ERRATA_10_INDEX.pdf
PDF 37 KB Posted
- Solicitation number
- N00024-16-R-4403
About this file
ERRATA 10 INDEX
View the file
Other files
Show all 49
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INDEX
SHIP: USS MCFAUL NSSA-501-16
ITEMS THAT ARE STRUCK OUT ON THIS INDEX DO NOT APPLY TO THIS CONTRACT.
CATEGORY I. FY-16 STANDARD ITEMS APPLICABLE TO THIS JOB ORDER WITHOUT FURTHER REFERENCE
DATETITLEITEM NO.
009-01 General Criteria; accomplish 02-Jan-15
009-02 Environmental Compliance Reports for Material Usage at Naval Facilities; provide
02-Jan-15
009-03 Toxic and Hazardous Substances; control 02-Jan-15
009-04 Quality Management System; provide 02-Jan-15
009-05 Temporary Accesses; provide 02-Jan-15
009-06 Maintaining Protection and Cleanliness from Non-Radioactive Operations; accomplish
02-Jan-15
009-07 Confined Space Entry, Certification, Fire Prevention and Housekeeping; accomplish
02-Jan-15
009-08 Fire Protection at Contractor's Facility; accomplish 02-Jan-15
009-10 Shipboard Asbestos-Containing Material (ACM); control 02-Jan-15
009-18 Magnetic Material; control 02-Jan-15
009-19 Provisioning Technical Documentation (PTD); provide 02-Jan-15
009-20 Government Property; control 02-Jan-15
009-21 Logistics and Technical Data; provide 02-Jan-15
009-23 Interferences; remove and install 02-Jan-15
009-24 Shipboard Authorization, Control, Isolation, Blanking, and Tagging Requirements; accomplish
17-Jul-15
009-24 Authorization, Control, Isolation, Blanking, and Tagging Requirements; accomplish
02-Jan-15
009-28 Fire Prevention Requirements; accomplish 02-Jan-15
Page 1 of 9 ERRATA NO. 10
009-29 Asbestos-Free Pipe Hanger Liner Material; install 02-Jan-15
009-34 Fire Protection of Unmanned Vessels at Contractor's Facility;
provide
02-Jan-15
009-35 Confined Space Entry, Certification, Fire Prevention Utilizing Military Fire Watches, and Housekeeping; accomplish
02-Jan-15
009-39 Technical Manual Contract Requirement (TMCR) for New Technical Manuals for Commercial Equipment/ Component;
provide
02-Jan-15
009-40 Requirements for Contractor Cranes, Multi-Purpose Machines and Material Handling Equipment at Naval Facilities; accomplish
02-Jan-15
009-59 Organotin Antifouling Material; control 02-Jan-15
009-60 Schedule and Associated Reports for Availabilities Over 9 Weeks in Duration; provide and manage
09-Sep-15
009-60 Schedule and Associated Reports for Availabilities Over 9 Weeks in Duration; provide and manage
02-Jan-15
009-61 Shipboard Use of Fluorocarbons; control 02-Jan-15
009-64 Synthetic Fire-Resistant Hydraulic Fluid; control 02-Jan-15
009-65 Polychlorinated Biphenyls (PCBs); control 02-Jan-15
009-67 Integrated Total Ship Testing; manage 02-Jan-15
009-69 Heavy Weather/Mooring Plan; provide 02-Jan-15
009-70 Confined Space Entry, Certification, Fire Prevention and Housekeeping for Unmanned Vessels; accomplish
02-Jan-15
009-72 Physical Security at Private Contractor's Facility; accomplish 02-Jan-15
009-73 Shipboard Electrical/Electronic/Fiber Optic Cable; remove, relocate, repair, and install
02-Jan-15
009-74 Occupational, Safety and Health Requirements; accomplish 02-Jan-15
009-74 Occupational, Safety and Health Requirements; accomplish 21-Jul-15
009-77 Cofferdam Requirements; accomplish 02-Jan-15
009-79 Government Owned Material (GOM); status reporting 02-Jan-15
Page 2 of 9 ERRATA NO. 10
009-80 Ship's Facilities; provide 02-Jan-15
009-81 Compartment Closeout; accomplish 02-Jan-15
009-82 Data Requirements When Installing an Equal Component Vice Specified Component; provide
02-Jan-15
009-83 Wire Rope Fitting Verfication; provide 19-Feb-15
009-84 Accountability of Temporary Fasteners; provide 13-Feb-15
009-86 Recovery of Chlorofluorocarbon (CFC) Refrigerants and Fire Suppressant Halon (H) Materials; accomplish
13-Feb-15
009-87 Chemical disinfection Procedures; accomplish 13-Feb-15
009-88 Collection, Holding and Transfer (CHT) and Mogas Tanks, Spaces, and Piping, including Sewage or Mogas-Contaminated Tanks, Spaces, and Piping; certify
02-Jan-15
009-89 Purchase and Inspection Requirements for Contractor Furnished Anodes; accomplish
02-Jan-15
009-93 Emergency Planning and Community Right-to-Know Act (EPCRA) and Pollution Prevention Act (PPA) Information; provide
02-Jan-15
009-94 General Environmental Requirements for Work at Contractor's Facility; accomplish
02-Jan-15
009-95 Mechanically Attached Fittings (MAF's) for Piping Systems;
install
02-Jan-15
009-97 Shipbuilding and Ship Repair Operations National Emission Standard for Hazardous Air Pollutants (NESHAPS) for Surface Coating Information; provide
02-Jan-15
009-99 Ship Departure Report; provide 02-Jan-15
009-100 Ship's Stability Process Control Procedure (PCP); maintain 02-Jan-15
009-101 Requirements for Entry to and Departure from Contractor's Facility; accomplish
02-Jan-15
009-102 Alteration Verification; provide 02-Jan-15
009-103 Weight and Moment Change Data; provide 02-Jan-15
009-106 Work Authorization Form Coordinator (WAFCOR); provide 02-Jan-15
009-108 Aircraft Carrier Requirements for Entry to, Movement within, and Departure from Contractor's Facility; accomplish
02-Jan-15
Page 3 of 9 ERRATA NO. 10
009-109 Special Requirements for Non-SUBSAFE Work on SUBSAFE-Certified Vessels; accomplish
02-Jan-15
009-110 Special Requirements for Non-Nuclear Work on Nuclear Vessels;
accomplish
02-Jan-15
009-111 Schedule and Associated Reports for Availabilities 9 Weeks or Less in Duration; provide and manage
02-Jan-15
009-112 Prevention of Radiographic-Inspection Ionizing-Radiation Hazards;
accomplish
02-Jan-15
009-118 CG Deck Loading; accomplish 02-Jan-15
009-120 Fact Finding and Critique of Unplanned Events; manage 02-Jan-15
009-121 Ship Assessment/Inspection Requirements; provide 02-Jan-15
Page 4 of 9 ERRATA NO. 10
DATETITLEITEM NO.
CATEGORY II. FY-16 STANDARD ITEMS WHICH MAY BE INVOKED IN THE WORK ITEMS OF THIS JOB ORDER
009-09 Process Control Procedure (PCP); provide and accomplish 02-Jan-15
009-09 Process Control Procedure (PCP); provide and accomplish 06-Jan-14
009-11 Insulation and Lagging Requirements; accomplish 17-Jan-13
009-11 Insulation and Lagging Requirements; accomplish 02-Jan-15
009-12 Welding, Fabrication, and Inspection Requirements;
accomplish
09-Sep-15
009-12 Welding, Fabrication, and Inspection Requirements;
accomplish
02-Jan-15
009-12 Welding, Fabrication, and Inspection Requirements;
accomplish
09-Sep-15
009-12 Welding, Fabrication, and Inspection Requirements;
accomplish
09-Sep-15
009-12 Welding, Fabrication, and Inspection Requirements;
accomplish
07-Nov-13
009-12 Welding, Fabrication, and Inspection Requirements;
accomplish
02-Jan-15
009-12 Welding, Fabrication, and Inspection Requirements;
accomplish
09-Sep-15
009-13 Meters; repair and certify calibration 02-Jan-15
009-13 Meters; repair and certify calibration 02-Jan-15
009-13 Meters; repair and certify calibration 02-Jan-15
009-14 Gages and Thermometers; repair and certify calibration 17-Jan-13
009-14 Gages, Switches, and Thermometers; repair and certify calibration
02-Jan-15
009-14 Gages, Switches, and Thermometers; repair and certify calibration
02-Jan-15
009-16 Electronic Equipment; repair 02-Jan-15
009-16 Electronic Equipment; repair 02-Jan-15
009-17 Rotating Electrical Equipment; repair 02-Jan-15
009-22 Shipboard Electric Cable; test 17-Jan-13
009-25 Structural Boundary Test; accomplish 02-Jan-15
Page 5 of 9 ERRATA NO. 10
009-25 Structural Boundary Test; accomplish 02-Jan-15
009-25 Structural Boundary Test; accomplish 17-Jan-13
009-25 Structural Boundary Test; accomplish 02-Jan-15
009-25 Structural Boundary Test; accomplish 02-Jan-15
009-25 Structural Boundary Test; accomplish 02-Jan-15
009-25 Structural Boundary Test; accomplish 02-Jan-15
009-26 Deck Covering Requirements; accomplish 02-Jan-15
009-26 Deck Covering Requirements; accomplish 02-Jan-15
009-26 Deck Covering Requirements; accomplish 17-Jan-13
009-26 Deck Covering Requirements; accomplish 02-Jan-15
009-26 Deck Covering Requirements; accomplish 02-Jan-15
009-26 Deck Covering Requirements; accomplish 02-Jan-15
009-32 Cleaning and Painting Requirements; accomplish 02-Jan-15
009-32 Cleaning and Painting Requirements; accomplish 17-Jul-15
009-32 Cleaning and Painting Requirements; accomplish 17-Jul-15
009-32 Cleaning and Painting Requirements; accomplish 07-Nov-13
009-32 Cleaning and Painting Requirements; accomplish 17-Jul-15
009-32 Cleaning and Painting Requirements; accomplish 17-Jul-15
009-32 Cleaning and Painting Requirements; accomplish 17-Jul-15
009-36 Controller; repair 02-Jan-15
009-36 Controller; repair 29-Jul-11
009-43 Engineering Plant Production Completion Date (PCD), Light-Off Assessment (LOA) Support; provide
02-Jan-15
009-47 Gate Valve; repair 29-Jul-11
009-50 Horizontal Swing Check Valve; repair 29-Jul-11
009-51 Globe, Globe Angle, and Globe Stop Check Valve; repair 17-Jan-13
Page 6 of 9 ERRATA NO. 10
009-52 Relief Valve; repair 29-Jul-11
009-55 Regulating/Reducing Valve; repair 30-Jul-10
009-57 Reduction Gear Security Requirements; accomplish 02-Jan-15
009-57 Reduction Gear Security Requirements; accomplish 02-Jan-15
009-63 Lubricating Oils and Hydraulic Fluids; analyze 02-Jan-15
009-71 Testing Requirements for Piping Systems; accomplish 21-Jul-15
009-71 Testing Requirements for Piping Systems; accomplish 17-Jan-13
009-71 Testing Requirements for Piping Systems; accomplish 21-Jul-15
009-71 Testing Requirements for Piping Systems; accomplish 21-Jul-15
009-71 Testing Requirements for Piping Systems; accomplish 02-Jan-15
009-76 Waveguide and Transmission Line Temporary Lay-Up, Pressurization, and Purging; accomplish
02-Jan-15
009-76 Waveguide and Transmission Line Temporary Lay-Up, Pressurization, and Purging; accomplish
29-Jul-11
009-78 Passive Countermeasures System (PCMS) Material Repair/Installation Requirements; accomplish
02-Jan-15
009-78 Passive Countermeasures System (PCMS) Material Repair/Installation Requirements; accomplish
07-Nov-13
009-78 Passive Countermeasures System (PCMS) Material Repair/Installation Requirements; accomplish
02-Jan-15
009-90 Technical Representative; provide 02-Jan-15
009-90 Technical Representative; provide 02-Jan-15
009-90 Technical Representative; provide 07-Nov-13
009-90 Technical Representative; provide 02-Jan-15
009-90 Technical Representative; provide 02-Jan-15
009-90 Technical Representative; provide 02-Jan-15
009-98 Monel Fasteners; inspect 02-Jan-15
009-98 Monel Fasteners; inspect 30-Jul-10
009-107 Piping System Cleanliness (Non-Nuclear); accomplish 17-Jan-13
009-107 Piping System Cleanliness (Non-Nuclear); accomplish 02-Jan-15
Page 7 of 9 ERRATA NO. 10
009-107 Piping System Cleanliness (Non-Nuclear); accomplish 02-Jan-15
009-117 Support for Combat Systems Light-Off; provide 02-Jan-15
Page 8 of 9 ERRATA NO. 10
ITEM NO. TITLE
150-11-006 02 Level structure; repair and preserve
528-80-002 ShipAlt DDG51-77690D, 02 Level Intake And Uptake Drains;
accomplish
Page 9 of 9 ERRATA NO. 10
File details come from the government source that posted it. Updated .