USS ROOSEVELT (DDG 80) Fiscal Year FY 17 Depot Maintenance Period (DMP)
Solicitation number
N00024-17-R-4415
Issued by

About this file

RFP RSV DDG 80 AMENDMENT 0002 FINAL

View the file

Other files

File Type Posted
RSV_Questions_and_Answers_3.docx DOCX document
RSV_Questions_and_Answers_4.docx DOCX document
J-4_Pricing_Spreadsheet_DDG_80_Rev3_LOCKED.xlsx XLSX spreadsheet
RFP_RSV_DDG_80_AMENDMENT_003.docx DOCX document
RFP_RSV_DDG_80_AMENDMENT_0001_FINAL.docx DOCX document
RSV_Questions_and_Answers_2.docx DOCX document
RFP_RSV_DDG_80_AMENDMENT_0002.docx DOCX document
RSV_Questions_and_Answers_1_Rev1.docx DOCX document
J-3_ERL_Final_Rev_DDG_80_Rev2.xlsx XLSX spreadsheet
J-4_Pricing_Spreadsheet_DDG_80_Rev2_LOCKED.xlsx XLSX spreadsheet
RFP_RSV_DDG_80_AMENDMENT_0001.docx DOCX document
J-4_Pricing_Spreadsheet_DDG_80_Rev1_LOCKED.xlsx XLSX spreadsheet
J-5_QASP_DDG_80_Rev1.docx DOCX document
RSV_Questions_and_Answers_1.docx DOCX document
J-3_ERL_DDG_80_Final_Rev_1.xlsx XLSX spreadsheet
S-4_PP_Reference_List.docx DOCX document
S-3_PPI_Form.docx DOCX document
S-1_Technical_Capabilites_Data_Sheet.docx DOCX document
S-2_Past_Performance_Questionnaire.docx DOCX document
FBO_FINAL_RFP.docx DOCX document
S-5_Eligibility_Criteria_Data_Sheet.docx DOCX document
J-3_ERL_DDG_80.xlsx XLSX spreadsheet
J-3_Milestones_DDG_80.xlsx XLSX spreadsheet
J-4_Pricing_Spreadsheet_DDG_80_LOCKED.xlsx XLSX spreadsheet
J-5_QASP_DDG_80.docx DOCX document
FBO_DRAFT_RFP3.docx DOCX document
J-7_RTR_Control_Log_and_Form.doc DOC document
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N00024-17-R-4415

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

AMENDMENT 2 SUMMARY OF CHANGES

Section B - CLIN 0042 is added to reflect the addition of a Work Item listed in attachment J-4.

Section J - Attachments J-1 and J-2 are revised as outlined in Errata 3 & 4 and Addendum 2. Attachments J-3 and J-4 are revised as outlined in Revision 2.

SECTION B - SUPPLIES OR SERVICES AND PRICES

CLIN 0042 is added as follows:

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 0042

WORK ITEM OPTION CLIN

FFP

1
Lot
OPTION
Work Items: See attachment J-4 for list

The Contractor shall prepare for and accomplish repair and alterations during the Depot Maintenance Period (DMP) Availability onboard USS ROOSEVELT (DDG 80) as specified in the statement of work provided herein and in accordance with standard items, work item specification package Attachment J-1 drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes A, B, & C.

FOB: Destination

NET AMT

SECTION E - INSPECTION AND ACCEPTANCE

The following Acceptance/Inspection Schedule was added for CLIN 0042:

INSPECT AT
INSPECT BY
ACCEPT AT
ACCEPT BY
Destination
Government
Destination
Government

SECTION F - DELIVERIES OR PERFORMANCE

The following Delivery Schedule item has been added to CLIN 0042:

DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
DODAAC
20-APR-2018
1
N/A

FOB: Destination

SECTION I - CONTRACT CLAUSES

The following have been modified:

52.217-7 OPTION FOR INCREASED QUANTITY--SEPARATELY PRICED LINE ITEM (MAR 1989)

(Applicable to CLINs 0004 – 0042)

The Government may require the delivery of the numbered line item, identified in the Schedule as an option item, in the quantity and at the price stated in the Schedule. The Contracting Officer may exercise the option by written notice to the Contractor within 20 days prior to the availability start date. Delivery of added items shall continue at the same rate that like items are called for under the contract, unless the parties otherwise agree.

(End of clause)

SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

The following have been modified:

DOCUMENTS/EXHIBITS/ATTACHMENTS

The following document(s), exhibit(s), and other attachment(s) form a part of this solicitation:

No.Document
Attachment S-1Technical Capabilities Data Sheet
Attachment S-2Past Performance Questionnaire
Attachment S-3Pre-Proposal Information (PPI) Form
Attachment S-4Past Performance References
Attachment S-5Eligibility Criteria Data Sheet

The following document(s), exhibit(s), and other attachment(s) also form a part of this solicitation and will form a part of the contract resulting from this solicitation:

No.Document
Attachment J-1Specification Package No. TPPC-DDG80-SERM17-CN01 (Errata 1, Errata 2, Errata 3, Errata 4, Addendum 1, Addendum 2)
Attachment J-2Work Item Plans, Drawings, and Other References (Errata 1, Errata 3, Errata 4, Addendum 1, Addendum 2)
Attachment J-3Execution Milestones and Key Event Dates (ERL Revision 2)
Attachment J-4Pricing Workbook (Revision 2)
Attachment J-5Quality Assurance Surveillance Plan (Revision 1)
Attachment J-6Subcontracting Plan (to be incorporated upon award)
Attachment J-7Reservation Task Request Control Log and Form

Exhibit A Contract Data Requirements List (CDRL) (DD Form 1423) A001-A003; A005-A009; A011; A012; A014 (Does not include A004, A0010, or A0013) Exhibit B Contract Data Requirements List (CDRL) (DD Form 1423) B001-B009 Exhibit C Contract Data Requirements List (CDRL) (DD Form 1423) C001-C002