev A references to accomplish work IAW. The References provided on CD are Not Rev A. Please review and provide correct references.

GOVERNMENT RESPONSE:

Addressed in Reference Disk dated 11/21/17

ITEM NO: 992-31-001

TITLE: Pumping and Gas Free

PARA. NO:

PAGE NO:

CONTRACTOR QUESTION 75: 116 tanks, spaces and bilges are to be dealt with. Paragraph 3.1.7 says to remove up to 38,500 gallons of additional fluid from compensating and adjacent tanks listed in 1.2. Paragraph 3.3 specifies to pump tanks containing petroleum products to the low suction level of the tank and paragraph 3.4.2 specifies to remove an additional 5,000 gallons of petroleum fluids generated by the Navy after the initial certifications are complete. There is no initial amount of gallons ID to remove. For estimating proposes, please provide number of gallons of Compensating Water and number of gallons of Fuel/Oil products to be removed.

GOVERNMENT RESPONSE:

Tank capacity references are to be used in estimating amounts to be removed.

76 CG 64

ITEM NO: 466-90-001

ShipAlt CG47-76231K Sonar Stave Cable Connectorization Modifications; accomplish

PARA. NO: 3.1

PAGE NO:1

CONTRACTOR QUESTION 76: This ShipAlt changes all (576 each) transducers; 80 each trunk cables and 72 each stave cables, normally the transducers, cables and other kitted materials are provided as GFM. Paragraph 5 does not list any GFM, will the government be providing any materials.

GOVERNMENT RESPONSE: Addressed ERRATA 3 CG 64.This applies to work item 463-90-001: Errata 3 CG 64 includes a LAR (added to work item) correcting material concerns.

77 CG 64

ITEM NO: 437-21-002

TITLE: TDR System

PARA. NO:

PAGE NO:

CONTRACTOR QUESTION 77: Per Standard Calibrations they are not the OEM and cannot fulfill the requirements of 009-90 and cannot accomplish paragraph 3.2. Please review item and provide possible source.

GOVERNMENT RESPONSE: Addressed ERRATA 4 CG

64. Item corrected to include OEM.

ITEM NO: 437-21-003

TITLE: Oily Waste Drain TLI System

PARA. NO:

PAGE NO:

CONTRACTOR QUESTION 78: Please review this item, it refers to non existing paragraphs.

GOVERNMENT RESPONSE:

Addressed ERRATA 2 CG 64

ITEM NO: 612-11-001

TITLE: Ladder, Liferail, and Guardline; replace

PARA. NO: 3.2

PAGE NO: 2 of 12

CONTRACTOR QUESTION 79: Para 3.2 states to fab, fit and install new the following parts for section of missing lifeline identified in 1.3.1 at locations listed in 1.2.1. Quantities in body of item and the identification in Para 1.3.1 do not match. Please review and advise.

GOVERNMENT RESPONSE:

Addressed ERRATA 2 CG 64

ITEM NO: 612-11-001

TITLE: Ladder, Liferail, and Guardline; replace

PARA. NO: 3.2.2

PAGE NO:

CONTRACTOR QUESTION 80: Para 3.2.2 states to fab, fit, and install new each guardrail listed in 1.3.3 and 1.3.4 in locations listed in 1.2.2 through 1.2.7.

Para 1.3.3 has a quantity of (3) kevlar lifelines. Para 1.3.4 has a quantity of (32) nylon guardlines. Para 1.2.2 through 1.2.7 is all over the ship. What quantities are we to work to? If it is (3) kevlar lifelines, what specific locations are needed?

GOVERNMENT RESPONSE:

Addressed ERRATA 2 CG 64 to remove unneeded work discrepancies

ITEM NO: Missing 4720's

TITLE:

PARA. NO:

PAGE NO:

CONTRACTOR QUESTION 81: 4720's are missing for the following items:

631-80-001, 150-90-004, 150-90-003 & 150-90-005. Please provide.

GOVERNMENT RESPONSE:

Addressed in Reference Disk dated 11/21/17

ITEM NO: 980-90-005

TITLE: ShipAlt CG47- 81251.03K, BFTT Aegis Hardware Build 4.2 Upgrade, Alteration Installation Team (AIT) Support Services; provide, OPTION ITEM

PARA. NO:

PAGE NO:

CONTRACTOR QUESTION 82: Para 3.1 States “Receive, Inventory, Bag, Tag, Store and turn over to installing activity, material listed in Attachment B, when directed by the SUPERVISOR. SUPERVISOR will provide notification 5 days prior to issuance”

QUESTION: Will attachment B to this specification be provided to identify the equipment to Receive, Inventory, Bag, Tag, Store and turn over to installing activity?

GOVERNMENT RESPONSE:

Attachment B should read "Ref 2.3". Addressed ERRATA 2

CG 63

ITEM NO: 415-90-001

TITLE: ShipAlt CG47- 86539.03K, Common Data Link Management System Installation; accomplish

PARA. NO:

PAGE NO:

CONTRACTOR QUESTION 83: Paragraph 3.1, states “Accomplish the requirements of 2.2 through 2.6, and applicable portions of SA 86539.03.3K in

2.7 and 2.8 including all general, local, special, test and rip-out notes, using 2.9 through 2.12 for guidance”.

• Contractor notes that upon review of the reference disc’s provided that the following references were not included.

*Reference 2.5, drawing 441-8735455, ShipAlt CG47-86539.03K PEO C41 C2P Tech Refresh Mod to Wire Connection List *Reference 2.6, drawing 441-8735456, ShipAlt CG47-86539.03K PEO C41 C2P Tech Refresh Mod to Blk Wrg Diag w/ Pre-Fab *Reference 2.7, drawing 401-8416998 Rev A, CG47 Class Integrated Design Drawing for CG63 Combat Info Center MOD to ARR (EDSRA18) *Reference 2.8, drawing 401-8416999, CG47 Class Integrated Design Drawing for CG63 Computer Central MOD to ARR (EDSRA18)

QUESTION: Can the Customer provide the above missing references to all bidders?

GOVERNMENT RESPONSE:

Reference 2.5 441-8735455 is not required. This reference and it's requirements will be deleted via ERRATA 2 CG 63.

Reference 2.6 441-8735456 and reference 2.7 401-8416998 and reference 2.8 401-8416999 will be provided.

Addressed ERRATA 2 CG 63

ITEM NO: 555-11-004

TITLE: SOPV AFFF

Modifications; accomplish

PARA. NO:

PAGE NO:

CONTRACTOR QUESTION 84: Paragraph 3.4, states “Accomplish repairs of SOPV the material in 3.3.1 and using 2.2 and Chapter 6 of 2.5 for guidance.

• Contractor notes that there is no paragraph 3.3.1 included in this specification as written.

• Contractor notes that paragraph 3.4 appears not to provide accurate requirement to estimate and or execute.

QUESTION: Can the Customer provide clarification as the disparities identified above regarding the requirements of paragraph 3.4 and missing paragraph 3.3.1, and will an Amendment be issued providing a revised specification be issued?

GOVERNMENT RESPONSE:

Correction provided in CG63 Errata 3. Revised paragraph

3.4 via Errata 3 work spec.

ITEM NO: 110-11-006

TITLE: Shell Plating, Crew Berthing; replace

PARA. NO:

PAGE NO:

CONTRACTOR QUESTION 85: Paragraph 3.8, states “Accomplish the Requirements of 009-32 of 2.1 to include Table 4, Line 8A, Columns A & B for area located in 1.2.3”.

• Contractor notes there is no Table 4, Line 8A in 009-32 STD ITEMS FY-18 Ch.1 But there is in 009-32 STD ITEMS FY-18.

QUESTION: Can the Customer please advise as to the correct FY STD ITEMS are to be used and or if a correct Table and Line will be issued?

GOVERNMENT RESPONSE:

Correction provided in CG63 Errata 2. Para 3.8 should state "Accomplish the Requirements of 009-32 of 2.1 to include Table 3, Line 7, Columns A, B, and D for area located in 1.2.3". STD ITEMS FY-18 Ch-1

ITEM NO: Multiple

TITLE:

PARA. NO:

PAGE NO:

CONTRACTOR QUESTION 86:

Work items 123-11-006, 123-12-001, 123-21-002, 123-21-003, 631-13-005 reference item 123-10-001; however, item 123-10-001 is not included in the work specs. Please advise.

Work item 150-90-001 references item 123-10-003; however, item 123-10-003 is not included in the work specs. Please advise.

GOVERNMENT RESPONSE:

Should be Work item 992-31-001 vice 123-10-001.

Addressed ERRATA 2 CG 64.

ITEM NO: 437-21-003

TITLE: Oily Waste Drain Tank Level Indicator (TLI) System; repair

PARA. NO: 3.1.1

PAGE NO: 1

CONTRACTOR QUESTION 87: Paragraph 3.1.1 states to Remove existing, fit, and install new parts listed in 5.1.1 and 5.1.2. Paragraph 5.1.2 does not exist. What are these new parts listed in

5.1.2. Please clarify.

GOVERNMENT RESPONSE:

Addressed ERRATA 2 CG 64.

ITEM NO: 437-21-003

TITLE: Oily Waste Drain Tank Level Indicator (TLI) System; repair

PARA. NO: 3.1.2

PAGE NO: 1

CONTRACTOR QUESTION 88: Paragraph 3.1.2 states to Remove existing, fit, and install new parts listed in 5.1.3 through 5.1.10. Paragraphs 5.1.3 through 5.1.10 do not exist. What are these new parts listed in the missing paragraphs 5.1.3 through 5.1.10. Please clarify.

GOVERNMENT RESPONSE:

Addressed ERRATA 2 CG 64.

ITEM NO: 150-11-001

TITLE: Superstructure Repairs

PARA. NO:

PAGE NO:

CONTRACTOR QUESTION 89: Paragraph 3.3.5 & 3.3.6 gives the size of Flat Bar to be renewed, but does not provide the footage to be renewed. Please review.

GOVERNMENT RESPONSE: Addressed ERRATA 2 CG 64.

ITEM NO: J-7

TITLE:

PARA. NO:

PAGE NO:

CONTRACTOR QUESTION 90: Items 168-12-004, 437-21-003, 514-11-005, 533-11-003, 551-31-003, 631-90-001, 980-11-002 & 980-11-027 are in the package, but not listed on the Pricing Sheet J-7. If these items belong, please add to J-7

GOVERNMENT RESPONSE:

Included in the CG 64 Package. Revision of J7 provided.

ITEM NO: J-7

TITLE:

PARA. NO:

PAGE NO:

CONTRACTOR QUESTION 91: The following items are listed on J-7, but there is no work item in the package: 244-11-002, 245-11-008, 261-12-002, 261-12-003, 321-11-001, 423-14-001, 423-90-001, 436-11-010, 437-21-001, 456-01-006, 456-10-002, 472-11-003, 472-11-004, 482-11-001, 505-11-009, 514-11-003, 533-11-002, 551-31-002, 562-11-001, 623-12-003, 631-80-001, 645-11-001, 661-11-001, 751-11-003, 763-11-002, 772-20-001, 980-11-005 & 992-11-003. Please review an advise.

GOVERNMENT RESPONSE:

Revision of J7 provided.

ITEM NO: J-7

TITLE:

PARA. NO:

PAGE NO:

CONTRACTOR QUESTION 92: Item 244-11-002 is on J-7 two places with different titles. Please review and advise.

GOVERNMENT RESPONSE:

Revision of J7 provided.

ITEM NO: 130-11-003

TITLE: Trimettallic Aircraft Securing Fittings

PARA. NO:

PAGE NO:

CONTRACTOR QUESTION 93: Paragraph 3.5 calls for Type 5 nonskid and paragraph 3.5.1 calls for Peel & Stick non-skid. Please clarify which is to be installed.

GOVERNMENT RESPONSE:

Addressed ERRATA 2 CG 64.

ITEM NO: 411-90-001

TITLE: ShipAlt 78510.03K

PARA. NO: 4.2

PAGE NO:

CONTRACTOR QUESTION 94: In reference to paragraph 4.2, please confirm that the AIT will be securing all equipment to foundations to include bolting, shimming and torqueing if required. If not, please list the equipment that the contractor is to secure.

GOVERNMENT RESPONSE:

4.2 States mounting of equipment to ALL foundations

within the work item. References list all foundations and equipment to be installed.

ITEM NO: 463-90-001

ShipAlt CG47-76231K Sonar Stave Cable Connectorization Modifications; accomplish

PARA. NO:

PAGE NO:1

CONTRACTOR QUESTION 95: There is no 4720/3 Material Summary Report listed as a reference in section 2 of the spec item.

GOVERNMENT RESPONSE:

Addressed ERRATA 2 CG 64.

ITEM NO: 463-90-001

TITLE: ShipAlt CG47- 76231K Sonar Stave Cable Connectorization Modifications; accomplish

PARA. NO: 2.2

PAGE NO:

CONTRACTOR QUESTION 96: Ref 2.2 (Dwg 463-8415475 Rev. C, sheet 6, Detail 47-A lists the stuffing tubes as existing for CG68-73. There is no material listed for changeout of the stuffing tubes for CG64. Based on experience the stuffing tubes installed on early CG's are a size 3 pressure proof tubes, where as the new trunk cables to be installed require a size 5 pressure proof tube. Are the stuffing tubes to be replaced as part of this ShipAlt? Who will provide these tubes?

GOVERNMENT RESPONSE:

Note 7 states that ALL incidental material required to accomplish modifications as shown on drawing shall be provided by the installing activity. Note 13 states that transits and stuffing tubes shall be installed as required.

ITEM NO: 463-90-001

TITLE: ShipAlt CG47- 76231K Sonar Stave Cable Connectorization Modifications; accomplish

PARA. NO: 2.2

PAGE NO:

CONTRACTOR QUESTION 97: Ref 2.2 (Dwg 463-8415475 Rev. C, List of Material (LOM) shows items 6-11 connectors but does not show the 4,620 each contact pin part# M39029/70-389 on the LOM, will the contact pins be supplied with the connectors or will contractor be required to supply them?

GOVERNMENT RESPONSE:

Comes as part of the connector, Addressed ERRATA 2 CG 64 to add 4720 reference

ITEM NO: 150-11-001

TITLE: Superstructure Repair; accomplish

PARA. NO: 3.7

PAGE NO: 1 of 5

CONTRACTOR QUESTION 99:

Paragraph 3.3.7 provides direction to "remove existing and install new material listed in 1.3.4 through 1.3.6 at 1.2.8 using 2.9 for guidance." There are no paragraphs 1.3.4 through 1.3.6 in the work item. The only paragraph is 1.3 and is noted as Not Applicable on the work item. Please advise.

GOVERNMENT RESPONSE:

Addressed ERRATA 2 CG 64

ITEM NO: 123-11-004

TITLE: Fuel Oil Tank Top Modification; accomplished

PARA. NO: 2.2

PAGE NO: 1 of 2

CONTRACTOR QUESTION 100:

Please provide a copy of reference 2.2, 83059/CG64/001. GOVERNMENT RESPONSE:

Addressed in Reference Disk dated 12/01/17

ITEM NO: 130-11-003

TITLE: Trimettallic Aircraft Securing Fitting;

replace

PARA. NO: 3.5, 3.5.1

PAGE NO: 1 of 3

CONTRACTOR QUESTION 101:

Paragraph 3.5 calls out Table 2, Line 47 which is type G liquid non-skid.

Paragraph 3.5.1 calls out 009-26 Attachment G which is slip resistant (peel & Stick) Type XI PS. Please clarify type of non-skid to be used.

GOVERNMENT RESPONSE:

Addressed ERRATA 2 CG 64

ITEM NO: 150-90-003

TITLE: ShipAlt CG47-

83506.06 Fatigue &

Sensitization Mod AFT;

accomplish

PARA. NO: 2.13, 2.26,

2.27, 3.17.1 PAGE NO: 1, 2 of 6

CONTRACTOR QUESTION 102:

Paragraph 3.17.1 provides direction to accomplish 009-26 Attachment G (peel and stick) for the accomplishment of 2.13 and 2.14. Should 2.14 (insulation) be

2.27 the weather deck covering drawing?

Please provide a copy of reference 2.26, 83506.06CG64P179.

GOVERNMENT RESPONSE:

Addressed ERRATA 3 CG 64: Reference correction (2.14 to 2.27)

ITEM NO: 150-90-004

TITLE: ShipAlt CG47- 83506.04K, Superstructure Fatigue and Sensitization Modifications (AFT);

accomplish

PARA. NO: 3.14, 3.14.1,

3.15 PAGE NO: 5 of 7

CONTRACTOR QUESTION 103:

Please review the references in the subject paragraphs.

Reference 2.25 should be changed to 2.18 and 2.37 be changed to 2.28.

GOVERNMENT RESPONSE:

Addressed ERRATA 3 CG 64:

Reference correction (2.25 to 2.18, 2.37 to 2.28)

ITEM NO: 411-90-001

TITLE: ShipAlt CG47-

78510.03K AWS:

ACB12/TI12 CIC Display Upgrades (SPLITALT);

accomplish

PARA. NO: 2.29, 2.31,

3.1, 5.3.2 PAGE NO: 1 thru 8

CONTRACTOR QUESTION 104:

Please clarify if 009-78 for PCMS needs to be called out in work item 411-90-

001. Paragraph 3.1 states to use material listed in 2.30, 2.31 and 5.3. Reference

2.31 is the PCMS summary which shows (29 ea.) type 3R tiles being installed in a portion of 2.29. Please advise.

GOVERNMENT RESPONSE:

Addressed ERRATA 3 CG 64: Added 009-78 and reference for pcms installation requirement.

ITEM NO: 452-90-002

TITLE: ShipAlt CG47- 87310.03K, Remove AN/SPS-49 Radar System;

accomplish

PARA. NO: 2.2

PAGE NO: 1 of 3

CONTRACTOR QUESTION 105:

Reference 2.2 references PCMS being in place. Has the PCMS been removed from the mast? There is GFM tiles in the 4720 for this ShipAlt. Should 009-78 be called out for the removal and installation of PCMS tiles after 2.2 is completed?

GOVERNMENT RESPONSE:

Addressed ERRATA 3 CG 64: Added 009-78 and reference for pcms installation requirement.

ITEM NO: 456-90-003

TITLE: ShipAlt CG47-

77614.03K ACB12/TI12

OA Computer Upgrade (SPLITALT); accomplish

PARA. NO: 3.1

PAGE NO: 4 of 8

CONTRACTOR QUESTION 106:

Paragraph 3.1 states to accomplish the applicable portion of 2.20. Reference

2.20 is the PCMS drawing. Without 009-78 called out in the work item, Sht 14 & 150 of Ref 2.20 cannot be accomplished. Recommend including 009-78 into the work item or delete the reference to 2.20.

GOVERNMENT RESPONSE:

Addressed ERRATA 3 CG 64: Added 009-78 and reference for PCMS installation requirement.

ITEM NO: 165-11-002

TITLE: Sonar Dome Rubber Window (SDRW);

inspect

PARA. NO: 2.2

PAGE NO: 1 of 3

CONTRACTOR QUESTION 107:

Please provide a copy of reference 2.2, S9165-AH-MMA-010. GOVERNMENT RESPONSE:

Addressed in Reference Disk dated 12/01/17

ITEM NO: 980-11-002

TITLE: AN/SPY-1B Radar Array Resurface Support;

provide

PARA. NO: 3.4, 3.6

PAGE NO: 2 of 2

CONTRACTOR QUESTION 108:

Please provide a copy of "Attachment A" referred to in paragraph 3.4 and 3.6. GOVERNMENT RESPONSE:

Addressed ERRATA 3 CG 64: Corrected Attachment A.

ITEM NO: 631-21-001

TITLE: Superstructure Preservation;

accomplish(OPTION

ITEM)

PARA. NO: 3.2.1, 3.3,

3.5 PAGE NO: 1 of 2

CONTRACTOR QUESTION 109:

Paragraph 3.2.1 states, "Accomplish the requirements of 009-32 of 2.1, including Table 5, Line 31 (powder coat) for each ventilation screen removed in 3.3." Paragraph 3.3 is a paragraph to accomplish 009-78.

Question 1) 3.2.1- if the vent screens are wrapped and protected in 3.1.2, will the Government provide a list or direction to remove the vent screens?

Question 2) 3.3 - what direction does 009-78 cover? There is no GFM for replacement, 3.5 covers painting areas contained by PCMS. Please clarify if the PCMS tile gets over-coated or removed.

GOVERNMENT RESPONSE:

Addressed ERRATA 3 CG 64: Changed table line to local powdercoating.

ITEM NO: 512-11-006

TITLE: Vent Screen;

replace

PARA. NO: 3.3

PAGE NO: 1 of 2

CONTRACTOR QUESTION 110:

The Fluidized Bed Method of powder coating called out in 3.3 Table 2, Line 35 for the (2 ea.) vent screens is less than 2 SF. Contractor requests the process be changed to traditional powder coating Table 5, Line 31.

GOVERNMENT RESPONSE:

Addressed ERRATA 3 CG 64: Changed table line to local powdercoating.

ITEM NO: 583-11-002

TITLE: Boat Davit; Repair

PARA. NO: 3.5

PAGE NO: 2 of 3

CONTRACTOR QUESTION 111:

The requirements of this paragraph appear to be incomplete. Paragraph states, "Accomplish the requirements of test Note T-2 of 2.3 for testing of newly installed boat davit, in accordance with 2.15 and 2.15, using Table 583.-7 of 2.-for guidance."

Please note the underlined areas of the paragraph and advise.

GOVERNMENT RESPONSE:

Addressed ERRATA 3 CG 64: Corrected reference.

ITEM NO: 641-11-001

TITLE: Officers Habitability and Berthing Enhancement Project (HOFF and BOFF);

accomplish

PARA. NO: 3.9

PAGE NO: 4, 5 of 7

CONTRACTOR QUESTION 112:

Paragraph 3.9 has…