USS MCFAUL (DDG 74) FY16 Extended Dry-Docking Selected Restricted Availability (EDSRA)
Solicitation number
N00024-16-R-4403
Issued by

About this file

ERRATA 10 INDEX

View the file

Other files

File Type Posted
N00024-16-R-4403-0014.pdf PDF
N00024-16-R-4403-0014_Conformed.pdf PDF
N00024-16-R-4403-0013.pdf PDF
N00024-16-R-4403-0013_Conformed.pdf PDF
N00024-16-R-4403-0012_Conformed.pdf PDF
N00024-16-R-4403-0012.pdf PDF
N0002416R4403-0011_Conformed.pdf PDF
N0002416R4403-0011.pdf PDF
N00024-16-R-4403_Conformed_through_Amendment_0010.docx DOCX document
N00024-16-R-4403-0010_Released.docx DOCX document
N00024-16-R-4403_Conformed_through_P0009.docx DOCX document
ERRATA_10_CVR_SHT.pdf PDF
N00024-16-R-4403-P0009_Released.docx DOCX document
N00024-16-R-4403_BQAs_218-229.pdf PDF
N00024-16-R-4403-0008_Conformed.pdf PDF
S-6_USS_McFaul_WI_Index_Rev7.xlsx XLSX spreadsheet
N00024-16-R-4403-0008.pdf PDF
N00024-16-R-4403-0007_Conformed.pdf PDF
N00024-16-R-4403-0007.pdf PDF
N00024-16-R-4403-0006_Conformed.pdf PDF
N00024-16-R-4403-0006.pdf PDF
N00024-16-R-4403_BQAs_132-217.pdf PDF
S-6 USS McFaul WI Index Rev6.xlsx XLSX spreadsheet
N00024-16-R-4403-0005.pdf PDF
N00024-16-R-4403-0005_Conformed.pdf PDF
N00024-16-R-4403-0004_Conformed.pdf PDF
N00024-16-R-4403-0004.pdf PDF
MCFAUL_ADDENDUM_1_CVR_SHT_(Amend_0003).pdf PDF
S-6_USS_McFaul_WI_Index_Rev5_(Amend_0003).xlsx XLSX spreadsheet
N00024-16-R-4403-P0003_Released.docx DOCX document
N00024-16-R-4403_Conformed_Through_P0003_Released.docx DOCX document
ERRATA_7_INDEX_REPORT_(Amend_0003).pdf PDF
ERRATA_7_CVR_SHT_(Amend_0003).pdf PDF
N00024-16-R-4403_BQ As_97-131.pdf PDF
N00024-16-R-4403-0002_Conformed.pdf PDF
N00024-16-R-4403-0002.pdf PDF
N00024-16-R-4403_BQ As_48-96.pdf PDF
N00024-16-R-4403_BQ As_1-47.pdf PDF
CDRLs_A-B-C_Signed.pdf PDF
N00024-16-R-4403-0001_Conformed.pdf PDF
N00024-16-R-4403-0001.pdf PDF
S-4_PP_Reference_List.docx DOCX document
S-6_USS_McFaul_Work_Item_Index_Rev4.xlsx XLSX spreadsheet
N00024-16-R-4403.pdf PDF
S-1_Technical_Capabilites_Data_Sheet.docx DOCX document
S-2_Past_Performance_Questionnaire.docx DOCX document
J-4_McFaul_Schedule_Incentives.pdf PDF
S-3_PPI_Form.doc DOC document
S-5_Eligibility_Criteria_Data_Sheet.docx DOCX document
Show all 49

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INDEX

SHIP: USS MCFAUL NSSA-501-16

ITEMS THAT ARE STRUCK OUT ON THIS INDEX DO NOT APPLY TO THIS CONTRACT.

CATEGORY I. FY-16 STANDARD ITEMS APPLICABLE TO THIS JOB ORDER WITHOUT FURTHER REFERENCE

DATETITLEITEM NO.

009-01 General Criteria; accomplish 02-Jan-15

009-02 Environmental Compliance Reports for Material Usage at Naval Facilities; provide

02-Jan-15

009-03 Toxic and Hazardous Substances; control 02-Jan-15

009-04 Quality Management System; provide 02-Jan-15

009-05 Temporary Accesses; provide 02-Jan-15

009-06 Maintaining Protection and Cleanliness from Non-Radioactive Operations; accomplish

02-Jan-15

009-07 Confined Space Entry, Certification, Fire Prevention and Housekeeping; accomplish

02-Jan-15

009-08 Fire Protection at Contractor's Facility; accomplish 02-Jan-15

009-10 Shipboard Asbestos-Containing Material (ACM); control 02-Jan-15

009-18 Magnetic Material; control 02-Jan-15

009-19 Provisioning Technical Documentation (PTD); provide 02-Jan-15

009-20 Government Property; control 02-Jan-15

009-21 Logistics and Technical Data; provide 02-Jan-15

009-23 Interferences; remove and install 02-Jan-15

009-24 Shipboard Authorization, Control, Isolation, Blanking, and Tagging Requirements; accomplish

17-Jul-15

009-24 Authorization, Control, Isolation, Blanking, and Tagging Requirements; accomplish

02-Jan-15

009-28 Fire Prevention Requirements; accomplish 02-Jan-15

Page 1 of 9 ERRATA NO. 10

009-29 Asbestos-Free Pipe Hanger Liner Material; install 02-Jan-15

009-34 Fire Protection of Unmanned Vessels at Contractor's Facility;

provide

02-Jan-15

009-35 Confined Space Entry, Certification, Fire Prevention Utilizing Military Fire Watches, and Housekeeping; accomplish

02-Jan-15

009-39 Technical Manual Contract Requirement (TMCR) for New Technical Manuals for Commercial Equipment/ Component;

provide

02-Jan-15

009-40 Requirements for Contractor Cranes, Multi-Purpose Machines and Material Handling Equipment at Naval Facilities; accomplish

02-Jan-15

009-59 Organotin Antifouling Material; control 02-Jan-15

009-60 Schedule and Associated Reports for Availabilities Over 9 Weeks in Duration; provide and manage

09-Sep-15

009-60 Schedule and Associated Reports for Availabilities Over 9 Weeks in Duration; provide and manage

02-Jan-15

009-61 Shipboard Use of Fluorocarbons; control 02-Jan-15

009-64 Synthetic Fire-Resistant Hydraulic Fluid; control 02-Jan-15

009-65 Polychlorinated Biphenyls (PCBs); control 02-Jan-15

009-67 Integrated Total Ship Testing; manage 02-Jan-15

009-69 Heavy Weather/Mooring Plan; provide 02-Jan-15

009-70 Confined Space Entry, Certification, Fire Prevention and Housekeeping for Unmanned Vessels; accomplish

02-Jan-15

009-72 Physical Security at Private Contractor's Facility; accomplish 02-Jan-15

009-73 Shipboard Electrical/Electronic/Fiber Optic Cable; remove, relocate, repair, and install

02-Jan-15

009-74 Occupational, Safety and Health Requirements; accomplish 02-Jan-15

009-74 Occupational, Safety and Health Requirements; accomplish 21-Jul-15

009-77 Cofferdam Requirements; accomplish 02-Jan-15

009-79 Government Owned Material (GOM); status reporting 02-Jan-15

Page 2 of 9 ERRATA NO. 10

009-80 Ship's Facilities; provide 02-Jan-15

009-81 Compartment Closeout; accomplish 02-Jan-15

009-82 Data Requirements When Installing an Equal Component Vice Specified Component; provide

02-Jan-15

009-83 Wire Rope Fitting Verfication; provide 19-Feb-15

009-84 Accountability of Temporary Fasteners; provide 13-Feb-15

009-86 Recovery of Chlorofluorocarbon (CFC) Refrigerants and Fire Suppressant Halon (H) Materials; accomplish

13-Feb-15

009-87 Chemical disinfection Procedures; accomplish 13-Feb-15

009-88 Collection, Holding and Transfer (CHT) and Mogas Tanks, Spaces, and Piping, including Sewage or Mogas-Contaminated Tanks, Spaces, and Piping; certify

02-Jan-15

009-89 Purchase and Inspection Requirements for Contractor Furnished Anodes; accomplish

02-Jan-15

009-93 Emergency Planning and Community Right-to-Know Act (EPCRA) and Pollution Prevention Act (PPA) Information; provide

02-Jan-15

009-94 General Environmental Requirements for Work at Contractor's Facility; accomplish

02-Jan-15

009-95 Mechanically Attached Fittings (MAF's) for Piping Systems;

install

02-Jan-15

009-97 Shipbuilding and Ship Repair Operations National Emission Standard for Hazardous Air Pollutants (NESHAPS) for Surface Coating Information; provide

02-Jan-15

009-99 Ship Departure Report; provide 02-Jan-15

009-100 Ship's Stability Process Control Procedure (PCP); maintain 02-Jan-15

009-101 Requirements for Entry to and Departure from Contractor's Facility; accomplish

02-Jan-15

009-102 Alteration Verification; provide 02-Jan-15

009-103 Weight and Moment Change Data; provide 02-Jan-15

009-106 Work Authorization Form Coordinator (WAFCOR); provide 02-Jan-15

009-108 Aircraft Carrier Requirements for Entry to, Movement within, and Departure from Contractor's Facility; accomplish

02-Jan-15

Page 3 of 9 ERRATA NO. 10

009-109 Special Requirements for Non-SUBSAFE Work on SUBSAFE-Certified Vessels; accomplish

02-Jan-15

009-110 Special Requirements for Non-Nuclear Work on Nuclear Vessels;

accomplish

02-Jan-15

009-111 Schedule and Associated Reports for Availabilities 9 Weeks or Less in Duration; provide and manage

02-Jan-15

009-112 Prevention of Radiographic-Inspection Ionizing-Radiation Hazards;

accomplish

02-Jan-15

009-118 CG Deck Loading; accomplish 02-Jan-15

009-120 Fact Finding and Critique of Unplanned Events; manage 02-Jan-15

009-121 Ship Assessment/Inspection Requirements; provide 02-Jan-15

Page 4 of 9 ERRATA NO. 10

DATETITLEITEM NO.

CATEGORY II. FY-16 STANDARD ITEMS WHICH MAY BE INVOKED IN THE WORK ITEMS OF THIS JOB ORDER

009-09 Process Control Procedure (PCP); provide and accomplish 02-Jan-15

009-09 Process Control Procedure (PCP); provide and accomplish 06-Jan-14

009-11 Insulation and Lagging Requirements; accomplish 17-Jan-13

009-11 Insulation and Lagging Requirements; accomplish 02-Jan-15

009-12 Welding, Fabrication, and Inspection Requirements;

accomplish

09-Sep-15

009-12 Welding, Fabrication, and Inspection Requirements;

accomplish

02-Jan-15

009-12 Welding, Fabrication, and Inspection Requirements;

accomplish

09-Sep-15

009-12 Welding, Fabrication, and Inspection Requirements;

accomplish

09-Sep-15

009-12 Welding, Fabrication, and Inspection Requirements;

accomplish

07-Nov-13

009-12 Welding, Fabrication, and Inspection Requirements;

accomplish

02-Jan-15

009-12 Welding, Fabrication, and Inspection Requirements;

accomplish

09-Sep-15

009-13 Meters; repair and certify calibration 02-Jan-15

009-13 Meters; repair and certify calibration 02-Jan-15

009-13 Meters; repair and certify calibration 02-Jan-15

009-14 Gages and Thermometers; repair and certify calibration 17-Jan-13

009-14 Gages, Switches, and Thermometers; repair and certify calibration

02-Jan-15

009-14 Gages, Switches, and Thermometers; repair and certify calibration

02-Jan-15

009-16 Electronic Equipment; repair 02-Jan-15

009-16 Electronic Equipment; repair 02-Jan-15

009-17 Rotating Electrical Equipment; repair 02-Jan-15

009-22 Shipboard Electric Cable; test 17-Jan-13

009-25 Structural Boundary Test; accomplish 02-Jan-15

Page 5 of 9 ERRATA NO. 10

009-25 Structural Boundary Test; accomplish 02-Jan-15

009-25 Structural Boundary Test; accomplish 17-Jan-13

009-25 Structural Boundary Test; accomplish 02-Jan-15

009-25 Structural Boundary Test; accomplish 02-Jan-15

009-25 Structural Boundary Test; accomplish 02-Jan-15

009-25 Structural Boundary Test; accomplish 02-Jan-15

009-26 Deck Covering Requirements; accomplish 02-Jan-15

009-26 Deck Covering Requirements; accomplish 02-Jan-15

009-26 Deck Covering Requirements; accomplish 17-Jan-13

009-26 Deck Covering Requirements; accomplish 02-Jan-15

009-26 Deck Covering Requirements; accomplish 02-Jan-15

009-26 Deck Covering Requirements; accomplish 02-Jan-15

009-32 Cleaning and Painting Requirements; accomplish 02-Jan-15

009-32 Cleaning and Painting Requirements; accomplish 17-Jul-15

009-32 Cleaning and Painting Requirements; accomplish 17-Jul-15

009-32 Cleaning and Painting Requirements; accomplish 07-Nov-13

009-32 Cleaning and Painting Requirements; accomplish 17-Jul-15

009-32 Cleaning and Painting Requirements; accomplish 17-Jul-15

009-32 Cleaning and Painting Requirements; accomplish 17-Jul-15

009-36 Controller; repair 02-Jan-15

009-36 Controller; repair 29-Jul-11

009-43 Engineering Plant Production Completion Date (PCD), Light-Off Assessment (LOA) Support; provide

02-Jan-15

009-47 Gate Valve; repair 29-Jul-11

009-50 Horizontal Swing Check Valve; repair 29-Jul-11

009-51 Globe, Globe Angle, and Globe Stop Check Valve; repair 17-Jan-13

Page 6 of 9 ERRATA NO. 10

009-52 Relief Valve; repair 29-Jul-11

009-55 Regulating/Reducing Valve; repair 30-Jul-10

009-57 Reduction Gear Security Requirements; accomplish 02-Jan-15

009-57 Reduction Gear Security Requirements; accomplish 02-Jan-15

009-63 Lubricating Oils and Hydraulic Fluids; analyze 02-Jan-15

009-71 Testing Requirements for Piping Systems; accomplish 21-Jul-15

009-71 Testing Requirements for Piping Systems; accomplish 17-Jan-13

009-71 Testing Requirements for Piping Systems; accomplish 21-Jul-15

009-71 Testing Requirements for Piping Systems; accomplish 21-Jul-15

009-71 Testing Requirements for Piping Systems; accomplish 02-Jan-15

009-76 Waveguide and Transmission Line Temporary Lay-Up, Pressurization, and Purging; accomplish

02-Jan-15

009-76 Waveguide and Transmission Line Temporary Lay-Up, Pressurization, and Purging; accomplish

29-Jul-11

009-78 Passive Countermeasures System (PCMS) Material Repair/Installation Requirements; accomplish

02-Jan-15

009-78 Passive Countermeasures System (PCMS) Material Repair/Installation Requirements; accomplish

07-Nov-13

009-78 Passive Countermeasures System (PCMS) Material Repair/Installation Requirements; accomplish

02-Jan-15

009-90 Technical Representative; provide 02-Jan-15

009-90 Technical Representative; provide 02-Jan-15

009-90 Technical Representative; provide 07-Nov-13

009-90 Technical Representative; provide 02-Jan-15

009-90 Technical Representative; provide 02-Jan-15

009-90 Technical Representative; provide 02-Jan-15

009-98 Monel Fasteners; inspect 02-Jan-15

009-98 Monel Fasteners; inspect 30-Jul-10

009-107 Piping System Cleanliness (Non-Nuclear); accomplish 17-Jan-13

009-107 Piping System Cleanliness (Non-Nuclear); accomplish 02-Jan-15

Page 7 of 9 ERRATA NO. 10

009-107 Piping System Cleanliness (Non-Nuclear); accomplish 02-Jan-15

009-117 Support for Combat Systems Light-Off; provide 02-Jan-15

Page 8 of 9 ERRATA NO. 10

ITEM NO. TITLE

150-11-006 02 Level structure; repair and preserve

528-80-002 ShipAlt DDG51-77690D, 02 Level Intake And Uptake Drains;

accomplish

Page 9 of 9 ERRATA NO. 10