J-4_McFaul_Schedule_Incentives.pdf

PDF 343 KB Posted

Attached to
USS MCFAUL (DDG 74) FY16 Extended Dry-Docking Selected Restricted Availability (EDSRA)
Solicitation number
N00024-16-R-4403
Issued by

About this file

Attachment J-4

View the file

Other files

File Type Posted
N00024-16-R-4403-0014.pdf PDF
N00024-16-R-4403-0014_Conformed.pdf PDF
N00024-16-R-4403-0013.pdf PDF
N00024-16-R-4403-0013_Conformed.pdf PDF
N00024-16-R-4403-0012_Conformed.pdf PDF
N00024-16-R-4403-0012.pdf PDF
N0002416R4403-0011_Conformed.pdf PDF
N0002416R4403-0011.pdf PDF
N00024-16-R-4403_Conformed_through_Amendment_0010.docx DOCX document
N00024-16-R-4403-0010_Released.docx DOCX document
N00024-16-R-4403_Conformed_through_P0009.docx DOCX document
ERRATA_10_CVR_SHT.pdf PDF
ERRATA_10_INDEX.pdf PDF
N00024-16-R-4403-P0009_Released.docx DOCX document
N00024-16-R-4403_BQAs_218-229.pdf PDF
N00024-16-R-4403-0008_Conformed.pdf PDF
S-6_USS_McFaul_WI_Index_Rev7.xlsx XLSX spreadsheet
N00024-16-R-4403-0008.pdf PDF
N00024-16-R-4403-0007_Conformed.pdf PDF
N00024-16-R-4403-0007.pdf PDF
N00024-16-R-4403-0006_Conformed.pdf PDF
N00024-16-R-4403-0006.pdf PDF
N00024-16-R-4403_BQAs_132-217.pdf PDF
S-6 USS McFaul WI Index Rev6.xlsx XLSX spreadsheet
N00024-16-R-4403-0005.pdf PDF
N00024-16-R-4403-0005_Conformed.pdf PDF
N00024-16-R-4403-0004_Conformed.pdf PDF
N00024-16-R-4403-0004.pdf PDF
MCFAUL_ADDENDUM_1_CVR_SHT_(Amend_0003).pdf PDF
S-6_USS_McFaul_WI_Index_Rev5_(Amend_0003).xlsx XLSX spreadsheet
N00024-16-R-4403-P0003_Released.docx DOCX document
N00024-16-R-4403_Conformed_Through_P0003_Released.docx DOCX document
ERRATA_7_INDEX_REPORT_(Amend_0003).pdf PDF
ERRATA_7_CVR_SHT_(Amend_0003).pdf PDF
N00024-16-R-4403_BQ As_97-131.pdf PDF
N00024-16-R-4403-0002_Conformed.pdf PDF
N00024-16-R-4403-0002.pdf PDF
N00024-16-R-4403_BQ As_48-96.pdf PDF
N00024-16-R-4403_BQ As_1-47.pdf PDF
CDRLs_A-B-C_Signed.pdf PDF
N00024-16-R-4403-0001_Conformed.pdf PDF
N00024-16-R-4403-0001.pdf PDF
S-4_PP_Reference_List.docx DOCX document
S-6_USS_McFaul_Work_Item_Index_Rev4.xlsx XLSX spreadsheet
N00024-16-R-4403.pdf PDF
S-1_Technical_Capabilites_Data_Sheet.docx DOCX document
S-2_Past_Performance_Questionnaire.docx DOCX document
S-3_PPI_Form.doc DOC document
S-5_Eligibility_Criteria_Data_Sheet.docx DOCX document
Show all 49

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment J-4 – Award Fee Intra-Availability Milestones

Required completion date Maximum Award Fee

A+151 $400,000

Award fee criteria for this intra-availability milestone is set forth in HQ B-2-0003 Determination of Fee Paragraph (f), using the ratings set forth in Paragraph (h) to determine the award fee earned.

Undocking

This milestone is considered complete when all work and testing is complete, OQE is completely reviewed and is on file and all work has been properly certified, as described in the Work Items listing below. All MSR contractor related production work must be complete (and satisfactorily tested with required OQE submitted certified and accepted by the SUPERVISOR in accordance with

NSSAINST 5400.1). The term complete is defined to mean the accomplishment of contractor responsible work that makes it possible to safely undock the vessel in accordance with the NSA approved plan and MIL-STD-1625D. The MSR shall certify by signature and serialized letter to the PCO that all work specification requirements (production, checkpoints, inspections, testing reports, WAFs) associated with the Key Event milestone have been satisfactorily completed. The availability Event Readiness List (ERL) shall be used to associate work specifications and testing to the specific Undocking Key Event.

Undocking Work Items

110-11-003 Freeboard Structure Repair

110-11-004 Strut inspect and repair

110-90-001 SA 70438K

113-11-001 Machinery Space Bilge Drain Well

123-11-002 Groups one and three inspect, repair and preserve

123-11-003 Group 2 inspect, repair and preserve

123-11-004 Group 3 inspect, repair and preserve

123-11-005 Group 4 inspect, repair and preserve

123-11-006 Group 5 inspect, repair and preserve

123-11-007 Group 6 inspect, repair and preserve

123-11-008 Accessible voids and cofferdam inspect, repair and preserve

123-11-009 FO Bolted plate manhole cover

123-11-010 FO Service tank inspect and preserve

123-14-002 Potable water tank inspect and preserve

123-17-001 Contaminated oil tank inspect, repair and preserve

150-11-008 Inner Bottom plate repair

161-80-001 SA 64204D

163-11-001 Sea chest inspect and preserve

163-11-002 Waster sleeve replace

165-11-001 Lower Sonar Dome access scuttle repair

165-11-002 Sonar Dome valve replace

243-11-001 Stern tube shaft seals

243-11-003 Shafting

243-12-003 Shafting

243-80-002 SA 73395D

244-11-001 Bearing clearance

244-12-001 Shaft alignment

245-11-001 CPP STBD

245-12-001 CPP Port

437-21-001 TLI replace and test

437-90-001 SA 77829K

520-11-001 Sea valve repair and replace

521-80-002 SA 75829D

562-11-001 Rudder bearing seal

562-11-002 Rudder repair

562-11-003 Rudder Stock Bearing

562-80-001 AER 64269

593-11-001 VCHT tanks

593-11-002 VCHT tank level switch

593-11-003 VCHT chemical flush

631-11-004 Underwater log trunk preserve

631-11-005 Tank top repairs

631-13-001 Chain locker repair and preserve

631-41-001 Freeboard preservation

633-11-002 Zinc anodes

See Below $400,000

Award fee criteria for this intra-availability milestone is set forth in HQ B-2-0003 Determination of Fee Paragraph (f), using the ratings set

Required Reports Complete

1) This incentive is considered complete when all Required Reports that could result in a change in work to be accomplished or additional material to be procured are accepted and approved by the Supervisor. The contractor shall complete the preliminary work and submit one legible copy of all Required Reports, in approved transferrable media no later than the first 25 percent point of the availability (A+66).

2) Dry dock and Tank related required inspection reports shall be submitted no later than the first 30 days of the scheduled docking period.

3) Dry dock related reports which contain readings (final, thickness, etc.), clearances, alignments, paint data sheets, or other such data for work certification must be submitted and approved by the Supervisor prior to pre-flood/undocking (A+151).

All reports across paragraphs 1, 2 and 3 above must be provided by their associated due dates to successfully complete this milestone.

A+55 $400,000

Award fee criteria for this intra-availability milestone is set forth in HQ B-2-0003 Determination of Fee Paragraph (f), using the ratings set forth in Paragraph (h) to determine the award fee earned.

HM&E Turnover #1

In the following Compartments:

4-254-0-E; MER-2

1-158-4-Q; OPS Office

1-206-3-A; Repair-5

1-268-0-C; Central Control Station

1-300-0-C; Combat Systems Equipment Room #3

3-300-0-C; IC/Gyro Room #2

4-370-6-A; Supply Dept Storeroom #4

3-310-2-L; Crew Berthing #5

3-220-2-Q; Supply Support Center

3-126-2-Q; Power Supply Conversion Room

3-97-02-L; Crew Berthing #2

4-94-0-C; IC/GYRO Room #1

4-126-0-E; AUX-1

3-220-01-A; Supply Dept Storeroom #1

3-300-1-L; Crew Berthing #4

3-338-1-L; Crew Berthing #6

2-300-01-L; Crew Berthing #3

1-254-6-L; Passageway

1-174-01-L; Passageway

Complete the following contractor responsible work, in accordance with the work item listed below:

Installation of foundations and equipment onto foundations (except AIT installed equipment less than 75lbs).

Installation and Hydrostatic testing of hydraulic piping disturbed by the installation of GEDMS Maintenance Group.

Installation of interferences disturbed by the ripout and/or installation of equipment under this turnover.

Installation and welding complete of new cableways to include cable trays / ladders.

Installation of lagging removed or disturbed by the ripout and/or installation of foundations or equipment under this turnover.

Preservation and painting of new and disturbed foundations and disturbed surfaces.

IAW the following work items:

438-90-002; 73088K, GEDMS Upgrade

A+69 $400,000

Award fee criteria for this intra-availability milestone is set forth in HQ B-2-0003 Determination of Fee Paragraph (f), using the ratings set forth

HM&E Turnover #2

4-174-0-E; MER-1

1-206-3-A; Repair-5

1-268-0-C; Central Control Station

1-97-1-A; Repair-2

01-130-2-Q; Admin Office

01-130-0-Q; Combat System Maintenance Central

4-126-0-E; AUX-1

1-78-01-L; Passageway

Installation of foundations and equipment onto foundations (except AIT installed equipment less than 75lbs).

Installation of interferences disturbed by the ripout and/or installation of equipment under this turnover.

Installation, welding, and air test of access cut(s) required for rigging of equipment under this turnover.

Installation and hydro testing of piping systems removed as interferences or relocated.

Installation and welding complete of new cableways to include cable trays / ladders.

Installation of lagging removed or disturbed by the ripout and/or installation of foundations or equipment under this

654-90-001; 71604K, Machinery Control System Upgrade (MCS)

A+83 $400,000

Award fee criteria for this intra-availability milestone is set forth in HQ B-2-0003 Determination of Fee Paragraph (f), using the ratings set forth

HM&E Turnover #3

4-174-0-E; MER-1

1-97-1-A; Repair-2

01-130-0-Q; Combat System Maintenance Central

4-126-0-E; AUX-1

4-442-0-E; Steering Gear Room

2-381-2-Q; Electrical Workshop

2-410-2-A; Repair-3

1-304-2-A; Repair-5A / DC Equip Office

Installation of foundations and equipment onto foundations (except AIT installed equipment less than 75lbs).

Installation of interferences disturbed by the ripout and/or installation of equipment under this turnover.

Installation, welding, and air test of access cut(s) required for rigging of equipment under this turnover.

Installation and hydro testing of piping systems removed as interferences or relocated.

Installation and welding complete of new cableways to include cable trays / ladders.

Installation of lagging removed or disturbed by the ripout and/or installation of foundations or equipment under this

A+99 $400,000

Award fee criteria for this intra-availability milestone is set forth in HQ B-2-0003 Determination of Fee Paragraph (f), using the ratings set forth

HM&E Turnover #4

4-254-0-E; MER-2

4-442-0-E; Steering Gear Room

2-410-2-A; Repair-3

3-370-0-E; #3 Generator Room

4-94-0-C; IC/Gyro Room #1

2-126-2-C; Combat Systems Equipment Room #2

3-300-0-C; IC/Gyro Room #2

02-133-1-L; Passageway

03-142-2-Q; Electronic Workshop #1

1-126-0-C; Combat Information Center

04-130-0-C; Pilot House

Installation of foundations and equipment onto foundations (except AIT installed equipment less than 75lbs).

Installation of interferences disturbed by the ripout and/or installation of equipment under this turnover.

Installation, welding, and air test of access cut(s) required for rigging of equipment under this turnover.

Installation and hydro testing of piping systems removed as interferences or relocated.

Installation and welding complete of new cableways to include cable trays / ladders.

Installation of lagging removed or disturbed by the ripout and/or installation of foundations or equipment under this

438-90-001; 71726K, Integrated Bridge Navigation System Upgrade (IBNS)

A+111 $400,000

Award fee criteria for this intra-availability milestone is set forth in HQ B-2-0003 Determination of Fee Paragraph (f), using the ratings set forth

HM&E Turnover #5

2-53-1-C; Combat Systems Equipment Room #1

03-142-2-Q; Electronic Workshop #1

1-126-0-C; Combat Information Center

04-130-0-C; Pilot House

2-370-3-A; Supply Dept Storeroom #2

2-78-01-L; Crew Berthing #1

1-18-0-Q; Sonar Equipment Room #1

01-130-0-Q; Combat System Maintenance Center

2-338-1-L; Passageway

4-370-5-A; Supply Storeroom #3

2-126-1-C; Radio Central

1-84-1-Q; GSE WKSHP / Inert Gas Cylinder Storeroom

2-116-1-T; Access Trunk

03-128-0-C; RADAR Room #1

03-142-0-C; RADAR Room #2

03-128-1-Q; Array Room #1

Installation of foundations and equipment onto foundations (except AIT installed equipment less than 75lbs).

Installation of interferences disturbed by the ripout and/or installation of equipment under this turnover.

Installation, welding, and air test of access cut(s) required for rigging of equipment under this turnover.

Installation and hydro testing of piping systems removed as interferences or relocated.

Installation and welding complete of new cableways to include cable trays / ladders.

Installation of lagging removed or disturbed by the ripout and/or installation of foundations or equipment under this

A+121 $400,000

Award fee criteria for this intra-availability milestone is set forth in HQ B-2-0003 Determination of Fee Paragraph (f), using the ratings set forth

HM&E Turnover #6

2-53-1-C; Combat Systems Equipment Room #1

4-126-0-E; AUX-1

4-174-0-E; MER-1

4-254-0-E; MER-2

3-370-0-E; #3 Generator Room

03-142-2-Q; Electrical Load Center Room #1

1-254-2-Q; Electrical Load Center Room #2

3-126-2-Q; Power Conversion Room #1

3-319-0-Q; Power Conversion Room #2

3-300-0-C; IC/Gyro Room #2

Installation of foundations and equipment onto foundations (except AIT installed equipment less than 75lbs).

Installation of interferences disturbed by the ripout and/or installation of equipment under this turnover.

Installation, welding, and air test of access cut(s) required for rigging of equipment under this turnover.

Installation and hydro testing of piping systems removed as interferences or relocated.

Installation and welding complete of new cableways to include cable trays / ladders.

Installation of lagging removed or disturbed by the ripout and/or installation of foundations or equipment under this

654-90-001; 71604K, Machinery Control System Upgrade (MCS)

; 80612K, Integrated Conditioning and Assessment System Install (ICAS)

A+145 $280,000

Award fee criteria for this intra-availability milestone is set forth in HQ B-2-0003 Determination of Fee Paragraph (f), using the ratings set forth

HM&E Turnover #7

3-18-0-Q; Sonar Room #3

4-126-0-E; AUX-1

4-174-0-E; MER-1

4-220-0-E, AUX-2

4-254-0-E; MER-2

5-300-01-E; A/C Machinery Room

3-370-0-E; #3 Generator Room

4-442-0-E; Steering Gear Room

1-191-0-Q; Crew Galley

02-158-6-L; Wardroom Galley

1-238-1-Q; Scullery

2-414-0-Q; Laundry

Installation of foundations and equipment onto foundations (except AIT installed equipment less than 75lbs).

Installation of interferences disturbed by the ripout and/or installation of equipment under this turnover.

Installation, welding, and air test of access cut(s) required for rigging of equipment under this turnover.

Installation and hydro testing of piping systems removed as interferences or relocated.

Installation and welding complete of new cableways to include cable trays / ladders.

Installation of lagging removed or disturbed by the ripout and/or installation of foundations or equipment under this

654-90-001; 71604K, Machinery Control System Upgrade (MCS)

541-90-001; Shipalt DDG51-70403K, Digital Fuel Control System Installation, accomplish

437-90-001; Shipalt DDG51-77829K, Installation of RADAR & TDR TLIs for DFM, JP-5 and Potable Water Tanks, accomplish

A+181 $520,000

Award fee criteria for this intra-availability milestone is set forth in HQ B-2-0003 Determination of Fee Paragraph (f), using the ratings set

Hot Plant Testing

Complete contractor responsible work on the following HM&E support systems, to facilitate Generator Light-Off (GLO) and

Main Engine Light-off (MELO) for Hot Plant Testing in accordance with the work items listed below:

Generator and Main Engine Intake, Uptake, and Exhaust

VCHT/Plumbing Waste Drain Tanks, Pumps, and System

Firepumps and Firemain System

Main Sea Water Service Pumps and System

Potable Water Tanks, Pumps, Brominators, and System

Low Pressure Air Compressors and System

High Pressure Air Compressors and System

Chill Water Circulating Pumps, Expansion Tanks, and System

Air Conditioning Units

Bleed Air System

Fan Rooms, Plenums, Ducting, and Fans for Engineering and CPS Zones 1-4

Lube Oil Service Pumps, Sumps, Filters, Purifiers, Heaters, Coolers, and System

Controllable Reversible Pitch Propeller Pumps, Sumps, Heaters, Filters, Hubs, Blades, Oil Distribution Box, Power

Module, and System

Fuel Oil Storage Tank Banks, Purifiers, Transfer Pumps, and Fill & Transfer System

Fuel Oil Service Tanks, Pumps, Filters, and System

Gas Turbine Generators, Modules, and Onboard Support Systems

60HZ Switchboards and Load Centers

Main Gas Turbine Engines, Modules, and Onboard Support Systems

Main Propulsion Shafting and Shaft Seals

110-11-002; Trap Door Repair, accomplish

123-11-001; Sounding Tube Plumb Bob Stuck in Sounding Tube, report and remove

123-12-001; JP-5 Tank, inspect and preserve

123-14-001; Potable Water Tanks Suction Line, repair

234-11-001; Main Propulsion Gas Turbine Module (GTM) Resilient Mount, replace

259-11-001; Engine Room No. One Uptake, repair and preserve

259-11-002; Gas Turbine (GTRB) Exhaust Duct Collector, repair

259-80-001; Shipalt DDG51-76087D, Gas Turbine (GTRB) and Ship Service Gas Turbine Generator (SSGTG)

Boundary Layer Infrared Suppression System (BLISS) Cap Modification, accomplish

259-80-002; Shipalt DDG51-64215D, Gas Turbine (GTRB) Uptake Flange Bolting Replacement, accomplish

262-11-001; Main Reduction Gear (MRG) Lube Oil Cooler, repair

262-11-002; Main Reduction Gear (MRG) Lube Oil Cooler, repair

Hot Plant Testing, cont’

437-90-003; Shipalt DDG51-77269K, Installation of Redundant Tank Level Indicators (TLI) on Generator Head

Tanks, accomplish

512-11-003; Galley and Laundry Ventilation Cleaning, accomplish

512-80-001; Shipalt DDG51-64238D, Collective Protection System Supply/Exhaust Hoods, replace

512-90-001; Shipalt DDG51-77419K, Textile Ducting Installation, accomplish

514-80-001; Shipalt DDG51-64216D, Fan Room Condensation Drainage Modifications, accomplish

514-80-002; Shipalt DDG51-76721D, TOTS Valve Installation, accomplish

521-11-001; Firemain Electric Motor Operated Valve Repair, accomplish

521-80-002; Shipalt DDG51-73738D, Installation of Additional Bulkhead Cutout Valves, accomplish

523-80-001; Shipalt DDG51-64254D, Countermeasure Washdown Bulkhead Penetration Sleeve Installation, accomplish

526-11-001; Low Pressure Air Supply Piping, replace

528-80-002; Shipalt DDG51-77690D, 02 Level Intake and Uptake Drains, accomplish

528-80-004; Shipalt DDG51-64240D, Uptake Drain Piping Overboard Routing, accomplish

532-11-001; Potable Water (FWC) Valve and Air Conditioning Chilled Water Circulation (CWR) Valve, replace

593-90-001; Shipalt DDG51-73622K, VCHT H2S Detector Installation, accomplish

624-11-001; Balanced Joiner Door, remove, store, repair, and install

631-11-001; Pressure Zone (PZ) Fan Rooms, prepare and preserve

631-11-003; Fan Room, repair and preserve

634-11-001; Cosmetic Polymeric Deck Covering System (Oil Lab), resurface

992-31-002; Off-Load, Testing, Storage, and On-Load of Ship’s Petroleum Fuels and Lubricants, accomplish

262-90-001; Shipalt DDG51-76253, Install L/O Coalescing Filter, accomplish

; Shipalt DDG51-85973K, L/O Purifier Heater Heat Exchanger, replace