ERRATA_7_INDEX_REPORT_(Amend_0003).pdf

PDF 44 KB Posted

Attached to
USS MCFAUL (DDG 74) FY16 Extended Dry-Docking Selected Restricted Availability (EDSRA)
Solicitation number
N00024-16-R-4403
Issued by

About this file

ERRATA 7 INDEX REPORT (Amend 0003)

View the file

Other files

File Type Posted
N00024-16-R-4403-0014.pdf PDF
N00024-16-R-4403-0014_Conformed.pdf PDF
N00024-16-R-4403-0013.pdf PDF
N00024-16-R-4403-0013_Conformed.pdf PDF
N00024-16-R-4403-0012_Conformed.pdf PDF
N00024-16-R-4403-0012.pdf PDF
N0002416R4403-0011_Conformed.pdf PDF
N0002416R4403-0011.pdf PDF
N00024-16-R-4403_Conformed_through_Amendment_0010.docx DOCX document
N00024-16-R-4403-0010_Released.docx DOCX document
N00024-16-R-4403_Conformed_through_P0009.docx DOCX document
ERRATA_10_CVR_SHT.pdf PDF
ERRATA_10_INDEX.pdf PDF
N00024-16-R-4403-P0009_Released.docx DOCX document
N00024-16-R-4403_BQAs_218-229.pdf PDF
N00024-16-R-4403-0008_Conformed.pdf PDF
S-6_USS_McFaul_WI_Index_Rev7.xlsx XLSX spreadsheet
N00024-16-R-4403-0008.pdf PDF
N00024-16-R-4403-0007_Conformed.pdf PDF
N00024-16-R-4403-0007.pdf PDF
N00024-16-R-4403-0006_Conformed.pdf PDF
N00024-16-R-4403-0006.pdf PDF
N00024-16-R-4403_BQAs_132-217.pdf PDF
S-6 USS McFaul WI Index Rev6.xlsx XLSX spreadsheet
N00024-16-R-4403-0005.pdf PDF
N00024-16-R-4403-0005_Conformed.pdf PDF
N00024-16-R-4403-0004_Conformed.pdf PDF
N00024-16-R-4403-0004.pdf PDF
MCFAUL_ADDENDUM_1_CVR_SHT_(Amend_0003).pdf PDF
S-6_USS_McFaul_WI_Index_Rev5_(Amend_0003).xlsx XLSX spreadsheet
N00024-16-R-4403-P0003_Released.docx DOCX document
N00024-16-R-4403_Conformed_Through_P0003_Released.docx DOCX document
ERRATA_7_CVR_SHT_(Amend_0003).pdf PDF
N00024-16-R-4403_BQ As_97-131.pdf PDF
N00024-16-R-4403-0002_Conformed.pdf PDF
N00024-16-R-4403-0002.pdf PDF
N00024-16-R-4403_BQ As_48-96.pdf PDF
N00024-16-R-4403_BQ As_1-47.pdf PDF
CDRLs_A-B-C_Signed.pdf PDF
N00024-16-R-4403-0001_Conformed.pdf PDF
N00024-16-R-4403-0001.pdf PDF
S-4_PP_Reference_List.docx DOCX document
S-6_USS_McFaul_Work_Item_Index_Rev4.xlsx XLSX spreadsheet
N00024-16-R-4403.pdf PDF
S-1_Technical_Capabilites_Data_Sheet.docx DOCX document
S-2_Past_Performance_Questionnaire.docx DOCX document
J-4_McFaul_Schedule_Incentives.pdf PDF
S-3_PPI_Form.doc DOC document
S-5_Eligibility_Criteria_Data_Sheet.docx DOCX document
Show all 49

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INDEX

SHIP: USS MCFAUL NSSA-501-16

ITEMS THAT ARE STRUCK OUT ON THIS INDEX DO NOT APPLY TO THIS CONTRACT.

CATEGORY I. FY-16 STANDARD ITEMS APPLICABLE TO THIS JOB ORDER WITHOUT FURTHER REFERENCE

DATETITLEITEM NO.

009-01 General Criteria; accomplish 02-Jan-15

009-02 Environmental Compliance Reports for Material Usage at Naval Facilities; provide

02-Jan-15

009-03 Toxic and Hazardous Substances; control 02-Jan-15

009-04 Quality Management System; provide 02-Jan-15

009-05 Temporary Accesses; provide 02-Jan-15

009-06 Maintaining Protection and Cleanliness from Non-Radioactive Operations; accomplish

02-Jan-15

009-07 Confined Space Entry, Certification, Fire Prevention and Housekeeping; accomplish

02-Jan-15

009-08 Fire Protection at Contractor's Facility; accomplish 02-Jan-15

009-10 Shipboard Asbestos-Containing Material (ACM); control 02-Jan-15

009-18 Magnetic Material; control 02-Jan-15

009-19 Provisioning Technical Documentation (PTD); provide 02-Jan-15

009-20 Government Property; control 02-Jan-15

009-21 Logistics and Technical Data; provide 02-Jan-15

009-23 Interferences; remove and install 02-Jan-15

009-24 Authorization, Control, Isolation, Blanking, and Tagging Requirements; accomplish

02-Jan-15

009-28 Fire Prevention Requirements; accomplish 02-Jan-15

009-29 Asbestos-Free Pipe Hanger Liner Material; install 02-Jan-15

Page 1 of 12 ERRATA NO. 7

009-34 Fire Protection of Unmanned Vessels at Contractor's Facility;

provide

02-Jan-15

009-35 Confined Space Entry, Certification, Fire Prevention Utilizing Military Fire Watches, and Housekeeping; accomplish

02-Jan-15

009-39 Technical Manual Contract Requirement (TMCR) for New Technical Manuals for Commercial Equipment/ Component;

provide

02-Jan-15

009-40 Requirements for Contractor Cranes, Multi-Purpose Machines and Material Handling Equipment at Naval Facilities; accomplish

02-Jan-15

009-59 Organotin Antifouling Material; control 02-Jan-15

009-60 Schedule and Associated Reports for Availabilities Over 9 Weeks in Duration; provide and manage

02-Jan-15

009-61 Shipboard Use of Fluorocarbons; control 02-Jan-15

009-64 Synthetic Fire-Resistant Hydraulic Fluid; control 02-Jan-15

009-65 Polychlorinated Biphenyls (PCBs); control 02-Jan-15

009-67 Integrated Total Ship Testing; manage 02-Jan-15

009-69 Heavy Weather/Mooring Plan; provide 02-Jan-15

009-70 Confined Space Entry, Certification, Fire Prevention and Housekeeping for Unmanned Vessels; accomplish

02-Jan-15

009-72 Physical Security at Private Contractor's Facility; accomplish 02-Jan-15

009-73 Shipboard Electrical/Electronic/Fiber Optic Cable; remove, relocate, repair, and install

02-Jan-15

009-74 Occupational, Safety and Health Requirements; accomplish 02-Jan-15

009-77 Cofferdam Requirements; accomplish 02-Jan-15

009-79 Government Owned Material (GOM); status reporting 02-Jan-15

009-80 Ship's Facilities; provide 02-Jan-15

009-81 Compartment Closeout; accomplish 02-Jan-15

009-82 Data Requirements When Installing an Equal Component Vice Specified Component; provide

02-Jan-15

Page 2 of 12 ERRATA NO. 7

009-83 Wire Rope Fitting Verfication; provide 19-Feb-15

009-84 Accountability of Temporary Fasteners; provide 13-Feb-15

009-86 Recovery of Chlorofluorocarbon (CFC) Refrigerants and Fire Suppressant Halon (H) Materials; accomplish

13-Feb-15

009-87 Chemical disinfection Procedures; accomplish 13-Feb-15

009-88 Collection, Holding and Transfer (CHT) and Mogas Tanks, Spaces, and Piping, including Sewage or Mogas-Contaminated Tanks, Spaces, and Piping; certify

02-Jan-15

009-89 Purchase and Inspection Requirements for Contractor Furnished Anodes; accomplish

02-Jan-15

009-93 Emergency Planning and Community Right-to-Know Act (EPCRA) and Pollution Prevention Act (PPA) Information; provide

02-Jan-15

009-94 General Environmental Requirements for Work at Contractor's Facility; accomplish

02-Jan-15

009-95 Mechanically Attached Fittings (MAF's) for Piping Systems;

install

02-Jan-15

009-97 Shipbuilding and Ship Repair Operations National Emission Standard for Hazardous Air Pollutants (NESHAPS) for Surface Coating Information; provide

02-Jan-15

009-99 Ship Departure Report; provide 02-Jan-15

009-100 Ship's Stability Process Control Procedure (PCP); maintain 02-Jan-15

009-101 Requirements for Entry to and Departure from Contractor's Facility; accomplish

02-Jan-15

009-102 Alteration Verification; provide 02-Jan-15

009-103 Weight and Moment Change Data; provide 02-Jan-15

009-106 Work Authorization Form Coordinator (WAFCOR); provide 02-Jan-15

009-108 Aircraft Carrier Requirements for Entry to, Movement within, and Departure from Contractor's Facility; accomplish

02-Jan-15

009-109 Special Requirements for Non-SUBSAFE Work on SUBSAFE-Certified Vessels; accomplish

02-Jan-15

009-110 Special Requirements for Non-Nuclear Work on Nuclear Vessels;

accomplish

02-Jan-15

009-111 Schedule and Associated Reports for Availabilities 9 Weeks or Less in Duration; provide and manage

02-Jan-15

Page 3 of 12 ERRATA NO. 7

009-112 Prevention of Radiographic-Inspection Ionizing-Radiation Hazards;

accomplish

02-Jan-15

009-118 CG Deck Loading; accomplish 02-Jan-15

009-120 Fact Finding and Critique of Unplanned Events; manage 02-Jan-15

009-121 Ship Assessment/Inspection Requirements; provide 02-Jan-15

Page 4 of 12 ERRATA NO. 7

DATETITLEITEM NO.

CATEGORY II. FY-15 STANDARD ITEMS WHICH MAY BE INVOKED IN THE WORK ITEMS OF THIS JOB ORDER

009-09 Process Control Procedure (PCP); provide and accomplish 06-Jan-14

009-09 Process Control Procedure (PCP); provide and accomplish 02-Jan-15

009-11 Insulation and Lagging Requirements; accomplish 02-Jan-15

009-11 Insulation and Lagging Requirements; accomplish 17-Jan-13

009-12 Welding, Fabrication, and Inspection Requirements;

accomplish

09-Sep-15

009-12 Welding, Fabrication, and Inspection Requirements;

accomplish

09-Sep-15

009-12 Welding, Fabrication, and Inspection Requirements;

accomplish

07-Nov-13

009-12 Welding, Fabrication, and Inspection Requirements;

accomplish

02-Jan-15

009-12 Welding, Fabrication, and Inspection Requirements;

accomplish

02-Jan-15

009-13 Meters; repair and certify calibration 02-Jan-15

009-13 Meters; repair and certify calibration 02-Jan-15

009-13 Meters; repair and certify calibration 02-Jan-15

009-14 Gages, Switches, and Thermometers; repair and certify calibration

02-Jan-15

009-14 Gages and Thermometers; repair and certify calibration 17-Jan-13

009-16 Electronic Equipment; repair 02-Jan-15

009-16 Electronic Equipment; repair 02-Jan-15

009-17 Rotating Electrical Equipment; repair 02-Jan-15

009-22 Shipboard Electric Cable; test 17-Jan-13

009-25 Structural Boundary Test; accomplish 02-Jan-15

009-25 Structural Boundary Test; accomplish 02-Jan-15

009-25 Structural Boundary Test; accomplish 02-Jan-15

009-25 Structural Boundary Test; accomplish 02-Jan-15

Page 5 of 12 ERRATA NO. 7

009-25 Structural Boundary Test; accomplish 17-Jan-13

009-25 Structural Boundary Test; accomplish 02-Jan-15

009-26 Deck Covering Requirements; accomplish 02-Jan-15

009-26 Deck Covering Requirements; accomplish 02-Jan-15

009-26 Deck Covering Requirements; accomplish 17-Jan-13

009-26 Deck Covering Requirements; accomplish 02-Jan-15

009-26 Deck Covering Requirements; accomplish 02-Jan-15

009-32 Cleaning and Painting Requirements; accomplish 07-Nov-13

009-32 Cleaning and Painting Requirements; accomplish 02-Jan-15

009-32 Cleaning and Painting Requirements; accomplish 17-Jul-15

009-32 Cleaning and Painting Requirements; accomplish 17-Jul-15

009-32 Cleaning and Painting Requirements; accomplish 17-Jul-15

009-36 Controller; repair 29-Jul-11

009-36 Controller; repair 02-Jan-15

009-43 Engineering Plant Production Completion Date (PCD), Light-Off Assessment (LOA) Support; provide

02-Jan-15

009-47 Gate Valve; repair 29-Jul-11

009-50 Horizontal Swing Check Valve; repair 29-Jul-11

009-51 Globe, Globe Angle, and Globe Stop Check Valve; repair 17-Jan-13

009-52 Relief Valve; repair 29-Jul-11

009-55 Regulating/Reducing Valve; repair 30-Jul-10

009-57 Reduction Gear Security Requirements; accomplish 02-Jan-15

009-57 Reduction Gear Security Requirements; accomplish 02-Jan-15

009-63 Lubricating Oils and Hydraulic Fluids; analyze 02-Jan-15

009-71 Testing Requirements for Piping Systems; accomplish 21-Jul-15

009-71 Testing Requirements for Piping Systems; accomplish 21-Jul-15

Page 6 of 12 ERRATA NO. 7

009-71 Testing Requirements for Piping Systems; accomplish 17-Jan-13

009-71 Testing Requirements for Piping Systems; accomplish 02-Jan-15

009-76 Waveguide and Transmission Line Temporary Lay-Up, Pressurization, and Purging; accomplish

02-Jan-15

009-76 Waveguide and Transmission Line Temporary Lay-Up, Pressurization, and Purging; accomplish

29-Jul-11

009-78 Passive Countermeasures System (PCMS) Material Repair/Installation Requirements; accomplish

02-Jan-15

009-78 Passive Countermeasures System (PCMS) Material Repair/Installation Requirements; accomplish

02-Jan-15

009-78 Passive Countermeasures System (PCMS) Material Repair/Installation Requirements; accomplish

07-Nov-13

009-90 Technical Representative; provide 02-Jan-15

009-90 Technical Representative; provide 07-Nov-13

009-90 Technical Representative; provide 02-Jan-15

009-90 Technical Representative; provide 02-Jan-15

009-90 Technical Representative; provide 02-Jan-15

009-98 Monel Fasteners; inspect 30-Jul-10

009-98 Monel Fasteners; inspect 02-Jan-15

009-107 Piping System Cleanliness (Non-Nuclear); accomplish 02-Jan-15

009-107 Piping System Cleanliness (Non-Nuclear); accomplish 02-Jan-15

009-107 Piping System Cleanliness (Non-Nuclear); accomplish 17-Jan-13

009-117 Support for Combat Systems Light-Off; provide 02-Jan-15

Page 7 of 12 ERRATA NO. 7

ITEM NO. TITLE

110-11-002 Trap Door Repair; accomplish

110-90-001 ShipAlt DDG51-70438 Bow Strengthening Modifications and Material List; accomplish

113-11-001 Machinery Space Bilge Drain Well; repair and preserve

120-10-001 Tank Top Plating and Margin Plate; repair

123-11-002 Fuel Oil & Exp Ovfl Tanks, Group One; inspect, repair and preserve

123-11-003 Fuel Oil Tanks, Group 2; inspect and preserve

123-11-004 Fuel Oil Tanks, Group 3; inspect and preserve

123-11-007 Fuel Oil Tank, Group 6; inspect and preserve

123-11-009 Fuel Oil Bolted Plate Manhole Cover; repair

123-11-011 Oily Waste Drain Collecting Tank Bolted Plate Manhole Cover;

replace

123-17-001 Contaminated Oil and Waste Tanks; inspect, repair and preserve

150-11-002 SLQ 32 Platform; inspect, repair and preserve

150-11-003 02 Level Deck; repair and preserve

150-11-004 02 LVL Deck and Bulkhead Area; repair and preserve

150-11-005 Exterior Foundation Repair; accomplish

150-11-006 02 Level structure; repair and preserve

150-11-009 02 Level Deck and Non-Skid; repair

150-11-010 Interior Bulkhead and Side Shell Repair; accomplish

150-11-016 Structural Repair; accomplish

163-11-002 Waster Sleeve; replace

163-80-001 S/A 85309D, Bubble Shield Optimal Configuration; accomplish

165-11-002 Sonar Dome Pressurization System Valves; replace

Page 8 of 12 ERRATA NO. 7

167-11-001 Bolted Equipment Removal Plate (BERP) Repair; accomplish

167-80-002 ShipAlt DDG51-72424D, MAFO-Holtkamp Door Installation;

accomplish

167-80-004 ShipAlt DDG51-76258D, MAFO-Holtkamp Door Installation;

accomplish

168-11-001 Cargo Door; repair

245-11-001 Controllable Pitch Propeller (CPP) System, STBD Propeller Hub;

replace

245-11-002 Controllable Pitch Propeller (CPP) System, STBD; repair

245-12-001 Controllable Pitch Propeller (CPP) System, Port Propeller Hub;

replace

245-12-003 Controllable Pitch Propeller (CPP) System, PORT; repair

251-31-002 Intake; preserve

251-31-003 Air Intake and Exhaust Louver; preserve

259-11-001 Engine Room No.One Uptake; repair and preserve

259-11-003 Uptake Engine Room / Ship Service Gas Turbine Generator Exhaust Flange Gasket and Fasteners; replace

259-11-004 Uptake; preserve

262-11-001 Main Reduction Gear (MRG) Lube Oil Cooler; repair

262-90-001 ShipAlt DDG51-76253K, Install Lube Oil Coalescing Filter;

accomplish

300-11-001 Cable and Cableway Inspection; accomplish

321-80-001 DDG51 Class AER 64201D, Stuffing Tube Replacement (Partial);

accomplish

411-90-001 ShipAlt DDG51-77427K, DDGM Digital Indicators Installation:

accomplish

421-80-001 ShipAlt DDG51-76853D, Magnetic Compass Tec Refresh;

accomplish.

437-90-001 ShipAlt DDG51-77829K, Installation of Radar and Time Domain Reflectrometer (TDR), Tank Level Indicator (TLI) for Diesel Fuel Marine (DFM), JP-5 and Potable Water Tanks; accomplish

438-90-001 ShipAlt DDG51-71726K, DDG Mod Full IBS Upgrade, Single Bridge Watchstander; accomplish

438-90-002 ShipAlt DDG51-73088K, Gigabit Ethernet Data Multiplex System (GEDMS) Upgrade; accomplish

Page 9 of 12 ERRATA NO. 7

441-90-001 ShipAlt DDG51-81443K Navy Multiband Terminal(NMT) AN/WSC-9(V)1 X/KA Installation via ShipAlt DDG51-01102 Common Radio IDD; accomplish (OPTION ITEM)

451-11-001 AN/SPS-67(V)5 Surface Search Radar; replace

456-90-001 ShipAlt DDG51-84530K, AWS: Peripherals Upgrade to SPRS (OJ-839(V)1/U) Installation; accomplish (OPTION ITEM)

463-80-001 SHIPALT DDG51-76231D, Sonar Stave Cable Connectorization and Transducer Element Replacement; accomplish

468-90-001 ShipAlt DDG51-83192K, AN/SQQ-89A(V)15 W/TI-12 Hardware on DDG 54, 56 and 77; accomplish (OPTION ITEM)

508-11-001 Pipe Lagging; replace

508-11-002 Chill Water Pipe Lagging; replace

520-11-001 Sea Valve; repair and replace

523-80-001 ShipAlt DDG51-64245D Countermeasure Washdown Bulkhead Penetration Sleeve Installation; accomplish

526-11-001 Low Pressure Air Station Filter/Regulator/Lubricator; replace

541-90-001 ShipAlt DDG51-70403K, Digital Fuel Control System Installation;

accomplish

562-11-001 Rudder Bearing Seal and Rudderstock Seal; Repair

583-11-001 Boat Handling and Stowage System; repair and preserve

593-11-001 Vacuum, Collecting, Holding, and Transfer (VCHT) and Plumbing Drain Tanks; repair and preserve

602-11-001 Label Plate; replace

622-12-001 Nomex Deck Panel; replace

622-12-002 Nomex Deck Panel; replace

622-12-003 Nomex Deck Panel; replace

624-11-001 Balanced Joiner Door; remove, store, repair and install

631-11-001 Pressure Zone (PZ) Fan Room; prepare and preserve

631-11-002 Laundry Bulkhead Structure and Deck Covering; repair and preserve

631-11-003 Fan Room; repair and preserve

631-11-007 Collective Protection System (CPS) Zone One Fan Room; repair and preserve

Page 10 of 12 ERRATA NO. 7

631-11-009 Collective Protection System (CPS) Zone 2 Fan Room; repair and preserve

631-11-010 Number One Vacuum, Collection, Holding and Transfer (VCHT) Room Deck; preserve

631-11-011 Collective Protection System (CPS) Zone 4 Fan Room; repair and preserve

631-11-012 Collective Protection System (CPS) Zone 3 Fan Room; repair

631-11-015 Shaft Alley Bilge; preserve

631-41-001 Freeboard Preservation; accomplish

633-11-002 Zinc Anode; replace

634-11-017 Terrazzo Deck Covering System; install

634-21-002 Flight Deck Nonskid; replace

644-11-001 Sheathing and Bulkhead; clean and repair

651-90-001 ShipAlt DDG51-71605K, DDG Mod Advanced Galley Installation;

accomplish

654-11-001 Cosmetic Polymeric Deck Covering System; replace

654-90-001 ShipAlt DDG51-71604K, DDG Mod MCS/DCS Upgrades, Single Central Control Station (CCS) Watchstander; accomplish

813-11-001 AEGIS Light-Off (ALO) Compartment Release Schedule; provide

857-11-007 Berthing Barge Towing and Support Services; provide

980-11-002 Ship's Force Office Space, Class Room and Parking Facilities Ashore; provide

980-90-002 ShipAlt DDG-51 LM2500 Digital Fuel Control (EC-70619), Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)

980-90-003 ShipAlt DDG-74 SCD-81301, BEWT II Hardware Install, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)

980-90-004 DDG51 Class OrdAlt 20353, ELEC CNTRL VLVS on C&D WTR CLR), Alteration Installation Team (AIT) Support Service; provide (OPTION

ITEM)

980-90-005 SHIPALT DDG51-70403K, 71604K, 71726K, 73088K, 77829, 77427

Asset Recovery; provide.

980-90-006 ShipAlt DDG-51-84530K, AWS: Peripherals Upgrade to SP, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)

Page 11 of 12 ERRATA NO. 7

980-90-007 SHIPALT DDG51-71615K, DDG MOD, Digital Video Surveillance System (DVSS) SHIPALT DDG51-76869K, 1MC Announcing System Upgrade SHIPALT DDG51-76974K, Moriah HW for DDG MOD SHIPALT DDG51-77259K, EM Log RPL AN/WSN-9(V)1 DHYSL SHIPALT DDG51-71688K, SIWCS, Alteration Installation Team (AIT) Support Service; provide

980-90-008 ShipAlt DDG51-79686K, Close In Weapon System (CIWS) Block 1B Next Generation, and Ordalt 78221 Close, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)

980-90-010 ShipAlt DDG-51-81077K, SSEE INCR E, BLADE SERVER UPGRADE, Alteration Installation Team (AIT) Support Service; provide

(OPTION ITEM)

980-90-012 ShipAlt DDG-51-77333K, CKT3TV Camera System Install, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)

980-90-013 ShipAlt DDG-51-83940K, AWS: Peripheral Upgrade, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)

980-90-014 DDG51 Class OrdAlt-82668, ASTAB COTS Upgrade, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)

980-90-016 ShipAlt DDG-51-80315, AFFF and CMWD SOPV Replacement, Alteration Installation Team (AIT) Support Service; provide (OPTION

ITEM)

980-90-017 ShipAlt DDG51-75913K, BFTT T46D Upgrade, Alteration Installation Team Support (AIT); provide (OPTION ITEM)

980-90-018 SHIPALT DDG51-70403K, 71604K, 71726K, 73088K, 77829, 77427

Alteration Installation Team (AIT) Support Services; provide.

982-31-003 Machinery Space Production Completion and Requirement for Light-Off Assessment (LOA)(Complex); accomplish

992-11-012 Crane, Rigging and Forklift Service for MK82 Directors; provide

992-21-001 TYCOM and Mid Atlantic Regional Maintenance Center (MARMC) Office Space; provide

992-21-002 Small Boat Storage and Repair Facility; provide (Option Item)

992-21-004 Regional Maintenance Center (RMC) Office Space With Computer, in plant/downriver availability; provide

992-26-001 Fleet Technical Assessment (FTA) Team Support; provide

992-31-001 Cleaning, Pumping and Gas Free; accomplish

993-11-005 TYCOM Warehouse Storage Space; provide

993-11-006 NAVSEA Warehouse Storage Space; provide

993-31-003 Temporary Main Reduction Gear (MRG) Dehumidifier System; provide

Page 12 of 12 ERRATA NO. 7

File details come from the government source that posted it. Updated .