N00024-16-R-4403-0010_Released.docx

DOCX document 56 KB Posted

Attached to
USS MCFAUL (DDG 74) FY16 Extended Dry-Docking Selected Restricted Availability (EDSRA)
Solicitation number
N00024-16-R-4403
Issued by

About this file

N00024-16-R-4403-0010 Released

View the file

Other files

File Type Posted
N00024-16-R-4403-0014.pdf PDF
N00024-16-R-4403-0014_Conformed.pdf PDF
N00024-16-R-4403-0013.pdf PDF
N00024-16-R-4403-0013_Conformed.pdf PDF
N00024-16-R-4403-0012_Conformed.pdf PDF
N00024-16-R-4403-0012.pdf PDF
N0002416R4403-0011_Conformed.pdf PDF
N0002416R4403-0011.pdf PDF
N00024-16-R-4403_Conformed_through_Amendment_0010.docx DOCX document
N00024-16-R-4403_Conformed_through_P0009.docx DOCX document
ERRATA_10_CVR_SHT.pdf PDF
ERRATA_10_INDEX.pdf PDF
N00024-16-R-4403-P0009_Released.docx DOCX document
N00024-16-R-4403_BQAs_218-229.pdf PDF
N00024-16-R-4403-0008_Conformed.pdf PDF
S-6_USS_McFaul_WI_Index_Rev7.xlsx XLSX spreadsheet
N00024-16-R-4403-0008.pdf PDF
N00024-16-R-4403-0007_Conformed.pdf PDF
N00024-16-R-4403-0007.pdf PDF
N00024-16-R-4403-0006_Conformed.pdf PDF
N00024-16-R-4403-0006.pdf PDF
N00024-16-R-4403_BQAs_132-217.pdf PDF
S-6 USS McFaul WI Index Rev6.xlsx XLSX spreadsheet
N00024-16-R-4403-0005.pdf PDF
N00024-16-R-4403-0005_Conformed.pdf PDF
N00024-16-R-4403-0004_Conformed.pdf PDF
N00024-16-R-4403-0004.pdf PDF
MCFAUL_ADDENDUM_1_CVR_SHT_(Amend_0003).pdf PDF
S-6_USS_McFaul_WI_Index_Rev5_(Amend_0003).xlsx XLSX spreadsheet
N00024-16-R-4403-P0003_Released.docx DOCX document
N00024-16-R-4403_Conformed_Through_P0003_Released.docx DOCX document
ERRATA_7_INDEX_REPORT_(Amend_0003).pdf PDF
ERRATA_7_CVR_SHT_(Amend_0003).pdf PDF
N00024-16-R-4403_BQ As_97-131.pdf PDF
N00024-16-R-4403-0002_Conformed.pdf PDF
N00024-16-R-4403-0002.pdf PDF
N00024-16-R-4403_BQ As_48-96.pdf PDF
N00024-16-R-4403_BQ As_1-47.pdf PDF
CDRLs_A-B-C_Signed.pdf PDF
N00024-16-R-4403-0001_Conformed.pdf PDF
N00024-16-R-4403-0001.pdf PDF
S-4_PP_Reference_List.docx DOCX document
S-6_USS_McFaul_Work_Item_Index_Rev4.xlsx XLSX spreadsheet
N00024-16-R-4403.pdf PDF
S-1_Technical_Capabilites_Data_Sheet.docx DOCX document
S-2_Past_Performance_Questionnaire.docx DOCX document
J-4_McFaul_Schedule_Incentives.pdf PDF
S-3_PPI_Form.doc DOC document
S-5_Eligibility_Criteria_Data_Sheet.docx DOCX document
Show all 49

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N00024-16-R-4403

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION A - SOLICITATION/CONTRACT FORM

The required response date/time has changed from 06-Jan-2016 01:00 PM to 07-Jan-2016 01:00 PM.

SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS

The following have been modified:

1.0 INTRODUCTION

This solicitation is a Request for Proposals (RFP) that will result in the award of a single Firm Fixed Price (FFP) contract for the FY16 Extended Dry-Docking Selected Restricted Availability (EDSRA) for USS MCFAUL (DDG 74). The Government anticipates awarding a single contract through a Best Value source selection process.

ALL INQUIRIES shall be made in writing and directed to:

Larry Joy, Procuring Contracting Officer (PCO) at larry.t.joy1@navy.mil; and An Nguyen, Contract Specialist at an.t.nguyen2@navy.mil.

To ensure the Government is able to adequately address and respond to an offeror’s request for pre-proposal information (PPI) via a solicitation amendment, questions shall be submitted no later than 1300, local time (EDT) 20 November 2015. Requests or questions received by the designated time will be answered in writing and provided to all offerors prior to the required date for submittal of proposals. The Government reserves the right to not answer any requests received after the designated time. All requests for PPI should reference the applicable solicitation and/or specification page and paragraph number and be submitted on the Pre-Proposal Information (PPI) form (Attachment S-3) provided with this solicitation.

2.0 INSTRUCTIONS FOR THE SUBMISSION OF OFFERS

Proposal Due Date: The Naval Sea Systems Command (NAVSEA) will not accept electronic submission of proposals. All copies of the proposals (Volumes I, II, and III if applicable) shall be received by the Government at the address below no later than 1300, local time (EDT) on 7 January 2016. Late proposals WILL NOT be considered. Partial proposals or attachments submitted late WILL NOT be considered. Offerors are advised to consult FAR 15.208 related to timely receipt of proposals.

Proposals shall be sent to:

NAVAL SEA SYSTEMS COMMAND HQ
ATTN: SEA 02442N AN NGUYEN, CONTRACT SPECIALIST
1333 ISAAC HULL AVE
WASHINGTON NAVY YARD, D.C. 20376-2030

Offerors shall mark all submittals “DO NOT OPEN PACKAGE IN MAIL ROOM—FORWARD UNOPENED DIRECTLY TO SEA 02442”. The outside of the package shall clearly indicate the Offeror’s name, the solicitation number and the contents of the package.

Originals may be shipped in the same boxes as the copies to eliminate excess shipping costs. However, originals should be separately wrapped inside the container, and clearly labeled “ORIGINAL PRICE PROPOSAL” or “ORIGINAL NON-PRICE PROPOSAL.” The exterior of each box MUST clearly indicate its contents.

Timeliness of receipt of proposals will be determined based on the time of receipt at the NAVSEA Washington Navy Yard location. Current threat conditions shall be considered when submitting the proposal for this solicitation.

Proposal Packages: A complete proposal submission will include the following:

VOLUME
TITLE
NUMBER OF PAPER ORIGINALS
NUMBER OF PAPER COPIES
NUMBER OF CDs
I
Price Proposal
1
2
2
II
Non-Price Proposal
1
3
3
III
MSRA* Equivalency (Applicable to Non-MSRA Holders Only)
1
2
2

* Master Ship Repair Agreement (MSRA)

3.0 GENERAL INFORMATION

Ship Checks: The USS MCFAUL (DDG 74) will not be available for a ship check prior to the proposal submission due date. Offerors, including significant subcontractors, may inspect the USS MAHAN (DDG 72), 7-14 November 2015 To schedule a ship check, offerors shall provide a request via email to the following points of contact:

1. Larry Joy- email: larry.t.joy1@navy.mil and An Nguyen- email: an.t.nguyen2@navy.mil.

2. Participants will be subject to security, safety and other applicable regulations established by Mid-Atlantic Regional Maintenance Center (MARMC) and the Commanding Officer of the USS MAHAN (DDG 72).

Additional Ship Checks: The USS MCFAUL (DDG 74) will now be available for a ship check, between 18-28 December 2015. To schedule a ship check, offerors shall email the following:

1. Coordinator: USS MCFAUL Project Manager Jeff Henson, jeffrey.s.henson@navy.mil and Fred Bairdain, frederick.bairdain@navy.mil, Copy to: larry.t.joy1@navy.mil and an.t.nguyen2@navy.mil.

2. Participants will be subject to security, safety and other applicable regulations established by Mid-Atlantic Regional Maintenance Center (MARMC) and the Commanding Officer of the USS MCFAUL (DDG 74).

Specifications and associated reference documentation: The Government will provide, upon request, CD/DVDs including Attachment J-1 Work Items and Work Item References not already in the possession of the offerors, commercially available, listed under 52.211-2, or available through the following websites:

https://jedmics.net/ https://webjed.nnsy.navy.mil/ https://psjed.psns.navy.mil/

Offerors may request a DVD be mailed to them by contacting the PCO and Contract Specialist, Larry Joy and An Nguyen respectively at larry.t.joy1@navy.mil and an.t.nguyen2@navy.mil.

Estimated Award Date: The Government anticipates making a single award on or around March 2016. Offerors are to insert 120 calendar days in block 12 of the Standard Form (SF) 33.

Alteration of Solicitation: Offerors shall respond to the solicitation as posted. Offerors who alter the solicitation (except for completing appropriate “fill-in” blocks and certifications) may be considered non-responsive and thus ineligible for award.

Proposal Information: Offerors shall not presume the Government has knowledge outside of information provided in the proposal. Additionally, offerors are advised that statements such as: “the offeror understands”, “the offeror has a long history of outstanding support”, “standard procedures shall be used”, “well known techniques shall be employed” or any paraphrasing of the solicitation, shall be considered inadequate to demonstrate experience, knowledge of, or compliance with solicitation requirements. Offerors are encouraged to provide specific and concise information to validate all assertions.

Amendments: The Government may revise the solicitation at any time by means of an Amendment. It is an offeror’s responsibility to ensure it is accessing the FBO website to view potential amendments and procurement notifications for this solicitation.

Teaming Arrangements: Proposals must be submitted by one (1) prime contractor. An Offeror may be listed as a subcontractor in multiple proposals but may only submit one (1) proposal as a prime contractor with a unique Commercial and Government Entity (CAGE) code and Taxpayer Identification Number (TIN). To be evaluated as a Joint Venture (JV), offerors must provide a notarized agreement (with the price proposal) delineating roles and responsibilities for all proposed work.

4.0 PROPOSAL FORMAT

Hard Copy Proposals: Offerors shall use the forms provided with this solicitation. All pages will be double-sided on 8.5 x 11 inch paper with a one-inch margin. Text will be Times New Roman with a minimum font size of 12. Each side of the page will count as one “page”. Any type contained on graphics page will not be smaller than 10-point font. Any pages that may be revised as a result of discussions (if required) shall contain revision numbers and date of the proposal revision submission.

CD: Proposal information provided on the CD shall conform to the requirements of the hard copy proposal such that if an evaluator were to print from the CD, the format shall be identical to that provided in hard copy. Documents shall be in Microsoft Office version 2010 and Adobe X Pro PDF compatible, virus-free stable media storage devices capable of being read on a DVD/CD-ROM drive. All spreadsheets shall be in Microsoft Excel format and all derived values shall show corresponding formulas. No fields shall be password protected. If files are compressed, the necessary decompression program must be included. In cases where the hard copy and the electronic copy of the proposal conflict, the hard copy shall take precedence. The CDs shall be labeled to indicate the Offeror’s name, the solicitation number and the associated volume numbers.

5.0 PROPOSAL CONTENT

VOLUME I - PRICE PROPOSAL

Volume I shall be comprised of the following:

1. Cover Letter

2. Signed SF 33 with all amendments acknowledged

3. Pricing Workbook (Attachment S-6)

4. Subcontracting Plan/ Joint Venture/teaming agreement (if applicable)

5. 009-72 Supporting Pricing Information

Cover Letter: The Cover Letter shall be the first page of the proposal and shall be in accordance with FAR 52.215-1(c)(2)(i-v) and be limited to three (3) pages.

Standard Form 33 (SF 33): As part of the Price proposal package, the offeror shall submit the completed SF 33 with blocks 12 through 18 completed, as well as all sections with applicable “fill-ins” filled in. The representative who signs this form must be authorized to contractually bind the company providing the offer. Section B CLIN pricing must also be completed for ALL CLINs. The Offeror shall complete and provide all Representations, Certifications, and Other Statements included in Section K of the solicitation. Submission of a signed offer to the Government constitutes agreement and acceptance of the terms and conditions of the solicitation in a FFP contracting environment.

Pricing Workbook: The offeror shall (i) propose each Contract Line Item Number (CLIN) price in accordance with Section B; (ii) insert proposed rates into Section B, Note A paragraph (7); and (iii) complete the Attachment S-6 Pricing Workbook. The Attachment S-6 excel file has imbedded formulas.

The breakdown of CLIN prices, corresponding to the specification work items, must add up to the total of each CLIN. If there is a discrepancy between the two, the Section B CLIN price shall govern. The Labor and Material Burden Rates worksheet included in Attachment S-6 must match the rates inserted in Section B, Note A paragraph (7). If there is a discrepancy between the two, the rates inserted in Section B shall govern.

The RFP specified 90K labor hours and $1,412,136 included for material in the Labor&Material Burden Rate worksheet contained in Attachment S-6 are for evaluation purposes only. The proposed labor and material burden rates included in Attachment S-6 and inserted in Section B, Note A paragraph (7) shall be the fixed rates and be used for negotiating growth and new work during the entire availability regardless of how many labor hours and material dollars are procured and negotiated.

An Interport Differential shall be proposed for offerors that do not plan to perform the proposed work at the USS MCFAUL homeport in Norfolk, Virginia. If applicable, include the value for the inter-port differential as follows:

Location
Differential
Pascagoula, MS
$1,265,561
Bath, ME
$932,800
Mayport, FL
$833,826
Charleston, SC
$1,050,030

Subcontracting Plan: A large business is required to submit an acceptable subcontracting plan. A subcontracting plan is NOT REQUIRED from small business concerns.

009-72 Supporting Price Information: As part of the Price proposal package, the offeror shall submit other than cost and pricing information sufficient for the Contracting Office to validate the offerors price associated with completing the requirements of 009-72. This other than cost and pricing data shall include both a narrative description, including the basis of all labor and, material estimates and a quantitative and traceable price estimate by cost element to complete these requirements.

VOLUME II

Volume II, non-price proposal information, shall be comprised of the following:

1. Eligibility Documentation

a. Eligibility Criteria Data Sheet (Attachment S-5) with the top portion filled out

b. Letter(s) or resource sharing / teaming agreement(s) confirming pier(s) (If Applicable).

2. Technical Capabilities Data Sheet (Attachment S-1)

3. Past Performance Information

4. USS MCFAUL FY16 EDSRA Execution Approach

Eligibility Documentation: Offerors must provide the following to demonstrate eligibility:

· Eligibility Criteria Data Sheet (Attachment S-5) with the top portion filled out

· A letter signed by the Principal identifying and confirming ownership or committed access (in the form of a letter signed by the subcontractor identifying and confirming committed access) to a pier capable of berthing the DDG-74 and a dry-dock capable of docking the DDG-74.

· Co-signed Master Ship Repair Agreement or proof of MSRA Equivalency to demonstrate capability.

Technical Capabilities Data Sheet (Factor 1) : Offerors shall complete the Technical Capabilities Data Sheet (Attachment S-1), provided with this solicitation for a previous availability or equivalent project. Offerors may not exceed a total of five (5) pages between the data sheet and the narrative.

The Contractor shall provide this documentation for contracts/projects demonstrating relevant experience as a Prime contractor. The Government is looking for experience in executing projects of same or similar type and complexity of work as required by the solicitation. For purposes of this solicitation, the Government considers an offeror’s Technical Capability relating to the following types of projects/contracts to be relevant given the type of effort involved in this solicitation:

(a) For this solicitation and evaluation purposes, the Government considers performance as a prime contractor of an availability similar in complexity and magnitude as the proposed USS MCFAUL availability, including approximately six (6) months production duration and 100,000 man-days in magnitude, using the same or similar personnel, processes and equipment the offeror is proposing to use to meet the solicitation requirements, to be relevant

OR

(b) Performance as a prime contractor of the construction of commissioned U.S. Naval Combat vessels of similar size and complexity and composition as a DDG 51 class ship or a comparable Naval vessel of similar type and complexity using the same or similar personnel, processes and equipment the offeror is proposing to use to meet the solicitation requirements.

The offeror’s proposed contracts/projects must demonstrate the following Technical Capabilities:

· Demonstrate experience providing engineering and design support capabilities with sufficient capability to diagnose and evaluate technical problems and issues and to make competent technical recommendations.

· Demonstrate experience providing an established management organization geared toward completing highly complex ship repair requirements, with clear lines of authority, delegation of responsibility and mid-level managerial positions

· Demonstrate experience in completing, controlling, integrating, scheduling, estimating and progressing complex ship repair requirements

· Demonstrate experience purchasing, monitoring, receiving, inspecting, segregating, issuing, determining nonconformance, and disposing of material

· Demonstrate experience managing subcontractors successfully, including successfully selecting, scheduling, managing, monitoring and controlling of subcontractors

Projects shall have been completed or be substantially complete within the past three (3) years. The contract/project provided must be considered relevant based on its own features rather than demonstrating relevant experience as a combination of projects. Offerors are advised that the Technical Capability Factor is "prime contractor" specific. Newly formed joint ventures may propose contracts/projects by the separate members of the joint venture as prime contractors. An offeror may not use the corporate experience of an affiliated "prime contractor" to meet the Technical Capability Factor requirements.

Past Performance (Factor 2): The Government requires relevant performance information based on the past and present efforts provided by the Offeror and data independently obtained from other government and commercial sources. The Government will evaluate the Offeror’s past performance as a prime contractor. In the investigation of an Offeror’s past performance, the Government reserves the right to contact former customers and Government agencies and other private and public sources of information.

Offerors with recent and relevant past performance shall submit information concerning contracts which offerors consider relevant in demonstrating their ability to perform the proposed effort. Offerors shall identify portions of the contracts that are relevant. Offerors are requested to provide information (up to five (5) previous contracts) where the effort is recent and relevant to the effort required by this solicitation.

· “Recent” is defined as a contract in-progress or completed within the last three (3) years as of the date of the initial solicitation. If the offeror has not completed up to five (5) contracts within the last three (3) years as of the date of the initial solicitation, information on recent and relevant commercial contracts may be submitted.

· “Relevant” is defined as a contract that is of similar scope, magnitude, and complexity to the requirements as set forth in this solicitation.

- Scope: Experience in the areas defined in the Solicitation Section C Statement of Work.

- Magnitude: The measure of the similarity of the volume, dollar value and/or duration of the work actually performed under the offeror’s submitted contracts to the requirements of this solicitation.

- Complexity: The measure of the similarity of technical difficulty, managerial intricacy and/or required coordination of efforts and disciplines performed by the offeror in its submitted contracts to the requirements of this solicitation. For complexity, not only will the tasks performed by the offeror be considered, but also the offeror’s ability to coordinate tasks (e.g., concurrent performance requirements). Offerors shall provide a detailed explanation demonstrating the similarity of the contracts to the requirements of this solicitation; a detailed description of the work performed for the contract. Offerors are responsible for the accuracy of all data provided.

An offeror that does not have recent and relevant past performance to provide for consideration is requested to affirmatively state that it does not have recent and relevant past performance for the Government to consider.

The Offeror’s proposal shall identify the customer point of contact and which of the listed contacts that each questionnaire was sent to be completed. This will let the Contracting Officer know whether all questionnaires from all of the Offeror’s references were received.

Offerors may inquire as to the status of receipt of these questionnaires using the e-mail address shown below.

Regarding Past performance information that is documented as a Contractor Performance Assessment Report (CPAR) and available in the Past Performance Information Retrieval System (PPIRS), the offeror may list it in Past Performance References, Attachment S-4. Attachment S-4 shall be used to identify the source of Past Performance in formation (e.g., CPARs, PPQs). For Past Performance information that does not have a current CPAR associated with it, the offeror may submit a Past Performance Questionnaire (PPQ), Attachment S-2 to its customer to complete. Each proposal shall include no more than a total of five (5) PPQs, one per contract identified. The offeror will complete Part A of the Questionnaire. Separately, the offeror shall provide the entire Past Performance Questionnaire, with Part A completed, to each customer for them to complete Parts B and C. Customer evaluation will not be included as part of the page count in this volume submitted by the offeror. The offeror shall instruct their customers to complete the Past Performance Questionnaires and return them before the closing date of this solicitation.

Mail to:

NAVAL SEA SYSTEMS COMMAND

ATTN: SEA 0244 LARRY JOY, CONTRACTING OFFICER

1333 ISAAC HULL AVE, STOP 2030

WASHINGTON NAVY YARD, D.C. 20376-2030

TEL NO.: (202) 781-2614

SOLICITATION NUMBER: N00024-16-R-4410

Or e-mail to:

larry.t.joy1@navy.mil and to an.t.nguyen2@navy.mil

It is the Offeror's responsibility to ensure that completed questionnaires are in the Contracting Officer's possession ON OR BEFORE THE REQUIRED PROPOSAL DUE DATE AND TIME. Any questionnaire received after the proposal due date/time may be considered as late and may not be considered in the Offeror’s past performance evaluation. The Government, at its discretion, will determine whether or not questionnaires received after the proposal due date will be considered.

In addition, the offeror shall provide for all Past Performance references included in Attachment S-4 a short description of the work performed and why the offeror considers it relevant to the requirements of this solicitation. Government may validate past performance information with the source regardless of whether it is provided under a CPAR reference or a PPQ.

All offerors (including small business offerors) are requested to address historical compliance with the requirements of FAR Part 52.219-8 (Utilization of Small Business Concerns) in a separate narrative not to exceed one page. In addition, large businesses are requested to address historical compliance with the requirements of FAR Part 52.219-9 (Small Business Subcontracting Plan) and DFARS 252.219-7003 (Small Business Subcontracting Plan (DOD CONTRACTS)) in a separate narrative not to exceed one page.

USS MCFAUL FY16 EDSRA Execution Approach (Factor 3) :

1. Offerors shall provide Integrated Production Schedule (IPS) Documentation for the USS MCFAUL EDSRA inclusive of the “Initial IPS” elements of NAVSEA Standard Item 009-60 as well as the Manpower Curves associated with the 009-60 “Schedule of Record”. The offeror shall provide both electronic and paper (hard copy) format (report does not require incorporation of Navy Intermediate -Level or Organizational (Ship's Force) schedules). The hard copy of the Gantt charts shall be provided on 11" X 17" paper. There is no page limit associated with this documentation.

a. Prepare an IPS containing each Work Item, including milestones identified under Section C. The IPS shall include:

i. Schedule each Work Item to the activity level listing the planned start, planned completion dates, and durations for each activity. Each activity shall be displayed to reflect its relevancy to the applicable key events and milestones. Assign each activity in the Integrated Production Schedule a short title to describe the nature of the activity, system and equipment or machinery involved. Integrate known Alteration Installation Team (AIT), Government-Contracted Third Party Maintenance Providers, Ship's Force, Commercial Industrial Services (CIS), and Fleet Maintenance Activity (FMA) work. Each activity shall be scheduled by location, system and integrated into a coordinated execution plan for the availability.

ii. The latest allowable receipt date for contractor and government furnished material to maintain schedule.

iii. Scheduled key events/milestones.

iv. Critical path and controlling Work Items.

v. Planned start and planned completion dates of Stage 3-6 tests, in accordance with the General Specification for Overall of Surface Ships.

2. Discuss the Offeror’s approach to meet the following milestone/ key event requirements as provided in the offeror’s Integrated Production Schedule: 1) Sub-contractor award(s) to complete production schedule, 2) Start of availability & first 100 hours, 3) Dry Docking, 4) 25% Discovery and all applicable reports provided, 5) Undocking, 6) Modernizations Turnovers (including compartment release), 7) PCD, 8) ALO, and 9) Sea Trials.

3. Discuss the Offeror’s technical approach to complete the following on the USS MCFAUL EDSRA: 1) identify, define and schedule major milestones on the critical path; 2) plan through validation of GFI/GFM; 3) complete prefabrication/advance staging; and 4) complete rip-out, repair, (re)installation, 5) complete test of the work requirements, and 6) complete compartment closeout.

4. Describe the Offeror’s quality management plan for the USS MCFAUL EDSRA, including details concerning the development and execution of a comprehensive test and inspection (T&I) plan and integration of subcontractor and government sponsored AIT tests and inspections with the availability master T&I plan. Discuss procedures for test discrepancy recovery on the USS MCFAUL EDSRA. Describe how the Offeror will verify Subcontractor’s quality performance on the USS MCFAUL EDSRA.

5. Describe the Offeror’s plans to integrate subcontractors, government sponsored AITs, and government agency representatives’ tasking with availability work scope, specifically to include planning and execution of integrated equipment and system testing on the USS MCFAUL EDSRA.

6. The Offeror must clearly demonstrate that it will be able to provide the production facilities (piers, cranes, dry-docks, shops, laydown areas, etc) required, utilizing in-house and subcontracted resources as necessary, to execute the USS MCFAUL schedule discussed above. Clearly indicate which facility resources are committed to this proposed work effort, which facility resources are committed to other work efforts and any residual facility resources available. Should the offeror propose to utilize subcontracted resources, provide the letters of commitment from the subcontractor(s) stating that they will be able to provide the facilities proposed.

7. The Offeror must clearly demonstrate that it will be able to provide the manpower workforce, including all necessary craft and trade laborers, Supervisors and Support staff required, utilizing in-house and subcontracted resources as necessary, to execute the USS MCFAUL schedule discussed above. As part of the offeror’s submission, provide a craft/trade/supervisor/support staffing plan for the USS MCFAUL period of performance and a plan to accommodate any peaks in workload occurring during the USS MCFAUL availability. Should the offeror propose to utilize subcontracted resources, provide letters of commitment from the subcontractor(s) stating that they will be able to provide the manpower proposed.

Offerors shall provide a narrative describing their Execution Approach to complete the USS MCFAUL FY16 EDSRA. Offerors may not exceed a total of fifteen (15) pages, with the exception of the following items:

· Integrated Production Schedule (IPS) Documentation (Paragraph #1 under Factor 3 identified above)

· Up to five pages of exhibits. Exhibits must not contain any text other than simple explanations pertinent to the exhibit.

· Resource Sharing Agreements / Letters of commitment from proposed subcontractors

VOLUME III MSRA EQUIVALENCY (APPLICABLE TO NON-MSRA HOLDERS ONLY)

1. MSRA equivalency documentation to demonstrate sufficient organization and facilities’ capabilities. (Specific documentation requirements provided upon inspection request)

2. To be eligible for the this award, a prospective contractor must possess a Master Ship Repair Agreement (MSRA) as described in DFARS 217.71 Master Agreement for Repair and Alteration of Vessels (MARAV) or demonstrate organization and facilities equivalent to that reflected in a MSRA. Offerors meeting this eligibility requirement with documents and evidence outside of a MSRA must contact the PCO to schedule an on-site inspection. All requests for Master Ship Repair Agreement (MSRA) equivalency inspections must be received by 1300, local time, (EDT) on 11 December 2015. Requests shall be sent to Larry Joy and An Nguyen. Failure to request an inspection by the designated time may result in a negative determination of offeror eligibility. All inspections will be completed by a representative from Commander, Navy Regional Maintenance Center (CNRMC). All offerors requesting equivalency inspections will receive a copy of the final inspection report prior to the date of contract award. The on-site inspection will supplement documentation provided with the offeror’s proposal.

3. The Government reserves the right to conduct a pre-award survey or to require other evidence of technical, production, managerial, financial, and similar abilities to perform prior to the award of any proposed contracts; regardless of whether the offeror has an existing MSRA.

(End of Summary of Changes) image1.wmf

File details come from the government source that posted it. Updated .