Response to Questions (SI Index 0204)

View the file

Other files

File Type Posted
N55236_170001_FBO.pdf PDF
N00024_170014_FBO.pdf PDF
N00024_170015_FBO.pdf PDF
N00024_170024_FBO.pdf PDF
N00024_170017_FBO.pdf PDF
N00024_170016_FBO.pdf PDF
N000024_170012_FBO.pdf PDF
N00024_170013.pdf PDF
N55236_170025_FBO.pdf PDF
JA_215N_redact.pdf PDF
JA_270N_redact.pdf PDF
JA_222N_redact.pdf PDF
JA_3_REDAC6.pdf PDF
JA_4_REDACT.pdf PDF
Redacted_Hamilton_JA2.pdf PDF
JA_PAUL_HAMILTON_REDACT.pdf PDF
DDG-60_RFP_Q_AND_A_-_FINAL.docx DOCX document
J-4_Pricing_Spreadsheet__(Amend_0010).xlsx XLSX spreadsheet
Amend_0010_conformed.pdf PDF
Amendment_0009.pdf PDF
Amend_0009.pdf PDF
Amend_0009_conformed.pdf PDF
Amend_0008.pdf PDF
N00024-16-R-4400-0007_Released.docx DOCX document
DDG_60_AC_Conversion_POAM_plants__1_and__4.mpp MPP file
DDG-60_RFP_Q_AND_A_-___250_-_345.pdf PDF
DDG-60_Mod_Critical_Path_Turnover_Schedule.pdf PDF
Amend_0006.pdf PDF
Amend_0006_Conformed.pdf PDF
J-7_Quality_Assurance_Surveillance_Plan_Amend_0005.pdf PDF
Amend_0004.pdf PDF
Amend_0004_conformed.pdf PDF
J-7_Quality_Assurance_Surveillance_Plan_(Amend_0003).pdf PDF
J-5_Award_Fee_Intra_Availability_(Amend_0003).pdf PDF
J-3_Execution_Milestones_(Amend_0003).xlsx XLSX spreadsheet
Amend_0003_conformed.pdf PDF
DDG-60_RFP_Q_and_A__28-97.pdf PDF
Amendment_0002.pdf PDF
J-4_Pricing_Spreadsheet_for_Amendment_0002.xlsx XLSX spreadsheet
Amendment_0002_Conformed.pdf PDF
DDG-60_RFP_Q_AND_A_-___1-_27.pdf PDF
RFP-IFB_Amend__1.pdf PDF
S-2_Past_Performance_Questionnaire.docx DOCX document
Exhibit_B.pdf PDF
Exhibit_C.pdf PDF
J-5_Award_Fee_Intra_Availability.docx DOCX document
S-4_PP_Reference_List.docx DOCX document
Exhibit_A.pdf PDF
S-5_Eligibility_Criteria_Data_Sheet.docx DOCX document
Synopsis_-_PAUL_HAMILTON_(DDG_60)_Final_(10-1-15).docx DOCX document
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INDEX

SHIP: USS PAUL HAMILTON (DDG 60) TPPC-DDG60-SSSD16-CN01

ITEMS THAT ARE STRUCK OUT IN THIS INDEX DO NOT APPLY TO THIS CONTRACT.

CATEGORY I. FY-16 STANDARD ITEMS APPLICABLE TO THIS JOB ORDER WITHOUT FURTHER REFERENCE.

ITEM_NO. TITLE DATE

009-01 General Criteria; accomplish 07/18/2014

009-02 Environmental Compliance Reports for Material Usage at Naval Facilities; provide 07/18/2014

009-03 Toxic and Hazardous Substances; control 07/18/2014

009-04 Quality Management System; provide 07/18/2014

009-05 Temporary Accesses; provide 07/18/2014

009-06 Maintaining Protection and Cleanliness from Non-Radioactive Operations;

accomplish

07/18/2014

009-07 Confined Space Entry, Certification, Fire Prevention and Housekeeping; accomplish 07/18/2014

009-08 Fire Protection at Contractor's Facility; accomplish 07/18/2014

009-10 Shipboard Asbestos-Containing Material (ACM); control 07/18/2014

009-18 Magnetic Material; control 07/18/2014

009-19 Provisioning Technical Documentation (PTD); provide 07/18/2014

009-20 Government Property; control 07/18/2014

009-21 Logistics and Technical Data; provide 07/18/2014

009-23 Interferences; remove and install 07/18/2014

009-24 Authorization, Control, Isolation, Blanking, and Tagging Requirements; accomplish 07/18/2014

009-28 Fire Prevention Requirements; accomplish 06/10/2014

009-29 Asbestos-Free Pipe Hanger Liner Material; install 07/29/2004

009-34 Fire Protection of Unmanned Vessels at Contractor's Facility; provide 01/17/2013

009-35 Confined Space Entry, Certification, Fire Prevention Utilizing Military Fire Watches, and Housekeeping; accomplish

07/18/2014

009-39 Technical Manual Contract Requirement (TMCR) for New Technical Manuals for Commercial Equipment/ Component; provide

07/19/2007

009-40 Requirements for Contractor Cranes, Multi-Purpose Machines and Material Handling Equipment at Naval Facilities; accomplish

07/18/2014

009-59 Organotin Antifouling Material; control 07/29/2011

009-60 Schedule and Associated Reports for Availabilities Over 9 Weeks in Duration;

provide and manage

07/18/2014

009-61 Shipboard Use of Fluorocarbons; control 07/18/2014

009-64 Synthetic Fire-Resistant Hydraulic Fluid; control 07/18/2014

009-65 Polychlorinated Biphenyls (PCBs); control 07/29/2011

009-67 Integrated Total Ship Testing; manage 07/18/2014

009-69 Heavy Weather/Mooring Plan; provide 07/18/2014

009-70 Confined Space Entry, Certification, Fire Prevention and Housekeeping for Unmanned Vessels; accomplish

07/18/2014

009-72 Physical Security at Private Contractor's Facility; accomplish 07/18/2014

009-73 Shipboard Electrical/Electronic/Fiber Optic Cable; remove, relocate, repair, and install

07/18/2014

009-74 Occupational, Safety and Health Requirements; accomplish 07/18/2014

009-77 Cofferdam Requirements; accomplish 07/18/2014

ITEM_NO. TITLE DATE

009-79 Government Owned Material (GOM); status reporting 07/18/2014

009-80 Ship's Facilities; provide 07/18/2014

009-81 Compartment Closeout; accomplish 07/18/2014

009-82 Data Requirements When Installing an Equal Component Vice Specified Component; provide

07/29/2011

009-83 Wire Rope Fitting Verfication; provide 01/17/2013

009-84 Accountability of Temporary Fasteners; provide 07/18/2014

009-86 Recovery of Chlorofluorocarbon (CFC) Refrigerants and Fire Suppressant Halon (H) Materials; accomplish

08/01/2008

009-87 Chemical disinfection Procedures; accomplish 07/18/2014

009-88 Collection, Holding and Transfer (CHT) and Mogas Tanks, Spaces, and Piping, including Sewage or Mogas-Contaminated Tanks, Spaces, and Piping; certify

07/18/2014

009-89 Purchase and Inspection Requirements for Contractor Furnished Anodes;

accomplish

07/29/2011

009-93 Emergency Planning and Community Right-to-Know Act (EPCRA) and Pollution Prevention Act (PPA) Information; provide

07/18/2014

009-94 General Environmental Requirements for Work at Contractor's Facility; accomplish 01/17/2013

009-95 Mechanically Attached Fittings (MAF's) for Piping Systems; install 07/18/2014

009-97 Shipbuilding and Ship Repair Operations National Emission Standard for Hazardous Air Pollutants (NESHAPS) for Surface Coating Information; provide

01/17/2013

009-99 Ship Departure Report; provide 07/18/2014

009-100 Ship's Stability Process Control Procedure (PCP); maintain 07/18/2014

009-101 Requirements for Entry to and Departure from Contractor's Facility; accomplish 07/18/2014

009-102 Alteration Verification; provide 07/29/2011

009-103 Weight and Moment Change Data; provide 07/18/2014

009-106 Work Authorization Form Coordinator (WAFCOR); provide 01/06/2014

009-108 Aircraft Carrier Requirements for Entry to, Movement within, and Departure from Contractor's Facility; accomplish

07/18/2014

009-109 Special Requirements for Non-SUBSAFE Work on SUBSAFE-Certified Vessels;

accomplish

07/18/2014

009-110 Special Requirements for Non-Nuclear Work on Nuclear Vessels; accomplish 07/18/2014

009-111 Schedule and Associated Reports for Availabilities 9 Weeks or Less in Duration;

provide and manage

07/18/2014

009-112 Prevention of Radiographic-Inspection Ionizing-Radiation Hazards; accomplish 07/18/2014

009-118 CG Deck Loading; accomplish 07/18/2014

009-120 Fact Finding and Critique of Unplanned Events; manage 07/18/2014

009-121 Ship Assessment/Inspection Requirements; provide 07/18/2014

DATETITLEITEM NO.

CATEGORY II. FY-16 STANDARD ITEMS WHICH MAY BE INVOKED IN THE WORK ITEMS OF THIS JOB ORDER

009-09 Process Control Procedure (PCP); provide and accomplish 07/18/2014

009-12 Welding, Fabrication, and Inspection Requirements;

accomplish

09/01/2015

009-12 Welding, Fabrication, and Inspection Requirements;

accomplish

07/18/2014

009-12 Welding, Fabrication, and Inspection Requirements;

accomplish

07/18/2014

009-13 Meters; repair and certify calibration 07/18/2014

009-14 Gages, Switches, and Thermometers; repair and certify calibration

07/18/2014

009-15 Rotating Machinery; balance 01/17/2013

009-16 Electronic Equipment; repair 07/29/2011

009-17 Rotating Electrical Equipment; repair 07/18/2014

009-22 Shipboard Electric Cable; test 07/18/2014

009-25 Structural Boundary Test; accomplish 07/18/2014

009-26 Deck Covering Requirements; accomplish 07/18/2014

009-32 Cleaning and Painting Requirements; accomplish 07/10/2015

009-32 Cleaning and Painting Requirements; accomplish 11/07/2013

009-32 Cleaning and Painting Requirements; accomplish 07/10/2015

009-36 Controller; repair 07/18/2014

009-43 Engineering Plant Production Completion Date (PCD), Light-Off Assessment (LOA) Support; provide

07/18/2014

009-55 Regulating/Reducing Valve; repair 07/30/2010

009-57 Reduction Gear Security Requirements; accomplish 07/18/2014

009-58 Pump and Driver Shaft Alignment; accomplish 09/01/2015

009-58 Pump and Driver Shaft Alignment; accomplish 07/18/2014

009-63 Lubricating Oils and Hydraulic Fluids; analyze 07/18/2014

009-71 Testing Requirements for Piping Systems; accomplish 07/10/2015

009-71 Testing Requirements for Piping Systems; accomplish 07/18/2014

009-76 Waveguide and Transmission Line Temporary Lay-Up, Pressurization, and Purging; accomplish

07/29/2011

009-78 Passive Countermeasures System (PCMS) Material Repair/Installation Requirements; accomplish

11/07/2013

009-90 Technical Representative; provide 07/18/2014

009-92 Resilient Mount; remove and install 07/18/2014

009-98 Monel Fasteners; inspect 07/18/2014

009-104 Vibration Testing and Analysis; accomplish 07/18/2014

009-107 Piping System Cleanliness (Non-Nuclear); accomplish 07/18/2014

009-113 Rotating Electrical Equipment with Sealed Insulation Systems (SIS); rewind

07/18/2014

ITEM NO. TITLE

Work Package Execution Review; accomplish042-11-001

Accountability of Manhour and Material Reservation; accomplish042-27-001

Hazardous Waste Produced on Naval Vessels; control077-01-001

Underwater Hull; inspect110-11-001

Bulkhead and Overhead Plating; repair110-21-001

Machinery Space Bilge Drain Well; repair113-11-001

Sonar Passage Drain Well; replace113-11-002

Sonar Cooling Equipment Room Sump; repair113-11-004

Machinery Room Structural Repair; accomplish120-11-001

Main Engine Room No. One Structural Repair; accomplish120-11-002

Auxiliary Machinery Room Number One and 2 Structural Repair;

accomplish

120-11-003

Fuel Oil Tanks, Group 3 and 4; inspect and preserve123-11-001

Fuel Service Tank; repair123-11-003

Contaminated Oil Tank; repair and preserve123-17-001

AER 84650D, Escape Trunk Manhole and Cover; install123-80-001

Flight Deck Tiedown Fitting; replace130-11-001

AER 83007D, Increase Deck Plate Thickness Modifications(Partial);

accomplish

130-80-001

Bulkhead and Scupper; repair and preserve150-11-001

Bridge Wing Repair; accomplish150-11-002

SLQ-32 Antenna Platform and Step Platform; preserve and replace150-11-003

04 Level Deck; repair and preserve150-11-004

Deck Edge Waterway Bar; replace150-11-005

03 Level Structural Repair; accomplish150-11-006

02 Level Bulkhead and SRBOC Deck; repair150-11-007

02 and 03 Level Structural Repair; accomplish150-11-008

05 Level Deck; repair150-11-009

Main Deck Bulkhead; repair150-11-010

CIWS Weapon Group Mount 21 Deck; repair150-11-011

CIWS Weapon Group Mount 22 Deck; repair150-11-012

06 Level Director Maintenance Deck; repair150-11-013

05 Level Structural; repair150-11-014

Weather Deck Corrosion Repairs; Accomplish150-11-015

Harpoon Stowage Foundation; replace150-11-017

Flight Deck; repair150-11-018

01 Level Superstructure; repair150-11-019

01 Level Bulkhead; repair150-11-020

Passage Structural; repair150-11-021

ShipAlt DDG51-64156D, Harpoon Blast Pad Corrosion Modification;

accomplish (Option Item)

150-80-001

03 Level Deck; repair154-11-001

03 Level Deck; repair154-11-002

Forward Stack; repair and preserve162-11-001

Aft Stack; repair and preserve162-11-002

Sea Chest; inspect163-11-001

Waster Sleeve; replace163-11-002

Sonar Dome Rubber Window (SDRW); inspect and repair165-11-001

Lower Sonar Dome Access Scuttle; repair165-11-002

Upper Sonar Dome Access Scuttle; repair165-11-003

ShipAlt DDG51-83678D, Sonar Dome Air Flow Meter Replacement;

accomplish

165-80-001

Bolted Equipment Removal Plate (BERP) Repair; accomplish167-11-001

Watertight Scuttle; replace167-11-002

Hatch and Scuttle; repair167-11-003

Bolted Equipment Removal Plate (BERP) Repair (Option Item);

accomplish

167-11-004

Bolted Equipment Removal Plate (BERP) Repair (Option Item);

accomplish

167-11-005

No. 2A GTM Bolted Equipment Removal Plate (BERP) Repair;

accomplish (OPTION ITEM)

167-11-006

No. 2B GTM Bolted Equipment Removal Plate (BERP) Repair;

accomplish (OPTION ITEM)

167-11-007

Watertight Scuttle and Hatch; replace167-11-008

Watertight Scuttle; repair167-11-009

No. 1A GTM Bolted Equipment Removal Plate (BERP) Repair;

accomplish (OPTION ITEM)

167-11-010

ShipAlt DDG51-76258D, MAFO-Holtkamp Door (PARTIAL) Installation;

accomplish

167-80-001

ShipAlt DDG51-77228D (Partial), Watertight Door; replace167-80-004

Cargo Door; replace168-11-001

Structural Door Assembly; replace168-11-002

Remove and Overhaul the Actuator; accomplish168-12-001

ShipAlt DDG51-64233, Improved Fan Room Access Modification;

accomplish

168-80-001

ShipAlt DDG51-78049D, Install Bridge Wing Void Manholes; accomplish168-80-002

Main Reduction Gear No. 2 Input Shaft Seal; replace241-11-001

Stern Tube Shaft Seal; overhaul243-11-001

Propulsion Shafting; inspect, repair and align243-11-002

ShipAlt DDG51-73395D, Bulkhead Shaft Seal Upgrade Modification;

accomplish

243-80-001

Outboard Propulsion Shafting, Bearing Clearance Measurement;

accomplish

244-12-001

Controllable Pitch Propeller (CPP) Blade; inspect and repair245-11-001

Controllable Pitch Propeller (CPP) Oil Sump Tank Heater Element;

inspect and clean

245-11-002

Controllable Pitch Propeller (CPP) Oil Distribution Box; replace245-12-001

Controllable Pitch Propeller (CPP) System, Propeller Hub; replace245-12-002

Controllable Pitch Propeller (CPP) Prairie Air Tube, and Valve Rod Assembly; repair and test

245-12-003

Moisture Separator Assembly Mounting Flange; repair251-11-001

Air Intake and Exhaust Louver and Screen; remove, crate and install251-31-001

Ship Service Gas Turbine Generator (SSGTG) Number One Generator Intake; repair and preserve

251-31-002

Forward Intake Repair; accomplish251-31-004

Forward Intake/Uptake Engine Room Number One Repair; accomplish251-31-005

Forward Intake (Clean Side) Repair; accomplish251-31-006

SSGTG No. 3 Generator Exhaust Trunk; repair and preserve251-31-007

Forward Mixing Room Repair; accomplish251-31-008

Ships Service Gas Turbine Generator (SSGTG) Number One Intake;

repair

251-31-009

Ships Service Gas Turbine Generator (SSGTG) Intake Trunk; preserve251-31-011

Intake/Uptake Engine Room No. 2; repair251-31-012

Ships Service Gas Turbine Generator No. 3 (SSGTG) Intake Trunk;

repair

251-32-001

Ship Service Gas Turbine Generator (SSGTG) Number 2 Intake (Dirty Side); repair

251-32-002

Engine Room No. 2B Intake; repair251-32-003

Engine Room No. 2A Intake; repair251-32-004

Seawater Service Piping; replace256-11-001

Ship Service Gas Turbine Generator (SSGTG) Lube Oil Cooler Sea Water Piping; repair

256-11-002

Seawater Air Cooler Piping; replace256-61-001

ShipAlt DDG51-64250D Ship Service Gas Turbine Generator (SSGTG) Emergency Seawater Cooling System Modification; accomplish

256-80-001

Gas Turbine (GTRB) Exhaust Duct Collector; repair259-11-001

SSGTG Exhaust Trunk No. One and No 2; repair and preserve259-11-002

Forward Gas Turbine Exhaust Duct Lagging and Insulation; replace259-11-003

Uptake, Manhole Cover; replace259-11-004

Aft Gas Turbine Exhaust Duct Lagging and Insulation; replace259-11-005

Number 3 Ship Service Gas Turbine Generator (SSGTG) Exhaust Anchor Flange; repair / replace

259-11-006

Gas Turbine Module 1A Exhaust Gasket and Lagging; replace259-11-007

Uptake Engine Room Exhaust Flange Fasteners and Anchor Flange;

replace / repair

259-11-009

No. 2A Propulsion Gas Turbine Exhaust Duct Internal Insulation Sheathing Tabs; replace

259-11-010

Ship Service Gas Turbine Generator (SSGTG) Uptake Trunk No. One and No. 2; repair and preserve

259-11-011

2B Gas Turbine Module (GTM) Duct Lagging; replace259-11-012

No. 2 Ship Service Generator Gas Turbine Exhaust Duct; repair259-11-013

No.2 Ship Service Gas Turbine Generator (SSGTG) Exhaust Flange;

repair

259-11-014

Uptake Deck; repair and preserve259-11-015

ShipAlt DDG51-76087D, Gas Turbine (GTRB) and Ship Service Gas Turbine Generator (SSGTG) Boundary Layer Infrared Suppression System (BLISS) Cap Modification; accomplish

259-80-001

Fuel Riser Mounting Bracket; replace261-11-001

Number One Main Reduction Gear (MRG) Lube Oil Cooler; repair262-11-001

Lube Oil Temperature Regulating Valve; repair262-11-002

Number 2 Main Reduction Gear (MRG) Lube Oil Cooler; repair262-12-001

Lube Oil Settling Tank Heater Element; inspect and clean262-21-001

Lube Oil Settling Tank Heater Element; inspect and clean262-22-001

Electric Driven Lube Oil Pump; repair262-41-001

ShipAlt DDG51-76253K, Install Lube Oil Coalescing Filter; accomplish262-90-001

Number One Lube Oil Purifier Heater Shell; replace264-11-001

ShipAlt DDG-51-85973K, Lube Oil Purifier Heat Exchanger Modifications;

accomplish

264-90-001

ShipAlt DDG51-64208D, SSGTG Emergency Cooling Water Activation Modification; accomplish

310-80-001

Electrical Receptacle Replacement; accomplish321-11-001

01 Level Weatherdeck Electrical Equipment, Electromagnetic Pulse (EMP) Conduit, Stuffing Tubes and Method Mount Foundations; replace

321-11-003

Weatherdeck Electrical Equipment, Electromagnetic Pulse (EMP) Conduit and Stuffing Tube; replace

321-11-004

01 Level Weatherdeck Lighting and Bulkhead; repair321-11-005

Stuffing Tube, Conduit and Dimmer Switch Replacement; accomplish321-11-006

Flight Deck Electrical Equipment; replace321-11-007

Running Lights Telltale Panel; replace324-11-001

ShipAlt DDG51-77427K, DDGM Digital Indicators Installation:

accomplish

411-90-001

ShipAlt DDG51-73088K, Gigabit Ethernet Data Multiplex System (GEDMS) Upgrade; accomplish

431-90-001

ShipAlt DDG-51-83419D, Removal Halocarbon Monitoring System;

accomplish

436-80-001

ShipAlt DDG51-77829K, Installation of Radar and Time Domain Reflectrometer (TDR), Tank Level Indicator (TLI) for Diesel Fuel Marine (DFM), JP-5 and Potable Water Tanks; accomplish

437-90-001

ShipAlt DDG51-77269K, Installation of Redundant Tank Level Indicators (TLI) on Generator Head Tanks; accomplish

437-90-002

ShipAlt DDG51-71604K, DDG Mod MCS/DCS Upgrades, Single Central Control Station (CCS) Watchstander; accomplish

438-90-001

ShipAlt DDG51-71726K, DDG Mod Full IBS Upgrade, Single Bridge Watchstander; accomplish

438-90-002

ShipAlt DDG51-80612K, Backfit ICAS Installation (ICAS); accomplish438-90-003

ShipAlt DDG51-80897K, Navy Multiband Terminal (NMT) AN/WSC-9(V)2 Q/KA/X/GBS Installation; accomplish

441-90-001

ShipAlt DDG-51-01100K, NTWK Build, PEOC4I INC 1, Consolidated Afloat Network and Enterprise Services (CANES), PEOC4I ADNS AN/USQ-144K(V)2 W/SP 1/2 and PEOC4I Naval Modular Automated Communications System (NAVMACS) Tech Refresh; accomplish

441-90-002

ShipAlt DDG51-74283K, AEGIS Ballistic Missile Defense (BMD) 4.0 Installation; accomplish (OPTION ITEM)

450-90-002

ShipAlt DDG51-79322K, AEGIS Ballistic Missile Defense (BMD) 4.0.1 Installation; accomplish (OPTION ITEM)

450-90-003

ShipAlt DDG51-74012K, BMD VLS Magazine Ventilation Upgrade;

accomplish (OPTION ITEM)

450-90-004

OrdAlt 75920 and AER 66030, Electronic Equipment Water Cooler A-Style Bonnet and Titanium Tube Bundle Installation; accomplish

456-90-001

ShipAlt DDG51-84530K, AWS: Peripherals Upgrade to SPRS Installation; accomplish (OPTION ITEM)

456-90-002

SCD 85218K, AN/SQQ-89A(V)15 Tech Refresh with TI-12 Plus Hardware; accomplish

468-90-001

ShipAlt DDG51-86644 K USW-DSS AN/UYQ-100(V)3 to AN/SQQ-89(V)15 Interface; install

468-90-002

OrdAlt-80831 Guided Missile Director AS-3444/SPG-62, Passive Countermeasures System (PCMS) Material; install

472-90-001

Silicon Aluminum Bronze (SAB) Union Fittings; inspect and replace505-11-001

Collective Protection System (CPS) Clean Side Access Plate; remove512-11-001

Supply Ventilation; replace512-11-004

Ventilation Ducting; replace512-11-005

Vaneaxial Fan; repair512-11-006

Ventilation Diffuser; install512-11-007

Cooling Coil Condensate Drain Piping; install512-11-008

ShipAlt DDG51-77419K, Textile Duct Installation; accomplish512-90-001

Chilled Water Piping Bulkhead Penetration; replace514-11-001

Air Conditioning Plant Resilient Mount; replace514-24-001

ShipAlt DDG51-76721, TOTS Valve Installation; accomplish514-80-001

ShipAlt DDG51-76648K, Refrigeration Plant Overboard Pressure Relieving Modification; accomplish

516-90-001

Sea Valve; repair and replace520-11-001

Firemain Valve and Piping; replace521-11-002

Number 5 Fire Pump Class B Overhaul; accomplish521-21-001

ShipAlt DDG51-73738, Installation of Additional Bulkhead Cutout Valves;

accomplish

521-80-001

ShipAlt DDG51-75829D, Firemain Regulator Strainer, Cord Piping and Structural Modifications; accomplish

521-80-002

ShipAlt DDG51-82474D, Relocation of CIWS, Torpedo and DLS Magazine Gauges (Partial); accomplish

522-80-001

Fan Room Deck Drain; replace526-11-001

Deck Drain; replace526-11-002

Deck Drain; replace528-11-001

Deck Drain Piping; replace528-11-002

Plumbing Valve Remote Operator Deck Box Cover; replace528-11-003

Deck Drain Piping; replace528-11-004

Main Eductor Overboard Discharge Valve Teleflex Cable; replace529-11-001

Electronic Cooling Water (ECW) Flow Switch; replace532-11-001

Machinery Space Structural Repairs and Preservation; accomplish533-11-001

ShipAlt DDG51-70403K, Digital Fuel Control System Installation;

accomplish

541-90-001

ShipAlt DDG51-76034K, Modify JP-5 Piping to Allow Emergency JP-5 Supply to Number 3 Gas Turbine Generator Head Tank and ML;

accomplish

542-90-001

Anti-Icing Hanger and Bellow; replace551-11-001

Number One High Pressure Air Compressor (HPAC) Class B Overhaul;

accomplish

551-51-001

Number 2 High Pressure Air Compressor (HPAC) Class B Overhaul;

accomplish

551-52-001

ShipAlt DDG51-64209D, Anti-Icing Piping Hot Hanger Modifications (Partial); accomplish

551-80-001

Halon Actuator Tubing Assembly; replace555-31-001

Steering Gear Hydraulic Power Unit (HPU) Number 1A Axial Piston Pump Class B Overhaul; accomplish (Option Item)

561-11-001

Rudder Stock Bearing; inspect562-11-001

Rudder Bearing Seal and Rudderstock Seal; repair562-11-002

Anchor and Anchor Chain Inspection and Preservation; accomplish581-11-001

Boat Handling and Stowage System; repair583-11-001

Vacuum, Collection, Holding and Transfer (VCHT) Piping System;

chemical cleaning

593-11-001

Plumbing Drain Tank; preserve593-11-002

Vacuum, Collection, Holding and Transfer (VCHT) System Piping, replace

593-11-003

ShipAlt DDG51-73622, Installation of H2S Detectors in VCHT Rooms;

accomplish

593-90-001

Portable J-Bar Davit; replace611-11-001

Reversible Deck Socket and Bolt; repair and replace612-11-001

ShipAlt DDG51-64223D, CIWS Grating and Corrosion Modifications;

accomplish

622-80-001

Inclined Ladder Grating Platform; replace623-11-001

ShipAlt DDG51-64213D, Vertical Ladder Corrosion Modification (Partial);

accomplish

623-80-001

Balanced Joiner Door; remove, store, repair and install624-11-001

VCHT Room No. 2 Bilge; inspect and preserve631-11-001

Generator Room Bilge; repair and preserve631-11-003

Collective Protection System (CPS) Zone 2 Fan Room; repair631-11-004

Fan Room; repair and preserve631-11-005

Vacuum Collection Holding Tank (VCHT) Room Bilge; preserve631-11-006

Fan Room; preserve631-11-009

Chain Locker; inspect and repair631-13-001

Mast Preservation; accomplish631-21-001

Antenna Platform Structure and Plating; inspect and preserve631-21-003

Underwater Hull; preserve631-31-001

Freeboard Preservation; accomplish631-41-001

Impressed Current Cathodic Protection (ICCP) System; inspect and repair

633-11-001

Scullery Deck Covering; replace634-11-002

Flight Deck Nonskid; replace634-21-001

Sonar Dome Hull Damping; preserve and replace636-11-001

ShipAlt DDG51-86249D, Removal of Overhead Sheathing in Battle Dressing Stations; accomplish

637-80-001

ShipAlt DDG51-64194D, Composite Radar Cross Section (RCS) Plating Installation; accomplish

639-80-001

Berthing Habitability Projects (BENL-S4329) Installation; accomplish643-11-001

Crew Messroom Renovation; accomplish643-11-003

Sanitary Space Habitability Project (HENL-S4330) Installation;

accomplish

644-11-002

ShipAlt DDG51-71605K, DDG Mod Advance Galley Inst; accomplish651-90-001

Vertical Launch System (VLS) Flush; accomplish721-31-001

Vertical Launch System (VLS), MK 41 Launcher Top and Uptake Hatch;

preserve

721-31-002

MK 41 Vertical Launching System (VLS) Uptake Hatch; replace721-31-003

Vertical Launching System (VLS) Cell Hatch; replace721-31-004

Torpedo Handling Transfer Station Chock Plate and Protective Screw;

replace

752-11-001

AEGIS Light-Off (ALO) Compartment Release Schedule; provide813-11-001

Production Planning and Estimating, On-Site Planning and Support Services (NAVSEA); provide

813-11-002

Production Planning and Estimating, On-Site Planning and Support Services (TYCOM); provide

813-11-003

Compartment Closeout Schedule; provide813-11-004

Antenna Photographs; provide837-11-001

Personnel Berthing Barge Support; provide857-11-001

TYCOM and SWRMC Office Space; provide980-11-001

Industrial Support Services, Hygienist; provide980-11-002

Light-Off Discrepancy Correction Assistance; provide980-11-003

Local Area Network (GIG-E LAN) Support Service; provide980-11-004

ShipAlts 70403K, 71604K, 71615K, 71726K, 73088K and 77829K Naval Surface Warfare Center (NSWC-CD) SSES Alteration Installation Team (AIT) Production, Test Sequence, Coordination and Testing Services;

provide

980-90-001

NAVSEA (PHD) Office Space; provide980-90-002

ShipAlt DDG51-00151.02K, Air Conditioning Plants No. One and 4 Upgrade Industrial Support; provide (OPTION ITEM)

980-90-003

ShipAlt DDG51-80897K, NMT AN/WSC-9(V)2 Q/KA/X/GBS Installation, Alteration Installation Team (AIT) Support Service; provide

980-90-004

ShipAlt DDG-51-83940K, Video Distribution System (VDS) Upgrade, Alteration Installation Team (AIT) Support Service; provide (OPTION

ITEM)

980-90-005

ShipAlt DDG-51-01100K, NTWK Build, Alteration Installation Team (AIT) Support Service; provide

980-90-006

OrdAlt 83135, CIWS Cable Reliability, Alteration Installation Team (AIT) Support Service; provide

980-90-007

ShipAlt EC 70619K Alteration Installation Team (AIT) Support Service;

provide

980-90-008

Digital Video Surveillance System (DVSS), 1MC Announcing System Upgrade, Moriah HW for DDG, EM Log Replace AN/WSN-9(V)1 DHYSL and SIWCS, Alteration Installation Team (AIT) Support Service; provide

980-90-009

SHIPALT DDG-51-70403K, 71604K, 71726K, 73088K, 77427K and 77829K DDG MOD CORE Alteration Installation Team (AIT) Support Services

980-90-010

SHIPALT DDG51-70403K, 71604K, 71726K, 73088K, 77829, 71615

Asset Recovery; provide.

980-90-011

ShipAlts 74283K BMD 4.0 Program ORTS Display Upgrade and 79322K BMD-DDG 4.0.1 Ship Impact, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)

980-90-012

ShipAlts 70403K, 71604K, 71615K, 71726K, 73088K and 77829K, Naval Surface Warfare Center (NSWC-CD) SSES Alteration Installation Team (AIT) Office Space; provide

980-90-013

ShipAlt DDG-51-77333K, CKT 3TV COTS Upgrade, Alteration Installation Team (AIT) Support Service; provide

980-90-014

OA and SA 79362 AWS Seawater Flow Meter Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)

980-90-017

ShipAlt DDG51-84530K, AWS: Peripherals Upgrade to SP, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)

980-90-018

ShipAlt DDG51-85218 K AN/SQQ-89A(V)15 Tech Refresh Alteration Installation Team (AIT) Support Services; provide

980-90-019

OA 82668, COTS, Upgrade, Alteration Installation Team (AIT) Support Service; provide

980-90-020

Dock Trial, Fast Cruise and Sea Trial; accomplish982-31-001

Engineering Plant Production Completion and Requirement for Light-Off Assessment (LOA); provide

982-31-002

Temporary Service; provide992-11-001

Temporary Flammable Liquid Storage and Hazardous Material Storage Unit, 640 Square Feet; provide

992-11-002

Pierside T-1 Line; provide992-11-003

Crew Transportation; provide992-11-004

Ship's Force Parking; provide992-11-005

Temporary Air Conditioning; provide992-11-006

Fuel Assistance and Towboat Service for Fuel Barge; provide992-11-007

Temporary Refrigerated Storage Facility, 7,000 Cubic Feet; provide992-11-008

Oil Spillage and Floating Sandblasting Debris Boom; install992-11-009

Small Boat Storage and Repair Facility for Ship's Force Use; provide992-21-001

Cleaning and Pumping; accomplish992-31-001

Demineralized Water; provide992-31-002

NAVSEA Cleaning, Pumping and Gas Free; provide992-90-003

Ship's Force Warehouse Storage Space; provide993-11-001

Pressurized Waveguide and Transmission Line Dry Air Lay-Up;

accomplish

993-11-002

Rigging, Crane and Forklift Service; provide993-11-003

Rigging, Crane and Transportation Service; provide993-21-001

Temporary Deck Covering; install993-31-001

Temporary Main Reduction Gear (MRG) Dehumidifier System; provide993-31-002

AN/SPY-1D Antenna Protective Cover; install993-31-003

Drydocking and Undocking; accomplish997-11-001