J-6_USS_GETTYSBURG_Milestones_Final_Rev1_FBO.xlsx

XLSX spreadsheet 205 KB Posted

Attached to
USS COWPENS (CG 63) and USS GETTYSBURG (CG 64) Modernization Period (MODPRD) Availabilities
Solicitation number
N00024-18-R-4439
Issued by

About this file

J-6 GETTYSBURG (CG 64) Milestones Rev1

View the file

Other files

Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Exec Milestones

USS GETTYSBURG (CG 64) KEY EVENTS & MILESTONES
Milestone / Key EventOfferor Proposed DateProposed 'A+' value
(Calculated Values)Schedule Constraint
Contract AwardOfferor is not to propose.

Offeror shall assume contract award on or about 16 March 2018 on initial proposals.

Offeror shall assume contract award on or about 6 April 2018 on Final Proposal Revisions.

Vessel AvailableOfferor shall assume "Vessel Available" milestone will occur no earlier than 16 March 2018.
Avail Start at KTR Facility0Offeror shall assume vessel will be available to commence transit to the contractor's facility no earlier than to "Vessel Available" milestone.

Offerors outside the vessels homeport shall propose an Availability start date no less than 60 days from contract award.

Offerors outside the vessels homeport shall propose an Availability start date accounting for vessel preparation and transit duration.

Offerors within the vessels homeport shall propose an Availability start date no less than 15 days from contract award.

Offerors within the vessels homeport shall propose an Availability start date no less than 15 days from "Vessel Available" milestone.

GFM Delivery Offeror is not to propose.

GFM will be delivered incrementally. Offeror should not assume GFM will be delivered prior to 12 May 2017.

10% Availability Complete 31-Dec-99 0 Offeror is not to propose.

Date shall be the mathematically solved 10% point between proposed "Avail Start at KTR Facility" and "KTR Contract Complete" Milestones.

20% Complete - Open and Inspect CFRs Due 31-Dec-99 0 Offeror is not to propose.

Date shall be the mathematically solved 20% point between proposed "Avail Start at KTR Facility" and "KTR Contract Complete" Milestones.

25% CONFERENCE 31-Dec-99 0 Offeror is not to propose.

Date shall be the mathematically solved 25% point between proposed "Avail Start at KTR Facility" and "KTR Contract Complete" Milestones.

Overhauled Equipment installed0Offeror proposed date shall be no less than 259 days before "KTR Contract Complete" milestone.
Complete Shipyard Combat Systems Space Release Turnover #10Offeror proposed date shall be no less than 103 days before "Distributed Systems Restored" milestone.
Complete Shipyard Combat Systems Space Release Turnover #20Offeror proposed date shall be no less than 110 days before "ALO" milestone.
Complete Shipyard Combat Systems Space Release Turnover #30Offeror proposed date shall be no less than 90 days before "ALO" milestone.
Complete Shipyard Combat Systems Space Release Turnover #40Offeror proposed date shall be no less than 77 days before "ALO" milestone.
Complete Shipyard Combat Systems Space Release Turnover #50Offeror proposed date shall be no less than 60 days before "ALO" milestone.
DOCK0Offeror shall propose Dock Date IAW Specification 997-11-001
20% Dock Period Complete - Dock Related Open and Inspect CFRs Due31-Dec-990Offeror is not to propose.

Date shall be the mathematically solved 20% point between proposed Dock and Undock Milestones.

UNDOCK 0

Offeror shall propose Undock Date IAW Specification 997-11-001

Firemain Restored (all repairs, piping mods completed, system filled and pressurized to 100 psi from shore)0Offeror proposed date shall be no later than "UNDOCK" milestone.
CHT system restored0"CHT system restored" must be complete prior to "AC plant restored."
CHW system filled and circulated0"CHT system restored" milestone must be complete prior to the completion of this milestone.
Sea Water cooling sys restored0Must be complete prior to "Distrubuted Systems Restored"" milestone
LP/HP air systems restored and pressurized0"Sea Water cooling sys restored" milestone must be complete prior to the completion of this milestone.
AC plant restored (2 of 4 ready to operate)0"CHW system filled and circulated" milestone must be complete prior to the completion of this milestone.
400 hz converter available0"AC plant restored (2 of 4 ready to operate)" milestone must be complete prior to the completion of this milestone.
Potable Water sys restored and sanitized0Must be complete prior to "Habitability Work Complete" milestone
50% CONFERENCE31-Dec-990Offeror is not to propose.

Date shall be the mathematically solved 50% point between proposed "Avail Start at KTR Facility" and "KTR Contract Complete" Milestones.

Distributed Systems Restored (CS Testing services avalible (FM, CHW, ECW, 60HZ, 400HZ, HP air, LP air available to CS turn over spaces) 0 Offeror proposed date shall be no less than 185 days before "KTR Contract Complete" milestone.

Combat Systems AEGIS Light Off (ALO) 0 Offeror proposed date shall be no less than 168 days before "KTR Contract Complete" milestone.

"Distributed Systems Restored " milestone must be complete prior to the completion of this milestone.

Habitability Work Complete
Commence Crew Move Aboard0Offeror proposed date shall be no less than 98 days before "KTR Contract Complete" milestone.

"ALO" milestone must be complete prior to the completion of this milestone.

75% CONFERENCE 31-Dec-99 0 Offeror is not to propose.

Date shall be the mathematically solved 75% point between proposed "Avail Start at KTR Facility" and "KTR Contract Complete" Milestones.

Fuel ship for HPT 0 Offeror proposed date shall be no less than 91 days before "KTR Contract Complete" milestone.

"Habitability Work Complete / Commence Crew Move Aboard" milestone must be complete prior to the completion of this milestone.

Engineering Plant Production Completion Date (PCD) 0 Offeror proposed date shall be no less than 84 days before "KTR Contract Complete" milestone.

"Fuel ship for HPT" milestone must be complete prior to the completion of this milestone.

Commence Hot Plant Testing 0 Offeror proposed date shall be no less than 84 days before "KTR Contract Complete" milestone.

"PCD" milestone must be complete prior to the completion of this milestone.

Complete Hot Plant Testing 0 Offeror proposed date shall be no less than 49 days before "KTR Contract Complete" milestone.

"Commence Hot Plant Testing" milestone must be complete prior to the completion of this milestone.

LOA Preps (Start) 0 Offeror proposed date shall be no less than 49 days before "KTR Contract Complete" milestone.

"Complete Hot Plant Testing" milestone must be complete prior to the completion of this milestone.

LOA 0 Offeror proposed date shall be no less than 21 days before "KTR Contract Complete" milestone.

"IBS testing (Complete)" milestone must be complete prior to the completion of this milestone.

Dock Trials 0 Offeror proposed date shall be no less than 14 days before "KTR Contract Complete" milestone.

"LOA" milestone must be complete prior to the completion of this milestone.

Fast Cruise 0 Offeror proposed date shall be no less than 13 days before "KTR Contract Complete" milestone.

"Dock Trials" milestone must be complete prior to the completion of this milestone.

Crew Rest Period0
HM&E SEA TRIALS (CSST 1)0Offeror proposed date shall be no less than 7 days before "KTR Contract Complete" milestone.

"Fast Cruise " milestone must be complete prior to the completion of this milestone.

Transit to NAVSTA 0 Offeror proposed date shall be no less than 0 days before "KTR Contract Complete" milestone.

"HM&E SEA TRIALS (CSST 1)" milestone must be complete prior to the completion of this milestone.

KTR Contract Complete0Offeror Shall propose date no later than 24 July 2019.
"Arrive NAVSTA" milestone must be complete prior to the completion of this milestone.24-Jul-19

A+ Dates Rev9

DDG-57 EDSRA 2013 A + DATES
REV917-Apr-13
SUNMONTUEWEDTHUFRISATSUNMONTUEWEDTHUFRISAT
3-Feb-134-Feb-135-Feb-136-Feb-137-Feb-138-Feb-139-Feb-1310-Feb-1311-Feb-1312-Feb-1313-Feb-1314-Feb-1315-Feb-1316-Feb-13
XST to BAE
17-Feb-1318-Feb-1319-Feb-1320-Feb-1321-Feb-1322-Feb-1323-Feb-1324-Feb-1325-Feb-1326-Feb-1327-Feb-1328-Feb-131-Mar-132-Mar-13
123456789101112
3-Mar-134-Mar-135-Mar-136-Mar-137-Mar-138-Mar-139-Mar-1310-Mar-1311-Mar-1312-Mar-1313-Mar-1314-Mar-1315-Mar-1316-Mar-13
Dock
1314151617181920212223242526
17-Mar-1318-Mar-1319-Mar-1320-Mar-1321-Mar-1322-Mar-1323-Mar-1324-Mar-1325-Mar-1326-Mar-1327-Mar-1328-Mar-1329-Mar-1330-Mar-13
2728293031323334353637383940
31-Mar-131-Apr-132-Apr-133-Apr-134-Apr-135-Apr-136-Apr-137-Apr-138-Apr-139-Apr-1310-Apr-1311-Apr-1312-Apr-1313-Apr-13
25% Conf
4142434445464748495051525354
14-Apr-1315-Apr-1316-Apr-1317-Apr-1318-Apr-1319-Apr-1320-Apr-1321-Apr-1322-Apr-1323-Apr-1324-Apr-1325-Apr-1326-Apr-1327-Apr-13
Turnover 1Turnover 2
5556575859606162636465666768
28-Apr-1329-Apr-1330-Apr-131-May-132-May-133-May-134-May-135-May-136-May-137-May-138-May-139-May-1310-May-1311-May-13
Turnover 3#1 SWBD#3 SWBD#2 SWBD
6970717273747576777879808182
12-May-1313-May-1314-May-1315-May-1316-May-1317-May-1318-May-1319-May-1320-May-1321-May-1322-May-1323-May-1324-May-1325-May-13
Turnover 4Turnover 5
8384858687888990919293949596
26-May-1327-May-1328-May-1329-May-1330-May-1331-May-131-Jun-132-Jun-133-Jun-134-Jun-135-Jun-136-Jun-137-Jun-138-Jun-13
2 FO BanksTurnover 6
979899100101102103104105106107108109110
9-Jun-1310-Jun-1311-Jun-1312-Jun-1313-Jun-1314-Jun-1315-Jun-1316-Jun-1317-Jun-1318-Jun-1319-Jun-1320-Jun-1321-Jun-1322-Jun-13
Turnover 750% Conf2 FO BanksUndockVCHT
111112113114115116117118119120121122123124
23-Jun-1324-Jun-1325-Jun-1326-Jun-1327-Jun-1328-Jun-1329-Jun-1330-Jun-131-Jul-132-Jul-133-Jul-134-Jul-135-Jul-136-Jul-13
SW/CCS DKPWFM/AFFF/Halon/LP/HP/ENG Vent/MRG LOLOFSP2 FO BanksPH Dk BA/CHW/AC/Steer
125126127128129130131132133134135136137138
7-Jul-138-Jul-139-Jul-1310-Jul-1311-Jul-1312-Jul-1313-Jul-1314-Jul-1315-Jul-1316-Jul-1317-Jul-1318-Jul-1319-Jul-1320-Jul-13
CRP400HZDIU CalAHSS/JP5FUELING
139140141142143144145146147148149150151152
21-Jul-1322-Jul-1323-Jul-1324-Jul-1325-Jul-1326-Jul-1327-Jul-1328-Jul-1329-Jul-1330-Jul-1331-Jul-131-Aug-132-Aug-133-Aug-13
Hab VentFO Test CompCOMX HPTNAVSSI/67/73AHSS Vent Test
153154155156157158159160161162163164165166
4-Aug-135-Aug-136-Aug-137-Aug-138-Aug-139-Aug-1310-Aug-1311-Aug-1312-Aug-1313-Aug-1314-Aug-1315-Aug-1316-Aug-1317-Aug-13
75% ConfAHSS CalALO
167168169170171172173174175176177178179180
18-Aug-1319-Aug-1320-Aug-1321-Aug-1322-Aug-1323-Aug-1324-Aug-1325-Aug-1326-Aug-1327-Aug-1328-Aug-1329-Aug-1330-Aug-1331-Aug-13
AHSS CertHab T/O
181182183184185186187188189190191192193194
1-Sep-132-Sep-133-Sep-134-Sep-135-Sep-136-Sep-137-Sep-138-Sep-139-Sep-1310-Sep-1311-Sep-1312-Sep-1313-Sep-1314-Sep-13
HPT COMPPCDMove NOBLOA Prep
195196197198199200201202203204205206207208
15-Sep-1316-Sep-1317-Sep-1318-Sep-1319-Sep-1320-Sep-1321-Sep-1322-Sep-1323-Sep-1324-Sep-1325-Sep-1326-Sep-1327-Sep-1328-Sep-13
Fueling/JP5
209210211212213214215216217218219220221222
29-Sep-1330-Sep-131-Oct-132-Oct-133-Oct-134-Oct-135-Oct-136-Oct-137-Oct-138-Oct-139-Oct-1310-Oct-1311-Oct-1312-Oct-13
LOALOALOALOALOA/DTFCSea TrialsSea TrialsSea TrialsEOA

&D

EquipCable Turnover R9

USS MITSCHER DDG-57

DDGM BF Critical Path Equipment/Cable Turnover, Power-up & Test Requirement Schedule

REV9, 17APR13

EquipmentA +DateComments
Turnover 1
SPS-73 ISEA Disconnect SAOP for relocation26-Feb-13
All Power Sources and Terminal Boxes for Equipment in A+45, A+55 & A+64 to also include new and upgraded sources.*4417-Apr-13*To include but not limited to: LC11, 12, 13, 21, 23, 24, 25, 31, 32, 33, 34, 35, 41; PP 3-210-2, 2-299-1, 2-299-2, 01-129-2, 1-268-1, 1-288-1, 2-199-2, 3-219-2, 3-173-3, 4-131-1, 2-199-4, 2-219-1, 1-113-1, 3-116-1, 01-130-0, 1-157-2 as per SIDs.

paul.r.jackson: Tim Gudge:

This is a list of all new or fully upgraded power panels that power 1st-3rd T/O equipment. Some will be removed and put in 4th T/O as they are secondary sources.

GEDMS Mesh B (BSE B1-B10)4417-Apr-13
GEDMS Mesh A BSEs and power cables affecting 1st Turnover IOUs*4417-Apr-13*Mount BSE enclosure and provide J2 connector and cable for IOU power. Fiber not required until MESH A light-off. (BSE A03: J2: 3-210-2-1L-C) (BSE A10: J2: 3-210-2-1L-G) (BSE A04: J2 : LC25-1L-A8)

robert.gudge: robert.gudge:

have to check power source.

IOUs: 31, 32, 34, 42, 72, 824417-Apr-13
USEs 31A, 31B, 32A, 32B, 34A, 34B, 42A, 72A, 82A & All Associated UPS, Relay Enclosures, Junction Boxes, and C/O Switches4417-Apr-13
C-DR Boxes 12, 13, 14, 14A, 15, 15A, 16, 24, 374417-Apr-13Install FDS ITB Modification Kit for the following ITB's; 12, 12A, 13, 13A, 14, 15, 16, 16A, 17, 17A, 25 & 25A.
Turnover 2
UCCs 1 & 25124-Apr-13
RSC DCC, C/O SW & Speaker5124-Apr-13Hold Keyboard, 40" Monitor & Printer for later installation per SMR direction.
RSC Repair 5, C/O SW, Speaker & Access Cut5124-Apr-13Hold Keyboard for later installation per SMR direction.
TIWS (CCS)5124-Apr-13LAN Drop & Power Outlet
IOUs: 73, 74, 83, 84, 945124-Apr-13
GEDMS Mesh A BSEs and power cables affecting 2nd Turnover IOUs*5124-Apr-13*Mount BSE enclosure and provide J2 connector and cable for IOU power. Fiber not required until MESH A light-off. (BSE A09: J2: LC33-1L-H1) (BSE A06: J2: LC25-1L-A12)

robert.gudge: robert.gudge:

have to check power source.

C-DR Boxes 7, 8, 8A, 11, 25, 26, 315124-Apr-13Install FDS ITB Modification Kit for the following ITB's; 7, 7A, 11, 11A, 26, & 26A.
USEs 73A, 74A, 74C, 83A, 83B, 84A, 94A & All Associated UPS, Relay Enclosures, Junction Boxes, and C/O Switches5124-Apr-13
Turnover 3
Electric Plant DIU 1 (Power/Network/Shipside Cabling)6003-May-13
Propulsion DIU 4 (Power/Network/Shipside Cabling)6003-May-13
UCC 36003-May-13
ECs 1A, 1B (Power/Network/Shipside Cabling)6003-May-13
FADC 16003-May-13
RSC Repair 2, C/O SW, Speaker6003-May-13Hold Keyboard for later installation per SMR direction.
TIWS (MER 1)6003-May-13LAN Drop & Power Outlet
RSC CSMC, C/O SW, Speaker6003-May-13Hold Keyboard for later installation per SMR direction.
Fire Detection System ITB Upgrade Electrical Mods & Cabling for IOUs in T/Os 1, 2, and 3.6003-May-13
IOUs: 22, 33, 61, 626003-May-13
GEDMS Mesh A BSEs and power cables affecting 3rd Turnover IOUs*6003-May-13*Mount BSE enclosure and provide J2 connector and cable for IOU power. Fiber not required until MESH A light-off. (BSE A02: J2: (3-210-2-1L-D)

robert.gudge: robert.gudge:

Have to check power source.

robert.gudge: robert.gudge:

have to check power source.

paul.r.jackson: Tim Gudge:

This is a list of all new or fully upgraded power panels that power 1st-3rd T/O equipment. Some will be removed and put in 4th T/O as they are secondary sources.C-DR Boxes 19, 21, 22, 23, 23A6003-May-13Install FDS ITB Modification Kit for the following ITB's; 20, 20A, 22, 23, 23A, 24 & 24A.
USEs 22A, 33A, 61A, 62A & All Associated UPS, Relay Enclosures, Junction Boxes, and C/O Switches6003-May-13
F/O, L/O & CRP valves associated with SCD 71604K, Including electrical hook-up, in MER16003-May-131A/1B F/O Filt/Sep Outlet, #1MRG Pur Suct/Fill, #1CRP Pur Suct/Fill
#1 SWBD and related Load Centers and 1SF Special Frequency SWBD (2-Days)6306-May-13Conduct all tie-ins and install Thermal Monitoring System
#3 SWBD and related Load Centers and 2SF Special Frequency SWBD (2-Days)6508-May-13Conduct all tie-ins and install Thermal Monitoring System
#2 SWBD/1SA and any outstanding work/Final Ringout (2-Days, Ships's 60HZ PWR Secured)6710-May-13Conduct all tie-ins and install Thermal Monitoring System
Turnover 4
All Power Sources & Terminal Boxes for Equipment in A+73, A+83 and A+92*7215-May-13*To include but not limited to: PP 02-167-1, 01-178-2, 2-116-1, 3-173-3, 2-48-1, 2-299-1, 3-258-1, 2-405-2, 1-143-2, 2-282-1, 3-256-2, 3-284-3, 04-154-2, 3-442-2, 3-442-1, 1-157-2, 03-142-2, 03-141-1, 03-154-2, 03-133-1, 03-129-1, 03-132-1, 03-130-1, 3-213-2, 3-255-1 as per SIDs.

paul.r.jackson: Tim Gudge:

This is a list of all new or fully upgraded power panels that feed 4th-6th T/O equipment. Some will be added from the list in 1st T/O.

Electric Plant DIUs 2 & 3 (Power/Network/Shipside Cabling)7215-May-13
Propulsion DIU 5 (Power/Network/Shipside Cabling)7215-May-13
UCC 47215-May-13
RSC Repair 3, C/O SW, Speaker7215-May-13Hold Keyboard for later installation per SMR direction.
ECs 2A, 2B (Power/Network/Shipside Cabling)7215-May-13
FADCs 2 & 37215-May-13
TIWS (MER 2)7215-May-13LAN Drop & Power Outlet
Aft Steering Unit (ASU)7215-May-13
Local Control Steering Units (LCUs 1 - 4)7215-May-13
IOUs: 11, 13, 14, 41, 51, 817215-May-13
C-DR Boxes 1, 10, 17, 27, 28, 28A, 30, 33, 34, 35, 367215-May-13Install FDS ITB Modification Kit for the following ITB's; 1, 10, 18, 27, 27A, 28, & 30.
USE 11A, 13A, 14A, 41A, 51A, 81A & All Associated UPS, Relay Enclosures, Junction Boxes, and C/O Switches7215-May-13
F/O, L/O & CRP valves associated with SCD 71604K, Including electrical hook-up, in MER27215-May-132A/2B F/O Filt/Sep Outlet, #2MRG Pur Suct/Fill, #2CRP Pur Suct/Fill
Turnover 5
Ship Control Console (SCC)8124-May-13
BCCS8124-May-13
HFS8124-May-13
IBNS Racks 1, 2, including HS Firewall, UPS & C/O Switches8124-May-13
IBNS Radar Rack8124-May-13
Trigger/Video Amp/Nulka Processor8124-May-13
IBNS NAV 1 computer (Pilot House)8124-May-13
IBNS NAV 2 computer (Chart Room)8124-May-13
IBNS NAV 3 computer (CIC)8124-May-13
IBNS NAV 4 computer (CO's Laptop)8124-May-13
SPS-73 SAOP, Ethernet SW, C/O SW & UPS8124-May-13
NAVSSI Inputs to IBNS/SAOP8124-May-13
ELS & LAN Drops/Receptacles8124-May-13
RSC CIC & C/O Switch8124-May-13Hold Keyboard for later installation per SMR direction.
Pilot House IBNS Trainer / RSC8124-May-13Hold Keyboard, Training Monitors, Joystick & Cables for later installation per SMR direction.
IOUs: 21, 23, 53, 71, 91, 938124-May-13
GEDMS Mesh A BSEs and power cables affecting 5th Turnover IOUs*8124-May-13*Mount BSE enclosure and provide J2 connector and cable for IOU power. Fiber not required until MESH A light-off. (BSE A01: J2: (3-210-2-1L-A) (BSE A08: J2: LC33-1L-F) (BSE A07: J2; LC25-1L-A10) (BSE A05: J2: LC25-1L-A11)

robert.gudge: robert.gudge:

Have to check power source.

robert.gudge: robert.gudge:

have to check power source.

paul.r.jackson: Tim Gudge:

This is a list of all new or fully upgraded power panels that feed 4th-6th T/O equipment. Some will be added from the list in 1st T/O.C-DR Boxes 4, 6, 5, 5A, 9, 18, 20, 328124-May-13Install FDS ITB Modification Kit for the following ITB's; 2, 4, 5, 6, 8, 8A, 9, 19, 19A, 21, & 21A.
Oil Lab PC (SCD 70403K)8124-May-13Includes all cabling, connections, Oil Lab PC, C-DR 40-43, SCD 70403K,
2 Fuel banks closed & ready to test (any two from groups 1 through 6)8901-Jun-13Includes requirements of SCD 70403K and 77829K for those tanks (MOVs, XDCRs, Press SWs, Flow Meters, C-DR 40-43, TDRs, cabling, connections)
Turnover 6
Continuous Thermal Monitoring System9204-Jun-13ADACS unit in MER2, including power and all hook-ups
GEDMS Maintenance Group9204-Jun-13
GEDMS Mesh A BSE A1-A10 Light Off9204-Jun-13
Turnover 7
SPS-73 ISEA Connectorize SAOP9810-Jun-13
DVSS - ALL VIROEs, CJBs, Cables (*)9810-Jun-13
IOU: 92 & Associated UPS, Relay Enclosure, Junction Boxes, and C/O Switches9810-Jun-13
C-DR Box 2 & 2A9810-Jun-13
2 Fuel banks closed & ready to test (any two from groups 1 through 6)10618-Jun-13Includes requirements of SCD 70403K and 77829K for those tanks (MOVs, XDCRs, Press SWs, Flow Meters, C-DR 40-43, TDRs, cabling, connections)
CCS Deck COMPLETE11325-Jun-13
Potable Water System, incl Tanks, TBs, MOVs, TLIs & Modified Pump Controllers11426-Jun-13
Ventilation - Engineering, CPS Zone 4, Exhaust & Supply11628-Jun-13E=SS01-150-1, SS01-150-3, ES01-146-1, ES01-146-3, SS2-203-1, ES01-191-1, SS3-251-2, ES01-258-2, SS2-262-2, SS2-270-1, ES01-243-1, ES01-255-2

CPS=SS01-301-2, SS01-305-2, ES01-308-2, ES01-309-2, ES01-308-4

LO Filter Separator Purifier (SCD 76253K)11901-Jul-13
Remaining fuel tank groups closed & ready to test - SCD 70403K COMPLETE12002-Jul-13Includes requirements of SCD 70403K and 77829K for those tanks (MOVs, XDCRs, Press SWs, Flow Meters, C-DR 40-43, TDRs, cabling, connections)
All TLI's not previously turned over, Including Redundant, Radar/TDR and associated TBs, JP-5, all electrical work COMPLETE, SCDs 77829K/77269K COMPLETE12002-Jul-13SCD 77829K, Includes all cabling, C-DR boxes, TBs, etc. from sensor/component to DIU (INCL OW, CRP & MRG due to DIU tie-ins)
Pilot House Deck COMPLETE12305-Jul-13
AHSS Install Complete, Including Vent Mod13113-Jul-13
Digital Indicators SCD 77427 COMPLETE13820-Jul-13Placeholder
(*) Install all DVSS Cameras as directed by PMR
70403Digital Fuel Fill Control System
71604Machinery Control Station/Damage Control Station Upgrade
71605Advanced Galley Mod
71615Digital Video Surveillance System
71726Full IBNS Upgrade
71734Joint Biological Point Detect System
77269Redundant TLI in GEN HD TK
73088Gigabit Ethernet Data Multiplex System
73622H2S Detector System in VCHT Rooms
76034Emer JP5 Fill to #3 GEN HD TK
76253Lube Oil Filter Separator Purifier
76974Moriah WS HW For DDG Mod Plan
77259EM Log Rpl AN/WSN-9(V)1 Digital Hybrid Speed Log (DHYSL)
77427Digital Indicators
77829Radar and TDR TLI's for DFM/JP5/PotWtr

&P

Shipbd Test Major Milestone R9

DDG 57 GEDMS/MCS/IBNS/DVSS/DFC INTEGRATED TEST SCHEDULE
INTERNAL MAJOR MILESTONES - REV9, 19APR13
SystemScheduledRevised (4/17/13)Actual EndA+ Dates
Ship Move to BAEThursday, February 07, 20132/7/13
DOCK SHIP (Tentative)Tuesday, March 05, 20133/5/131
1TURNOVER 1Wednesday, April 17, 20133/15/1344
2TURNOVER 2Wednesday, April 24, 201351
3GEDMS MESH B POWER UP/INITIAL SW LOAD (ISEA)Monday, April 29, 201356
4DFC (LM2500) TRAINING (ISEA)Wednesday, May 01, 201358
7TURNOVER 3Friday, May 03, 201360
6#1/3/2 SWBD/LC/1SF/2SF TIE-IN/CTM INSTALL - 6-11 MAYMonday, May 06, 201363
GEDMS TEMPORARY 3GMG (COMMS AVAILABLE)(ISEA)Wednesday, May 08, 201365
8START FDS HARNESS CHECKS (T/O 1,2,3) (ISEA)Wednesday, May 08, 201365
9TURNOVER 4Wednesday, May 15, 201372
10START FDS INITIAL POWER UP (ISEA)Thursday, May 16, 201373
11MCS PWR UP/EC/MCS SW LOAD (INCL TIWS) (ISEA)Thursday, May 16, 201373
13MCS/EC GRND ISO/SIG VERIFICATION/COLD TESTING(MER1)Saturday, May 18, 201375
14TURNOVER 5Friday, May 24, 201381
16MCS/EC GRND ISO/SIG VERIFICATION/COLD TESTING(MER2)Saturday, May 25, 201382
18START DC SENSOR TESTING (ISEA)Monday, May 27, 201384
19IBNS POWER UP (ISEA)Monday, May 27, 201384
212 FO TANK GROUPS TURNED OVER START TLI/FCS TESTINGSaturday, June 01, 201389
22TURNOVER 6Monday, June 03, 201391
24IBNS SIGNAL VERIFICATION/SW LOAD (ISEA)Wednesday, June 05, 201393
GEDMS MESH A POWER UP (ISEA)Wednesday, June 05, 201393
23TURNOVER 7Monday, June 10, 201398
242 FO TANK GROUPS TURNED OVER CONT' TLI/FCS TESTINGTuesday, June 18, 2013106
UNDOCKMonday, June 03, 2013Thursday, June 20, 2013108
20VCHT (TANKS/PIPING/PUMPS)Friday, June 14, 2013Friday, June 21, 2013109
26SWS SYSTEM (PIPING/PUMPS/MOVs)Tuesday, June 18, 2013Tuesday, June 25, 2013113
DECK IN CCS COMPLETETuesday, June 25, 2013113
POTWTR SYSTEM (PIPING/TANKS/PUMPS/MOVs)Wednesday, June 19, 2013Wednesday, June 26, 2013114
27FM/AFFF/HALON (PIPING/PUMPS/MOVs)Friday, June 14, 2013Friday, June 28, 2013116
28VENT SYSTEM (FUELING/HPT, ENG/CPS-Z4)Wednesday, June 19, 2013Friday, June 28, 2013116
29LP/HP AIR (PIPING/VALVES/COMPRESSORS)Friday, June 21, 2013Friday, June 28, 2013116
30MRG LO SYSTEM (PIPING/MRGs/PUMPS/FILTERS/COOLERS)Saturday, June 22, 2013Saturday, June 29, 2013117
31LO FILTER SEPARATOR PURIFIERSaturday, June 22, 2013Monday, July 01, 2013119
REMAINING FO TANKS TURNED OVER TO TESTTuesday, June 25, 2013Tuesday, July 02, 2013120
32DECK IN PILOT HOUSE COMPLETEFriday, July 05, 2013123
BLEED AIR (PIPING/VALVES)Thursday, June 27, 2013Saturday, July 06, 2013124
33STEERING (RUDDERS/RAMS/HPUs)Thursday, June 27, 2013Saturday, July 06, 2013124
34AC PLANTS / CHILL WATER SYSTEMFriday, June 28, 2013Saturday, July 06, 2013124
EOSS VALIDATION (ISEA)Wednesday, July 03, 2013Sunday, July 07, 2013125
35CPP/CRP (PIPING/SHAFTS/PUMPS/HOPM/OD BOX)Monday, June 24, 2013Sunday, July 07, 2013125
FCS TRAINING FOR SHIPS FORCE (ISEA/NAG)Wednesday, June 26, 2013Monday, July 08, 2013126
DVSS OPERATOR TRAINING (ISEA)Friday, July 05, 2013Monday, July 08, 2013126
36LUBE OIL FILTER SEPARATOR TRAINING (ISEA)Wednesday, June 26, 2013Monday, July 08, 2013126
400HZ AVAILABLETuesday, July 02, 2013Tuesday, July 09, 2013127
DIU CALIBRATIONS COMPLETEFriday, July 05, 2013Friday, July 12, 2013130
AHSS SYSTEM COMPLETE (INCL VENT MOD)Saturday, July 06, 2013Saturday, July 13, 2013131
JP5 (TANKS/TLIs/PIPING/PUMPS/FILTERS)Saturday, July 06, 2013Saturday, July 13, 2013131
37RSC TRAINING (ISEA)Monday, July 01, 2013Monday, July 15, 2013133
38FUEL SHIPWednesday, July 03, 2013Wednesday, July 17, 2013135
TIWS TRAINING (ISEA)Tuesday, July 09, 2013Monday, July 22, 2013140
VENT SYSTEM (HAB, CPS-Z1-3)Thursday, July 18, 2013Thursday, July 25, 2013143
39F/O TESTING COMPLETESaturday, July 13, 2013Saturday, July 27, 2013145
40HOT PLANT TESTING COMMENCEMonday, July 15, 2013Monday, July 29, 2013147
41NAVSSI/IFF/67/73 RADAR AVAILABLE FOR IBNS TESTINGTuesday, July 23, 2013Tuesday, July 30, 2013148
AHSS VENT VELOCITY TESTING (MSR/BIW)Monday, July 15, 2013Wednesday, July 31, 2013149
42AHSS CAL/TESTING/TRAINING (ISEA/OEM)Thursday, August 01, 2013Thursday, August 15, 2013164
AEGIS LIGHT OFFSaturday, August 03, 2013Saturday, August 17, 2013166
43AHSS CERTIFICATION (NHRC)Monday, August 05, 2013Monday, August 19, 2013168
44HAB TURNOVER / MOVE ABOARD COMMENCEThursday, August 08, 2013Thursday, August 22, 2013171
HOT PLANT TESTING COMPLETEWednesday, August 21, 2013Wednesday, September 04, 2013184
46PCDThursday, August 22, 2013Thursday, September 05, 2013185
47SHIP MOVES TO NAVSTAFriday, August 23, 2013Friday, September 06, 2013186
48SHIP LOA PREPMonday, August 26, 2013Monday, September 09, 2013189
MCS OVER THE SHOULDER TRAINING (ISEA ~5 days)Monday, August 26, 2013Monday, September 09, 2013189
IBNS OPERATOR TRAININGTuesday, September 03, 2013Monday, September 16, 2013196
49FUELING / RECEIVE JP5Thursday, September 05, 2013Thursday, September 19, 2013199
IBNS IOS/IBNS OPERATOR TRAINING BUFFERMonday, September 09, 2013Monday, September 23, 2013203
LOAMonday, September 16, 2013Monday, September 30, 2013210
51DOCK TRIALSFriday, September 20, 2013Friday, October 04, 2013214
52FAST CRUISESaturday, September 21, 2013Saturday, October 05, 2013215
53SEA TRIALSTuesday, September 24, 2013Tuesday, October 08, 2013218
IBNS TRAINING UNDERWAYTuesday, September 24, 2013Tuesday, October 08, 2013218
54END OF AVAILFriday, September 27, 2013Friday, October 11, 2013221
55FINAL SOFTWARE LOADPost Sea Trials
56TLI TESTING (FUELING AT SEA)Post Sea Trials
FOLLOW-ON IBNS MAINTENANCE TRAINING (TBD)Post Sea Trials

GEDMS Checklist

DDG61 GEDMS CHECKLIST
BSEBSEIOUC-DRNEWUSE-AUSE-B
A1Weight RmB1Supply Strm 41130ET Shop11A
A2DC LockerB2Crew 5132828ALoad Center 113A
A3PW 1-254-6-LB3Supply Support1427CO PW 02-154-1-L14A
A4PW 1-174-01-LB4Pwr Convers Rm2118Supply Strm 3
A5CSMCB5Crew 22221EM Shop22A
A6PW 1-78-01-LB6Fwd IC2320PW 2-338-1-L
A7SonarB7AUX 13112 & 13MER 231A31B
A8Crew 1B8Supply Strm 13216CCS32A32B
A9MER 1B9Crew 4332323ADC Locker33A
A10Crew 3B10Crew 63437MER 234A34B
4117Aft IC41A
4224CSER 342A
511Fwd IC51A
5355ATR 2-116-1-T
5431MER 154A
6122Rep 361A
6219Aft Steering62A
719Radio
7215Rep 572A
7326CSMC73A
7411MER 174A74C
8110CSER 281A
821414AOPS Office82A
8388AAux 183A
8425Admin84A
916GSE Shop/Gage Cal
9222ASonar 3
934CSER 1
947Sec Force Locker94A
DELETED:IOU 12 / C-DR29 IOU 52 / C-DR3

Tota # of USE = 26

ALO CRS

USS OSCAR AUSTIN DDG79 FY18 DMP AEGIS Light Off Compartment Release Schedule
COMPARTMENT NUMBERCOMPARTMENT NAMEMSR turnover to AITDateA = SOA8-Jan-18SUPPORT SERVICES: Gray Fill Indicates Services Required
60 Hz400 HzA/CECWChill WaterFire MainDry AirHP AirLP Air
4-94-0-CIC & Gyro Room #1 (FWD)15815-Jun-18932073-Aug-18
3-300-0-CIC & Gyro Room #2 (AFT)15815-Jun-18932073-Aug-18
03-128-0-CRadar Room #120027-Jul-186622117-Aug-18
06-157-0-TMast and Access Trunk22117-Aug-187023531-Aug-18
03-142-0-CRadar Room #22073-Aug-186323531-Aug-18
2-53-1-CCSER #12073-Aug-186323531-Aug-18
2-126-2-CCSER #219320-Jul-18622416-Sep-18
1-300-0-CCSER #319320-Jul-18622416-Sep-18
1-126-0-CCombat Information Center19320-Jul-18622416-Sep-18
05-131-0-QDirector Equipment Room #122824-Aug-18582416-Sep-18
2-50-2-CSonar Control Room22117-Aug-18582416-Sep-18
1-18-0-QSonar Equipment Room #122117-Aug-184222824-Aug-18
2-18-0-QSonar Equipment Room #222117-Aug-184222824-Aug-18
3-18-0-QSonar Equipment Room #322117-Aug-184222824-Aug-18
01-130-2-CSSES2427-Sep-18462416-Sep-18
2-220-1-QSNAP II Computer Room (LAN Room)18613-Jul-182522117-Aug-18
03-128-1-QSPY Array Room #1 (FWD/STBD)2427-Sep-182522117-Aug-18
03-128-2-QSPY Array Room #2 (FWD/PORT)2427-Sep-182522117-Aug-18
03-158-3-QSPY Array Room #3 (AFT/STBD)2427-Sep-182522117-Aug-18
03-158-2-QSPY Array Room #4 (AFT/PORT)2427-Sep-182522117-Aug-18
01-130-0-QCombat Systems Maintenance Central23531-Aug-182522117-Aug-18
2-126-1-CCommunications Center20027-Jul-183923531-Aug-18
3-126-2-QPower Supply/Conversion Room2427-Sep-1892073-Aug-18
3-319-0-QPower Conversion Room2427-Sep-1892073-Aug-18
4-42-0-QSonar Cooling Equipment Room2427-Sep-1892073-Aug-18
4-126-0-EAuxiliary Machinery Room #12427-Sep-1892073-Aug-18
1-78-1-QVLS Fan Room fwd24914-Sep-182822824-Aug-18
1-78-2-QVLS Fan Room fwd24914-Sep-182822824-Aug-18
3-362-0-QVLS Fan Room aft24914-Sep-182822824-Aug-18
04-130-0-CPilot House22824-Aug-182322824-Aug-18
2-338-0-MVLS Magazine #2 (AFT)2427-Sep-182222824-Aug-18
2.5-78-0-MVLS Magazine #1 (FWD)2427-Sep-182222824-Aug-18
02-112-0-QCIWS Workshop #12427-Sep-181422117-Aug-18
2-153-2-CTomahawk Equipment Room22117-Aug-181422117-Aug-18
03-142-1-CCSER #42427-Sep-18722117-Aug-18
04-150-0-CChart Room (w/4)24914-Sep-18722117-Aug-18
03-142-2-QElectric Load Center #125621-Sep-182123531-Aug-18
01-274-1-CRadar Room #323531-Aug-182123531-Aug-18
03-112-0-CCIWS Control Room #12427-Sep-182123531-Aug-18
1-46-0-M5"/54 Loader Drum & Fan Room2427-Sep-182123531-Aug-18
2-458-0-QMFTA Winch Room25621-Sep-181322824-Aug-18
2-157-1-CRadio Transmitter Room25621-Sep-181122824-Aug-18
01-300-0-QCIWS Wpn & Avn Ord Eqpt Wks25621-Sep-181122824-Aug-18
02-299-0-CCIWS Control Room#225621-Sep-181122824-Aug-18
1-314-0-CCSER 3 Annex2427-Sep-18212416-Sep-18
1-268-0-CCCS (VLS Alarms)24914-Sep-18723531-Aug-18
Fwd 03 lvl, Aft 05 lvlAN/SPY-1 Antenna Arrays25621-Sep-18023531-Aug-18
04-272-0-QDirector Equipment Room #225621-Sep-18023531-Aug-18
03-282-0-QDirector Equipment Room #325621-Sep-18023531-Aug-18
1-97-2-QVLS Service Interface Room (FWD)25621-Sep-18023531-Aug-18
02 LVL FR 338-370Missile Deck (AFT)25621-Sep-18023531-Aug-18
01 LVL FR 78-110Missile Deck (FWD)25621-Sep-18023531-Aug-18
01-(46-78)-0-M5"/54 CAL Gun Mount (MT 51)25621-Sep-18023531-Aug-18
06-150-0/DeckFCS Director #125621-Sep-18023531-Aug-18
05-280-0/DeckFCS Director #225621-Sep-18023531-Aug-18
04-292-0/DeckFCS Director #325621-Sep-18023531-Aug-18
01-(247-257)SVTT (STBD)25621-Sep-1802416-Sep-18
01-(240-250)SVTT (PORT)25621-Sep-1802416-Sep-18
2-450-1-QNIXIE Room25621-Sep-1802416-Sep-18
02-(200-220)-1Decoy Launchers (STBD)25621-Sep-1802416-Sep-18
02-(200-220)-2Decoy Launchers (PORT)25621-Sep-1802416-Sep-18
02-(220-237)NULKA Launchers (PORT)25621-Sep-1802416-Sep-18
02-(220-237)NULKA Launchers (STBD)25621-Sep-1802416-Sep-18
03-(142-158)-3EW Array SLQ-32 (STBD)25621-Sep-1802416-Sep-18
03-(142-158)-4EW Array SLQ-32 (PORT)25621-Sep-1802416-Sep-18
03-(112-128)-0CIWS (MT 21) FWD25621-Sep-1802416-Sep-18
02-(300-316)-0CIWS (MT 22) AFT25621-Sep-1802416-Sep-18
2-442-6-QBathythermograph Room25621-Sep-1802416-Sep-18
0 1/2-28-0-QDome Equipment Room25621-Sep-1802416-Sep-18
1-304-2-MTorpedo, Missile & Rocket Mag25621-Sep-1802416-Sep-18
01-110-3-QFan Room PZ #122420-Aug-1820027-Jul-18
01-126-3-QFan Room PZ #2

Mike Kraft: Mike Kraft:

supply AUX 1 fan SS 01-150-122420-Aug-1820027-Jul-18
01-158-0-QFan Room PZ #222420-Aug-1820027-Jul-18
01-190-1-QFan Room PZ #222420-Aug-1820027-Jul-18
01-200-2-QFan Room PZ #2

Mike Kraft: Mike Kraft:

supplies MER 1 fan SS 2-203-122420-Aug-1820027-Jul-18
01-240-01-QFan Room PZ #3

Mike Kraft: Mike Kraft:

supply for MER2 (fans SS 262-2 and SS 2-270-1) and AUX 2 (SS 3-251-2)22420-Aug-1820027-Jul-18
01-300-2-QFan Room

Mike Kraft: Mike Kraft:

Aft VCHT supply fan 4-330-1 ?22420-Aug-1820027-Jul-18
01-338-3-QFan Room

Mike Kraft: Mike Kraft:

supplies #3GTG and aft steering Mike Kraft: Mike Kraft:

supply AUX 1 fan SS 01-150-1 Mike Kraft: Mike Kraft:

supplies MER 1 fan SS 2-203-1 Mike Kraft: Mike Kraft:

supply for MER2 (fans SS 262-2 and SS 2-270-1) and AUX 2 (SS 3-251-2)22420-Aug-1820027-Jul-18
01-338-4-QFan Room22420-Aug-1820027-Jul-18
03-142-3-QFan Room22420-Aug-1820027-Jul-18
03-142-4-QFan Room22420-Aug-1820027-Jul-18
03-152-2-QFan Room22420-Aug-1820027-Jul-18
2-42-2-QFan Room22420-Aug-1820027-Jul-18
2-430-1-QFan Room22420-Aug-1820027-Jul-18
3-164-2-QFan Room22420-Aug-1820027-Jul-18

Conf day calc

34787174260
KTR days2025%50%75%

CS Turnovers USS GETTYSBURG CG 64 FY18 EDSRA Combat Systems (CS) Turnovers

Offeror proposed date shall be no less than X days before Completion milestone.MSR/AIT Completion milestone
COMPARTMENT NUMBERCOMPARTMENT NAME
COMBAT SYSTEMS TURNOVER #1 (MSR to AIT)
2-127-0-CIC & GYRO RM #1 (FWD)103Distrubited Systems Restored
3-382-0-CIC & GYRO RM #2 (AFT)103Distrubited Systems Restored
01-138-0-CCOMPUTER CENTRAL103Distrubited Systems Restored
02-138-0-CCOMBAT INFO CENTER103Distrubited Systems Restored
02-174-0-CSONAR CONTROL RM103Distrubited Systems Restored
1-159-0-QC/S MAINT CENTRAL103Distrubited Systems Restored
2-236-0-QAEGIS COOLING RM #1 (C&D SKID)103Distrubited Systems Restored
3-382-2-QAEGIS COOLING RM #2 (SPY SKID)103Distrubited Systems Restored
5-220-0-EAMR 1 (UPPER DK) (SPY SKID)103Distrubited Systems Restored
5-220-0-EAMR 1 (UPPER DK) 400HZ103Distrubited Systems Restored
3-393-4-Q400 HZ CONV RM103Distrubited Systems Restored
03-220-0-QEW EQUIP COOLING RM (EW SKID)103Distrubited Systems Restored
4-58-0-QDOME EQUIP RM (SONAR SKID)103Distrubited Systems Restored
1-28-0-QSONAR RM #1103Distrubited Systems Restored
2-28-0-QSONAR RM #2103Distrubited Systems Restored
3-28-0-QSONAR RM #3103Distrubited Systems Restored
4-34-0-QSONAR RM #4103Distrubited Systems Restored
2-220-0-QSONAR RM #5103Distrubited Systems Restored
5-260-0-EAUX 2 (SPY SWS PUMP)103Distrubited Systems Restored
02-220-0-CRADIO CENTRAL103Distrubited Systems Restored
5-138-0-EPUMP RM # 1 (SPY SWS PUMP)103Distrubited Systems Restored
COMBAT SYSTEMS TURNOVER #2 (MSR to AIT)
03-224-0-CELEC WARFARE RM110ALO
04-140-1-CAEGIS RADAR RM #1110ALO
03-138-1-CAEGIS RADAR RM #2110ALO
01-220-0-CAEGIS RADAR RM #3110ALO
05-316-0-CAEGIS RADAR RM #4110ALO
04-316-0-CAEGIS RADAR RM #5110ALO
06-170-1-QFCS DIR #1110ALO
06-170-2-QFCS DIR #2110ALO
07-312-2-QFCS DIR #3110ALO
06-324-2-QFCS DIR #4110ALO
COMBAT SYSTEMS TURNOVER #3 (MSR to AIT)
04-188-0-QFOREMAST90ALO
03-260-0-QMAINMAST90ALO
03-138-2-QFAN ROOM (CEC AECU)90ALO
03-174-1-QFAN ROOM90ALO
03-188-0-QFAN ROOM90ALO
2-94-1-QFAN ROOM90ALO
2-94-2-QFAN ROOM90ALO
2-464-1-QFAN ROOM90ALO
3-426-0-QFAN ROOM90ALO
01-392-2-QFAN ROOM90ALO
01-148-1-QFAN ROOM90ALO
01-178-0-QFAN ROOM90ALO
01-226-1-QFAN ROOM90ALO
02-228-4-QFAN ROOM90ALO
02-234-2-QFAN ROOM90ALO
04-300-2-QFAN ROOM90ALO
1-82-2-QFAN ROOM90ALO
1-382-3-QFAN ROOM90ALO
03-162-2-CMK 99 XMTR ROOM90ALO
05-149-0-CPILOT HOUSE90ALO
03 LVL FR 228-248AN/SLQ-32 (STBD)90ALO
03 LVL FR 228-248AN/SLQ-32 (PORT)90ALO
COMBAT SYSTEMS TURNOVER #4 (MSR to AIT)
04 LVL FR 221-260PHALANX (MT 21) STBD77ALO
01-236-0-CLOAD CENTER 4177ALO
02-200-0-CRADIO TRANSMITTER RM77ALO
03-199-0-QIFF EQUIPMENT ROOM77ALO
03-227-2-CPHALANX LOC CONT RM77ALO
05-166-1-CDIR SLIP RING ASSY RM #177ALO
05-166-2-CDIR SLIP RING ASSY RM #277ALO
06-308-2-QDIR SLIP RING ASSY RM #377ALO
05-308-2-QDIR SUPT EQUIP RM77ALO
3-260-2-QSNAP EQUIPMENT ROOM77ALO
01-180-0-CSHIP SIG EXP SPACE77ALO
3-127-0-QT-HAWK EQUIPMENT RM77ALO
1-390-1-MTORPEDO RM #177ALO
1-390-4-MTORPEDO RM #277ALO
01 LVL FR 97-127VLS MODULE TOP (FWD)77ALO
3-94-0-MVLS LAUNCHER #1 (FWD)77ALO
1-92-1-QSECURITY STA #1 (FWD)77ALO
01 LVL FR 435-464VLS MODULE TOP (AFT)77ALO
3-435-0-MVLS LAUNCHER #2 (AFT)77ALO
1-464-2-QSECURITY STA #2 (AFT)77ALO
MD FR 506-529HARPOON LNCHR #1 (PORT)77ALO
MD FR 506-529HARPOON LNCHR #2 (PORT)77ALO
05 LVL FR 142EOSS (FWD PORT)77ALO
04 LVL FR 345EOSS (AFT STBD)77ALO
COMBAT SYSTEMS TURNOVER #5 (MSR to AIT)
FWD,STBD,PORT,AFTAN/SPY-1A ARRAYS60ALO
03-(250-260) STBDSRBOC Lnchr No. 660ALO
03-(250-260) PORTSRBOC Lnchr No. 560ALO
04-(190-220) STBDSRBOC Lnchr No. 1 and 3; DECOY Lnchr No. 1 and 560ALO
04-(220-230) PORTDECOY Lnchr No. 660ALO
05-(292-308) PORTDECOY Lnchr No. 2; SRBOC Lnchr No. 2 and 460ALO
2-506-0-QTOWED ARRAY RM60ALO
2-506-1-QNIXIE RM60ALO
01 LVL FR 46-945”/62 GUN MT (MT 51)60ALO
1-58-0-M5”/62 LOAD DRUM RM #160ALO
MD FR 464-5065”/62 GUN MT (MT 52)60ALO
2-482-0-M5”/62 LOAD DRUM RM #260ALO
04 LVL FR 221-260PHALANX (MT 22) PORT60ALO

GET PERL

WORK ITEM NO. USS GETTYSBURG (CG-64)

FY18 EDSRA Planning Event Readiness List (PERL) (Work Item Title) FOUO: Distribution authorized to Department of Defense and U.S. Department of Defense contractors only (administrative use) (26 Sep 16) Other requests referred to CNRMC.GOV ESTDRY DOCK SHIP TBDAVAIL 20% (O&I) 27 AUG 18FIREMAIN SYS RESTORED 100 PSI PIER SERVICE 15 OCT 18UNDOCK SHIP3 OF 6 FIREPUMPS READY TO OPERATE 19DISTRIBUTED SYSTEMS RESTORED 21 DEC 18ALO CSST 07 JAN 19HABITABILITY TURN OVER 18 MAR 19REFUEL SHIP for HPT 25 MAR 19PCD 01 APR 19FUEL SHIP FOR SEA TRIALS 20 MAY 19DOCK TRIALS 10 JUN 19FAST CRUISE 11 JUN 19CREW REST 12 - 16 JUN 19SEA TRIALS 17 -18 JUN 18KTR CONTRACT COMPLETE 24 JUN 19COMMENTS
LEGEND"I" = Open & Inspect (CFR)"P"=Production"T" = Testing"C"=Certification
042-02-001Contractors Facility Work Authorization Form (WAF) Requirements; accomplish
042-10-001Accountability of Manhour and Material Reservation; accomplish
042-11-002Work Completion Certification Data for Chief of Naval Operations (CNO) Availabilities; provideC
042-11-003Physical Security at Private Contractor's Facility; accomplish
042-32-001Marine Coatings Containing Heavy Metals Material; remove and dispose
074-11-001Structural Ultrasonic Impact Treatment (UIT) and G67 Sampling; accomplish
077-11-001Hazardous Waste Produced on Naval Vessels; control
110-11-001Structural; repairPC
110-11-002Structural Repair; accomplishPC
110-11-003Underwater Hull Inspection, Repair, and Preservation; accomplishIPC
110-11-004Structural Bulkhead Non Destructive Testing (NDT); accomplish
110-21-001Structural Shell Plating Repair; accomplishP
120-11-001Structural Repair and Preservation; accomplishP
120-11-002Bulkhead; repairP
120-11-003Bulkhead and Stiffeners; repairP
120-11-004Structural Repair; accomplishP
120-11-005Deck and Valve; repairIPT
120-21-001Structural Bulkhead; repairP
123-11-004Fuel Oil Tank Top Modification; accomplishedI
123-11-006Fuel Oil Service and Compensated Tanks; repair and preserveIPC
123-11-008Fuel Oil Gravity Head Tank; repair and preserveIP
123-12-001JP-5 Tank; repair and preserveIPC
123-15-001Lube Oil Tank; repairIPC
123-17-003Oily Waste Tank Repair and Preserve; accomplishIP
123-19-009Sounding Tube Valve; replaceIP
123-21-002Accessible Void Repair and Preservation; accomplishIPC
123-21-003Void/Cofferdam; repair and preserveIPC
123-22-001Access Trunk Preservation; accomplishP
130-11-003Trimettallic Aircraft Securing Fitting; replacePC
130-11-004Towed Array Bulkhead and Deck Repair; accomplishP
130-11-0065 Inch Ammo Pallet Staging Room Foundation Preservation; accomplishP
130-90-001ShipAlt CG47 83265.03K Catwalk Removal Fwd/Stbd 03 Level; accomplishP
133-11-001Deck and Bulkhead; repair and preserveP
135-11-002Fuel Oil Tank Top Plating Repair; accomplishIP
150-11-001Superstructure Repair; accomplishP
150-11-002Deckhouse Bulkhead; repairP
150-11-004GTM Cooling Fan Foundation Repair; accomplishP
150-11-007Gear Locker Bulkhead Plating; repairP
150-90-001ShipAlt CG47-90123.01K, 01 Level-Main Deck Frame 332 & 346 Cracking Mod to Structure; accomplishP
150-90-002ShipAlt CG47-83506.01K, Superstructure Fatigue and Sensitization Modifications (AFT); accomplishP
150-90-003ShipAlt CG47-83506.06 Fatigue & Sensitization Mod AFT; accomplishP
150-90-004ShipAlt CG47-83506.04K, Superstructure Fatigue and Sensitization Modifications (AFT); accomplishP
150-90-005ShipAlt CG47-83506.07 Fatigue & Sensitization Mod AFT;accomplishP
150-90-006ShipAlt CG47-83503.02K and CG47-83503.03K Superstructure Fatigue and Sensitization Modifications (Fwd); accomplishP
150-90-008ShipAlt CG47-83506.03K, Superstructure Fatigue and Sensitization Modifications (AFT); accomplishP
154-90-001ShipAlt CG47-00386K, Modify Bulkhead Frame 248 at 03 Level Structural Mod; accomplishP
165-11-002Sonar Dome Rubber Window (SDRW); inspectIPC
165-11-004Lower Sonar Dome Access Scuttle; repairIP
167-11-004Quick Acting Watertight Door (QAWTD), Steel; replaceP
167-11-011Scuttle, Steel, Flush, Spring-Balanced, Quick-Acting; repairP
168-11-001Hatch and Scuttle Replacement; accomplishP
168-12-001Structural Door, Hatch and Scuttle Replacement; accomplishP
168-12-002Door and Scuttle Repair; accomplishP
168-12-003ShipAlt CG47-83308K, QAWTT Aluminum Door Upgrade Mod to Door: accomplishP
171-11-001Main Mast IFF Platform; repairP
171-11-002Main Mast; repairPC
191-90-001ShipAlt CG47-89577.01K, Weight and Moment Compensation; accomplish
220-11-001Calibration Services; provideP
241-11-002Main Reduction Gear (MRG) No. One; flushPC
241-12-001Main Reduction Gear (MRG) and Controllable Pitch Propeller (CPP) Lube Oil Purifier Heater Controller clean and calibrate: accomplish
241-12-002Number 2 Main Reduction Gear Input Coupling Shaft Oil Seal (2B); replacePC
241-12-003Main Reduction Gear (MRG) No. 2; FlushPC
242-11-001Number One Main Reduction Gear (MRG) Multiple Disc Brake and Bleed Air Valve; replacePC
242-12-001Number 2 Main Reduction Gear (MRG) Multiple Disc Brake and Bleed Air Valve; replacePC
243-11-001Port and Starboard Waterborne Propulsion Shafting; replaceIPC
243-11-002Main Propulsion Shaft and Rudder Locking Device; removeP
244-11-002Line Shaft Bearing (LSB) Sampling Valve; replaceP
244-11-002Line Shaft Bearing (LSB) Sampling Valve Stem; replaceP
245-10-001Controllable Reversible Pitch Propeller (CRP) Hydraulic Oil Tank; repairP
245-11-001Controllable Reversible Pitch (CRP) Hydraulic System Valves; replaceP
245-11-004Controllable Reversible Pitch (CRP) No. One Hydraulic & Electric Pump/Motor; repairIP
245-11-006Controllable Reversible Pitch (CRP) No. 2 Hydraulic & Electric Pump/Motor; repair
IP
245-11-007Controllable Reversible Pitch Hydraulic System Flexible Hose; replaceIP
245-11-008Controllable Pitch (CPP) Propeller; repairIP
251-80-001CG47 Class AER 68155, GTM Blow-In Door and Louver Heater Controller Relocation; accomplishP
252-90-001ShipAlt CG47-84251K, ECP-187 Bridge Wing Display Unit Upgrade (SPLITALT); accomplish
P
252-90-002ShipAlt CG47-80054K Integrated Ship Control SS9 MCS-UPS Redistribution; accomplishPT
259-10-001Gas Turbine Main (GTM) Exhaust Mixing Tubes Insulation; replaceP
260-11-001Diaphragm Control Pilot Operated Valve; repairP
261-11-001Machinery Room Chain Hoist Weight Test; accomplishP
261-12-001Fuel Oil Service Valve and Actuator Overhaul; accomplishP
261-12-0021A and 1B Gas Turbine Main (GTM) Engine and Enclosure; repairP
261-12-0032A and 2B Gas Turbine Main (GTM) Engine and Enclosure; repairP
261-20-001Fuel Oil System (1A,1B,2A,2B) Magnetic Motor Controller Overhaul; accomplishP
261-20-002Fuel Oil Service Pump No. 2, Coalescer and Prefilter; repairP
261-20-003Fuel Oil Service Pump No. One, Coalescer and Prefilter; repairP
262-11-002Lube Oil Valve; replaceP
262-41-002Main Reduction Gear (MRG) Lube Oil Equalizer Valve and Mechanical Seal; repairP
262-42-001Main Reduction Gear (MRG) Lube Oil Equalizer Valve and Mechanical Seal; repairP
290-11-001Gas Turbine Water Wash System Valve; replaceP
311-31-001Gas Turbine Generator One, 2 and 3 Isolator Assembly Mount Repair and Preserve; accomplishP
311-31-002Gas Turbine Generator Main Reduction Gear (MRG); flushPC
311-33-001Gas Turbine Generator Set (GTG) No. 3 Enclosure Repair; accomplishP
313-11-001Uninterruptible Power Supply (UPS) Battery; installP
313-80-002ShipAlt CG47-81260K, MHE Battery Charger; replaceP
321-11-001Multiple Cable Transit (MCT); repairPC
321-90-001ShipAlt CG47-88891K, Electronic Ground Fault Detectors Replacement; accomplishP
324-80-001CG47 Class AER 76101D Replace Dossert Lug Connectors; accomplishP
331-11-001Topside lighting; repairP
331-11-005Electrical Protective Conduit; replaceP
332-11-001Flight Deck Lighting and Electrical; repairPTC
332-11-002Restoration of Battle Lanterns; accomplishP
343-11-001Pump and Motor Shipment and Installation; accomplishP
343-11-004Gas Turbine Generator (GTG), Blow-in Door; repairP
343-11-007Generator Air Box, Gear Oil and Lube Oil Cooler Cleaning; accomplishP
343-13-001Generator Exhaust Expansion Joint; replaceP
411-90-001ShipAlt CG47-78510.03K AWS: ACB12/TI12 CIC Display Upgrades (SPLITALT); accomplishP
411-90-002ShipAlt CG47-83712K PEOC41 COMSEC KW46 Replacement; accomplishP
412-90-001ShipAlt CG47-86539.03K, Common Data Link Management System Installation (SPLITALT); accomplishP
422-11-002Temporary Navigation Light System for Towing; removeP
423-14-001Speed and Miles traveled Indicator; replaceP
423-90-001Shipalt CG47-71386K, Advanced Digital Antenna Production (ADAP),(SPLITALT); accomplishP
424-90-001ShipAlt CG47-86222.03K, NGF Backfit Phase I; accomplishP
428-90-001ShipAlt CG64-MA 84636 K ISC SIIG PCI CARD REMOVAL, accomplishP
428-90-002ShipAlt CG64-86418K, Navigation Sensor System Interface Removal (SplitAlt); accomplishP
430-90-003ShipAlt CG47-87106.03K, Interior Voice Communication System (IVCS) Upgrade (SPLITALT); accomplishP
432-12-001Kickpipe; replaceP
432-12-002Sound Powered and Integrated Voice Communication System (IVCS) Jack Box; replaceP
432-12-003Kickpipe; replaceP

This is the start of the file's text. The full file is on GovTribe.