DDG-60_RFP_Q_AND_A_-___250_-_345.pdf

PDF 587 KB Posted

Attached to
USS PAUL HAMILTON (DDG 60) EDSRA
Solicitation number
N00024-16-R-4400
Issued by

About this file

Responses to Questions (DDG - 60 RFP Q and A 250 - 345)

View the file

Other files

File Type Posted
N55236_170001_FBO.pdf PDF
N00024_170014_FBO.pdf PDF
N00024_170015_FBO.pdf PDF
N00024_170024_FBO.pdf PDF
N00024_170017_FBO.pdf PDF
N000024_170012_FBO.pdf PDF
N00024_170013.pdf PDF
N55236_170025_FBO.pdf PDF
JA_222N_redact.pdf PDF
JA_215N_redact.pdf PDF
JA_270N_redact.pdf PDF
JA_3_REDAC6.pdf PDF
JA_4_REDACT.pdf PDF
Redacted_Hamilton_JA2.pdf PDF
JA_PAUL_HAMILTON_REDACT.pdf PDF
DDG-60_RFP_Q_AND_A_-_FINAL.docx DOCX document
J-4_Pricing_Spreadsheet__(Amend_0010).xlsx XLSX spreadsheet
Amend_0010_conformed.pdf PDF
Amendment_0009.pdf PDF
Amend_0009.pdf PDF
Amend_0009_conformed.pdf PDF
Amend_0008.pdf PDF
J-3_Execution_Milestones_(Amend_0008).xlsx XLSX spreadsheet
N00024-16-R-4400-0007_Released.docx DOCX document
DDG-60_Mod_Critical_Path_Turnover_Schedule.pdf PDF
SI_Index_0204.pdf PDF
DDG_60_AC_Conversion_POAM_plants__1_and__4.mpp MPP file
Amend_0006.pdf PDF
Amend_0006_Conformed.pdf PDF
J-7_Quality_Assurance_Surveillance_Plan_Amend_0005.pdf PDF
DDG-60_RFP_Q_AND_A_-___98_-_249_FBO.pdf PDF
Amend_0004.pdf PDF
J-3_Execution_Milestones_(Amend_0003).xlsx XLSX spreadsheet
Amend_0003_conformed.pdf PDF
J-7_Quality_Assurance_Surveillance_Plan_(Amend_0003).pdf PDF
J-5_Award_Fee_Intra_Availability_(Amend_0003).pdf PDF
DDG-60_RFP_Q_and_A__28-97.pdf PDF
Amendment_0002_Conformed.pdf PDF
Amendment_0002.pdf PDF
J-4_Pricing_Spreadsheet_for_Amendment_0002.xlsx XLSX spreadsheet
DDG-60_RFP_Q_AND_A_-___1-_27.pdf PDF
RFP-IFB_Amend__1.pdf PDF
S-5_Eligibility_Criteria_Data_Sheet.docx DOCX document
J-1_PH_EDSRA_Specification_Work_Package.pdf PDF
S-2_Past_Performance_Questionnaire.docx DOCX document
Exhibit_B.pdf PDF
Exhibit_C.pdf PDF
J-5_Award_Fee_Intra_Availability.docx DOCX document
S-4_PP_Reference_List.docx DOCX document
Synopsis_-_PAUL_HAMILTON_(DDG_60)_Final_(10-1-15).docx DOCX document
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NAVAL SEA SYSTEMS COMMAND

N00024-16-R-4400

QUESTIONS AND ANSWERS

The following are answers to questions received from potential offerors. The answers provide clarification only and DO NOT constitute an amendment to the solicitation.

28. The following discrepancies are noted following an inventory of the CD contents against the work specification requirements. Note – we are unable to access the web locales listed in Section L.

Discrepancies

Document Type Work Item Document Number Other

ORDALT 450-90-003 OD32382 Rev E Revision F was on Disk not Revision

E as called out on the Work Item

Tech Manual 450-90-003 S9AA0-AB-GOS-030-GSO Rev5

Revision 5 is not available in the

Disk

Drawing 468-890-001 8100-3153-0060

Typo on the work spec; correct number should be 8100-3513-0060

UNKNOWN

262-90-001, 411-

90-001, 431-90-

001, 437-90-002, 438-90-001, 438-

90-002, 438-90-

003, 450-90-004, 456-90-002, 468-

90-001, 512-90-

001, 541-90-001, 542-90-001 DDG MOD, Critical Path Equipment Not available in the Disk

S/A Drawing 472-90-001 472-7498087-L Not available in the Disk

Tech Manual 472-90-001 0910-LP-110-2937 Not available in the Disk

Test Procedure 438-90-001 15221-3-007 Rev A/21 Not available in the Disk

Drawing 150-11-010 472-7498087-B Not available in the Disk

Drawing

150-11-014, 162-

11-001, 162-11-

002, 168-11-001, 321-11-004, 321-

11-005, 631-21-

003 472-7498087-P Not available in the Disk

Drawing

150-11-014, 162-

11-001, 162-11-

002, 321-11-004, 321-11-005, 631-

21-003 472-7538860-F Not available in the Disk

NSTM

167-11-004, 167-

11-005 S9286-CJ-STM-010

Typo on the work spec; correct number is S9086-CJ-STM-010 and is available on Disk

Drawing 168-11-002 472-7498087-L Not available in the Disk

DM 245-11-001 DM 08-95 Not available in the Disk

Drawing 168-11-001 167-8100-1251-0191 Rev AE

Typo in the work spec; the correct number is 8100-1251-0191 Rev AE

Drawing 168-11-001 167-8100-1251-0192 Rev AJ

Typo in the work spec; the correct number is 8100-1251-0192 Rev AJ

RLAR 542-90-001 RLAR 76034/DDG60/1155353 Not available in the Disk

Drawing 259-11-011 635-6221265PL-R

Only revision - is available in the

Disk

Test Procedure 583-11-001 583-H05077-A Not available in the Disk

UNKNOWN 721-31-004 6692849-29 Not available in the Disk

ANSWER:

Document Type Work Item Document Number Other

ORDALT 450-90-003 OD32382 Rev E An ERRATA will be issued. Rev F.

Reference is on the disc.

Tech Manual 450-90-003 S9AA0-AB-GOS-030-GSO Rev5

Technical Manual is to remain as

Rev 1. Rev 1 is on the disc.

Drawing 468-890-001 8100-3153-0060

An ERRATA will be issued. 8100-

3513-0060.

UNKNOWN

262-90-001, 411-

90-001, 431-90-

001, 437-90-002, 438-90-001, 438-

90-002, 438-90-

003, 450-90-004, 456-90-002, 468-

90-001, 512-90-

001, 541-90-001, 542-90-001 DDG MOD, Critical Path Equipment Document available upon request

S/A Drawing 472-90-001 472-7498087-L

This document is protected by distribution statement F. MSR shall contact NAVSEA 05 for document.

Tech Manual 472-90-001 0910-LP-110-2937

This document is protected by distribution statement F. MSR shall contact NAVSEA 05 for document.

Test Procedure 438-90-001 15221-3-007 Rev A/21

This document is protected by distribution statement F. MSR shall contact NAVSEA 05 for document.

Drawing 150-11-010 472-7498087-B

This document is protected by distribution statement F. MSR shall contact NAVSEA 05 for document.

Drawing

150-11-014, 162-

11-001, 162-11-

002, 168-11-001, 321-11-004, 321-

11-005, 631-21-

003 472-7498087-P

This document is protected by distribution statement F. MSR shall contact NAVSEA 05 for document.

Drawing

150-11-014, 162-

11-001, 162-11-

002, 321-11-004, 321-11-005, 631-

21-003 472-7538860-F

This document is protected by distribution statement F. MSR shall contact NAVSEA 05 for document.

NSTM

167-11-004, 167-

11-005 S9286-CJ-STM-010

An ERRATA will be issued. S9086-CJ-

STM-010. NSTM is available on disc provided.

Drawing 168-11-002 472-7498087-L

This document is protected by distribution statement F. MSR shall contact NAVSEA 05 for document.

DM 245-11-001 DM 08-95

This document is to be provided by the technical representative.

Drawing 168-11-001 167-8100-1251-0191 Rev AE

An ERRATA will be issued. The correct number is 8100-1251-0191

Rev AE

Drawing 168-11-001 167-8100-1251-0192 Rev AJ

An ERRATA will be issued. The correct number is 8100-1251-0192

Rev AJ

RLAR 542-90-001 RLAR 76034/DDG60/1155353 Drawing available upon request.

Drawing 259-11-011 635-6221265PL-R

Per standard item 009-001, a revision does not have to be listed unless the work to be performed is on a drawing that has been superceded. The only revision for drawing 635-6221265PL Rev R.

Test Procedure 583-11-001 583-H05077-A

An ERRATA will be issued. 583-2-

001 Rev A. This test procedure is on the disc.

UNKNOWN 721-31-004 6692849-29

This reference was deleted in an

ERRATA.

29. Work Item# 113-11-001. Paragraphs 3.5 and 3.5.1 through 3.5.3 state “Use Ref 2.8 through 2.10 as guidance.” The location of the structural unit for Reference 2.8, being the bow of the ship, doesn’t match with the location of work listed on paragraph 1.2 which are the machinery spaces.

Please clarify.

For Work Item# 113-11-001, an ERRATA will be issued:

The WI’s 2.8 should read 100-6218926 Rev AB (UNIT STRL ARR DWG ASSY UNIT 2410).

38. Work Item# 243-11-002. Para 3.29.1 state for KTR to assemble each coupling using new O-Rings and Split Pins confirming to the material requirements of 2.7.

2.7 does not identify P/N’s, quantity, or what material is needed.

Contractor request more information be provided on what is needed in paragraph 2.7.

Please review and advise.

For Work Item# 243-11-002, O-ring and split pin details with material callout are on sheet 3D4 of

2.7.

45. Contractor has reviewed all references listed in the Specifications provided.

In addition to information previously provided, the following Work Items have at least ONE OR

MORE out-of-date revision listed:

110-11-001 243-11-002 262-90-001 521-11-002 631-21-001

113-11-001 243-80-001 264-11-001 521-80-001 631-31-001

113-11-004 244-12-001 264-90-001 521-80-002 631-41-001

120-11-001 245-11-001 321-11-001 522-80-001 633-11-001

120-11-002 245-11-002 321-11-003 526-11-002 634-21-001

120-11-003 245-12-002 321-11-005 529-11-001 636-11-001

123-17-001 245-12-003 324-11-001 532-11-001 643-11-001

123-80-001 251-31-001 411-90-001 533-11-001 643-11-003

130-80-001 251-31-002 431-90-001 541-90-001 651-90-001

150-11-009 251-31-004 437-90-001 542-90-001 721-31-001

150-11-011 251-31-007 437-90-002 551-11-001 721-31-002

150-11-012 251-31-008 438-90-001 551-51-001 721-31-003

150-11-013 251-31-009 438-90-002 551-52-001 857-11-001

150-11-014 251-31-011 438-90-003 561-11-001 980-90-005

162-11-001 259-11-001 450-90-002 562-11-001 980-90-009

163-11-001 259-11-006 450-90-003 562-11-002 980-90-010

163-11-002 259-11-010 450-90-004 581-11-001 980-90-011

165-80-001 259-11-011 456-90-001 583-11-001 980-90-012

167-11-002 259-11-012 456-90-002 593-11-001 980-90-018

167-11-003 259-11-013 468-90-001 593-11-003 980-90-019

167-11-004 259-11-015 468-90-002 593-90-001 982-31-001

167-11-005 259-80-001 505-11-001 622-80-001 982-31-002

167-11-009 261-11-001 512-11-007 623-80-001 992-11-001

167-80-004 262-11-001 512-11-008 624-11-001 992-31-001

168-11-002 262-11-002 514-11-001 631-11-001 992-90-003

168-80-001 262-12-001 514-24-001 631-11-003 993-11-002

241-11-001 262-21-001 516-90-001 631-11-004 997-11-001

243-11-001 262-22-001 520-11-001 631-11-005

Please review the entire specification package and their associated work item references listed provided and advise.

Provide more clarification as to which references are not the most current revisions.

55. Work Item# 113-11-002. Paragraph 3.4 states “Remove existing deteriorated and install new the entire bilge well listed in 1.3.1, using 2.6 and 2.8 for guidance.” Ref 2.8 location of work does not match with the location of work to be accomplished in paragraph 1.3.1.

For Work Item# 113-11-002, an ERRATA will be issued:

Work can be accomplished using ref 2.6. The WI will be revised to change 2.8 to 165-6218895

UNIT STRL ARR DWG ASSY UNIT 1210 REV M.

56. Work Item# 150-11-005. None of the structural drawings listed in paragraph 2 match the location of work for paragraph 1.2.1. The drawing listed in paragraph 2.4 is for the 06 level while paragraph

1.2.1 is for the 03 level. The other drawings correlate to the other locations of work. Please provide the correct drawing for paragraph 1.2.1 location.

For Work Item# 150-11-005, an ERRATA will be issued:

2.4 should read 150-6218963, REV M, UNIT STRL ARR DWG ASSY UNIT 4320.

57. Work Item# 150-11-006. The structural drawing listed in paragraph 2.2 does not match with the location of work from paragraph 1.2.1. Please provide the correct drawing for paragraph 1.2.1 location.

For Work Item# 150-11-006, an ERRATA will be issued:

2.2 should be 150-6218956 Rev Y (Unit Structural ARR DWG Assy Unit 4220)

61. Work Item# 611-11-001. Paragraph 1.3.1 states “Quantity (One EA), 3000 Pound, Aluminum, Portable 48 Inch J-Bar Davit.”

Is the 3000 Pound statement for Work Load, Static Load or Dynamic Load?

Please review & advise.

For Work Item# 611-11-001, the 3000 Pound statement is for Working Load.

65. Work Item# 150-11-015. What are “Fueling at Sea access covers”?

Ref provided (2.4) gives insufficient guidance. Please provide sheet and detail from this ref. Also

Frame in ref (174) is not the same as that in the location (1.2).

Please advise.

For Work Item# 150-11-015, an ERRATA will be issued:

Fueling at Sea access covers are close plate that cover the voids on FAS foundations on the port and starboard bulkheads. Covers are called out with FN on Reference 2.4, which has a parts list that provides the fab document Ref 3.5.2, which states “TEMPLATE EXACT SIZE AND SHAPE FROM

EXISTING”. The fab reference isn’t truly required. The title of 2.4 should be “FR 126-174”.

2.4 600-6219308 Rev AF, Hull Outfit Instl, Dz 4220 02 Lvl Fr 126-174

75. Work Item# 643-11-003. Paragraph 3.9 states, “remove existing and install new access covers latches located in 1.2.1, using Ref. 2.3 and 2.8 for guidance.”

These references did not provide enough information for fabrication and installation of these covers.

Are these covers for valve, test fittings and electrical controls on the overhead above the sheathings?

Please provide more details and information.

For Work Item# 643-11-003, an ERRATA will be issued:

The access covers are to be installed in new false BHD that gets installed along the entire aft BHD of the space, where you find an item that will require access like a valve, use DWG 8100-1281-0223 for fabrication guidance.

2.11 8100-1281-0223

3.9 Remove existing and install new access cover hatches located in 1.2.1, and identified in 1.3.7, using 2.3, 2.8 and 2.11 for guidance.

85. Work Item# 168-12-001. Paragraph 3.2 states to accomplish repairs/overhaul to equipment listed in

1.3 in accordance with section 2 of 2.2 (S9169-AQ-MMA-010).

Section 2 does not indicate which parts will be placed for an overhaul it only states to replace parts deemed necessary.

Please clarify the intent of this paragraph whether it is an open, inspect and report or should the offeror should estimate to order all parts associated with Table 7-3 of 2.2.

For Work Item# 168-12-001, remove and overhaul the actuator; it is currently inoperable.

91. Work Item# 150-11-015. Paragraph 3.12 states to accomplish overhaul/replacement of “flood lights, at sea lights & in port lights”. Is the intent of this to overhaul or replace the fixture and replace the light, is the intent to only replace the light or some other effort?

Since no specific work can be identified until direction has been designated by the supervisor, is this paragraph subject to a change order at the time the actual requirements are provided.

Please Review and Advise.

For Work Item# 150-11-015, overhaul/replace the fixtures and replace the lights (there is significant damage to fixtures – some are in bad shape).

93. Work Item# 644-11-002. Compartments listed in Para 1.2 do not match do not match compartments listed in Ref. 2.2, 2.3, 2.4 & 2.5.

Please provide correct Ref drawings for references 2.2, 2.3, 2.4 & 2.5.

Work Item# 644-11-002, drawings will be provided upon request. Submit request to elyssa.parana@navy.mil and randolph.cook@navy.mil

95. After reviewing the USS Paul Hamilton Specification package, the following 17 Work Items contain verbiage within the requirements that do not provide the EXACT intent of the Customer …

Specifically, those work items containing the words “repair, provide, clad weld, install, or replace up to…” or include the same adding “as directed by the SUPERVISOR,” or “As directed by the

AIT.”

For this fixed price competitive bid, the terms “repair, provide, clad weld, install, or replace up to…”, “as directed by the SUPERVISOR,”, or “As directed by the AIT.” introduce work scope ambiguity.

For the following Work Items, bidder requests specific estimating instructions associated with the following ambiguous requirements; “repair, provide, clad weld, install, or replace up to…”, “as directed by the SUPERVISOR,”, or “As directed by the AIT.”

113-11-001

3.5.1.1 Replace up to 20 sq. ft plating

In one location or in multiple locations?

3.11 Replace up to 4 valves

What sizes and/or types?

3.12 Replace up to 10 ft piping

What sizes and/or types? In one location or in multiple locations? Will any fittings/flanges/ect be needed as well?

123-11-001

3.4 Replace up to 10 sq. ft of deck, shell and/or bulkhead plating

What needs to be replaced? 10 sq. ft of each? Is the deck, shell, and bulkhead plating the same thickness?

3.6 Clad weld up to 3 sq. inch tank surface

In one location or up to 3 sq. inch in multiple locations?

150-11-015

3.7 Replace up to a (7 EA) deck drain brackets

In one location or in multiple locations? Will any existing decking requiring 009-26 be disturbed? If so, what types of decking will be disturbed?

167-11-001

3.4 Install up to 25% of bolts removed

What sizes and/or types?

244-12-001

3.5.1 Provide up to 100 gallons, of additional, new MIL-C-11796, Class A Corrosion Preventative

Compound

Will 100 gallons be necessary? 100 gallons seems excessive.

251-31-001

3.5.5 Repair up to 660 square feet of structural plating (bulkhead)

In one location or in multiple locations? Are we to replace shell or bulkhead plating? What material type and/or thickness?

251-31-011

3.6 Replace up to 10 linear feet of vertical stringer

In one location or in multiple locations? What material type and/or thickness?

3.7 Replace up to 5 linear feet of flat bar

In one location or in multiple locations? What material type and/or thickness?

259-11-010

3.3.1 Replace and weld repair up to a total of (20 EA) exhaust insulation sheathing clips/tabs and

(10 EA) CRES sheathing buttons

In one location or in multiple locations? What material type and/or thickness? How many sq.

ft of perforated sheathing will be disturbed? Is the disturbed perforated sheathing going to be provided GFM?

259-11-014

3.5 Vee out / weld repairs up to a total of 2 linear feet near the support stiffeners

In one location or in multiple locations? What material type and/or thickness are the areas to be repaired?

259-11-015

3.6 Clad weld up to 3 square inches each area for a total of 144 square inches of pitted area

450-90-003 (Option Item)

3.6.9 Remove / install up to 50 linear feet of ducting (as directed by AIT)

In one location or in multiple locations? What material type, sizes, and/or thickness are the to be replaced?

551-51-001

3.3.6.1 Remove / install new up to 50 percent of fasteners.

551-52-001

3.3.6.1 Remove / install new up to 50 percent of fasteners.

583-11-001

3.6 Preserve up to 20 square feet of surface areas

In one location or in multiple locations? What 009-32 tables and lines are we to preserve?

593-11-002

3.5 Clad weld up to 32 square inches pitted areas inside a tank

631-11-005

3.18 Clad weld up to 100 square inches deteriorated surfaces

651-90-001

3.2.6 Remove / replace with new up to (20 EA) stainless steel honeycomb panels

In one location or in multiple locations? Are we to re-use or replace any existing C-channels, U-channels, H-posts, Curtain plate, Deck Coamings etc?

For Work Item 113-11-001, paragraph 3.5.1.1 requires the Contractor to replace up to 20 sq. ft plating in multiple locations.

For Work Item 113-11-001, an ERRATA will be issued that deletes the requirements of 3.11 and

3.11.1 for replacing valves.

For Work Item 113-11-001, an ERRATA will be issued that deletes the requirements of 3.12, 3.12.1 and 3.12.2 for replacing piping.

For Work Item 123-11-001, paragraph 3.4 refers to the shell plating.

For Work Item 123-11-001, paragraph 3.6 requires the Contractor to clad weld up to 3 sq. inch tank surface per location, over multiple locations, for a maximum of 200 sq. inches total.

For Work Item 150-11-015, replacing the drain brackets will be in multiple locations. Decking was available for ship check.

For Work Item 167-11-001, the BERPS have one size bolt. Drawings were made available and are available for ship check.

For Work Item 244-12-001, IAW the work specification, 100 gallons is called out to ensure a sufficient amount is available.

For Work Item 251-31-001, requires replacing bulkhead plating in multiple locations.

For Work Item 251-31-011, paragraph 3.6 requires multiple locations. Drawings were made available and ship checks were made available.

For Work Item 251-31-011, paragraph 3.7 requires multiple locations. Drawings were made available and ship checks were made available.

For Work Item 259-11-010, paragraph 3.3.1 requires multiple locations. Review the drawings for material.

For Work Item 259-11-014, paragraph 3.5 requires multiple locations. Review the drawings for

For Work Item 259-11-015, paragraph 3.6 requires multiple locations. Review the drawings for

For Work Item 450-90-003 (Option Item) - It is usually the HVAC ducting in the CCS P-Way and the small section in the aft hatch out of the mess-decks. It is only taken down as an interference and then put back up after the cables have been run. No material requirement.

For Work Item 551-51-001, paragraph 3.3.6.1 review the drawings for material. The material is called out on the drawing.

For Work Item 551-52-001, paragraph 3.3.6.1 review the drawings for material. The material is called out on the drawing.

For Work Item 583-11-001, on equipment listed 1.3.1. 009-32 tables and lines are called out.

For Work Item 593-11-002, paragraph 3.6 requires multiple locations. Review the drawings for

For Work Item 631-11-005, paragraph 3.18 requires multiple locations. Review the drawings for

For Work Item 651-90-001 - Contractor should include in the proposal the purchase and replacement of 20 ea stainless steel honeycomb panels. Any material not used will be turned over to the Supervisor at the end of the contract.

103. Work Item# 321-11-003. Paragraphs 1.2.1 through 1.2.4 state the locations of work for the work item. Each location is followed by paragraphs in parenthesis to reference the specific scope of work in the “identification” paragraph 1.3.

Paragraphs 1.2.2 through 1.2.4 list paragraphs in 1.3 that do not exist – specifically, paragraphs

1.3.14 through 1.3.53 are listed but do not exist in the sub-paragraph of 1.3.

Please clarify the scope of work for this work item.

Work Item# 321-11-003 is all weather deck electrical equipment that is damaged or corroded, to include cabling, foundations and stuffing tubes through the 01 level weather deck. Disregard references in parenthesis in paragraph 1.2. An ERRATA will be issued deleting the parenthetical references in 1.2.

109. Work Item# 813-11-001. Attachment A is missing column headers on some pages. Also, some of the spaces on pages 5-8 are duplicated on pages 9-12 in a different order.

1. Please provide corrected Attachment A that includes column headers on all pages and eliminates duplication of spaces.

2. Please provide Attachment A in MS Excel format.

For Work Item# 813-11-001, the revised Attachment A will be provided upon request. Submit request to elyssa.parana@navy.mil and randolph.cook@navy.mil

124. Work Item# 150-11-015. As currently written, the location of work for the structural repairs is vague. In order to identify and include interferences in the estimate for this work item, please provide a more precise location of repairs to be accomplished since “as designated by supervisor” and “based on report” are un-biddable.

For Work Item# 150-11-015, this information should have been gathered during one of the ship checks, in accordance with 3.1, to identify and assess the extent and exact location of repairs.

142. Work Item# 612-11-001.

Para 3.3 requires the fabrication and replacement of Qty (70 EA) CRES Deck Bolts/Reversible

Bolts/Inserts

Yet

Para 1.3.1 lists (7 each Reversible Deck Bolt)

These totals for Bolts appear to be 63 Bolts short

Question: Is the correct number of bolts 70 or 7?

Request advise

For Work Item# 612-11-001, an ERRATA was issued to fix the mathematical error on the work spec.

The numbers in paragraph 1.3 now match what is called out in the requirements section.

149. Work Item# 167-11-004. Paragraph 3.3.1 requires tagging and retaining of existing fasteners.

Paragraph 3.6.1 requires installation of new fasteners.

Is the intent of the work specification to re-install the existing fasteners? If not, please identify the quantity of fasteners to be renewed.

For Work Item# 167-11-004, when the Contractor removes all of the existing fasteners, replace them with new fasteners. The Contractor shall notate the amount of fasteners upon removal of fasteners and retain them consistent with the guidelines of 3.6.1.

150. Work Item# 167-11-005. Paragraph 3.3.1 requires tagging and retaining of existing fasteners.

Paragraph 3.6.1 requires installation of new fasteners.

Is the intent of the work specification to re-install the existing fasteners? If not, please identify the

For Work Item# 167-11-005, when the Contractor removes all of the existing fasteners, replace them and retain them consistent with the guidelines of 3.6.1.

151. Work Item# 167-11-006. Paragraph 3.2.1 requires tagging and retaining of existing fasteners.

Paragraph 3.5.1 requires installation of new fasteners.

Is the intent of the work specification to re-install the existing fasteners? If not, please identify the

For Work Item# 167-11-006, when the Contractor removes all of the existing fasteners, replace them and retain them consistent with the guidelines of 3.5.1.

152. Work Item# 167-11-007. Paragraph 3.2.1 requires tagging and retaining of existing fasteners.

Paragraph 3.5.1 requires installation of new fasteners.

Is the intent of the work specification to re-install the existing fasteners? If not, please identify the

For Work Item# 167-11-007, when the Contractor removes all of the existing fasteners, replace them and retain them consistent with the guidelines of 3.5.1.

161. Work Item# 321-11-003. In paragraph 3.2.2 the specification states the following

3.2.2 Find Numbers One, 3, 5, 9, 10, 13, 33, 44, 45, 46, 47 and 49 of 2.3 and 2.4

2.3 (301-6219068 Rev K, Installation of Electrical and Electronic Equipment, DZ 1360, 01 Level

Weather Deck Frame 42-78)

2.4. (301-6219073 Rev J, Installation of Electrical and Electronic Equipment, DZ 1460, 01 Level

Weather Deck Frame 78-126).

Question: It appears that the numbering is for Ref. 2.3 and not for Ref 2.4. Can you please clarify the equipment that is to be replaced in Ref 2.4?

For Work Item# 321-11-003, all of the equipment affected is listed in 1.3. That being said, any of that equipment that is found to be between 01 level frames 78 to 126 will be detailed in 2.4.

175. Work Item# 251-31-002. Is the total plate replacement requirement 6 square feet? Please advise.

Work Item# 251-31-002, paragraph 1.3.1 and 1.3.2 define the amount of plate replacement required.

176. Work Item# 167-11-002. Is the total plate replacement requirement 1 square foot? Please advise.

For Work Item# 167-11-002, there is no requirement for plate replacement.

188. Work Item# 251-31-007. Paragraph 3.15.1. What area or space is to be inspected under this paragraph?

For the space listed in this spec, this is an inappropriate standard of cleanliness.

We believe this question was submitted in error as there is no paragraph 3.15.1 in Work Item# 251-

31-007.

189. Work Item# 251-31-005. Paragraph 3.15.1. What areas or spaces are to be inspected under this

Paragraph?

For some of the spaces listed in this spec, this is an inappropriate standard of cleanliness.

We believe this question was submitted in error as there is no paragraph 3.15.1 in Work Item# 251-

31-005.

190. Work Item# 251-31-005. Paragraph 3.7.1. What area or space is to be inspected under this

For the spaces listed in this spec, this is an inappropriate standard of cleanliness.

For Work Item# 251-31-005, all locations listed in 1.2 are to be inspected.

191. Work Item# 251-31-002. Paragraph 3.15.1. What area or space is to be inspected under this

For the dirty side of the intake, this is an inappropriate standard of cleanliness. This space is open to the weather.

For Work Item# 251-31-002, this is an appropriate standard of cleanliness that the SUPERVISOR deems required for the work being conducted in these spaces. This form of cleanliness is standard on the dirty side intakes. The Contractor is to encapsulate them per the work spec for environmental requirements as well as ensuring it is perfectly clean when turning the space back over to the

Government.

192. Work Item# 130-80-001. Paragraph 3.10.1. What area or space is to be inspected under this

Paragraph?

For any of the spaces listed in this spec, this is an inappropriate standard of cleanliness. These spaces are open to the weather.

For Work Item# 130-80-001, this is an appropriate standard of cleanliness that the SUPERVISOR deems required for the work being conducted in these spaces. The Contractor is to encapsulate them per the work spec for environmental requirements as well as ensuring it is perfectly clean when turning the space back over to the Government.

193. Work Item# 251-31-012. Paragraph 3.8.1. What area or space is to be inspected under this

If it is to be the 01-248-0-Q, then this is an inappropriate standard of cleanliness.

For Work Item# 251-31-012, this is an appropriate standard of cleanliness that the SUPERVISOR deems required for the work being conducted in these spaces. The Contractor is to encapsulate them per the work spec for environmental requirements as well as ensuring it is perfectly clean when turning the space back over to the Government.

196. Work Item# 168-80-001. Paragraph 3.1 requires accomplishment of 2.2 for each door identified in paragraph 1.3.

There are no doors identified in paragraph 1.3 of the work item.

Is the intent to accomplish the requirements of 2.2 for each manhole identified in 1.3?

For Work Item# 168-80-001, an ERRATA will be issued:

3.1 Accomplish the requirements of 2.2 for each manhole identified in 1.3, at the locations listed in

1.2, including the required revisions in 2.3 through 2.9.

203. Work Item# 243-11-002. Para. 4.1 indicates SHIPALT DDG51-64204, Composite Fairwater and

Removable Rope Guard Installation will impact work item 243-11-002 Propulsion Shafting, inspect, repair and align.

Please indicate which work item SHIPALT DDG51-64204, Composite Fairwater and Removable

Rope Guard Installation will be accomplished.

ShipAlt 64204 is reported complete; it will not impact Work Item# 243-11-002.

204. Work Item# 165-80-001. Paragraph 5.3 and reference 2.3 identify Government Furnished Material.

The provided 4720 GFM Listing does not include material for ShipAlt DDG51-83679D.

Please identify all material that will be provided by the government for this ShipAlt.

The updated 4720 reflects all GFM being provided. An updated 4720 has been provided.

206. Work Item# 251-31-004. Paragraph 3.5.14 does not identify the quantity and size of the lagging pads required to be replaced.

What is the quantity and size of lagging pads to be replaced?

For Work Item# 251-31-004, an ERRATA will be issued deleting 3.5.14 and 3.5.14.1

207. Work Item# 251-31-004. Paragraph 3.6.1 does not identify the quantity and size of the deck drains required to be replaced.

What is the quantity and size of the deck drains to be replaced?

For Work Item# 251-31-004, deck drain quantity and size are identified in 1.3.12.

214. RFP Question

Amendment 0001 extended the due date for receipt of proposals to 19-Feb and answered 27 questions. While this was helpful, there are still a very significant amount of unanswered questions, pending revisions to specifications and missing GFI in the form of drawings and material lists. At this juncture, there are many estimates stalled as a result of waiting for this information. Offeror requests that the Government modify the bid due date by 2 weeks to 11-March to allow for receipt of questions, specification revisions and GFI in order to allow sufficient time to process and provide a competitive, responsive bid.

The due date for proposals has been extended to 1 Mar 16 to allow sufficient time for the

Government to answer bid questions, make revisions to specifications, and for the Offerors to revise their proposals accordingly.

217. Work Item# 251-32-002. Paragraph 3.4.8 states “Remove existing and install new a total of 2 each deteriorated anti-icing CRES piping assemblies and pipe brackets, including turnbuckles and staple welded to the deck, identified in 1.3.3., in accordance with 2.7 through 2.9”.

Reference 2.9 shows only “details” for fabrication of many hanger assemblies/spring hanger assemblies.

Contractor notes with references provided, the above CRES piping assemblies and pipe brackets/spring hanger assemblies cannot be identified. No sizes, part numbers, assembly numbers are provided.

Contractor cannot estimate this paragraph as written without direction from SUPERVISOR.

Request provide information such as reference drawing number, piece numbers, quantities, for materials needed for replacement of CRES piping assemblies, called out in paragraph 3.4.8.

Provide information such as drawing number, piece number(s) for pipe brackets/spring hangers called out in paragraph 1.3.3.

OR

Request Government provide CRES pipe in assemblies and pipe hanger assemblies/spring hanger assemblies as GFM.

For Work Item# 251-32-002, 3.4.8 states “in accordance with 2.7 through 2.9”, and 2.8 contains the answers. Pages 41, and 52-54 identify piping, hangers and associated parts and material is identified on pages 208-212.

218. Work Item# 251-32-001. Paragraph 3.17 states “Remove existing and install new a total of 4 pipe hanger assemblies to the Lugs/Staples installed in 3.7, using material identified in 1.3.8 in the location listed in 1.2.1, as directed by the SUPERVISOR, using 2.10 for guidance”.

Paragraph 3.18 states “remove existing and install new all spring loaded anti-icing pipe hangers located in 1.2.2, as directed by the SUPERVISOR, using 2.10 for guidance”.

Reference 2.1 shows only “details” for fabrication of many hanger assemblies/spring hanger

Contractor notes with references provided, none of the above pipe hanger assemblies/spring hanger assemblies can be identified. No sizes, quantities, part numbers, assembly numbers are provided.

Contractor cannot estimate these paragraphs as written without “direction by SUPERVISOR”.

Materials for these will not be included in estimate for this work item will be subject to “Equitable

Adjustment”.

Request provide hanger/spring hanger part numbers for reference 2.10 as well as quantities for paragraphs 3.17 and 3.18.

OR

Request Government provide pipe hanger assemblies/spring hanger assemblies as GFM.

For Work Item# 251-32-001, the details provided in 2.10 are what’s required; M/F sheets 286, 287 and 291 through 293, which is for Zone 3350 Anti-Icing System material and details. Regarding exact repair locations, these should have been noted during the ship checks that were provided.

221. Work Item# 721-31-004. Please provide Reference 2.2 - 6692849-29 “Class A Overhaul Process, Cell Hatch.” This reference was not provided with the references on CD and is needed in order to develop an estimate.

For Work Item# 721-31-004, an ERRATA will be issued deleting reference 2.2

226. Work Item# 150-11-004. Paragraph 3.4.3 states “Remove existing and install new a total of 2 stanchion base supports.”

For estimating purposes and material procurement please provide a drawing that shows the fabrication & material details.

For Work Item# 150-11-004, an ERRATA will be issued.:

2.5 These are safety stanchions. M/F sheet 50 of 611-6567058 Rev J (FAB & INSTL OF EXTERIOR

RAILS, STANCHIONS & LIFE Lines).

3.4.3 Remove existing and install new a total of 2 stanchion base supports, using 2.5 for guidance.

232. Work Item# 110-11-001. Paragraphs 3.6.2.1, 3.9, 3.10 & 3.11. These paragraphs describe the requirements to steam clean and then preserve various underwater inaccessible voids.

These requirements are also included in both 992-31-001 and 992-90-003 without identifying specific spaces.

Which item should the contractor include the cost for cleaning and preserving the voids?

For Work Item# 110-11-001, none of the locations listed in paragraphs 3.6.2.1, 3.9, 3.10 & 3.11 are covered under work item 992-90-003. If the locations listed in work item 110-11-001 in paragraphs

3.6.2.1, 3.9, 3.10 & 3.11 require the services of Cleaning and Pumping, these services should be provided by work item 992-31-001 and the work item updated to reflect these requirements;

paragraph 4.1 in work item 110-11-001 will be updated in an ERRATA to state "Work in this item interfaces with Work Items titled: 992-31-001 Cleaning and Pumping: accomplish".

233. Work Item# 520-11-001. Paragraph 3.1.1. Work Item states to “Accomplish Standard Item 009-90

(Technical Representative) for each valve with Teleflex Remote Operator listed in Reference 2.2.”

Reference 2.2 includes a detailed listing of Sea Valves, but does not include details for quantity, size and location of Teleflex Remote Operators. This information cannot be found on any of the other listed References, as well.

Please provide detailed information for Sea Valve Teleflex Remote Operator installations affected by this Work Item.

For Work Item# 520-11-001, paragraph 3.1.1 has been deleted. The change is reflected in ERRATA

2.

250. Work Item# 113-11-002. Paragraphs 3.10.1 & 3.10.2 state; “Fabricate and install new flood level switch cover, as designated by the SUPERVISOR. Template from original flooding level switch cover retained in 3.11 and to suite existing shipboard conditions, using 2.3 and 2.9 for guidance.”

“Materials shall comply with the material requirements of 2.9.”

Material specification to fabricate new flood level switch cover cannot be found on references 2.3 and/or 2.9, please provide.

For Work Item# 113-11-002, the material shall be the same as the retained item. As offerors will not have retained the item until they remove it, the procurement of Materials to satisfy this work item will be included via a contract change.______________________________________________________________________________

251. Work Item# 150-11-006. Paragraph 3.5 states, “Remove existing, fit and install new (One EA)

CRES stuffing tubes and (4 EA) fittings listed in 1.3.3, associated Electro-Magnetic Pulse (EMP) conduit, fittings and hubs, in location identified in 1.2, as designated by the SUPERVISOR.”

Contractor cannot find part numbers of stuffing tub and fittings on references 2.2 through 2.4, please provide.

For Work Item# 150-11-006, BIW Catalog Numbers for new CRES stuffing tubes, wire and fittings are 27044-042, 27275-168, 27298-141, 27298-605 and 27245-277.

252. Work Item# 622-80-001. Paragraph 2.5 (Ship Alteration Material Summary 4720/3) is referenced by the kit listed in paragraph 5.3.

Although referenced, Reference 2.5 doesn’t include this shipalt (64223D).

Reference 2.2 LM indicates IAF in several of the line items and GFM in some of the line items in the SCE column.

Please clarify what is included in the kit listed in paragraph 5.3 and whether or not it includes any of the materials listed in Reference 2.2.

The 4720 report has been updated and reflects current GFM being provided. An updated 4720 has been provided.

253. Work Item# 150-11-007. Part numbers and quantities for the replacement of stuffing tubes, deck drains & scuppers from paragraphs 3.2.1 through 3.2.3 are not found on references 2.2 through 2.11.

Please provide.

For Work Item# 150-11-007, Scuppers and drains are on Ref 2.5, detail 4B-8C. (BIW Catalog

Number for CRES Stuffing Tubes = 27044-042)

254. Work Item# 150-11-013.

1. Paragraph 1.2.1 states - “Top of Director Equipment Room, 06 Level, Frames 130-165, Port and Starboard.” This does not apply for DDG-60 (see PLAN VIEW 3B2-4A from ref 2.5). The correct location of work is stated on paragraph 1.2.2 (see PLAN VIEW 3B2-6E from ref 2.5), please review and advise.

2. Is the intent of this work item to fabricate & install new handrails for platforms at location

1.2.2? There are no handreail details indicating replacement with new handrails.

3. Paragraph 1.3.5 states - “Quantity (12 EA), Hold Down, DET 3W2-C, Find Number: M329 of

2.6.” DET W2-C cannot be found on ref 2.6 but is found on ref 2.7. Is this a typo?

4. Is the intent to replace the foundation of the 12 EA hold downs which on the drawing appears to be as one assembly.

5. Part number for CRES Stuffing Tubes from paragraph 1.3.6 cannot be found on ref 2.11.

Please provide

6. Paragraph 3.2.2 states - “Remove existing and install new the equipment listed in 1.3.3, including gratings and hardware located in 1.2.2, using M/F Sheet 8 of 2.5 and M/F Sheets 255 through 259 of 2.6 for guidance and material conformance.” M/F sheets 255 through 259 does not apply to DDG-60 (see M/F sheet 8 PART PLAN 3B2-6E from ref 2.5)but M/F sheets 442 through 447. Please review and advise.

7. Paragraph 3.2.3 states - “Remove existing and install new the equipment listed in 1.3.4 and located in 1.2.1, to include piping down to first fitting on drain line, using M/F Sheet 8, Plan

3B2-4A and M/F Sheet 10 of 2.5 and 2.8 for guidance.” Plan 3B2-4A does not apply to DDG-

60.

Please review & advise.

For Work Item# 150-11-013:

1.) There is work in both locations (1.2.1 and 1.2.2). 3B2-4A sends you to 3B2-6E for DDG-

60. 3B2-6E is the correct view for DDG-60 grating and supports.

2.) The intent of the WI is to replace (12) handrail stowage supports identified in 1.3.5 and removed in 3.2.4 – not stanchion and handrails.

3.) Use detail 3W2-C of 2.7.

4.) Only the hold down assemble as detailed on 3W2, MF 35, not the stanchion base to which it attaches.

5.) Stuffing tube = BIW Cat# 27044-158

Adaptor = BIW Cat# 27298-974

Conduit = BIW Cat# 27275-168

Box Hub Coupling = BIW Cat# 27298-605

6.) M/F sheet 8 is for DDG-54 AF. 3B2-4A sends you to 3B2-6E for DDG-60. 3B2-6E is the correct view for grating and supports. Use MF 442-447 of 2.6 for fabrication.

7.) M/F 8 is for DDG-54 AF, 3B2-4A sends you to 3B2-6E for DDG-60.

255. Work Item# 150-11-010. Part numbers of Shroud Assemblies, Stuffing Tube & type of Scupper from paragraphs 1.3.2.1, 1.3.3.1, 1.3.6.2 & 1.3.7 cannot be found on any of the references from 2.2 through 2.19. Please provide.

For Work Item# 150-11-010, the two deck scuppers are referenced on sheet 3A2 of Reference 2.10 and are detailed on 600-6221273 Rev “T” sheet 313, detail IH-313.

Stuffing Tube = BIW Catalog Number 27044-158

Light shrouds are on Reference 2.9 (Detail H16)

256. Work Item# 130-80-001. Paragraph 3.6.4 states - “Unbolt and remove existing deteriorated bottom half (only) and install new mixing tube anchor foundations (to new deck plating installed in 3.7.3), identified in 1.3.3, 1.3.4, 1.3.5 and 1.3.6 and located in 1.2.1 and 1.2.2, using 2.7 and 2.10 through

2.15 for guidance.”

There is no paragraph 3.7.3 on the spec, is this a typo? Please review and advise.

For Work Item# 130-80-001, an ERRATA will be issued:

3.7.3 is now 3.6.3

257. Work Item# 150-11-015.

1. Paragraph 3.5 states - “Accomplish the fabrication and replacement of (6 EA) damaged

Fueling at Sea access covers, located approximately at frame 132 (Port and Stbd) of 1.2, as designated by the SUPERVISOR, using 2.4 for guidance.” The access covers cannot be found on ref 2.4, please provide part numbers, material specifications and/or a detail view.

2. Part numbers for items overhauled/replaced on paragraphs 3.12.2 through 3.12.5 cannot be found on ref 2.11 through 2.14 as stated on paragraph 3.12. Please provide.

For Work Item# 150-11-015:

1.) See answer to Bidders Question #65.

2.) Ship check is required, per 3.1, to determine which lights require repair and which ones require replacement. Lights are shown on ref 2.11 and 2.12 with FN numbers listed in parts list of the ref drawing. Also in the parts list is a column called “MTG MTHD” that lists the foundation used on 2.13 for a given FN.

258. Work Item# 612-11-001. Paragraph 1.3.8 states - “Quantity (14 EA) Reversible Insert, 3 inch Dia, 3-1/4 inch Long, 2-4-1/2 Internal and 3-4UNC-2A External, UNC-2B, Part Number DHLLN/BF401, Cres, Detail 71A of 2.3.”

There is no such detail 71A on reference 2.3. Please review and advise.

For Work Item# 612-11-001, an ERRATA will be issued.

The detail can be found on 612-6220454, Rev U, Fab of Safety Rails and Lifelines.

2.19 612-6220454 Rev U, Fab of Safety Rails and Lifelines

1.3.8 Quantity (14 EA) Reversible Insert, 3 inch Dia, 3-1/4 inch Long, 2-4-1/2 Internal and 3-4UNC-

2A External, UNC-2B, Part Number DHLLN/BF401, Cres, Detail 71A of 2.19

259. Work Item# 813-11-002. Paragraph 3.1 specifies a requirement to provide engineering and technical support services. Paragraph 3.1.7 requires the development of new work specifications.

Both are un-biddable without a specific work scope. For estimating purposes, please provide the specific scope of work that will require engineering and technical support services or provide a level of effort of manhours.

Any development of new work specifications will result in an equitable adjustment.

260. Work Item# 813-11-003. Paragraph 3.1 specifies a requirement to provide engineering and technical support services. Paragraph 3.1.7 requires the development of new work specifications.

Both are un-biddable without a specific work scope. For estimating purposes, please provide the specific scope of work that will require engineering and technical support services or provide a level of effort of manhours.

Any development of new work specifications will result in an equitable adjustment.

261. Work Item# 450-90-003. 3.2.3 Accomplish any required Radiological Control (RADCON) survey for access cut from Radar Room Number 2 to Ship Service Gas Turbine Generator Intake Trunk.

In support of an accurate estimate, request advise if a RADCON survey for access cut from Radar

Room Number 2 to Ship Service Gas Turbine Generator Intake Trunk will or will not be required

For Work Item#450-90-003, an ERRATA will be issued. Paragraph 3.2.3 is not applicable to DDG-

60 and will be removed from work item# 450-90-003.

262. Work Item# 631-11-005. Paragraphs 3.12 & 3.12.1 state - “Remove and overhaul structural doors identified in 1.3.6 and 1.3.7, using 2.9 and 2.10 for guidance, as directed by the SUPERVISOR.

3.12.1 - “Install new gaskets and hardware.”

Offeror’s only available copy of 2nd tier drawings (805-14000070 & 805-1400073) from ref 2.10 are not legible. Please provide a legible drawing or the part numbers to overhaul doors from paragraphs 1.3.6 & 1.3.7.

Work Item# 644-11-005, drawings will be provided upon request. Submit request to

263. Work Item# 521-80-001. The GFM paragraph 5.1 references paragraph 2.5 which is the ship alteration summary listing of Government Furnished Materials. The page for shipalt DDG51-73738 is blank. Please clarify what specific materials are provided in the kit listed in paragraph 5.3.

The 4720 report has been updated and reflects current GFM being provided. An updated 4720 has been provided.

264. Work Item# 251-32-001. Need more information to determine the cost of item 1.3.3 (Bleed air anchor foundations , P/N BAI / FTG803) and item 1.3.8 (Bleed air hanger assemblies).

Please provide more information or provide as GFM.

For Work Item# 251-32-001, part information is located in the references listed in the work specification. GFM will not be provided.

265. Work Item# 251-32-003. Need more information to determine the cost of item 1.3.4 (Bleed air anchor foundations , P/N BAI / FTG803).

Please provide more information or provide as GFM.

For Work Item# 251-32-003, part information is located in the references listed in the work specification. GFM will not be provided.

266. Work Item# 644-11-002. Paragraph 3.1 states,” accomplish removals and installations of habitability improvements in accordance with 2.2 through 2.5, in support of habitability improvements in locations listed in 1.2”.

Reference drawings 2.2 (644-8410065) and 2.3 (512-8410068) don’t show the spaces located in 1.2.

Therefore, estimates cannot be accomplished based on these drawings. Please provide correct reference callout and provide drawings.

For Work Item# 644-11-002, drawings will be provided upon request. Submit request to

267. Work Item# 521-21-001. Work Item states to “Accomplish the requirements of 009-92 (Resilient

Mounts) for equipment listed in 1.3.1.” Standard Item 009-92 includes Paragraph 3.3 which states to

“Select, procure, assemble, install, load, and adjust new resilient assemblies.”

Question: Is the purpose of 009-92 to change out the existing Resilient Mounts and replace with new? Or is the intent of reference to 009-32 instead to inspect existing Resilient Mounts and foundation surface IWO of mounts as is normally the case?

For Work Item# 521-21-001, the intent of the work specification is to replace the resilient mounts with new.

268. Work Item# 632-11-003. Paragraph 3.13 cites “accomplish 009-32 of 2.1 Including Table 5, Line

18 for surfaces of piping and components that have an operating temperature of 125-200 degrees

Fahrenheit”, but does not provide affected piping.

Please provide scope of piping affected (size and length).

For Work Item# 632-11-003, an ERRATA will be issued deleting paragraph 3.13.

269. Work Item# 721-31-004. Since Ref. 2.2 is “not found” and the scope of cell hatch replacement and overhaul is not clear, please clarify scope of cell hatch replacement. Does the replacement hatches include cell hatch motors & reduction gear assemblies, for instance? Please cite applicable steps of

Ref. 2.4.

Para.3.7. Please clarify if S/Y to undertake overhaul of cell hatch assemblies. If yes, please provide scope of overhaul.

Are the replacement cell hatches preserved including non-skid?

Is Contractor responsible for adjustments, alignment verification, data recording and testing stipulated in ref. 2.4 or will this be done by the Government and/or third parties?

Para. 3.3 states to include nine (9) additional cell hatches. Please verify this brings the total of cell replacement hatches to 33 each total?

For Work Item# 721-31-004, an ERRATA will be issued:

S/Y is not to overhaul the cell hatch assemblies. The Certified SMT is responsible for overhauling.

Replacement cell hatches including non-skid.

Contractor is fully responsible for adjustments, alignment verification, data recording and testing via the qualified SMT.

The total is 33 cell hatches.

2.2 deleted

270. Standard Item# 009-69. Contractor is assembling it’s heavy weather mooring plan and requires the following information:

1. Reference 845-6686999 Rev E. US Navy Vessel Water Depth, Mooring and Hull/Appendage

Clearance Requirements for Transit and Berthing.

2. Arrival drafts of the vessel and displacement.

1. Reference 845-6686999 Rev E. is available upon request. Submit request to

2. For estimating purposes only, use arrival drafts of 21 ft fwd, 16.8 ft aft and displacement of 7441

LT. Actual drafts and displacement for DDG 60 will be provided at the start of the availability.

271. Work Item# 162-11-001.

1. “1.3.1 Quantity (6 EA), Spool, Ventilation (to include vent grating & louver assembly),CRES

316L, Spool Item Number A018 and A019 of 2.2.”

2. Identification paragraph references 6ea Spools, but calls out spools A018 and A019 of 2.2.

Please clarify how many spools are to be addressed and if more than 2, please provide call out numbers for each.

For Work Item# 632-11-003, an ERRATA will be issued to clarify no Spools being removed.

ERRATA will change:

1.3.1 should read; Quantity (6 EA), Ventilation (to include vent grating & louver assembly),CRES

316L, Spool Item Number A018 and A019 of 2.2. 3.10 should read; Install ventilation, vent grating and louver assemblies, retained in 3.1, back to original location in 1.2, using 2.2, 2.3, 2.9 and 2.14 for guidance.

272. RFP, J-4 Pricing Spreadsheet:

Sheet “Labor & Material Burden Rate” has direct production hours and Material sections contractor is to insert its rates into. These amounts appear to be the total of all the growth amounts in the individual work item specifications.

Question: Is contractor to provide pricing for this growth in the individual work items or just on this “Proposed Labor & Material Burden Rate Growth Price Sheet” only.

Reservation growth included within work items is separate from the growth found in Attachment J-4.

The Offeror is to provide the proposed total price which includes both Prime labor hours times the labor rate and Subcontractor and material pricing to include material mark-up. The reservation growth contained within individual work items should not be part of the Labor & Material Burden

Rate, but rather part of the Work Item pricing.

273. Work Item# 593-11-001. Paragraph 3.6 states “For estimating purposes, estimate removing 100 linear feet of 2” ips in VCHT system piping and fittings, using 2.3 for guidance, as directed by the

SUPERVISOR.”

The list of fittings required in connection with replacement of 100 linear feet of 2” VHCT system piping are not provided

Request provide this list of fittings

For Work Item# 593-11-001, include 16(sixteen) 2” couplings and 10 (ten) 2” 90 degree elbows.

274. Work Item# 533-11-001. Para 3.1 directs removal of Brominator pump and #2 Firepump.

Para 3.3 directs surface prep surface prep of the foundations and sub-bases of these pumps, but also the #1 AC unit, #1 CW pump and the spy-skid.