SSN_765_CDRLS_12_4_14.ppt
PPT presentation 1 MB Posted
- Attached to
- USS COLUMBUS (SSN 762) Engineering Overhaul (EOH) Federal contract opportunity
- Solicitation number
- N0002415R4300
About this file
SSN 765 Contract Data Requirements List (CDRLs)
View the file
Other files for this federal contract opportunity
Show all 50
USS COLUMBUS (SSN 762) Engineering Overhaul (EOH) has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item) Form Approved OMB No. 0704-0188
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY
F. CONTRACTOR
E. CONTRACT/PR NO.
D. SYSTEM/ITEM
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE
7. DD 260 REQ
8. APP CODE
10. FREQUENCY
9. DIST STATEMENT
REQUIRED
12. DATE OF FIRST SUBMISSION
11. AS OF DATE
13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE
14. DISTRIBUTION
b. COPIES Draft Final Reg Report
18. ESTIMATED
TOTAL PRICE
17. PRICE GROUP
16. REMARKS
G. PREPARED BY
I. APPROVED BY
H. DATE
J. DATE
DD Form 1423-1, JUN 90 Previous editions are obsolete Page ____ of ____ Pages 1007/183
15. TOTAL
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services. Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
TDP ________ TM ____________ OTHER _________________________________
1 0
USS MONTPELIER (SSN 765)
Competitive A001 Technical Work Documents
OT-
CLIN 0001
SUPSHIP
LT
(See Blk 16) (See Blk 16) (See Blk 16)
Block 4: Complete initial issuance of technical work documents (i.e. Task Group Instructions (TGIs), Inspection Reports (IRs)) associated with availability planning and execution. Technical work documents are written for each job in the Availability Work Package (AWP).
A
CLIN 0002
SUPSHIP
Task Group Instructions / Inspection Reports
1 0
N/A
Natalia Argote PMS392H13
N/A
N/A Block 5/10/12/13:
The full 100%, of this special incentive shall be paid if 95% or more of the required detailed work planning documents (excluding test documents) are issued for work at start of the availability in accordance with the USS MONTPELIER (SSN 765) AWP. The special incentive date is the start of execution of the availability.
Three quarters of this special incentive (75%) shall be paid if more than 93% and less than 95% of required detailed work planning documents (excluding test documents) are issued for work at the start of execution of the availability.
Half of the special incentive (50%) shall be paid if 90% up to 93% of the required detailed work planning documents (excluding test documents) are issued for work at start of execution of the availability.
Issuance of less than 90% of the detailed work planning documents (excluding T-phase) for work at the start of execution of the availability shall result in no special incentive.
Within thirty (30) business days after the start of execution of the availability, the Contractor shall provide documentation to the Supervisor that includes: 1) a letter indicating the percentage of detailed work planning documents (excluding test documents) issued for the ship’s start of execution, 2) the master listing of detailed work planning documents (excluding test documents) required prior to the ship’s execution – with Actual and Estimated detailed work planning documents issue dates, and 3) identification of any issues of concern related to detailed work planning documents development (excluding test documents) for the ship’s execution. This documentation shall include the number and percentage of required detailed work planning documents (excluding test documents) issued for the ship at the start of execution, the number and percentage of detailed work planning documents (excluding test documents) still in development at the start of the ship execution, and the Contractor’s self-assessment of performance under this special incentive.
It should be noted that any changes beyond the above noted AWP that affect the detailed work planning documents in process (excluding test documents), the detailed work planning documents will be excluded from the special incentive determination.
Natalia Argote PMS392H13
14 NOV 14
Form Approved OMB No. 0704-0188
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY
F. CONTRACTOR
E. CONTRACT/PR NO.
D. SYSTEM/ITEM
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE
7. DD 260 REQ
8. APP CODE
10. FREQUENCY
9. DIST STATEMENT
REQUIRED
12. DATE OF FIRST SUBMISSION
11. AS OF DATE
13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE
14. DISTRIBUTION
b. COPIES Draft Final Reg Report
18. ESTIMATED
TOTAL PRICE
17. PRICE GROUP
16. REMARKS
G. PREPARED BY
I. APPROVED BY
H. DATE
J. DATE
DD Form 1423-1, JUN 90 Previous editions are obsolete Page ____ of ____ Pages 1007/183
15. TOTAL
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services. Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
DI-MGMT-80269
CLIN 0001, CLIN 0003
SUPSHIP
LT
ONE/R (See Blk 16)
60 DAC
(See Blk 16)
Block 4: GFM Schedule shall include description of item to include military designator, vendor drawing, and/or part number (if applicable), National Stock Number (NSN), quantity required, date required and source document.
All undocking and Level I SAED/SUBSAFE Items shall be so marked.
Block 5: CLIN 0001, CLIN 0003 and DDGOS 0902-018-2010, 5000-0-e.
Blocks 10/13: Revisions required for currency.
A002 Report, Support Equipment Delivery Schedule/ Delinquency Schedule of GFM (Exception Report) Material Ordering Schedule
Natalia Argote, PMS 392H13
14 Nov 14
Form Approved OMB No. 0704-0188
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY
F. CONTRACTOR
E. CONTRACT/PR NO.
D. SYSTEM/ITEM
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE
7. DD 260 REQ
8. APP CODE
10. FREQUENCY
9. DIST STATEMENT
REQUIRED
12. DATE OF FIRST SUBMISSION
11. AS OF DATE
13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE
14. DISTRIBUTION
b. COPIES Draft Final Reg Report
18. ESTIMATED
TOTAL PRICE
17. PRICE GROUP
16. REMARKS
G. PREPARED BY
I. APPROVED BY
H. DATE
J. DATE
DD Form 1423-1, JUN 90 Previous editions are obsolete Page ____ of ____ Pages 1007/183
15. TOTAL
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services. Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
1 0
A003
Product Drawings and Associated Lists
DI-DRPR-81000A
CLINs 0001, 0003, 0004, 0005, 0006
SUPSHIP
LT
(See Blk 16) (See Blk 16) (See Blk 16)
Block 5: Drawings/Tracings shall be provided in an electronic format suitable for reproduction DDGOS 0902-018-2010, 9020.1.i NAVSEA SL720-AA-MAN-010 applies to SHIPALTs.
Block 8: Content and format. Allow 10 days for Navy review.
Blocks 10/12/13: In accordance with Block 5 reference requirements.
New And Revised Drawings, Final Tracings
Natalia Argote, PMS 392H13 Natalia Argote, PMS 392H13 14 Nov 14
Form Approved OMB No. 0704-0188
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY
F. CONTRACTOR
E. CONTRACT/PR NO.
D. SYSTEM/ITEM
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE
7. DD 260 REQ
8. APP CODE
10. FREQUENCY
9. DIST STATEMENT
REQUIRED
12. DATE OF FIRST SUBMISSION
11. AS OF DATE
13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE
14. DISTRIBUTION
b. COPIES Draft Final Reg Report
18. ESTIMATED
TOTAL PRICE
17. PRICE GROUP
16. REMARKS
G. PREPARED BY
I. APPROVED BY
H. DATE
J. DATE
DD Form 1423-1, JUN 90 Previous editions are obsolete Page ____ of ____ Pages 1007/183
15. TOTAL
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services. Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A004 Material Status Report
CLIN 0001, 0003, 0004, 0006
SUPSHIP
LT
ASREQ
(See Blk 16) (See Blk 16) (See Blk 16)
Block 5: CLIN 0001 and DDGOS 0902-018-2010, 5000-0-I.
Blocks 10/12/13: NLT 10 days after initiation of purchase order.
Purchase Order, Copies of
DI-ILSS-80114
USS MONTPELIER (SSN 765)
Natalia Argote, PMS 392H13 Natalia Argote, PMS 392H13 14 Nov 14
Form Approved OMB No. 0704-0188
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY
F. CONTRACTOR
E. CONTRACT/PR NO.
D. SYSTEM/ITEM
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE
7. DD 260 REQ
8. APP CODE
10. FREQUENCY
9. DIST STATEMENT
REQUIRED
12. DATE OF FIRST SUBMISSION
11. AS OF DATE
13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE
14. DISTRIBUTION
b. COPIES Draft Final Reg Report
18. ESTIMATED
TOTAL PRICE
17. PRICE GROUP
16. REMARKS
G. PREPARED BY
I. APPROVED BY
H. DATE
J. DATE
DD Form 1423-1, JUN 90 Previous editions are obsolete Page ____ of ____ Pages 1007/183
15. TOTAL
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services. Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
1 0
A005
Ship Construction Report
CLIN 0001, 0003, 0004, 0006
SUPSHIP
LT
15 DARP
| Block 4: | DDGOS 0902-018-2010, 5000-0-d. |
| Data may be a diskette, or as a hard copy. Contractor’s |
format acceptable. Data shall include both Shipbuilder’s and Vendor’s drawings.
Block 5: CLIN 0001 and DDGOS 0902-018-2010, 5000-0-e
Drawing/Schedule Status
MTHLY
90 DAC
USS MONTPELIER (SSN 765)
Natalia Argote, PMS 392H13 Natalia Argote, PMS 392H13 14 Nov 14
Form Approved OMB No. 0704-0188
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY
F. CONTRACTOR
E. CONTRACT/PR NO.
D. SYSTEM/ITEM
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE
7. DD 260 REQ
8. APP CODE
10. FREQUENCY
9. DIST STATEMENT
REQUIRED
12. DATE OF FIRST SUBMISSION
11. AS OF DATE
13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE
14. DISTRIBUTION
b. COPIES Draft Final Reg Report
18. ESTIMATED
TOTAL PRICE
17. PRICE GROUP
16. REMARKS
G. PREPARED BY
I. APPROVED BY
H. DATE
J. DATE
DD Form 1423-1, JUN 90 Previous editions are obsolete Page ____ of ____ Pages 1007/183
15. TOTAL
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services. Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A006
Mass Properties Data Report (Submarines)
DI-MISC-81507
CLIN 0001, 0003, 0004,0005, 0006
SUPSHIP
LT
(See Blk 16)
Block 5: DDGOS 0902-018-2010, 9290-1-d.
Blocks 10/12/13: In accordance with SWLIN.
ASREQ
Natalia Argote, PMS 392H13 Natalia Argote, PMS 392H13 14 Nov 14
Form Approved OMB No. 0704-0188
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY
F. CONTRACTOR
E. CONTRACT/PR NO.
D. SYSTEM/ITEM
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE
7. DD 260 REQ
8. APP CODE
10. FREQUENCY
9. DIST STATEMENT
REQUIRED
12. DATE OF FIRST SUBMISSION
11. AS OF DATE
13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE
14. DISTRIBUTION
b. COPIES Draft Final Reg Report
18. ESTIMATED
TOTAL PRICE
17. PRICE GROUP
16. REMARKS
G. PREPARED BY
I. APPROVED BY
H. DATE
J. DATE
DD Form 1423-1, JUN 90 Previous editions are obsolete Page ____ of ____ Pages 1007/183
15. TOTAL
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services. Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A007
Engineering Change Proposals
DI-CMAN-80639C
CLIN 0001, 0003, 0004, 0005, 0006
SUPSHIP
LT
Block 5: CLIN 0001 and DDGOS 0902-018-2010, 5000-0-l-b.
Block 8: Content and format. Allow 15 days for Navy review.
Block 10: Revisions required to satisfy Navy Comments.
Blocks 10/12: As determined by contractor or directed by Navy.
SUPSHIP 1 0
2 0
20 DARC
A
PMS 392H1 1 0
USS MONTPELIER (SSN 765)
Natalia Argote, PMS 392H13 Natalia Argote, PMS 392H13 14 Nov 14
Form Approved OMB No. 0704-0188
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY
F. CONTRACTOR
E. CONTRACT/PR NO.
D. SYSTEM/ITEM
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE
7. DD 260 REQ
8. APP CODE
10. FREQUENCY
9. DIST STATEMENT
REQUIRED
12. DATE OF FIRST SUBMISSION
11. AS OF DATE
13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE
14. DISTRIBUTION
b. COPIES Draft Final Reg Report
18. ESTIMATED
TOTAL PRICE
17. PRICE GROUP
16. REMARKS
G. PREPARED BY
I. APPROVED BY
H. DATE
J. DATE
DD Form 1423-1, JUN 90 Previous editions are obsolete Page ____ of ____ Pages 1007/183
15. TOTAL
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services. Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A008
Request for Waivers and Deviations
DI-CMAN-80640C
CLIN 0001, 0003, 0004, 0005, 0006
SUPSHIP
LT
Block 5: CLIN 0001 and DDGOS 0902-018-2010, 9020-1-q.
Block 8: Content and format. Allow 15 days for Navy review.
Block 10: Revisions required to satisfy Navy Comments.
Blocks 10/12: As determined by contractor or directed by Navy.
20 DARC
A
PMS392H1 1 0
USS MONTPELIER (SSN 765)
Natalia Argote, PMS 392H13 14 Nov 14
PMS392CB 1 0
Form Approved OMB No. 0704-0188
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY
F. CONTRACTOR
E. CONTRACT/PR NO.
D. SYSTEM/ITEM
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE
7. DD 260 REQ
8. APP CODE
10. FREQUENCY
9. DIST STATEMENT
REQUIRED
12. DATE OF FIRST SUBMISSION
11. AS OF DATE
13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE
14. DISTRIBUTION
b. COPIES Draft Final Reg Report
18. ESTIMATED
TOTAL PRICE
17. PRICE GROUP
16. REMARKS
G. PREPARED BY
I. APPROVED BY
H. DATE
J. DATE
DD Form 1423-1, JUN 90 Previous editions are obsolete Page ____ of ____ Pages 1007/183
15. TOTAL
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services. Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A009
CLIN 0001
LT
Block 5: CLIN 0001 DDGOS 0902-018-2010, 9020-3, 5000-0-i
Block 8: Content and format. Allow 60 days for Navy review.
Blocks 12/13: Plan must be received and approved before commencing availability. Change in plan must be submitted for review.
ONE/R
Fire Protection Plan Organization Chart and Instructions and Flooding Chart
A (See Blk 16)
USS MONTPELIER (SSN 765)
Natalia Argote, PMS 392H13 Natalia Argote, PMS 392H13
Form Approved OMB No. 0704-0188
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY
F. CONTRACTOR
E. CONTRACT/PR NO.
D. SYSTEM/ITEM
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE
7. DD 260 REQ
8. APP CODE
10. FREQUENCY
9. DIST STATEMENT
REQUIRED
12. DATE OF FIRST SUBMISSION
11. AS OF DATE
13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE
14. DISTRIBUTION
b. COPIES Draft Final Reg Report
18. ESTIMATED
TOTAL PRICE
17. PRICE GROUP
16. REMARKS
G. PREPARED BY
I. APPROVED BY
H. DATE
J. DATE
DD Form 1423-1, JUN 90 Previous editions are obsolete Page ____ of ____ Pages 1007/183
15. TOTAL
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services. Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A010 Agenda, Ship Sea Trial
Block 4: Data shall satisfy Block 5 reference requirements. OPNAVINST 4700.8H and CINCLANTFLT/CINCPACFLTINST 4790.3 Joint Fleet Maintenance Manual
| Block 5: | CLIN 0003 |
| DDGOS 0902-018-2010, 9080-1. |
Block 8: Submit for government review 60 days prior to Fast Cruise. Content and format. Allow 30 days for Navy review.
Block 10: Revisions required to satisfy Navy review , comments and as directed by Navy.
Block 12: NLT 30 days prior to Fast Cruise.
LT
PMS 392H1
SHIP
TYCOM
A
CLIN 0003
USS MONTPELIER (SSN 765)
Natalia Argote, PMS 392H13 Natalia Argote, PMS 392H13
Form Approved OMB No. 0704-0188
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY
F. CONTRACTOR
E. CONTRACT/PR NO.
D. SYSTEM/ITEM
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE
7. DD 260 REQ
8. APP CODE
10. FREQUENCY
9. DIST STATEMENT
REQUIRED
12. DATE OF FIRST SUBMISSION
11. AS OF DATE
13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE
14. DISTRIBUTION
b. COPIES Draft Final Reg Report
18. ESTIMATED
TOTAL PRICE
17. PRICE GROUP
16. REMARKS
G. PREPARED BY
I. APPROVED BY
H. DATE
J. DATE
DD Form 1423-1, JUN 90 Previous editions are obsolete Page ____ of ____ Pages 1007/183
15. TOTAL
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services. Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A011 Publication Package, Field Change
Blocks 10/12/13: As required by DDGOS DDGOS 0902-018-2010, 9020-1-j and SWLIN.
Block 14: SUPSHIP will provide distribution.
This item includes changes and updates to all publications affected by availability validated by shipcheck. As a minimum, “Printer Proof” copies of SRD shall be onboard prior to Fast Cruise.
CLIN 0001, 0003, 0004, 0005, 0006
NTE
Natalia Argote, PMS 392H13 14 Nov 14
PMS392CB 1 0
Form Approved OMB No. 0704-0188
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY
F. CONTRACTOR
E. CONTRACT/PR NO.
D. SYSTEM/ITEM
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE
7. DD 260 REQ
8. APP CODE
10. FREQUENCY
9. DIST STATEMENT
REQUIRED
12. DATE OF FIRST SUBMISSION
11. AS OF DATE
13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE
14. DISTRIBUTION
b. COPIES Draft Final Reg Report
18. ESTIMATED
TOTAL PRICE
17. PRICE GROUP
16. REMARKS
G. PREPARED BY
I. APPROVED BY
H. DATE
J. DATE
DD Form 1423-1, JUN 90 Previous editions are obsolete Page ____ of ____ Pages 1007/183
15. TOTAL
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services. Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A012 Submarine Safety/Material Certification Composite List
PMS 392
Block 5: DDGOS 0902-018-2010, 9020-0, 5000-0-f and NAVSEA 0924-062-0010.
Blocks 10/12: Deferred delivery, retain on file.
Blocks 14/15: Quantity and distribution will be provided by SUPSHIP.
See Blk 16
DFDEL (See Blk 16)
PMS392H1
CLIN 0001, 0003, 0004, 0005, 0006
DI-QCIC-80815
DFDEL (See Blk 16)
USS MONTPELIER (SSN 765)
Natalia Argote, PMS 392H13 Natalia Argote, PMS 392H13
Form Approved OMB No. 0704-0188
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY
F. CONTRACTOR
E. CONTRACT/PR NO.
D. SYSTEM/ITEM
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE
7. DD 260 REQ
8. APP CODE
10. FREQUENCY
9. DIST STATEMENT
REQUIRED
12. DATE OF FIRST SUBMISSION
11. AS OF DATE
13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE
14. DISTRIBUTION
b. COPIES Draft Final Reg Report
18. ESTIMATED
TOTAL PRICE
17. PRICE GROUP
16. REMARKS
G. PREPARED BY
I. APPROVED BY
H. DATE
J. DATE
DD Form 1423-1, JUN 90 Previous editions are obsolete Page ____ of ____ Pages 1007/183
15. TOTAL
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services. Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A013 Test/Inspection Report
Block:4: Applicable URO MRC(s) specified in the Availability Work Package. Submarine Maintenance standard 7650-081-091 for those items not specifically inspected under a URO MRC, (e.g., tanks opened for preservation only vice URO MRC inspection(s).)
| Block 5: | DDGOS 0902-018-2010, 9110-0-b and NAVSEA |
| 0924-062-0010 |
Blocks 10/12/13/14: In accordance with the applicable inspection document, i.e., URO MRC and/or Submarine Maintenance standard 7650-081-091
(See Blk 16) (See Blk 16) Report, Hull Surveys and Surveillance Inspection
Natalia Argote, PMS 392H13 14 Nov 14
CLIN 0001, 0003, 0004, 0005, 0006
Form Approved OMB No. 0704-0188
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY
F. CONTRACTOR
E. CONTRACT/PR NO.
D. SYSTEM/ITEM
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE
7. DD 260 REQ
8. APP CODE
10. FREQUENCY
9. DIST STATEMENT
REQUIRED
12. DATE OF FIRST SUBMISSION
11. AS OF DATE
13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE
14. DISTRIBUTION
b. COPIES Draft Final Reg Report
18. ESTIMATED
TOTAL PRICE
17. PRICE GROUP
16. REMARKS
G. PREPARED BY
I. APPROVED BY
H. DATE
J. DATE
DD Form 1423-1, JUN 90 Previous editions are obsolete Page ____ of ____ Pages 1007/183
15. TOTAL
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services. Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A014 Ship Construction Schedule Report
Block 5: CLIN 0001 and DDGOS 0902-018-2010, 9190-1.
Block 8: Content. Allow 7 days for Navy review.
Block 10/12: NLT 60 days before availability commences.
CLIN 0001
Paint Schedule
10 DARC
SUPSHIP
SHIP
NAVSEA 05UT
USS MONTPELIER (SSN 765)
Natalia Argote, PMS 392H13 Natalia Argote, PMS 392H13
Form Approved OMB No. 0704-0188
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY
F. CONTRACTOR
E. CONTRACT/PR NO.
D. SYSTEM/ITEM
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE
7. DD 260 REQ
8. APP CODE
10. FREQUENCY
9. DIST STATEMENT
REQUIRED
12. DATE OF FIRST SUBMISSION
11. AS OF DATE
13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE
14. DISTRIBUTION
b. COPIES Draft Final Reg Report
18. ESTIMATED
TOTAL PRICE
17. PRICE GROUP
16. REMARKS
G. PREPARED BY
I. APPROVED BY
H. DATE
J. DATE
DD Form 1423-1, JUN 90 Previous editions are obsolete Page ____ of ____ Pages 1007/183
15. TOTAL
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services. Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A015
Ship, Booklet of Inclining Experiment Data
Block 5: CLIN 0001, CLIN 0003 and DDGOS 0902-018-2010, 9020-3.
Blocks 10/12/13: Data to be delivered in accordance with Block 5.
CLIN 0001, 0003
DI-MISC-80904
(See Blk 16)
SUPSHIP
PMS 392CB
SHIP
USS MONTPELIER (SSN 765)
Natalia Argote, PMS 392H13 Natalia Argote, PMS 392H13
Form Approved OMB No. 0704-0188
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY
F. CONTRACTOR
E. CONTRACT/PR NO.
D. SYSTEM/ITEM
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE
7. DD 260 REQ
8. APP CODE
10. FREQUENCY
9. DIST STATEMENT
REQUIRED
12. DATE OF FIRST SUBMISSION
11. AS OF DATE
13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE
14. DISTRIBUTION
b. COPIES Draft Final Reg Report
18. ESTIMATED
TOTAL PRICE
17. PRICE GROUP
16. REMARKS
G. PREPARED BY
I. APPROVED BY
H. DATE
J. DATE
DD Form 1423-1, JUN 90 Previous editions are obsolete Page ____ of ____ Pages 1007/183
15. TOTAL
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services. Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A016
Block 5: Including DDGOS 0902-018-2010, 9400-1.
Blocks 10/12/13: Preliminary report one month after initial survey. Final after completion of Sea Trials.
DI-NDTI-80809B
(See Blk 16)
PMS 392H1
SHIP
Noise Measurement (Submarines)
USS MONTPELIER (SSN 765)
Natalia Argote, PMS 392H13 Natalia Argote, PMS 392H13 14 Nov 14
Form Approved OMB No. 0704-0188
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY
F. CONTRACTOR
E. CONTRACT/PR NO.
D. SYSTEM/ITEM
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE
7. DD 260 REQ
8. APP CODE
10. FREQUENCY
9. DIST STATEMENT
REQUIRED
12. DATE OF FIRST SUBMISSION
11. AS OF DATE
13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE
14. DISTRIBUTION
b. COPIES Draft Final Reg Report
18. ESTIMATED
TOTAL PRICE
17. PRICE GROUP
16. REMARKS
G. PREPARED BY
I. APPROVED BY
H. DATE
J. DATE
DD Form 1423-1, JUN 90 Previous editions are obsolete Page ____ of ____ Pages 1007/183
15. TOTAL
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services. Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A017 Inspection and Test Plan
Block 4: Data shall satisfy Block 5 reference requirements and Availability Work Package requirements.
Block 5: CLIN 0001 and DDGOS 0902-018-0210, 9020-0-h
| Block 12: | Development and submission of test plan schedule (i.e. |
| POTS/PATS) A – 7 Months | |
| Development and submission of the test plan schedule (i.e. Open and Inspect Plan) A-30 Days |
Block 14: SEA05U7T will provide additional distribution as needed.
OTIME
CLIN 0001
DI-QCIC-81110 (See Blk 16)
PMS 392H1
NAVSEA 05UT
Pre-overhaul Material Condition Report
USS MONTPELIER (SSN 765)
Natalia Argote, PMS 392H13 Natalia Argote, PMS 392H13
Form Approved OMB No. 0704-0188
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY
F. CONTRACTOR
E. CONTRACT/PR NO.
D. SYSTEM/ITEM
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE
7. DD 260 REQ
8. APP CODE
10. FREQUENCY
9. DIST STATEMENT
REQUIRED
12. DATE OF FIRST SUBMISSION
11. AS OF DATE
13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE
14. DISTRIBUTION
b. COPIES Draft Final Reg Report
18. ESTIMATED
TOTAL PRICE
17. PRICE GROUP
16. REMARKS
G. PREPARED BY
I. APPROVED BY
H. DATE
J. DATE
DD Form 1423-1, JUN 90 Previous editions are obsolete Page ____ of ____ Pages 1007/183
15. TOTAL
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services. Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A018 Inspection and Test Plan
Block 4: To be submitted in digital microsoft project (mpp). Prior approval required to ensure proper sequencing with other scheduled availability events.
Block 5: Including DDGOS 0902-018-2010, 9290-8.
Block 8: Content. Allow 14 days for Navy review.
Block 12: 30 days prior to start of availability.
Block 13: Revise as required to suit availability events scheduled.
DI-QCIC-81110 (See Blk 16)
PMS 392H1
Compartment Test
A (See Blk 16)
SHIP
USS MONTPELIER (SSN 765)
Natalia Argote, PMS 392H13 Natalia Argote, PMS 392H13 14 Nov 14
Form Approved OMB No. 0704-0188
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY
F. CONTRACTOR
E. CONTRACT/PR NO.
D. SYSTEM/ITEM
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE
7. DD 260 REQ
8. APP CODE
10. FREQUENCY
9. DIST STATEMENT
REQUIRED
12. DATE OF FIRST SUBMISSION
11. AS OF DATE
13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE
14. DISTRIBUTION
b. COPIES Draft Final Reg Report
18. ESTIMATED
TOTAL PRICE
17. PRICE GROUP
16. REMARKS
G. PREPARED BY
I. APPROVED BY
H. DATE
J. DATE
DD Form 1423-1, JUN 90 Previous editions are obsolete Page ____ of ____ Pages 1007/183
15. TOTAL
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services. Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A019
Block 4: Completion of all open, inspect, and reporting requirements to identify to fully encompass all open and inspect activities reflected in the AWP and scheduled completion date, will be submitted to the Supervisor for approval and establishment of incentive baseline at least 30 Days prior to the start of the availability. Reports generated during the availability as a result of inspections, test, work requirements, etc., should clearly define the purpose of the inspection or test and include a clear description of condition, comparison of acceptable data vs. actual data, and recommend corrective action required/taken. Data shall be the result of inspections directed on equipment prior to repair, test alteration, etc.
Blocks 10/12/13: Report required no later than five days after completion of each inspection directed. The contractor shall provide weekly status reports of progress completing Open and Inspect actions to the Open and Inspect Plan.
DI-NDTI-80809B
SUPSHIP
SHIP
Equipment Inspection Report Prior to Repair/Alteration (See Blk 16)
USS MONTPELIER (SSN 765)
Natalia Argote, PMS 392H13 Natalia Argote, PMS 392H13 14 Nov 14
Form Approved OMB No. 0704-0188
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY
F. CONTRACTOR
E. CONTRACT/PR NO.
D. SYSTEM/ITEM
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE
7. DD 260 REQ
8. APP CODE
10. FREQUENCY
9. DIST STATEMENT
REQUIRED
12. DATE OF FIRST SUBMISSION
11. AS OF DATE
13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE
14. DISTRIBUTION
b. COPIES Draft Final Reg Report
18. ESTIMATED
TOTAL PRICE
17. PRICE GROUP
16. REMARKS
G. PREPARED BY
I. APPROVED BY
H. DATE
J. DATE
DD Form 1423-1, JUN 90 Previous editions are obsolete Page ____ of ____ Pages 1007/183
15. TOTAL
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services. Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A020 Test/ Inspection Report
Block 5: Including DDGOS 0902-018-2010, 9110-0-I and 9020-9
Blocks 10/12/13: Reports shall be submitted at the time specified in SWLIN and DDGOS sections listed for Block 5 above.
ASREQ (See Blk 16)
DI-NDTI-80809B
SUPSHIP
TYCOM
Reports, Hull Structure Tests (See Blk 16)
SHIP
USS MONTPELIER (SSN 765)
Natalia Argote, PMS 392H13 Natalia Argote, PMS 392H13 14 Nov 14
Form Approved OMB No. 0704-0188
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY
F. CONTRACTOR
E. CONTRACT/PR NO.
D. SYSTEM/ITEM
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE
7. DD 260 REQ
8. APP CODE
10. FREQUENCY
9. DIST STATEMENT
REQUIRED
12. DATE OF FIRST SUBMISSION
11. AS OF DATE
13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE
14. DISTRIBUTION
b. COPIES Draft Final Reg Report
18. ESTIMATED
TOTAL PRICE
17. PRICE GROUP
16. REMARKS
G. PREPARED BY
I. APPROVED BY
H. DATE
J. DATE
DD Form 1423-1, JUN 90 Previous editions are obsolete Page ____ of ____ Pages 1007/183
15. TOTAL
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services. Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A021
Engineering Documents
SUPSHIP
Data shall consist of one (1) full-size repro, suitable for electrostatic process .
Block 5: Including DDGOS 0902-018-2010, 9020-9-f.
Blocks 12/13: 30 days after completion of all tests.
Final Set of Test Reports 0 4
USS MONTPELIER (SSN 765)
Natalia Argote, PMS 392H13 Natalia Argote, PMS 392H13 14 Nov 14
Form Approved OMB No. 0704-0188
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY
F. CONTRACTOR
E. CONTRACT/PR NO.
D. SYSTEM/ITEM
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE
7. DD 260 REQ
8. APP CODE
10. FREQUENCY
9. DIST STATEMENT
REQUIRED
12. DATE OF FIRST SUBMISSION
11. AS OF DATE
13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE
14. DISTRIBUTION
b. COPIES Draft Final Reg Report
18. ESTIMATED
TOTAL PRICE
17. PRICE GROUP
16. REMARKS
G. PREPARED BY
I. APPROVED BY
H. DATE
J. DATE
DD Form 1423-1, JUN 90 Previous editions are obsolete Page ____ of ____ Pages 1007/183
15. TOTAL
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services. Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
Material History
A022 Lists, Master Equipment
SUPSHIP
LT
Block 5: Including DDGOS 0902-018-2010, 9020-2, 5000-h
Block 12: 60 days after end of availability.
SHIP
USS MONTPELIER (SSN 765)
Natalia Argote, PMS 392H13 Natalia Argote, PMS 392H13 14 Nov 14
Form Approved OMB No. 0704-0188
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY
F. CONTRACTOR
E. CONTRACT/PR NO.
D. SYSTEM/ITEM
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE
7. DD 260 REQ
8. APP CODE
10. FREQUENCY
9. DIST STATEMENT
REQUIRED
12. DATE OF FIRST SUBMISSION
11. AS OF DATE
13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE
14. DISTRIBUTION
b. COPIES Draft Final Reg Report
18. ESTIMATED
TOTAL PRICE
17. PRICE GROUP
16. REMARKS
G. PREPARED BY
I. APPROVED BY
H. DATE
J. DATE
DD Form 1423-1, JUN 90 Previous editions are obsolete Page ____ of ____ Pages 1007/183
15. TOTAL
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services. Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A023 Docking Procedures Documentation
CLIN 0003
PMS 392
LT
(See Blk 16)
Block 4: NSTM Chapter 997 and NAVSEA Forms 9997-1, 9997-2, 9997-3, and/or 9997-4 as applicable
Block 5: CLIN 0003and DDGOS 0902-018-2010, 5000-0-h
Blocks 10/12/13: As directed by work package. .
Docking Reports
5 0
SUPSHIP
SHIP
(See Blk 16)
TYCOM
Planning Yard
USS MONTPELIER (SSN 765)
Natalia Argote, PMS 392H13 Natalia Argote, PMS 392H13
NAVSEA 05U7T
Form Approved OMB No. 0704-0188
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY
F. CONTRACTOR
E. CONTRACT/PR NO.
D. SYSTEM/ITEM
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE
7. DD 260 REQ
8. APP CODE
10. FREQUENCY
9. DIST STATEMENT
REQUIRED
12. DATE OF FIRST SUBMISSION
11. AS OF DATE
13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE
14. DISTRIBUTION
b. COPIES Draft Final Reg Report
18. ESTIMATED
TOTAL PRICE
17. PRICE GROUP
16. REMARKS
G. PREPARED BY
I. APPROVED BY
H. DATE
J. DATE
DD Form 1423-1, JUN 90 Previous editions are obsolete Page ____ of ____ Pages 1007/183
15. TOTAL
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services. Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A024
DI-NDTI-80809B
SUPSHIP
LT
(See Blk) 16
Block 5: Including DDGOS 0902-018-2010, 9670-1-d.
Blocks 10/12/13: Submit in accordance with the applicable test schedules.
J.H. Houk, Data Manager Reports, Test,…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .