813-11-001_-_ALO_Compartment_Release_Schedule.pdf

PDF 281 KB Posted

Attached to
USS PAUL HAMILTON (DDG 60) EDSRA
Solicitation number
N00024-16-R-4400
Issued by

About this file

Response to Questions (813-11-001 - ALO Compartment Release Schedule)

View the file

Other files

File Type Posted
N55236_170001_FBO.pdf PDF
N00024_170014_FBO.pdf PDF
N00024_170015_FBO.pdf PDF
N00024_170024_FBO.pdf PDF
N00024_170017_FBO.pdf PDF
N000024_170012_FBO.pdf PDF
N00024_170013.pdf PDF
N55236_170025_FBO.pdf PDF
JA_215N_redact.pdf PDF
JA_222N_redact.pdf PDF
JA_270N_redact.pdf PDF
JA_3_REDAC6.pdf PDF
JA_4_REDACT.pdf PDF
Redacted_Hamilton_JA2.pdf PDF
JA_PAUL_HAMILTON_REDACT.pdf PDF
DDG-60_RFP_Q_AND_A_-_FINAL.docx DOCX document
J-4_Pricing_Spreadsheet__(Amend_0010).xlsx XLSX spreadsheet
Amend_0010_conformed.pdf PDF
Amendment_0009.pdf PDF
Amend_0009.pdf PDF
Amend_0009_conformed.pdf PDF
Amend_0008.pdf PDF
J-3_Execution_Milestones_(Amend_0008).xlsx XLSX spreadsheet
N00024-16-R-4400-0007_Released.docx DOCX document
DDG_60_AC_Conversion_POAM_plants__1_and__4.mpp MPP file
DDG-60_Mod_Critical_Path_Turnover_Schedule.pdf PDF
SI_Index_0204.pdf PDF
DDG-60_RFP_Q_AND_A_-___250_-_345.pdf PDF
Amend_0006.pdf PDF
Amend_0006_Conformed.pdf PDF
J-7_Quality_Assurance_Surveillance_Plan_Amend_0005.pdf PDF
DDG-60_RFP_Q_AND_A_-___98_-_249_FBO.pdf PDF
Amend_0004.pdf PDF
J-3_Execution_Milestones_(Amend_0003).xlsx XLSX spreadsheet
Amend_0003_conformed.pdf PDF
J-7_Quality_Assurance_Surveillance_Plan_(Amend_0003).pdf PDF
J-5_Award_Fee_Intra_Availability_(Amend_0003).pdf PDF
DDG-60_RFP_Q_and_A__28-97.pdf PDF
Amendment_0002.pdf PDF
Amendment_0002_Conformed.pdf PDF
DDG-60_RFP_Q_AND_A_-___1-_27.pdf PDF
RFP-IFB_Amend__1.pdf PDF
S-2_Past_Performance_Questionnaire.docx DOCX document
Exhibit_B.pdf PDF
S-5_Eligibility_Criteria_Data_Sheet.docx DOCX document
J-1_PH_EDSRA_Specification_Work_Package.pdf PDF
Exhibit_C.pdf PDF
J-5_Award_Fee_Intra_Availability.docx DOCX document
S-4_PP_Reference_List.docx DOCX document
Synopsis_-_PAUL_HAMILTON_(DDG_60)_Final_(10-1-15).docx DOCX document
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SHIP: USS PAUL HAMILTON (DDG 60) ITEM NO: 813-11-001

COAR: 16 PCN: EXSY-ZA38

CSWT FILE NO: 813-001 CMP: NONE

REVISED: 16 Feb 2015 PLANNER: BRITT, BROOKS

SSP: TPPC-DDG60-SSSD16-CN01 1 of 12 ITEM NO: 813-11-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

1. SCOPE:

1.1 Title: AEGIS Light-Off (ALO) Compartment Release Schedule; provide

1.2 Location of Work:

1.2.1 Throughout the Ship

1.3 Identification:

1.3.1 Not Applicable

1.4 Security Classification of Equipment, Components, Spaces and Documents: The Equipment, Space or Document is classified and subject to the applicable provisions of the National Industrial Security Program Operating Manual, DOD 5220.22M (0584-LP-179-6400).

1.4.1 Spaces:

1.4.1.1 All Combat Systems Equipment Spaces when outfitted and operational (SECRET)

2. REFERENCES:

2.1 Standard Items,

2.2 S9AAO-AB-GOS-010, General Specifications for Overhaul

3. REQUIREMENTS:

3.1 ALO Compartment Release: To enter Combat System Support Equipment (CSSE) Light-off or ALO, all services either ship or shore based, must be available in all compartments as specified in ATTACHMENT A on a continuous basis. These services include: 60HZ/400HZ, Air Conditioning (AC), Chilled Water(CW), Firemain or AEGIS Salt Water Cooling pumps, Ventilation, Electronic Cooling Water (ECW) (demineralized water), Dry Air, High Pressure Air (HP), Low Pressure Air (LP), Forward and Aft SPY skids, Sonar skid, AN/SPS-49 skid, Command and Decision (C&D) skid, AN/SLQ-32 Cooling unit and CIWS heat exchanger. In addition, the Electric Plant Control Equipment (EPCE) console must be available. Cabling from 60Hz Power panel, Chilled Water (CW) hose and routes must be intact to MK 84 converters. ECW modifications must be completed and all contractor flushes accomplished. If in dry-dock, overboard discharges for AC plants, Skids and Firemains must be installed. In addition to all of the services being available heavy industrial work in all compartments as specified in ATTACHMENT A must be complete including hot work, cutting, grinding, deck work (PRC, Terrazzo, NOMEX), and spray painting and any other industrial type of work that would either limit compartment access or limit the availability of services in the compartment.. Access routes need not be released but must be passable or alternate routes made available at all times. Level 3 testing shall not begin in a compartment which has not been formally turned over and accepted by the SUPERVISOR, without permission of Naval Surface Warfare Center Port Hueneme (NSWC PHD) Project Engineer.

3.1.1 To meet the milestones for ALO or CSSE LO, all requirements of

3.2 must be met and the supporting services of 3.2 must be

SHIP: USS PAUL HAMILTON (DDG 60)

SSP: TPPC-DDG60-SSSD16-CN01 2 of 12 ITEM NO: 813-11-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

continuously available.

3.2 Accomplish the requirements of 3.2 and 3.2.1 in support of CSSE Light-off and ALO Compartment Release in accordance with ATTACHMENT A and the information provided below:

3.2.1 A = Availability Start.

3.2.2 CSSE LO NLT = A + 35 days.

3.2.2.1 The compartments applicable to CSSE Light-off are

identified as those compartments listed in ATTACHMENT A with a compartment release date of CSSE LO. In addition to other compartments identified in ATTACHMENT A, other compartments in which industrial work effects service availability are also applicable.

3.2.3 ALO NLT = A + 42 days.

3.2.3.1 CSSE LO must occur prior to ALO. The compartments

applicable to ALO are identified in ATTACHMENT A with a compartment release date of ALO.

3.3 Develop an original and a weekly revised ALO Compartment Release Schedule (CRS). All spaces listed in ATTACHMENT A shall be turned over to Ship's Force and the SUPERVISOR no later than A+42 to meet ALO. The schedule shall contain the following information as a minimum:

3.3.1 Index the CRS by compartment number.

3.3.2 List of compartments, by name and number, where work is to be, has been, or remains to be accomplished.

3.3.2.1 List of contractor responsible, incomplete work by Work Item Number.

3.3.2.2 Known Ship's Force work that impacts or interfaces with contractor responsible Work Items and support services identified in paragraph 3.1.

3.3.2.3 Estimated completion date for contractor responsible

Work Items listed by compartment.

3.3.3 Submit 4 legible copies, in hard copy or approved

transferrable media, of the original CRS to the Port Hueneme Detachment, Naval Surface Warfare Center (PHD NSWC) Project Engineer and the SUPERVISOR no later than A-15.

3.3.4 Submit 4 legible copy, in hard copy or approved transferrable media, of the revised CRS to the PHD NSWC Project Engineer and the SUPERVISOR on a weekly basis, commencing at A+30.

3.3.4.1 Highlight changes from the previous CRS.

3.3.4.2 Highlight each discrepancy to be corrected prior to ALO, providing the reason and expected completion date.

3.3.4.3 Highlight compartments likely to be unprepared for ALO.

(V)(G) "JOINT COMPARTMENT INSPECTION"

3.4 Accomplish a joint inspection of the compartments listed in the CRS

SSP: TPPC-DDG60-SSSD16-CN01 3 of 12 ITEM NO: 813-11-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

with the SUPERVISOR, NSWC PHD Combat Systems Project Engineer, and Ship's Commanding Officer, or his designee, upon completion of industrial work.

3.4.1 The joint inspection team shall document the discrepancies and determine if the scope and nature of work remaining will impede uninterrupted testing.

Report: Impede Testing Discrepancy Report Date: + 0

3.4.1.1 Submit one legible copy, in hard copy or approved

transferrable media, of a report listing the discrepancies found during each inspection that will impede testing and the discrepancies found that will not impede testing, to the

SUPERVISOR.

3.4.1.2 Identify each discrepancy as contractor responsible or Government responsible.

3.4.1.3 The three parties identified in 3.2 will sign the report upon completion of discrepancies.

3.4.2 Notify the SUPERVISOR verbally and in writing, when each compartment is ready to be turned over to Ship's Force for maintenance.

3.4.2.1 Indicate on the revised CRS when each compartment is

complete.

3.5 The purpose of this work item is to ensure that compartments listed on ATTACHMENT A have been inspected and ready to support ALO and CSSE LO.

Aegis Light-off (ALO) and the start of Combat System Test shall be synonymous and is defined as: designated compartments and support systems completed, to the degree required to support uninterrupted testing once started in accordance with section 092 of 2.2. All support services defined in 3.1 are required at CSSE LO to conduct testing at ALO.

3.6 A compartment is released when the compartment is clear of all the industrial work and/or services supporting the industrial work as identified in 3.2. At the time of the compartment release, equipment required for Level 3 Testing is required to be accessible to the test teams.

4. NOTES:

4.1 The Ship's Commanding Officer will furnish a list of the work, by compartment and location, including the schedule, that is planned for accomplishment by Ship's Force on a weekly basis to the SUPERVISOR.

4.2 For the purpose of this Work Item, the term compartment indicates compartment, gun mounts, weather deck weapons areas, tanks and voids.

5. GOVERNMENT FURNISHED MATERIAL (GFM):

5.1 LLTM:

1. None.

5.2 PUSH MATERIAL:

1. None.

SSP: TPPC-DDG60-SSSD16-CN01 4 of 12 ITEM NO: 813-11-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

5.3 KITTED MATERIAL:

1. None.

SSP: TPPC-DDG60-SSSD16-CN01 5 of 12 ITEM NO: 813-11-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S. International Traffic in Arms Regulation (ITAR).

This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

Attachment A

SSP: TPPC-DDG60-SSSD16-CN01 6 of 12 ITEM NO: 813-11-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S. International Traffic in Arms Regulation (ITAR).

This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in

SSP: TPPC-DDG60-SSSD16-CN01 7 of 12 ITEM NO: 813-11-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S. International Traffic in Arms Regulation (ITAR).

This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in

SSP: TPPC-DDG60-SSSD16-CN01 8 of 12 ITEM NO: 813-11-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S. International Traffic in Arms Regulation (ITAR).

This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in

SSP: TPPC-DDG60-SSSD16-CN01 9 of 12 ITEM NO: 813-11-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S. International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

SUPPORT SERVICES ALO=15MAY17

CSSE LO=

SPACE

NO.

SPACE NAME 60HZ 400HZ A/C ECW CW FM DRY

AIR

HP

AIR

LP

AIR

RELEASE

DATE

4-94-0-C IC & Gyro Room #1 (FWD) YES YES YES YES 28-APR-17 3-300-0-C IC & Gyro Room #2 (AFT) YES YES YES 28-APR-17 3-126-2-Q Power Supply/Coversion Room YES YES YES YES 28-APR-17 3-319-0-Q Power Conversion Room YES YES YES YES 28-APR-17 4-42-0-Q Sonar Cooling Equipment Room YES YES YES YES 28-APR-17 03-142-1-Q Electronic Workshop #1 YES YES 28-APR-17 1-268-0-C CCS/DCC (VLS Alarms) YES 28-APR-17 1-314-0-C HWS Equipment Room YES YES YES YES 28-APR-17 4-126-0-E Auxiliary Machinery Room #1 (CND &

SPY Skids)

YES YES YES YES YES YES 28-APR-17

4-220-0-E Auxiliary Machinery Room #2 YES YES YES YES YES YES 28-APR-17 03-142-2-Q Electric Load Center #1 YES YES 28-APR-17 03-142-3-Q Fan Room YES YES 28-APR-17 03-142-4-Q Fan Room YES YES 28-APR-17 01-110-3-Q Fan Room PZ#1 YES YES 28-APR-17 01-126-3-Q Fan Room PZ#2 YES YES 28-APR-17 01-158-0-Q Fan Room YES YES 28-APR-17 01-240-01-Q Fan Room PZ#3 YES YES 28-APR-17 01-300-4-Q Fan Room PZ#4 YES YES 28-APR-17 1-78-1-Q Fan Room YES YES 28-APR-17 1-78-2-Q Fan Room YES YES 28-APR-17 1-358-2-Q Fan Room YES YES 28-APR-17 1-359-1-Q Fan Room YES YES 28-APR-17 1-364-2-Q Fan Room YES YES 28-APR-17

SSP: TPPC-DDG60-SSSD16-CN01 10 of 12 ITEM NO: 813-11-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S. International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

SUPPORT SERVICES ALO=15MAY17

CSSE LO=

SPACE NO. SPACE NAME 60HZ 400HZ A/C ECW CW FM DRY AIR HP AIR LP AIR RELEASE DATE

3-338-0-M VLS Magazine #2 (AFT) YES YES YES YES YES 1-MAY17 3-335-2-T VLS Access Trunk YES 1-MAY17 3-97-2-T VLS Access Trunk YES 1-MAY17 1-97-2-Q VLS Service Interface Room (FWD) YES 1-MAY17 3-78-0-M VLS Magazine #2 (FWD) YES YES YES YES 1-MAY17 01-130-0-Q Combat Systems Maintenance Central YES YES YES 1-MAY17

2-53-1-C CSER #1 YES YES YES YES 1-MAY17

2-126-2-C CSER #2 YES YES YES YES 1-MAY17

1-300-0-C CSER #3 YES YES YES YES 1-MAY17

1-126-0-C Combat Information Center YES YES YES YES 1-MAY17 1-18-0-C Sonar Equipment Room #1 YES YES YES YES 1-MAY17 2-126-1-C Communications Center YES YES YES YES YES YES YES 1-MAY17 2-158-1-C Radio Transmitter Room YES YES YES YES YES YES 1-MAY17 2-200-1-Q LAN Equipment Room YES YES 1-MAY17

1-158-0-C TSCSI YES 1-MAY17

03-128-0-C Radar Room #1 YES YES YES YES YES YES YES 1-MAY17 03-142-0-C Radar Room #2 YES YES YES YES YES YES YES 1-MAY17 01-274-1-C Radar Room #3 YES YES YES YES YES YES YES 1-MAY17 03-128-1-Q SPY Array Room #1 (FWD/STBD) YES YES YES YES 1-MAY17 03-128-2-Q SPY Array Room #2 (FWD/PORT) YES YES YES YES 1-MAY17 03-158-3-Q SPY Array Room #3 (AFT/STBD) YES YES YES YES 1-MAY17 03-158-0-C SPY Array Room #4 (FWD/PORT) YES YES YES YES 1-MAY17 02-126-4-L Wardroom YES YES 1-MAY17 1-100-2-Q VLS Security Station (FWD) YES 1-MAY17 1-330-0-Q VLS Service Interface Room (AFT) YES 1-MAY17 1-330-2-Q VLS Security Station (AFT) YES 1-MAY17

SSP: TPPC-DDG60-SSSD16-CN01 11 of 12 ITEM NO: 813-11-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S. International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

SUPPORT SERVICES ALO=15MAY17

CSSE LO=

SPACE NO. SPACE NAME 60HZ 400HZ A/C ECW CW FM DRY

AIR

HP

AIR

LP

AIR

RELEASE

DATE

FWD, STBD, PORT,

AFT

AN/SPY-1A Antenna Arrays YES YES YES YES YES YES 8-MAY-17

2-80-2-C Sonar Control Room YES YES YES YES 8-MAY-17 2-18-0-Q Sonar Equipment Room #2 YES YES YES YES 8-MAY-17 3-18-0-Q Sonar Equipment Room #3 YES YES YES YES 8-MAY-17 04-150-0-C Chart Room YES 8-MAY-17 06-157-0-T Main Mast and Access Trunk YES 8-MAY-17 04-130-0-C Pilothouse YES YES YES YES YES YES 8-MAY-17 05-131-0-Q Director Equipment Room #1 YES YES YES YES 8-MAY-17 04-272-0-Q Director Equipment Room #2 YES YES YES YES YES 8-MAY-17 03-228-0-Q Director Equipment Room #3 YES YES YES YES YES 8-MAY-17 1-46-0-M 5”/54 CAL Loader Drum & Fan

Room

YES YES YES YES 8-MAY-17

2-442-0-Q TACTAS Hoist Room YES YES YES YES 8-MAY-17 01 LVL FR 338-370 Missile Deck (AFT) YES YES YES YES YES YES 8-MAY-17 01 LVL FR 78-110 Missile Deck (FWD) YES YES YES YES YES YES 8-MAY-17 01-(46-78)-0-M 5”/54 CAL Gun Mount (MT 51) YES YES YES YES 8-MAY-17 3-68-1-M 5”/54 CAL Propellant Mag #1 YES YES YES YES 8-MAY-17 3-68-2-M 5”/54 CAL Propellant Mag #2 YES YES YES YES 8-MAY-17 06-150-0 FCS Director #1 YES 8-MAY-17 05-280-0 FCS Director #2 YES YES 8-MAY-17 04-292-0 FCS Director #3 YES YES 8-MAY-17 3-42-0-M 5”/54 CAL Projectile Magazine YES YES YES YES 8-MAY-17

SSP: TPPC-DDG60-SSSD16-CN01 12 of 12 ITEM NO: 813-11-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S. International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

SUPPORT SERVICES ALO=15MAY17

CSSE LO=

SPACE NO. SPACE NAME 60HZ 400HZ A/C ECW CW FM DRY AIR HP AIR LP AIR RELEASE DATE

03-112-0-C CIWS Control Room #1 YES YES YES YES 15-MAY-17 02-299-0-C CIWS Control Room #2 YES YES YES YES 15-MAY-17 01-342-1-M Torpedo Tube (STBD) YES YES YES 15-MAY-17 01-342-2-M Torpedo Tube (PORT) YES YES YES 15-MAY-17 2-450-1-Q NIXIE Room YES YES YES YES 15-MAY-17 2-153-2-C Tomahawk Equipment Room YES YES YES YES 15-MAY-17 02-(200-220)-1 Decoy Launchers (STBD) YES 15-MAY-17 02-(200-200)-2 Decoy Launchers (PORT) YES 15-MAY-17 03-(142-158)-3 EW Array SLQ-32 (STBD) YES YES Glycl YES YES YES 15-MAY-17 03-(142-158)-4 EW Array SLQ-32 (PORT) YES YES Glycl YES YES YES 15-MAY-17

03-(112-128)-0 CIWS (MT 21) FWD YES YES YES 15-MAY-17

02-(300-316)-0 CIWS (MT 22) AFT YES YES YES 15-MAY-17

01-300-1-Q CIWS Workshop #2 15-MAY-17 02-112-0-Q CIWS Workshop #1 15-MAY-17 01-(318-338)-0 Harpoon Launcher YES YES 15-MAY-17 6-0-0-Q Transducer Compartment 15-MAY-17 6-10-0-Q Transducer Cylinder YES 15-MAY-17 2-442-4-Q Bathythermograph Room YES YES 15-MAY-17 0 ½-28-0-Q Dome Equipment Room YES YES YES YES 15-MAY-17 5-28-0-T Sonar Dome Access Trunk 15-MAY-17 1-370-8-M Torpedo Magazine YES YES YES 15-MAY-17