DDG-60_RFP_Q_AND_A_-___98_-_249_FBO.pdf

PDF 372 KB Posted

Attached to
USS PAUL HAMILTON (DDG 60) EDSRA
Solicitation number
N00024-16-R-4400
Issued by

View the file

Other files

File Type Posted
N55236_170001_FBO.pdf PDF
N00024_170014_FBO.pdf PDF
N00024_170015_FBO.pdf PDF
N00024_170019_FBO.pdf PDF
N00024_170024_FBO.pdf PDF
N00024_170023_FBO.pdf PDF
N00024_170017_FBO.pdf PDF
N00024_170016_FBO.pdf PDF
N000024_170012_FBO.pdf PDF
N00024_170013.pdf PDF
N55236_170025_FBO.pdf PDF
N55236_17006_FBO.pdf PDF
JA_215N_redact.pdf PDF
JA_270N_redact.pdf PDF
JA_222N_redact.pdf PDF
JA_3_REDAC6.pdf PDF
JA_4_REDACT.pdf PDF
Redacted_Hamilton_JA2.pdf PDF
JA_PAUL_HAMILTON_REDACT.pdf PDF
DDG-60_RFP_Q_AND_A_-_FINAL.docx DOCX document
J-4_Pricing_Spreadsheet__(Amend_0010).xlsx XLSX spreadsheet
Amend_0010.pdf PDF
Amend_0010_conformed.pdf PDF
J A_DDG_60_Directed_Subcontractors.pdf PDF
DDG-60_RFP_Q_AND_A_-__357_-_361.pdf PDF
Amendment_0009.pdf PDF
Amend_0009.pdf PDF
Amend_0009_conformed.pdf PDF
J-3_Execution_Milestones_(Amend_0008).xlsx XLSX spreadsheet
Amend_0008_Conformed.pdf PDF
Amend_0008.pdf PDF
DDG-60_RFP_Q_AND_A_356.docx DOCX document
N00024-16-R-4400-0007_Released.docx DOCX document
N00024-16-R-4400_CONFORMED_0007.docx DOCX document
DDG-60_RFP_Q_AND_A_-___250_-_345.pdf PDF
813-11-001_-_ALO_Compartment_Release_Schedule.pdf PDF
DDG_60_AC_Conversion_POAM_plants__1_and__4.mpp MPP file
DDG-60_Mod_Critical_Path_Turnover_Schedule.pdf PDF
SI_Index_0204.pdf PDF
Amend_0006.pdf PDF
Amend_0006_Conformed.pdf PDF
Amendment_0005.pdf PDF
J-7_Quality_Assurance_Surveillance_Plan_Amend_0005.pdf PDF
Amendment_0005_Conformed.pdf PDF
Amend_0004_conformed.pdf PDF
Amend_0004.pdf PDF
J-4_Pricing_Spreadsheet__(Amend_0003).xlsx XLSX spreadsheet
J-7_Quality_Assurance_Surveillance_Plan_(Amend_0003).pdf PDF
Amend_0003.pdf PDF
J-5_Award_Fee_Intra_Availability_(Amend_0003).pdf PDF
Show 40 more

Latest 50 of 74 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NAVAL SEA SYSTEMS COMMAND

N00024-16-R-4400

QUESTIONS AND ANSWERS

The following are answers to questions received from potential offerors. The answers provide clarification only and DO NOT constitute an amendment to the solicitation.

36. Work Item# 120-11-001. Please clarify area to be prepared under this paragraph. Does mid level area only include solid deck on stbd side or does it extend to the cribbing? Does it include the deck under the compressors and other equipment?

What areas on the lower level are to be prepped? No deck is present there (only cribbing and bilge).

Please advise.

ANSWER:

For Work Item# 120-11-001 the mid level area includes solid deck only, does not include area under compressors.

For lower level, entire bilge area between frames 284 and 292 up to the 3 rd horizontal stringer are to be prepped.

37. Work Item# 644-11-002. Reference 2.4 find number M002S calls for 3 each stainless steel urinals

EVAC p/n 5700268. Evac’s new part number for these is 7250150.

Currently (Jan 2016) they have 2 in stock. If sold the lead time for the urinals is 140 days.

Bidder recommends the 3 urinals be provided GFM.

Please review and advise.

For Work Item# 644-11-002, urinals will remain as Contractor Furnished Material (CFM).

46. Work Item# 514-24-001. Contractor finds that the length of the bolts called out in paragraph 3.1.2 are listed as “A/R”, and cannot be identified in the SPEC or the drawing.

Please provide the lengths or provide a change order once they can be identified.

For Work Item# 514-24-001, bolts are listed as A/R on the as built ship drawings. The A/R requires the Contractor to take measurements onboard under existing conditions to determine the length needed. The ship was made available for ship check to measure the length of the bolts needed. No

Change Order will be issued.

49. Work Item# 150-11-005. There is no transverse bulkhead at this location.

Request clarification regarding location of this work. Is the intent to identify the weather deck bulkhead under the flag bags at frame 178?

For Work Item# 150-11-005, an ERRATA will be issued stating the following:

1.2.2 04 Level, Weather Deck, Frame 178, Port and Starboard

3.1 Remove all PCMS for the bulkhead at location 1.2.1 and 1.2.2, in way of knife edge repairs.

3.3 Accomplish the requirements of 009-32 of 2.1, including Table 2, Line One, for preservation of the entire transverse bulkhead at the 03 and 04 level frame 178.

50. Work Item# 150-11-005. There is no waterway at this location.

Is the intent to identify the waterway on the 04 level (location 1.2.2) frame 178?

For Work Item# 150-11-005, the intent is to identify the waterway on the 04 level (location 1.2.2) frame 178.

60. Work Item# 611-11-001. Paragraph 3.2 states “Fabricate and install new portable J-Bar Davit listed in 1.3 and located in 1.2, using 2.2 for guidance.”

Is the intent of this work item to fabricate and install the entire J-Bar Davit Assembly including

Deck Socket?

Please review & advise.

For Work Item# 611-11-001, the intent is to fabricate and install a new portable J-Bar Davit and use the existing deck socket/flower pot.

63. Work Item# 639-80-001. According to test note T-1 from Ref 2.3, Page # 7, paragraph c, “Testing shall be conducted at sea at least 50 nm from land, clear from industrial noise sources. In a typical underway configuration i.e., with no scaffolding, dress lines, etc., this test may be conducted dockside for training or during other IMI investigations. If conducted dockside (for training) ship must not be nested and should not be at least 200 feet from any large metallic structure. Check with local SOPA regulations for radiating in port.”

These limitations make it appear that it is not intended to conduct the subject testing during the availability. Will paragraphs 3.2, 3.2.1 and 3.2.2 be accomplished by the government?

Please review & advise.

For Work Item# 639-80-001, Paragraphs 3.2, 3.2.1, and 3.2.2 will be accomplished by the

Government.

64. Work Item# 583-11-001. Paragraph 3.1 states accomplish the requirements of 009-90 of 2.1. The work spec and technical references do not provide technical representative name or contact information. Please provide POC for the technical representative for the subject work item equipment.

For Work Item# 583-11-001, it is the Contractor’s responsibility to obtain the on-site Technical

Representative. 009-90 paragraph 3.1 and sub-paragraphs 3.1.1 through 3.1.4 state the qualifications needed to be the on-site Technical Representative.

68. Work Items# 120-11-003, 120-11-002, 120-11-001. Para 3.1.2 tasks Contractor to accomplish the requirements of 009-32 of 2.1, including Table 3, Lines 11, Column A, for surface preparation of internal surfaces and starboard side 2nd platform deck from Frame 126 through 174, including one foot up outboard bulkhead, and as directed by the SUPERVISOR.

CONTRACTOR needs clarification for Para 3.1.2, to identify internal surfaces and

STARTBOARD SIDE 2nd PLATFORM DECK from FRAME 126 through 174, INCLUDING

ONE FOOT UP OUTBOARD BULKHEAD, AND AS DIRECTED BY THE SUPERVISOR. IS

CONTRACTOR TO ASSUME ENTIRE SURFACES OF STARBOARD SIDE 2nd

PLATFORM DECK from FRAME 126 through 174, INCLUDING ONE FOOT UP

OUTBOARD BULKHEAD TO BE PART OF “INTERNAL SURFACES”?

Para 3.4 tasks Contractor to accomplish the requirements of 009-32 of 2.1, including Table 3, Lines

11, Columns B, D and E, for preservation of internal surfaces starboard side 2nd platform deck from

Frame 126 through 174, including one foot up outboard bulkhead, and as directed by the

SUPERVISOR.

ADDITIONALLY, note that there is no coverage for 2nd Surface Preparation in 3.4 and will be subject to change order due to extent of structural repairs impacting completed surface preparation requirements in 3.1.2. This RFC also applies to work items 120-11-001 & 120-11-

002.

For Work Items# 120-11-001, 120-11-002, 120-11-003, para 3.1.2 is for the solid deck area on the starboard side.

For 120-11-001 an ERRATA will be issued that states:

3.1 Accomplish the removal of paint to allow for inspection and all structural repair without invoking requirements of 009-32 in accordance with paragraph 3.1.30 of 009-32 between Frames

254 and 282 and Frames 284 and 292, as designated by the SUPERVISOR, to facilitate inspections.

3.5 Accomplish the requirements of 009-32 of 2.1, including Table 3, Line 11, Columns A, B, D, E and F, for surface preservation of the entire area between Frames 254 and 282 one foot up bulkhead and one foot from the bulkhead and one foot all the way around each vertical stringer mid-level, as designated by the SUPERVISOR.

3.5.1 Accomplish the requirements of 009-32 of 2.1, including Table 3, Line 11, Columns A, B, D, E and F, for surface preservation of entire bilge area between Frames 284 and 292 up to the 3rd horizontal stringer, as designated by the SUPERVISOR.

For 120-11-002 an ERRATA will be issued that states:

3.1 Accomplish the removal of paint to allow for inspection and all structural repair without invoking requirements of 009-32 in accordance with paragraph 3.1.30 of 009-32.

3.5 Accomplish the requirements of 009-32 of 2.1, including Table 3, Line 11, Columns A, B, D, E and F, for surface preparation of the entire area between S-15 and S-16 from Frame 174 through

220 to include 6 inches above and below each stringer, as designated by the SUPERVISOR.

For 120-11-003 an ERRATA will be issued that states:

3.1.2 Accomplish the removal of paint to allow for inspection and all structural repair without invoking requirements of 009-32 in accordance with paragraph 3.1.30 of 009-32 of internal surfaces and starboard side 2nd platform deck from Frame 126 through 174, including one foot up outboard bulkhead, and as directed by the SUPERVISOR.

3.4 Accomplish the requirements of 009-32 of 2.1, including Table 3, Lines 11, Columns A, B, D, E and F, for preservation of internal surfaces starboard side 2nd platform deck from Frame 126 through 174, including one foot up outboard bulkhead, and as directed by the SUPERVISOR.

69. Work Item# 150-11-003. Paragraph 3.4 states Contractor to fabricate and install new equipment listed in Para 1.3.1 & 1.3.2 and equipment removed in Para 3.1 as directed by supervisor.

Para 3.1 is “inspect & report”, Contractor is not directed to remove any equipment in Para 3.1.

For estimating purposes, is Contractor to be tasked to remove SLQ-32 Antenna in order to install newly fabricated Access Platform?

For Work Item# 150-11-003, an ERRATA will be issued that states:

3.4 Fabricate and install new the equipment listed in 1.3.1, 1.3.2 and equipment removed in 3.2, as directed by the SUPERVISOR, using 2.2 and 2.3 for guidance.

Contractor is not tasked to remove SLQ-32 Antenna.

74. Work Item# 150-11-007.

# 1: Paragraph 1.2.1 states “02 Level, Weather Deck, Frames 194 through 240, Port and Starboard” while paragraph 3.2.4 states “Remove existing and install new deck plating at 02 level from Frames

194 through 220, Port and Starboard.” What is the correct location?

# 2: Square footage of deck plate to be replaced is unknown. Please provide.

#3: Please modify the specification to include specified manhours and material dollars to cover unknown interferences due to the nonspecific location of work.

For Work Item# 150-11-007, the intent of paragraph 3.2.4 is to install new deck plating on the 02 level frames 194 through 220, port and starboard. Paragraph 1.2.1 is still correct.

Refer to the ship drawings for square footage.

The requirement for this work spec is to remove and install new deck plating at 02 level from

Frames 194 through 220, Port and Starboard. No change order will be provided for interference removal, scope of work is defined in the work specification.

77. Work Item# 651-90-001. Ref.2.42 (with paragraph 5.3) suggests a Kit for this Shipalt.

Please provide this 4720.

The 4720 report has been updated and reflects current GFM being provided and can be provided upon request.

78. Work Item# 168-11-002. Paragraph 3.2 states, “Remove existing and install new each door located in 1.2 , listed in1.3 including associated frames in accordance with 2.3 and 2.4 for guidance.”

On paragraph 5.1, only 5 WT doors are listed as GFM instead of 7 doors required. The 2 doors in paragraph 1.3.4 are not listed in paragraph 5.1.

Please clarify this discrepancy.

For Work Item# 168-11-002, the 2 Doors not identified in 5.1 are to be procured by the Contractor.

79. Work Item# 251-31-002. Paragraph 3.7 states, “ Remove and install new a total of 6 linear feet of T-bar, using material listed in 1.3.3 , to the lower bhd starting from deck and upward , based on report submitted in 3.3.1 and 3.4.2.1 , in the location listed in 1.2.2.”

There is no paragraph 1.2.2 listed. Please provided missing information or correct work spec.

For Work Item# 251-31-002, an ERRATA will be issued that states:

3.7 Remove existing and install new a total of 6 linear feet of T-Bar, using material identified in

1.3.3, to the lower level bulkhead starting from deck and upward, based on the report submitted in

3.3.1 and 3.4.2.1, in the location listed in 1.2.1, as directed by the SUPERVISOR, using 2.5 for guidance.

80. Work Item# 150-11-009. Paragraph 1.3.1 identifies “Quantity (41 SF), Deck Plating, PL100, .188

Inch, MIL-S-22698, GR DH-36” while Paragraph 3.4.1 states “Remove existing and install new a total of 36 Square Feet of deck plating listed in 1.3.1.”

Please clarify the correct amount of square footage to be replaced?

For Work Item# 150-11-009, an ERRATA will be issued that states:

3.4.1 Remove existing and install new a total of 41 Square Feet of deck plating listed in 1.3.1.

84. Work Item# 150-11-013. Paragraph 3.2.1 states, “Remove and install new a total of 45 linear feet of deteriorated or damaged deck edge waterway bar located in 1.2.1 and identified in 1.3.2, using M/F

Sheet 11 of 2.4 for guidance.”

Paragraph 1.3.2 identifies “Quantity (45), Flat Bar 127, 3 inch x 3/16 Inch, ASTM A-588 GRA.”

According to Ref 2.4, M/F 11 Flat Bar 127 is shown as a “header” (or “back up structure”) and 45

Linear Feet is excessive to replace it. The only deck edge water way bar is found on M/F 15, Detail

5A-4-7G & Section 5A-4-4F. There is no other “deck edge water way bar” on this unit, except for side shell sticking up the deck that works as a “water way bar” or “coaming.”

Please confirm that the intent of this item is to replace the deck edge side shell PL 101, and not to replace the under-deck structure flat bar 127 as specified. If confirmed, please provide the plate square footage of deck edge side shell plate to be replaced.

For Work Item# 150-11-013, the intent is to replace the deteriorated water way bar on the 06 level.

95. RESERVED

98. Work Item# 256-11-002. Contractor notes para 3.2.2.1 and 3.2.7.1 both state to Repair/Re-braze 40 leaking joints.

Contractor believes that Para 3.2.7.1 is a duplication of the same work to be accomplished in Para

3.2.2.1.

For Work Item 256-11-002, an ERRATA will be issued that deletes the requirements of paragraphs

3.2.7 and 3.2.7.1

99. Work Item# 150-11-020. For bidding purposes, how much of this bulkhead will be directed to be prepped under this paragraph. Spec says “as designated by the SUPERVISOR”? Should bidder assume only the area around the one square foot to be replaced under para 3.2?

For Work Item 150-11-020, the offeror can assume only one square foot to be replaced under para

3.2.

100. Work Item# 150-80-001. Ref 2.2 is only a LAR (changing material) from DDG-64. This para directs Contractor to accomplish modifications that are not included in this ref. The underlying mod dwg is NOT called out in this spec.

Please provide direction/reference for the accomplishments of the desired modifications.

As stated in the response to question #94 and #96, Work Item# 150-80-001 is cancelled and was deleted as part of ERRATA 1. Do not bid on this work specification.

101. Work Item# 150-11-002. Paragraphs 3.2.1 and 3.2.2 require replacing a total of 20 square feet of bulkhead plating and a total of 9 square feet of deck plating in locations listed in 1.2.1 and 1.2.2.

The locations listed in 1.2.1 and 1.2.2 are on the weather deck 04 level between frames 129-178 port and starboard respectively. Because the exact location of the plating to be replaced is not identified, it is assumed that interferences will be subject to an equitable adjustment.

1. Please confirm unknown interferences will be the subject of an equitable adjustment or add a reserve pool for the cost of interferences, or revise the specification to provide specific locations for the repairs.

2. Please confirm that all repairs will be concentrated in one location rather than spread out over multiple locations or provide a reserve pool for the cost of the structural repairs.

For Work Item 150-11-002, interferences will not be subject to equitable adjustment. The ship was made available for two ship checks.

Repairs will be in multiple locations.

102. Work Item# 168-80-002. The subject item installs Bridge Wing Void Manholes. Section 5 of specification states there is no GFM.

Paragraph 3.1 requires accomplish of References 2.2 through 2.6. On 2.2 all of the material (with the exception of label plate) is listed as GFM.

Please confirm that the Government will provide the (2 EA) Manhole Assemblies listed in 1.3.1 in accordance with 2.2.

For Work Item 168-80-002, the material identified in 2.2 as GFM will be provided as GFM as listed on the 4720.

103. RESERVED

104. Work Item# 514-80-001. Paragraph 3.1 states “Accomplish removals, modifications and installations in accordance with 2.2 through 2.4.”

Reference 2.2 (514-8504769 Rev A) identifies 6ea - 6” Butterfly valves for DDG 54-64 & 66-78.

However, sheet 3 contains a local note that states, “These valves are “REPLACE-AS-FAIL.”

This note renders replacement of the valves to be un-biddable because the offeror doesn’t have insight into which valves have or will ultimately fail.

For estimating purposes, please identify which valves are required to be replaced.

The 4720 report has been updated and reflects current GFM being provided.

105. Work Item# 514-80-001. Paragraph 3.1 states “Accomplish removals, modifications and

Reference 2.2 (514-8504769 Rev A) identifies 6 ea - 6” Butterfly valves for DDG 54-64 & 66-78.

The SCE column identifies the valves as GFM, however, paragraph 5.1 lists a GFM kit with no further information.

Please confirm these valves will be provided as GFM.

106. Work Item# 514-80-001. Paragraph 3.1 states “Accomplish removals, modifications and

Reference 2.2 (514-8504769 Rev A) identifies 6ea - 6” Butterfly valves / 48ea Bolts / 96ea Nuts and

12ea Gaskets for DDG 54-64 & 66-78. On sheet 7 the valves are identified as GFM in the SCE column.

Paragraph 5.3 of the work item calls out 1 kit of GFM listed in reference 2.5 (4720-DDG74-FY16).

The 4720 (reference 2.5), for this shipalt states, “NO DRAWINGS FOUND FOR DDG 60 ALT SA

76721 00 Paul Brown (619) 437-2371.”

Contractor request the identification of the GFM called out as a Kit referencing 2.5 and clarification on whether the drawings GFM identification is correct.

Please provide information.

107. Offeror notes that several ship alteration drawings reference material as GFM in the SCE column of the list of materials. This information either doesn’t match paragraph 5.1 of the work item and/or the 4720 report, and/or the 4720 report is blank for the shipalt containing no information.

Please confirm that where ship alteration drawings list GFM in the SCE column, that the material is in fact being provided as GFM regardless of omissions or discrepancies in paragraph 5.1 or the 4720 report.

108. Attachment J-3 lists the Crew Move-aboard Milestone as “TBD.”

Please provide.

A future RFP amendment will revise Attachment J-3.

109. RESRVED

110. Work Item# 441-90-001, para. 5.3 states there is GFM “Kitted Material” as per para. 2.12.

Sheet 134 of the 4720 Material List states “No drawings found for DDG-60 Alt SA 80897”

Please provide a listing of all material that will be provided as GFM for this work item.

The 4720 has been updated. GFM is now listed for the subject work item (DDG-60 SA 80897).

111. Work Item# 113-11-001. As currently written, the location of work for the structural repairs is vague. In order to identify and include interferences in the estimate for this work item, please provide a more precise location of repairs to be accomplished since “as designated by supervisor” is un-biddable.

For Work Item 113-11-001, ship checks were made available on two occasions.

112. Work Item# 113-11-004. As currently written, the location of work for the structural repairs is provide a more precise location of repairs to be accomplished since “as designated by supervisor” and “based on report” are un-biddable.

For Work Item 113-11-004, ship checks were made available on two occasions.

113. Work Item# 130-11-001. As currently written, the location of work for the structural repairs is

For Work Item 130-11-001, ship checks were made available on two occasions.

114. Work Item# 150-11-004. As currently written, the location of work for the structural repairs is

For Work Item 150-11-004, ship checks were made available on two occasions.

115. Work Item# 150-11-005. As currently written, the location of work for the structural repairs is

For Work Item 150-11-005, ship checks were made available on two occasions.

Paragraph 3.2 may be subject to equitable adjustment. Material requirements identified in 1.3 are to be priced under the basic and are not subject to equitable adjustment.

116. Work Item# 150-11-006. As currently written, the location of work for the structural repairs is

For Work Item 150-11-006, ship checks were made available on two occasions.

117. Work Item# 150-11-008. As currently written, the location of work for the structural repairs is

For Work Item 150-11-008, ship checks were made available on two occasions.

118. Work Item# 150-11-009. As currently written, the location of work for the structural repairs is

For Work Item 150-11-009, ship checks were made available on two occasions.

119. Work Item# 150-11-010. As currently written, the location of work for the structural repairs is

For Work Item 150-11-010, ship checks were made available on two occasions.

120. Work Item# 150-11-011. As currently written, the location of work for the structural repairs is

For Work Item 150-11-011, ship checks were made available on two occasions.

121. Work Item# 150-11-012. As currently written, the location of work for the structural repairs is

For Work Item 150-11-012, ship checks were made available on two occasions.

122. Work Item# 150-11-013. As currently written, the location of work for the structural repairs is

For Work Item 150-11-013, ship checks were made available on two occasions.

123. Work Item# 150-11-014. As currently written, the location of work for the structural repairs is

For Work Item 150-11-014, ship checks were made available on two occasions.

124. RESERVED

125. Work Item# 150-11-018. As currently written, the location of work for the structural repairs is

For Work Item# 150-11-018, Replacement of .375 inch deck plating identified in 1.3.1 and 3.1.1, located in 1.2 is more specifically located 4 inches forward to 8 inches aft of bulkhead 389 and from

10 feet 9 inches to 11 feet 9 inches port of centerline. This equates to a 2 ft by 2 ft insert.

126. Work Item# 251-31-007. As currently written, the location of work for the structural repairs is

For Work Item# 251-31-007, Ship was made available during two ship check opportunities. Repairs are marked up inside space. The purpose of conducting NDT’s and submitting a report is to identify any more repairs. The deck and bulkhead repairs are for existing holes and damage in the trunk..

127. Work Item# 251-31-008. As currently written, the location of work for the structural repairs is

For Work Item# 251-31-008, Scope of work is identified clearly in the work specification. Refer to drawings to determine drain locations and plating locations.

An ERRATA will be issued to add:

3.13 Accomplish the requirements of 009-11 of 2.1, for new and disturbed lagging.

128. Work Item# 533-11-001. As currently written, the location of work for the structural repairs is

For Work Item# 533-11-001, Scope of work is identified clearly in the work specification. Refer to drawings if unfamiliar with locations identified and called out in work specification. Ship was made available for two separate ship checks.

129. Work Item# 631-11-005. As currently written, the location of work for the structural repairs is

For Work Item# 631-11-005, Scope of work is identified clearly in the work specification. Amount of plating is identified and location of work is called out. Ship was made available for two separate ship checks.

130. Work Item# 431-90-001. For clarification purposes, Answer to question #19 states, “As indicated in paragraph 3.1.1, the AIT contractor accomplishing electrical modifications shall accomplish ALL hot work operations (to include but not be limited to welding, burning, grinding , drilling and firewatch operations)”

Unless otherwise directed, the contractor shall assume that the AIT is also fabricating the foundations being installed.

Please confirm.

The AIT will fabricate the foundations they are installing.

131. Work Item# 438-90-001. For clarification purposes, Answer to question #21 states, “As indicated in paragraph 3.2.2.1, the AIT contractor accomplishing electrical modifications shall accomplish ALL

132. Work Item# 438-90-002. For clarification purposes, Answer to question #22 states, “As indicated in paragraph 3.1.5, the AIT contractor accomplishing electrical modifications shall accomplish ALL

133. Work Item# 411-90-001. For clarification purposes, Answer to question #20 states, “As indicated in paragraph 3.1.2, the AIT contractor accomplishing electrical modifications shall accomplish ALL

134. Work Item# 154-11-001. What is a “life raft securing bracket”? Can we be provided a more specific reference (e.g. dwg Detail #)? Ref 2.4 lists several types of 316 CRES plate (3/8”, 5/16”, ¼”). Which of these should be estimated?

For Work Item# 154-11-001, the mounting of each post, considering the uppermost buoyancy member, comprises a flexible, grommeted bracket flap seamed to and projecting horizontally inward from the top of the buoyancy member, and a molded tubular rubber bracket having base flanges for strength of anchorage, the bracket being adhered to the inboard side of the buoyancy member.

2.4 583-7284247 Rev B, ShipAlt DDG-51-TY 64, 161 Encapsulated Liferafts/Lifeboat, Corrosion

MODS & ML

2.3 583-6220293 Rev AF, Fabrication of inflatable boat stowage FTG material & sizes.

135. Work Item# 583-11-001. Para 3.1, states “Accomplish the requirements of 009-90 of 2.1”.

Para 3.1.1, “Provide the services of a qualified OEM technical representative for removal, disassembly, inspection, repair, assembly, installation and testing of the equipment listed in 1.3.1.”

Is the intent to solicit OEM technical representative for the controller, the davit or both?

Request advise

For Work Item# 583-11-001, 009-90 paragraph 3.1 and sub-paragraphs 3.1.1 through 3.1.4 state the qualifications needed to be the on-site Technical Representative.

136. Work Item# 259-11-003. Requirements of subject work item:

Para 3.5 lists to replace Lagging using the material identified in 1.3.4 through 1.3.7 = 1,022 SF

Para 3.6 lists 300 SF of Lagging for 1.3.4 and 1.3.5

Para 3.7 lists 100 SF of Lagging for 1.3.8 and 1.3.9

Total of 1,422 SF

Yet the identification paragraphs state:

Para 1.3.5 lists (400 Square Feet) of Lagging.

Para 1.3.6 lists (492 Square Feet) of Lagging.

Para 1.3.7 lists (130 Square Feet) of Lagging.

Para 1.3.8 lists (120 Square Feet) of Lagging. Missing from Para 3 scope of work in specification

Para 1.3.9 lists (100 Square Feet) of Lagging. Missing from Para 3 scope of work in specification

Para 1.3.10 lists (96 Square Feet) of Lagging. Missing from Para 3 scope of work in specification

Total of 1,338 SF of Lagging

Request advise correct amount of lagging to estimate for the work above; 1,022 SF, 1,422 SF or

1,338 SF?

For Work Item# 259-11-003, an ERRATA will be issued:

1.3.5 484 SF

137. Work Item# 110-11-001. Para 3.1, states “Immediately upon drydocking, Low-Pressure Water

Clean (LP WC) the underwater hull listed in 1.2 using clean, pressurized water at 2,000-3,000 pounds per square inch (PSI), removing surface contaminants, marine fouling and loose non-adhering paint.”

Question: Will the underwater hull be scubbed to remove most of the marine growth and fouling by a separate government contract prior to this CNO availability?

For Work Item# 110-11-001, if the ships schedule allows, a scrubbing will take place prior to going into dock. The Contractor needs to bid and schedule as if this scrubbing will not take place on a separate contract.

138. Work Item# 120-11-002. Para 1.3.2, states “(20 LF), Shell Stringer, IT101, 8 Inch X 4 Inch X 10

Pound I-T, Mil-S-22698 GR AH-36”

Para 3.3.2 only lists replacement of 8 LF.

Para 3.3.4 only lists replacement of 4 LF.

Question: Is the correct number of LF to replace 20 or 12?

For Work Item# 120-11-002, an ERRATA will be issued:

1.3.2 12 LF

139. Work Item# 120-11-003.

Para 1.3.1, states “(20 LF), Deck Plating

Para 1.3.3 states “(6 LF) Vertical Stringer

Para 1.3.5 states “(18 LF) Port Shell Plating

For Para 1.3.1, Paras 3.1.3 has 20 LF and Para 3.1.10 has another 2 LF. (2 extra LF)

For Para 1.3.3, Paras 3.1.5 has 8 LF, Para 3.1.8, 3.1.9, 3.1.14 and 3.1.15 have 1 LF each. (6 extra

LF)

For Para 1.3.5, Para 3.1.11 only has 8 LF. (10 Less LF)

Question: What are the correct amounts of LF to replace for Paras 1.3.1, 1.3.3, 1.3.5?

For Work Item# 120-11-003, an ERRATA will be issued:

Para. 1.3.1 (22LF) Deck Plating

Para. 1.3.3 (12LF ) Vertical Stringer

Para. 1.3.5 is correct.

140. Work Item# 150-11-001.

Para 1.3.3, states “(3 EA) Pipe Hangars (CRES)

Para 3.2.2.1 states “Remove existing and install new a total of (6 EA) hangars to support the piping and prevent vibration in accordance with 2.7 and as directed by the SUPERVISOR.”

Question: Is the correct number of new pipe hangers to install three or six? Are they all CRES?

For Work Item# 150-11-001, an ERRATA will be issued:

1.3.3 (6 EA). New Hangars will be made of CRES. Refer to current drawings or ship check for current material make-up.

141. Work Item# 259-11-012.

Para 3.3 does not list a specific Square Feet value from 1.3.1 but could be considered 2 Square Feet

Para 3.4 lists 30 SF of Lagging for 1.3.1

Para 3.5 lists 8 SF of Lagging for 1.3.1

Total of 40 Square Feet

Yet

Para 1.3.1 lists (238 Square Feet) of Lagging.

These totals for lagging materials appear to be 198 Square Feet short

Question: Is the correct amount to estimate for lagging 40 SF or 238 SF?

For Work Item# 259-11-012, 238 SQ FT of lagging is required per requirements of work specification and references.

142. RESERVED

143. Work Item# 634-11-004.

Para 3.1.7 requires the removal of existing and install new a total of one square foot of deteriorated bulkhead plating listed in 1.3.4 …..

Yet

Para 1.3.4 lists (5 Square Feet)

These totals for square feet appear to be 4 SF short

Question: Is the correct amount of bulkhead plating to remove and install new 1 SF or 5 SF?

Work Item# 634-11-004 is not a work specification for this solicitation.

144. (Revised) Work Item# 520-11-001. Paragraphs 3.6 & 3.7 require the replacement of new fasteners

IAW Mil-DTL-1222 GR-500 Nickel Copper Alloy (K-Monel), local supplier has quoted these but has concerns about requiring GR-500 Monel for the hex nuts, they state normally when GR-500 fasteners are quoted or purchased from them, the Customer usually asks for GR-400 Monel. GR-500

Monel is common for the bolts, but not for the Hex nuts (which are extremely costly as compared to

GR-400), should we still quote GR-500 on the hex nuts?

Request review and advise

For Work Item# 520-11-001, GR-400 nuts are an authorized substitute.

145. Work Item# 150-11-017. Para 3.1, states “Remove existing corroded stowage foundation below

Harpoon Launcher framing, and install new, at the location listed in 1.2.1, using 2.2 for guidance.”

Para 1.3.1 lists (5 Square Feet) Plate.

Para 1.3.2 lists (One Square Foot) Plate.

These materials appears to be for Para 3.1.2 fabrication of new stowage foundation

The specification is not clear on what is Remove Existing and Install new or reused?

Request advise number of SF is “remove existing” and the number of SF is “install new or reused”

For Work Item# 150-11-017, Refer to1.3 para. 1.3.1, Square Feet, remove old existing foundation and replace with new foundation. in para. 3.1.2. There is no mentioning of reusing existing foundation materials. Use existing foundation as the template.

146. Work Item# 123-17-001. This paragraph directs contractor to clean and maintain the tanks listed in

1.2.

1.2.1, 1.2.2 & 1.2.4 are also included in 992-90-003.

1.2.3 & 1.2.5 are also included 992-31-001.

Which item(s) should the contractor price the cleaning?

For Work Item# 123-17-001, Contractor should price the cleaning and maintaining necessary for this work item under this work item. Additional coverage for tanks listed in this spec will be covered under 992-90-003 and 992-31-001.

147. Work Item# 259-11-009. This paragraph directs contractor to clean and maintain the tanks listed in

1.2.

1.2.1, 1.2.2 & 1.2.4 are also included in 992-90-003.

1.2.3 & 1.2.5 are also included 992-31-001.

Which item(s) should the contractor price the cleaning?

For Work Item# 259-11-009, Contractor should price the cleaning and maintaining necessary for this work item under this work item. Additional coverage for tanks listed in this spec will be covered under 992-90-003 and 992-31-001.

148. Work Item# 167-11-002. Paragraph 3.2 requires that the Government provided Scuttle be flame sprayed in accordance with 009-105.

Is flame spray coating of the new scuttle required?

For Work Item# 167-11-002, yes, this is a requirement for any and all machinery space closures.

149. RESERVED

150. RESERVED

151. RESERVED

152. RESERVED

153. Work Item# 514-80-001. Work Item states to accomplish removals and modifications in accordance with References 2.2 -2.4.

Reference 2.2 “Chilled Water TOTS Valve & ML” includes a listing of Chilled Water Valve replacements. However a majority of the valves replacements are not applicable to DDG 60. The only valves specific to DDG 60 include a drawing note notes that valves are “Replace As Fail”.

Contractor assumes that quantity and size of valves to be worked are listed in Paragraph 5.3 “Kitted

Material”, for ShipAlt Kit 76721. Reference 2.5 “ShipAlt Material Summary (Dwg 4720)” does not contain a detail listing of this GFM.

Question: Please provide ShipAlt Kit 76721 (Dwg 4720) GFM Material List, or information that defines quantity, location, and size of valves to be replaced.

The 4720 has been updated. All material being provided for subject work item are now identified in the current 4720.

154. Work Item# 521-80-001. Work Item states to accomplish installation of bulkhead Stop Valves in accordance with References 2.2 -2.4. Work Item also includes Reference 2.5 ShipAlt Material

Summry for GFM kitted material referenced in paragraph 5.3 of the Specification.

Reference 2.5 “ShipAlt Material Summary (Dwg 4720)” does not contain a detail listing of GFM for

ShipAlt 73738K. Reference 2.2 “Installation of Additional Cutout Valves & ML” includes a List of

Materials, with certain items listed as GFM.

Question: Is the GFM listed in Reference 2.2 identical to the GFM provided in ShipAlt Kit 73738K

(Dwg 4720)?

155. Work Item# 521-80-002. Work Item states to accomplish installation of Helen Strainer and associated valves and piping in accordance with Reference 2.2. Work Item also includes Reference

2.5 ShipAlt Material Summry for GFM kitted material referenced in paragraph 5.3 of the

Specification.

Reference 2.5 “ShipAlt Material Summary (Dwg 4720)” does not contain a detail listing of GFM for

ShipAlt 75829D. Reference 2.2 “Firemain Regulator Strainer Installation” includes a List of

Materials, with certain items listed as GFM.

Question: Is the GFM listed in Reference 2.2 identical to the GFM provided in ShipAlt Kit 75829D

156. Work Item# 522-80-001. Work Item states to accomplish relocation of gauges, valves and piping in accordance with Reference 2.2. Work Item also includes Reference 2.9 ShipAlt Material Summry for GFM kitted material referenced in paragraph 5.3 of the Specification.

Reference 2.9 “ShipAlt Material Summary (Dwg 4720)” does not contain a detail listing of GFM for

ShipAlt 82474D. Reference 2.2 “Relocation of CIWS, Torpedo & DLS Magazine Gagues” (as modified by Reference 2.5) includes a List of Materials, with certain items listed as GFM.

Question: Is the GFM listed in Reference 2.2 identical to the GFM provided in ShipAlt Kit 82474D

157. Work Item# 551-80-001. Work Item states to accomplish upgrade and change out of various pipe hangers throughout ship accordance with References 2.2-2.4. Work Item Paragraph 5 “Government

Furnished Material does not list any GFM. However, Reference 2.2 “Anti-Icing Pipe Hanger, Corrosion Mods & ML” includes a “List of Materials”, with certain items listed as GFM.

Question: Are the Items listed as GFM in Reference 2.2 “List of Materials” intended to be

Government Furnished Materials for this Work Item?

158. Work Item# 468-90-001. Para 5.3 states kitted material. As per 4720 report, there is no kitted material for this work item.

All material will be provided (AIT has already purchased all material and will provide) with the exception of HAZMAT in which the SY will provide.

159. Work Item# 438-90-003. Para 5.3 states kitted material. As per 4720 report, there is no kitted material for this work item.

For Work Item# 438-90-003, the GFM will be provided by the PARM once the contract has been issued and the government has a shipping address for GFM as listed on the 4720.

160. Work Item# 130-80-001. Paragraph 3.6.6 is unclear if all countermeasure wash down piping is to be replaced or just the sections associated with the CRES penetrations as there isn’t any piping identified in section 1.3.

For Work Item# 130-80-001, CWDS piping is covered under work items 162-11-001 and 162-11-

002.

161. RESERVED

162. Standard Item# 009-35. Category I Standard Item 035, Paragraph 3.3 states that “Contractor shall request sufficient Fire Watches from Ship’s Force to provide trained fire watches at all affected areas where hot work is being accomplished.” Category I Standard Item 070, Paragraph 3.3 addresses fire watches trained and provided by the Contractor.

Question: Does the Government intend to make available Ship’s Force personnel for training and fire watch duties under this availability? If the answer is yes, what quantity of fire watch personnel does the Government intend to provide to the Contractor (per day, per shift)?

All Fire Watch personnel will be supplied by the Contractor.

163. Work Item# 130-80-001. Specification paragraph 3.6.4.6 references the preservation of (7) removed mixing tubes/stacks.

Please confirm there are only (6) six mixing tubes/stacks.

An ERRATA will be issued.

For work item# 130-80-001, paragraph 3.6.4.6 should read Six (6) not seven (7).

164. Work Item# 437-90-001. The specification paragraph 3.1.1 directs the contractor to accomplish the requirements of 009-90 of 2.1. Provide the services of an OEM certified technical representative to assist in assembling, installing, testing, calibrating and conducting training of new RADAR and

TDR TLI systems.

The contractor summited a request for a quote and received the following response. “After further review of the work spec, we will have to offer a no bid. The work we would complete (Par. 3.1.1) has already been funded by a DO from an IDIQ contract per NSWCCD Philadelphia (Joseph

McGillian’s group). Please let me know if you have any questions. Thank you for your request.”

Will the government be supplying the OEM technical rep?

For work item# 437-90-001, an ERRATA will be issued.

Delete 3.1.1

4.2 The Government will provide an OEM technical representative for this work item.

165. Work Item# 167-11-001. This work item includes work scope which is also covered by work item

167-11-010.

BERP 03-182-3 is identified in paragraph 1.3.1 of 167-11-010.

Please advise that work scope of work item 167-11-001 is to include repairs to BERP 03-182-3 and if so that the requirements of work item 167-11-010 are not required.

Work item 167-11-001 is a test only work item. If repairs need to be invoked it will be covered under work item 167-11-010 (option item).

166. Work Item# 167-11-002. Paragraph 3.2 requires that the Government provided Scuttle be flame sprayed in accordance with 009-105.

Is flame spray coating of the new scuttle required?

For Work Item# 167-11-002, it is only required if the New scuttle arrives without a flame spray coating.

167. Work Item# # 167-11-001. This work item includes work scope which is also covered by work item

167-11-010.

BERP 03-182-3 is identified in paragraph 1.3.1 of 167-11-010.

Please advise that work scope of work item 167-11-001 is to include repairs to BERP 03-182-3 and if so that the requirements of work item 167-11-010 are not required.

Work item 167-11-001 is a test only work item. If repairs are needed, work item 167-11-010 (option item) will be invoked.

168. Work Item# 251-31-001. Paragraph 3.2.3.2 requires installation of protective covering to the surface of the louvers to ensure positive grounding and bonding at final installation.

Please identify the type of protective material which is known to remain intact upon completion of the powder coating process.

For Work Item# 251-31-001, Aluminum Tape.

169. Work Item# 251-31-001. Paragraph 3.2 requires installation of new bonding strap assemblies for each louver listed in 1.3.

Paragraph 3.2.1 requires removal of 50 existing bonding assemblies.

Is the total requirement to replace 50 bonding assemblies for the louvers listed in 1.3? If not, please identify the total number of bonding assemblies that are required to be replaced.

For Work Item# 251-31-001, the requirement is to Install new and remove a total of 50 existing bonding assemblies from louvers which are not in conformance with 3.2.

170. Work Item# # 251-31-001. Paragraph 3.5.5. requires repair of up to 660 square feet of structural bulkhead plating.

Please identify the type of repair that is required to be performed for up to 660 square feet of structural bulkhead plating and the quantity by location.

For Work Item# 251-31-001, the intent is to insert new bulkhead plating in way of damaged bulkhead plating around the louvers and exposed bulkhead after louver removal. Location of repairs are all louver areas. A minimum of 10 FT of plating will be replaced in each louver group.

171. Work Item# # 251-31-001. Removed louvers are being loaded on a government provided transport in accordance with paragraph 3.6.

Paragraph 3.6.2 indicates a ship to company and address.

As conveyance is on a government provided transport there is no contractor incurred shipping cost in the shipment of materials.

What is the intent of paragraph 3.6.2?

An ERRATA will be issued

For Work Item# 251-31-001, Para 3.6 should read as follows;

Crate, secure and on load for shipment to powder coat facility no later than 10 days after the start of

Availability each louver assembly removed in 3.5. Packaging shall conform to 2.6.

3.6.1 Ensure that all ITAR and SSA requirements are met before shipping.

3.6.2 Prior to packaging and crating, visually inspect the equipment for general condition and completeness.

172. Work Item# # 251-31-001. Paragraph 3.6. What is the date that the louvers, which are transported on the government conveyance, will be returned to the contractor for installation?

For Work Item# 251-31-001, an estimated 16 weeks. Contractor should contact vendor to get an estimated timeframe.

173. Work Item# 251-31-001. Paragraph 3.7.2 requires repair of louver assembly coating defects prior to installation.

There is no identified basis upon which to estimate the extent of repair required.

What basis is to be used for estimating the extent of damages prior to installation?

For Work Item# 251-31-001, if Louvers are packaged and handled properly there should be no repair requirements. For estimating purposes estimate for 6 repairs between 1-3 inches long by ¼ inch wide.

174. Work Item# 251-31-001. References 2.2 and 2.3 indicate that there are two (2) louvers located on the 02 level and two (2) louvers located on the 03 level at frame locations 275 – 284 port and starboard, total of four (4) per side.

Work item identifies a total of six (6) louvers on the 03 level starboard side between frames 275 –

284 (paragraphs 1.3.10 and 1.3.19) and a total of six (6) louvers on the 03 level port side between frames 275 – 284 (paragraphs 1.3.9 and 1.3.18).

Are there a total of six louvers on 03 level starboard side between frames 275 and 284?

Are there a total of six louvers on 03 level port side between frames 275 and 284?

Please advise and provide identification of references.

For Work Item# 251-31-001;

1.3.9-4 ea

1.3.10-4ea

1.3.18-2 ea

1.3.19-2 ea

Total= 6 port and 6 stbd

175. RESERVED

176. RESERVED

177. Work Item# 251-31-001. Paragraph 3.6 states that the louvers will be shipped on a “government provided transport.”

Paragraph 3.6.2 states to “ship to” an specific address, implying that this is contractor responsibility.

Please clarify who is responsible for the actual shipping of the louvers. The government or the contractor?

For Work Item# 251-31-001, an ERRATA will be issued:

Para 3.6 should read as follows;

Crate, secure and on load for shipment to powder coat facility no later than 10 days after the start of

Availability each louver assembly removed in 3.5 Packaging shall conform to 2.6.

3.6.1.2 Ensure that all ITAR and SSA requirements are met before shipping.

3.7 Pick-up, receive and off-load each louver shipped in 3.6 upon completion of off-site application of powder coating.

178. Work Item# 251-11-001. Para 3.5, states “Remove existing and install new 20 SF of Bulkhead plating, 100 SF of Cres Sheathing, 5 linear feet on angle bar framing, 15 lineal feet of flat bar, and

20 square feet of decking located in 1.2.1 identified in 1.3.6 through 1.3.9.”

Please note: The material identified in 1.3.5 is not listed in Para 3.5. Contractor notes that this type of material will likely need to be disturbed/replaced in order to accomplish Para 3.5.

Request Advise #1: Is the 100 SF of Cres Sheathing mentioned in Para 3.5 identified in addition to the 100 SF Cres Sheathing listed in 1.3.5, or are they one in the same?

Request Advise #2: Is there a typo in the specification and should Para 3.5 read “…identified in

1.3.5 through 1.3.9.”

Request Advise #3: For the 20 SF of Bulkhead plating, will the material identified in 1.3.8 or the material identified in 1.3.9 be used?

Request Advise #4: For the 20 SF of decking, will the material identified in 1.3.8 or the material identified in 1.3.9 be used?

Para 3.6 states “Remove existing and install new 10 SF of Bulkhead plating located in 1.2.2, around periphery of the openings exposed by the removals in 3.3 and identified in 1.3.8, using 2.7 for guidance.”

Please note: Para 1.3.8 lists (40 Square Feet) Plate 1/4 Inch.

Request Advise #5: If Para 3.5 requires 20 SF of the material identified in 1.3.8 and Para 3.6 requires 10 SF of the material identified in 1.3.8 (totaling 30 SF), what is the additional 10 SF identified in Para 1.3.8 for?

Answer to Request Advise #1: YES. The 100 SF of Cres Sheathing mentioned in Para 3.5 is the material listed in 1.3.5. Changes were made and can be seen in ERRATA NO. 1.

Answer to Request Advise #2: YES. An ERRATA will be issued. 3.5 Remove existing and install new 20 square feet of bulkhead plating, 100 square feet of cres sheathing, 5 linear feet on angle bar framing, 15 linear feet of flat bar and 20 square feet of decking located in 1.2.1, around periphery of the openings exposed by removals in 3.3 and identified in 1.3.5 through 1.3.9, as designated by the SUPERVISOR, using 2.6 and 2.7 for guidance.

Answer to Request Advise #3: Refer to referenced drawings for information.

Answer to Request Advise #4: Refer to referenced drawings for information.

Answer to Request Advise #5: Work Specification calls out 40 SF of bulkhead plating, and in the

Requirements, 40 SF is called out. Review Work Specification.

179. Work Item# 162-11-001. Existing spools identified in 1.3.1 are not made of CRES 316L as stated in the spec. While these spools can be “removed” they will almost certainly NOT be suitable for reuse.

Understand that removal of these spools is not the government’s intention for this work.

Please clarify exactly what is desired to be removed under this paragraph and installed under paragraph 3.10.

For Work Item# 162-11-001, an Errata will be issued. 1.3.1 should read; Quantity (6 EA), Ventilation (to include vent grating & louver assembly),CRES 316L, Spool Item Number A018 and

A019 of 2.2.

3.10 should read; Install ventilation, vent grating and louver assemblies, retained in 3.1, back to original location in 1.2, using 2.2, 2.3, 2.9 and 2.14 for guidance.

No spools are to be removed.

180. Work Item# 162-11-002. Blast shield identified in 1.3.1 is made of CRES, and could be removed and reused, but it is questionable whether its removal is desirable.

Removal of these items is not be in the government’s intention for this work.

Please clarify exactly what is desired to be removed under this paragraph and installed under paragraph 3.10.

For Work Item# 167-11-002, Para 3.1 states; Remove the equipment identified in 1.3.1 and 1.3.2 in the location listed in 1.2.1, using 2.2 and 2.3 for guidance. Tag and retain.

Removal of items 1.3.1 and 1.3.2 is required for the work called out in this item. 3.10 calls out to re-install the items removed in 3.1

181. Work Item# 162-11-002. Para 3.4.2 states “Crop out deteriorated and install new a total of 36 square inches of plating, in way of each sprinkler head and penetration removed and installed in 3.5.1, using

2.5 and 2.7 for guidance.”

21 (ea) locations of 36 square inches equal 5.25 square feet.

Para 3.4.4 states “Remove existing and install new a total of 25 square feet of plating for additional repairs as directed by the SUPERVISOR using 2.5 for guidance.”

Para 1.3.6 lists (16 Square Feet) Plate.

The totals in 3.4.2 and 3.4.2 for square feet appear to be 14.5 SF more than para 1.3.6.

Request advise correct SF of plate required

For Work Item# 167-11-002, an Errata will be issued. Para 3.4.2 should read;

Crop out deteriorated and install new a total of 36 square inches of plating, in way of each sprinkler head and penetration removed and installed in 3.4.1, using 2.5 and 2.7 for guidance.

Para 1.3.6 should read 30 vice 16

182. Work Item# 251-31-006. Para 3.4.2 states “Remove existing and install new (3 EA) deck drains, using material identified in 1.3.7, in the location listed in 1.2.1 and 1.2.2, as directed by the

SUPERVISOR, using 2.9 through 2.12 for guidance.”

Para 1.3.6 lists (2 EA) Drain, Deck.

The total in 3.4.2 for deck drains appears to be 1 EA deck drain short.

Request advise correct number of deck drains required

For Work Item# 251-31-006, An ERRATA will be issued.

Para 3.4.2 does not state that requirement. Para 3.8 is the para in question.

Para 1.3.6 QTY should read 3 EA.

183. Work Item# 150-11-009. Para 3.4.1, states “Remove existing and install new a total of 36 Square

Feet of deck plating listed in 1.3.1.”

Para 1.3.1 lists (41 Square Feet) Plate.

The total in 3.4.1 for square feet appears to be 5 SF short.

Request advise correct SF of deck plating required

For Work Item# 150-11-009, An ERRATA will be issued.

41 SQ FT.

184. Work Item# 251-31-005. The location listed in para 1.2.1.1 is unclear. The space listed (01-174-0-

Q) is NOT a weather deck.

For Work Item# 251-31-005, An ERRATA will be issued.

1.2.1 deleted. All spaces are in 1.2.2.

185. Work Item# 251-31-006. There is no vent ducting in the location listed (1.2.1; the clean-side intake)

Correct location is 1.2.3

186. Work Item# 251-31-006. Preservation is directed in all spaces listed in this spec, “and as designated by the SUPERVISOR”.

Is it the intention to conduct FULL…