J-5 Attachment (Amend 0003)

View the file

Other files

File Type Posted
N55236_170001_FBO.pdf PDF
N00024_170014_FBO.pdf PDF
N00024_170015_FBO.pdf PDF
N00024_170024_FBO.pdf PDF
N00024_170017_FBO.pdf PDF
N000024_170012_FBO.pdf PDF
N00024_170013.pdf PDF
N55236_170025_FBO.pdf PDF
JA_215N_redact.pdf PDF
JA_222N_redact.pdf PDF
JA_270N_redact.pdf PDF
JA_3_REDAC6.pdf PDF
JA_4_REDACT.pdf PDF
Redacted_Hamilton_JA2.pdf PDF
JA_PAUL_HAMILTON_REDACT.pdf PDF
DDG-60_RFP_Q_AND_A_-_FINAL.docx DOCX document
J-4_Pricing_Spreadsheet__(Amend_0010).xlsx XLSX spreadsheet
Amend_0010_conformed.pdf PDF
Amendment_0009.pdf PDF
Amend_0009.pdf PDF
Amend_0009_conformed.pdf PDF
Amend_0008.pdf PDF
J-3_Execution_Milestones_(Amend_0008).xlsx XLSX spreadsheet
N00024-16-R-4400-0007_Released.docx DOCX document
DDG_60_AC_Conversion_POAM_plants__1_and__4.mpp MPP file
DDG-60_Mod_Critical_Path_Turnover_Schedule.pdf PDF
SI_Index_0204.pdf PDF
DDG-60_RFP_Q_AND_A_-___250_-_345.pdf PDF
Amend_0006.pdf PDF
Amend_0006_Conformed.pdf PDF
J-7_Quality_Assurance_Surveillance_Plan_Amend_0005.pdf PDF
DDG-60_RFP_Q_AND_A_-___98_-_249_FBO.pdf PDF
Amend_0004.pdf PDF
J-3_Execution_Milestones_(Amend_0003).xlsx XLSX spreadsheet
Amend_0003_conformed.pdf PDF
J-7_Quality_Assurance_Surveillance_Plan_(Amend_0003).pdf PDF
DDG-60_RFP_Q_and_A__28-97.pdf PDF
Amendment_0002.pdf PDF
Amendment_0002_Conformed.pdf PDF
J-4_Pricing_Spreadsheet_for_Amendment_0002.xlsx XLSX spreadsheet
DDG-60_RFP_Q_AND_A_-___1-_27.pdf PDF
RFP-IFB_Amend__1.pdf PDF
S-2_Past_Performance_Questionnaire.docx DOCX document
Exhibit_B.pdf PDF
S-5_Eligibility_Criteria_Data_Sheet.docx DOCX document
J-1_PH_EDSRA_Specification_Work_Package.pdf PDF
Exhibit_C.pdf PDF
J-5_Award_Fee_Intra_Availability.docx DOCX document
S-4_PP_Reference_List.docx DOCX document
Synopsis_-_PAUL_HAMILTON_(DDG_60)_Final_(10-1-15).docx DOCX document
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment J-5 – Award Fee Intra-Availability Milestones

Required completion date Maximum Award Fee

A+171 $225,000

Award fee criteria for this intra-availability milestone is set forth in HQ B-2-0003 Determination of Fee Paragraph (f), using the ratings set forth in Paragraph (h) to determine the award fee earned.

Undocking This milestone is considered complete when all work and testing is complete, OQE is completely reviewed and is on file and all work has been properly certified, as described in the Work Items listing below. All MSR contractor related production work must be complete (and satisfactorily tested with required OQE submitted certified and accepted by the SUPERVISOR in accordance with NSSAINST 5400.1). The term complete is defined to mean the accomplishment of contractor responsible work that makes it possible to safely undock the vessel in accordance with the NSA approved plan and MIL-STD-1625D. The Master Ship Repair (MSR) shall certify by signature and serialized letter to the PCO that all work specification requirements (production, checkpoints, inspections, testing reports, WAFs) associated with the Key Event milestone have been satisfactorily completed. The availability Event Readiness List (ERL) shall be used to associate work specifications and testing to the specific Undocking Key Event.

IAW the following work items:

437-90-001; SA 77829K, Install Radar and TDR TLI’s for DFM, JP-5 and Potable Water 541-90-001; SA 70403K, Digital Fuel Control System Installation 593-90-001; SA 73622K, Installation of H2S Detectors in VCHT Rooms

Required completion date Maximum Award Fee

See Below $725,000

Award fee criteria for this intra-availability milestone is set forth in HQ B-2-0003 Determination of Fee Paragraph (f), using the ratings set forth in Paragraph (h) to determine the award fee earned.

Required Reports Complete

1) This incentive is considered complete when all Required Reports that could result in a change in work to be accomplished or additional material to be procured are accepted and approved by the Supervisor. The contractor shall complete the preliminary work and submit one legible copy of all Required Reports, in approved transferrable media no later than the first 25 percent point of the availability (A+80).

2) Dry dock and Tank related required inspection reports shall be submitted no later than the first 30 days of the scheduled docking period.

3) Dry dock related reports which contain readings (final, thickness, etc.), clearances, alignments, paint data sheets, or other such data for work certification must be submitted and approved by the Supervisor prior to pre-flood/undocking (A+157).

All reports across paragraphs 1, 2 and 3 above must be provided by their associated due dates to successfully complete this milestone.

A+58 $150,000

Award fee criteria for this intra-availability milestone is set forth in HQ B-2-0003 Determination of Fee Paragraph (f), using the ratings set forth in Paragraph (h) to determine the award fee earned.

HM&E Turnover #1

In the following Compartments:

• 4-174-0-E; MER-1

• 4-254-0-E; MER-2

• 1-158-4-Q; OPS Office

• 1-206-3-A; Repair-5

• 1-268-0-C; Central Control Station

• 1-300-0-C; Combat Systems Equipment Room #3

• 4-370-6-A; Supply Department Storeroom #4

• 3-310-2-L; Crew Berthing #5

• 3-220-2-Q; Supply Support Center

• 3-126-2-Q; Power Supply Conversion Room

• 3-97-02-L; Crew Berthing #2

• 4-94-0-C; IC/GYRO Room #1

• 4-126-0-E; AUX-1

• 3-220-01-A; Supply Dept Storeroom #1

• 3-300-1-L; Crew Berthing #4

• 3-338-1-L; Crew Berthing #6

• 2-300-01-L; Crew Berthing #3

• 1-254-6-L; Passageway

• 1-174-01-L; Passageway

• 1-258-3-Q; Engineering Department Office

Complete the following contractor responsible work, in accordance with the work item listed below:

• Installation of foundations and equipment onto foundations (except AIT installed equipment less than 75lbs).

• Installation and Hydrostatic testing of hydraulic piping disturbed by the installation of GEDMS Maintenance Group.

• Installation of interferences disturbed by the ripout and/or installation of equipment under this turnover.

• Installation and welding complete of new cableways to include cable trays / ladders.

• Installation of lagging removed or disturbed by the ripout and/or installation of foundations or equipment under this turnover.

• Preservation and painting of new and disturbed foundations and disturbed surfaces.

• Installation of GTM Main Engine Digital Fuel Controls

431-90-001; SA 73088K Gigabit Ethernet Data Multiplex System (GEDMS) Upgrade 980-90-008; ShipAlt EC 70619K Alteration Installation Team (AIT) Support Service

A+72 $150,000

Award fee criteria for this intra-availability milestone is set forth in HQ B-2-0003 Determination of Fee Paragraph (f), using the ratings set forth in Paragraph (h) to determine the award fee earned.

HM&E Turnover #2

In the following Compartments:

• 4-174-0-E; MER-1

• 1-206-3-A; Repair-5

• 1-268-0-C; Central Control Station

• 01-130-2-Q; Admin Office

• 01-130-0-Q; Combat System Maintenance Central

• 4-126-0-E; AUX-1

• 1-78-01-L; Passageway

• 1-84-1-Q; Weapons Department Office

• 01-122-0-L; Passageway

• Installation of foundations and equipment onto foundations (except AIT installed equipment less than 75lbs).

• Installation of interferences disturbed by the ripout and/or installation of equipment under this turnover.

• Installation, welding, and air test of access cut(s) required for rigging of equipment under this turnover.

• Installation and hydro testing of piping systems removed as interferences or relocated.

• Installation and welding complete of new cableways to include cable trays / ladders.

• Installation of lagging removed or disturbed by the ripout and/or installation of foundations or equipment under this turnover.

438-90-002; SA 71604K DDG Modification MCS/DCS Upgrades Single Watchstander

A+86 $150,000

Award fee criteria for this intra-availability milestone is set forth in HQ B-2-0003 Determination of Fee Paragraph (f), using the ratings set forth in Paragraph (h) to determine the award fee earned.

HM&E Turnover #3

In the following Compartments:

• 4-174-0-E; MER-1

• 1-97-1-A; Repair-2

• 01-130-0-Q; Combat System Maintenance Central

• 4-126-0-E; AUX-1

• 4-442-0-E; Steering Gear Room

• 2-381-2-Q; Electrical Workshop

• 2-410-2-A; Repair-3

• 1-304-2-A; Repair-5A / DC Equip Office

• 2-395-2-A; Electrical Tool Issue

• 2-116-1-T; Access Trunk

• Installation of foundations and equipment onto foundations (except AIT installed equipment less than 75lbs).

• Installation of interferences disturbed by the ripout and/or installation of equipment under this turnover.

• Installation, welding, and air test of access cut(s) required for rigging of equipment under this turnover.

• Installation and hydro testing of piping systems removed as interferences or relocated.

• Installation and welding complete of new cableways to include cable trays / ladders.

• Installation of lagging removed or disturbed by the ripout and/or installation of foundations or equipment under this

A+100 $150,000

Award fee criteria for this intra-availability milestone is set forth in HQ B-2-0003 Determination of Fee Paragraph (f), using the ratings set forth in Paragraph (h) to determine the award fee earned.

HM&E Turnover #4

In the following Compartments:

• 4-254-0-E; MER-2

• 4-442-0-E; Steering Gear Room

• 2-410-2-A; Repair-3

• 3-370-0-E; #3 Generator Room

• 4-94-0-C; IC/Gyro Room #1

• 2-126-2-C; Combat Systems Equipment Room #2

• 3-300-0-C; IC/Gyro Room #2

• 03-133-1-L; Passageway

• 03-142-2-Q; Electronic Workshop #1

• 1-126-0-C; Combat Information Center

• 04-130-0-C; Pilot House

• 2-174-8-Q; Test Lab

• 03-142-2-Q; Electrical Load Center No.1

• 03-154-2-L; Passageway

• 02-154-1-L; Passageway

• Installation of foundations and equipment onto foundations (except AIT installed equipment less than 75lbs).

• Installation of interferences disturbed by the ripout and/or installation of equipment under this turnover.

• Installation, welding, and air test of access cut(s) required for rigging of equipment under this turnover.

• Installation and hydro testing of piping systems removed as interferences or relocated.

• Installation and welding complete of new cableways to include cable trays / ladders.

• Installation of lagging removed or disturbed by the ripout and/or installation of foundations or equipment under this

441-90-001; SA 71726K DDG Modification Full IBS Upgrade Single Bridge Watchstander

A+114 $150,000

Award fee criteria for this intra-availability milestone is set forth in HQ B-2-0003 Determination of Fee Paragraph (f), using the ratings set forth in Paragraph (h) to determine the award fee earned.

HM&E Turnover #5

In the following Compartments:

• 2-53-1-C; Combat Systems Equipment Room #1

• 1-126-0-C; Combat Information Center

• 04-130-0-C; Pilot House

• 2-370-3-A; Supply Department Storeroom #2

• 2-78-01-L; Crew Berthing #1

• 1-18-0-Q; Sonar Equipment Room #1

• 01-130-0-Q; Combat System Maintenance Center

• 2-338-1-L; Passageway

• 4-370-5-A; Supply Storeroom #3

• 2-126-1-C; Radio Central

• 03-128-0-C; RADAR Room #1

• 03-142-0-C; RADAR Room #2

• 03-128-1-Q; Array Room #1

• 04-150-0-C; Chart Room

• 02-146-1-L; CO Cabin In Port

• 04-158-01-L; CO Cabin At-Sea

• 1-100-2-Q; Security Force Issue Room

• Installation of foundations and equipment onto foundations (except AIT installed equipment less than 75lbs).

• Installation of interferences disturbed by the ripout and/or installation of equipment under this turnover.

• Installation, welding, and air test of access cut(s) required for rigging of equipment under this turnover.

• Installation and hydro testing of piping systems removed as interferences or relocated.

• Installation and welding complete of new cableways to include cable trays / ladders.

• Installation of lagging removed or disturbed by the ripout and/or installation of foundations or equipment under this

441-90-001; SA 71726K DDG Modification Full IBS Upgrade Single Bridge Watchstander

A+128 $150,000

Award fee criteria for this intra-availability milestone is set forth in HQ B-2-0003 Determination of Fee Paragraph (f), using the ratings set forth in Paragraph (h) to determine the award fee earned.

HM&E Turnover #6

In the following Compartments:

• 2-53-1-C; Combat Systems Equipment Room #1

• 4-126-0-E; AUX-1

• 4-174-0-E; MER-1

• 4-220-0-E; AUX-2

• 4-254-0-E; MER-2

• 3-370-0-E; Generator Room

• 3-300-0-C; IC/Gyro Room #2

• 3-18-0-C; Sonar Equipment Room #3

• 1-78-01-L; Passageway

• 1-84-1-Q; Weapons Department Office

• 1-174-01-L; Passageway

• 1-220-5-L; Passageway

• 1-300-01-L; Passageway

• 4-110-0-E; VCHT Room #1

• 4-300-0-E; VCHT Room #2

• 5-300-01-E; A/C Machinery Room

• 2-338-4-L; Crew Library

• 4-442-0-E; Steering Gear Room

• 2-410-0-L; Passageway

• Installation of foundations and equipment onto foundations (except AIT installed equipment less than 75lbs).

• Installation of interferences disturbed by the ripout and/or installation of equipment under this turnover.

• Installation, welding, and air test of access cut(s) required for rigging of equipment under this turnover.

• Installation and hydro testing of piping systems removed as interferences or relocated.

• Installation and welding complete of new cableways to include cable trays / ladders.

• Installation of lagging removed or disturbed by the ripout and/or installation of foundations or equipment under this

431-90-001; SA 73088K, Gigabit Ethernet Data Multiplex System (GEDMS) Upgrade 438-90-002; SA 71604K, DDG Modification MCS/DCS Upgrades Single Watchstander 441-90-001; SA 71726K, DDG Modification Full IBS Upgrade Single Bridge Watchstander 980-90-009; SA 71615K, DDG Mod Digital Video Surveillance System (DVSS) 438-90-003; SA 80612K, Integrated Conditioning and Assessment System Install (ICAS)

A+142 $150,000

Award fee criteria for this intra-availability milestone is set forth in HQ B-2-0003 Determination of Fee Paragraph (f), using the ratings set forth in Paragraph (h) to determine the award fee earned.

HM&E Turnover #7

In the following Compartments:

• 4-126-0-E; AUX-1

• 4-174-0-E; MER-1

• 4-220-0-E, AUX-2

• 4-254-0-E; MER-2

• 5-300-01-E; A/C Machinery Room

• 3-370-0-E; #3 Generator Room

• 4-442-0-E; Steering Gear Room

• Fuel Oil Tank Groups 1-6

• JP-5 Storage, Service and Stripping Tanks

• Potable Water Tanks

• NR1 and NR2 MRG L/O Sumps

• Port and Starboard CPP L/O Sumps

• All Waste Drain Collecting Tanks

• Fuel Oil Service Tanks and Generator Head Tanks (Two Tank Groups at A+142, A+149 and A+156)

• Installation of foundations and equipment onto foundations (except AIT installed equipment less than 75lbs).

• Installation of interferences disturbed by the ripout and/or installation of equipment under this turnover.

• Installation, welding, and air test of access cut(s) required for rigging of equipment under this turnover.

• Installation and hydro testing of piping systems removed as interferences or relocated.

• Installation and welding complete of new cableways to include cable trays / ladders.

• Installation of lagging removed or disturbed by the ripout and/or installation of foundations or equipment under this turnover.

• Preservation and painting of new and disturbed foundations and disturbed surfaces.

• Installation of Radar, TDR and Redundant TLIs in all tanks

• Modifications and repairs to JP-5 piping, valves and tanks

• Complete all work associated with fan rooms associated with Engineering spaces and CPS Zones 1, 2, 3 and 4

• Installation of Main Reduction Gear/Controllable Pitch Propeller Lube Oil Filter Separators

• Modification to lube oil Purifier Heat Exchangers

262-90-001; SA 76253K, Main Reduction Gear/Controllable Pitch Propeller Lube Oil Purifier Replace with Filter Separator 264-90-001; SA 85973K, DDG Lube Oil Purifier Heat Exchanger Modification 431-90-001; SA 73088K, Gigabit Ethernet Data Multiplex System (GEDMS) Upgrade 437-90-001; SA 77829K, Installation of RADAR & TDR TLIs for DFM, JP-5 and Potable Water Tanks, accomplish 437-90-002; SA 77269K, Installation of Redundant Tank Level Indicators (TLI) on Generator Head Tanks 438-90-002; SA 71604K DDG Modification MCS/DCS Upgrades Single Watchstander 541-90-001; SA 70403K, Digital Fuel Control System Installation, accomplish 542-90-001; SA 76034K, Modify JP-5 Piping to Allow Emergency JP-5 Supply to Number 3 Gas Turbine Generator Head Tank and ML